A Arjun C: + Arjunc8@h +971 56 121 4376
A Arjun C: + Arjunc8@h +971 56 121 4376
ARJUN C
arjunc8@h
hotmail.com
C
Career Tim
meline
Abutstone PProject
Solutions Pv
vt. Ltd., Dutcoo Balfour
Cochin, Kera
ala, INDI Beattty LLC,
A Duba
ai, UAE
Al Naboo
odah Kla
ampfer Middlle East
Contractiing Company
y LLC
C, Sharjah, UA
AE
LLC, Dubai, UAE
E
Education
Baachelor of Enggineering in Civil from VLB Janakiammal College of Engineering & Technology,
T Co
oimbatore, An
nna Universityy in
20
012 Year; secu ured 7.25 CGPPA
T
Trainings/Certificatiions
In
ntegrated Solid
d Waste Manaagement on 28 8th March 201 12
Tssunami Resisttant Structurees on 28th and d 29th Decemb ber 2011
Grround Water Quality,
Q Polluttion and its Reecharge on 244th August 20111
Cooastal Zone Management
M an
nd Its Protectiion on 15th March
M 2012
Atttended a Pressentation on Atlas
A 1.0-Innovative Civil Esstimator on 19
9th March 201
11
Caandy- C 201 Construction
C Estimating
E & Valuations
V
W
Work Expeerience
Since Mar’18 with Klampfer Miiddle East LL LC, Sharjah, UA AE as Senior Estimator / Q QS
Key RResult Areas:
Sppearheading overall
o projecct estimation department for High Rise, Medium Rise and Low Rise Buildinggs, Industrial &
Coommercial Structures from m scratch till project handover to the project
p executtion team and d Post Contraact QS activitiies
th
hereafter.
Id
dentified labou ur, material, and time requiirements by sttudying propo osals, specificaations, and rellated documen nts
Coomputed costs by analysingg labour, mateerial, and timee requirementss using CCS
Quantity Take off o & BOQ Preparation in co ompliance with Principle off Measurements Internation nal (POMI)
Resolved discreepancies by co ollecting and analysed
a inforrmation Mainttained cost database by enteering and backing up data
Administratingg the cost analy ysis of one or several projeccts
Pllanning & con ntrolling several projects at a the same tiime and ensu uring perfect comprehensio
c on with respeect to deadlines,
buudget & conteent;
Undertaking veerification & fiinalization of alla technical aspects,
a tenderring, negotiatiion & selection of vendors, controlling daay-
to
o-day activity of execution, resource
r planning & cost co ontrol.
Annchoring onsiite construction activities to t ensure com mpletion of project within the time & cost c parameteers and effectiive
reesource utilizaation to maxim mize output.
In
nspecting field d sites to obserrve & evaluatee condition & operability off facilities & sttructures, and
d collecting fielld survey dataa
M
Managing contrract preparatiion activities for
f projects in ncluding pre-q
qualification ofo contractors and vendors, bids evaluatiion
annd so on; man naging the tend dering process from floating of bids to awwarding of con ntracts
Stteering materrial planning and developing vendors for fo obtaining timely procurement of maaterials & equ uipment at co ost
efffective pricess to ensure smmooth executio on of projects
Liiaising with Cllients, Architeects, Consultannts, Contractors & External Agencies for pricing
p tenderrs precisely.
Prreparing subccontract agreeement; BOQ of suppliers an nd subcontracctors and alloccating work to t subcontracttors, measurin ng,
ceertifying their works, and prepare paymeent certificatio on.
Suubmitting mon nthly Bill to th
he client for work
w done and d identify con
ntractor’s variation claims in the project by coordinatiing
w Consultan
with nt.
Prrepare cash fllow and claim m documentatiion and liaise with consultaant and clientt quantity surv veyor for relaated commerccial
issues.
P
Previous Experiencee
Aug’1
15‐March’18 w with Dutco Balfour Beatty y LLC, Dubai, UAE as Estim mator
Key R
Result Areas:
Id
dentified labouur, material, and time requiirements by sttudying propo osals, specificaations, and rellated documen
nts
Coomputed costs by analysingg labour, mateerial, and timee requirementss using CCS
Quantity Take off
o & BOQ Preparation in co ompliance with Principle off Measurements Internation nal (POMI)
Resolved discreepancies by co ollecting and analysed
a inforrmation Mainttained cost database by enteering and backing up data
Atttended educaational worksh hops; reviewing technical publications
p an
nd maintainin ng technical knnowledge
Coontributed teaam effort by accomplishing related resultts as needed;p prepared:
o Work to bee estimated by y gathering proposals, speciifications, and
d relateddocum ments
o Special rep ports by colleccting, analysing, and summaarizing information andtren nds
Esstimated by asssembling and d displaying numerical
n and descriptive innformation
Jan’14
4–Jul’15 withh Al Naboodah h Contracting g Company LLC, Dubai, UAAE
Growwth Path:
Jan’14
4 – Feb’15 as Assistant Esttimator;
Mar’115 – Jul’15 Esttimator
Key R
Result Areas:
Caalculated and prepared quaantities in acco
ordance with tender docum
ments; manageed the tender preparation including raisiing
quueries to clien
nt/ consultants with respectt to documentt discrepancies
Coonducted sitee inspections forf tender understanding, analysed
a condditions and id
dentified activ
vities that mayy or may not be
sh
hown in the teender documeents
Prrepared com mparison repo orts on mateerials, and su ubcontractorss’ quotes;man naged post award
a procedure: preparred
doocuments and d other tender information n summaries for
f handover to relevant project
p team members
m Assiisted estimatiing
deepartment in the
t tendering of projects
Reviewed and assisted
a tendeers; ensured all tender docu
uments are recceived and weerecorrect
Prroduced comp parison reporrts on materiaals, and subco ontractor's qu
uote;compiledd tender schedules, prograamme and oth her
iteems required by the tenderr
Cooordinated wiith Quantity Surveyor, Purcchasing Officerr and other Esstimators and sent out subccontractor pacckages
Acted as liaisonn with subconttractors in exp pediting draw
wings and relatted informatio
on
M
Maintained up--to-date log (CClarifications, NTTs, Addennda, and so onn) Tracked ressponse and addvised the esttimation team of
th
he status of claarifications, NTTs, Addendaa, and so on
Jun’122‐Dec’13 with h Abutstone Project Soluttions Pvt. Ltd d., Cochin, Kerrala, India as Site Engineeer
Key R
Result Areas:
Dealt with subccontract activiities
Suupervised thee site labour and subconttractor's works; executed the works Executed E the work as perr drawings aand
sttandards, both
h discipline (sttructural, arch
hitectural worrks)
Prrepared daily progress repo orts
Cooordinated wiith Consultantt & Project Maanager regarding works and d inspection
Toook action & followed
f the in
nstruction of Consultant
C an
nd Project Mannager
P
Projects
Klamp
pfer Middle E
East LLC: Dutco Ballfour Beatty L
LLC:
P
Personal Deetails
Marital Sttatus: Marriedd
Date o
of Birth: 28 July 1990
th Nationaliity: Indian
Langu
uages Known n: English, Hindi, Malayalam
m, Tamil Number o of Dependentt: Wife & 1 Chhild
Permanent Address: Saraswaathi Nivas, Customs
C Road, Driving L
License: Uniteed Arab Emirates & India
Kozhikode-673 032 2, Kerala, Indiaa Visa Statu
us: Visit Visa – UAE
Passp
port Details: LL2832079 Notice Peeriod: Availabble Immediatelly