Standard Survey MFM-50

The document provides survey data from a horizontal well, MFM-AF (GW-180), located in the Macolla N4 field in Venezuela. It includes location coordinates, well trajectory data with inclination, azimuth and measured depths from 658 to 5,272 feet, and details on the well design and survey tools used.

Uploaded by

Jose Rosario
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views4 pages

Standard Survey MFM-50

The document provides survey data from a horizontal well, MFM-AF (GW-180), located in the Macolla N4 field in Venezuela. It includes location coordinates, well trajectory data with inclination, azimuth and measured depths from 658 to 5,272 feet, and details on the well design and survey tools used.

Uploaded by

Jose Rosario
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PDVSA SAN TOME

MAKIRITARE
Macolla N4
MFM-AF (GW-180)

Pozo Horizontal

Design: Pozo Horizontal

Standard Survey Report


22 September, 2016
Survey Report

Company: PDVSA SAN TOME Local Co-ordinate Reference: Well MFM-AF (GW-180)
Project: MAKIRITARE TVD Reference: EMR @ 560.4ft (GW-180)
Site: Macolla N4 MD Reference: EMR @ 560.4ft (GW-180)
Well: MFM-AF (GW-180) North Reference: Grid
Wellbore: Pozo Horizontal Survey Calculation Method: Minimum Curvature
Design: Pozo Horizontal Database: AYACUCHO

Project MAKIRITARE

Map System: Universal Transverse Mercator System Datum: Mean Sea Level
Geo Datum: Prov. S.A. 1956 - Venez.
Map Zone: Zone 20N (66 W to 60 W)

Site Macolla N4

Site Position: Northing: 924,040.00 m Latitude: 8° 21' 28.153 N


From: Map Easting: 377,139.00 m Longitude: 64° 6' 56.814 W
Position Uncertainty: 0.0 ft Slot Radius: 13.200 in Grid Convergence: -0.16 °

Well MFM-AF (GW-180)

Well Position +N/-S 0.0 ft Northing: 924,070.00 m Latitude: 8° 21' 29.129 N


+E/-W 0.0 ft Easting: 377,139.00 m Longitude: 64° 6' 56.817 W
Position Uncertainty 0.0 ft Wellhead Elevation: 0.0 ft Ground Level: 538.4 ft

Wellbore Pozo Horizontal

Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(°) (°) (nT)
HDGM 8/25/2016 -13.90 29.03 31,367

Design Pozo Horizontal


Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 0.0

Vertical Section: Depth From (TVD) +N/-S +E/-W Direction


(ft) (ft) (ft) (°)
0.0 0.0 0.0 87.88

Survey Program Date 9/22/2016


From To
(ft) (ft) Survey (Wellbore) Tool Name Description

658.0 2,742.0 Fase 12.25" Intermedia (Pozo Horizontal) MWD Fixed Fixed:v2:standard declination
2,837.0 5,272.0 Fase 8.5" Lateral (Pozo Horizontal) MWD Fixed Fixed:v2:standard declination

Survey

Measured Vertical Vertical Dogleg Build Turn


Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft) (°/100ft)

0.0 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.00 0.00
658.0 0.84 71.64 658.0 1.5 4.6 4.6 0.13 0.13 0.00
682.0 1.46 68.34 682.0 1.7 5.0 5.1 2.60 2.59 -13.73
KOP @ 682' MD
745.0 3.10 66.00 744.9 2.7 7.3 7.4 2.60 2.60 -3.72
832.0 6.64 74.41 831.6 5.0 14.3 14.5 4.14 4.07 9.67

919.0 8.46 73.16 917.8 8.2 25.3 25.6 2.10 2.09 -1.44
1,006.0 13.27 69.25 1,003.3 13.6 40.8 41.2 5.59 5.53 -4.49
1,093.0 18.17 72.23 1,087.0 21.3 63.0 63.8 5.71 5.63 3.43
1,181.0 21.65 79.68 1,169.7 28.4 92.1 93.1 4.89 3.95 8.47

9/22/2016 6:24:36PM Page 2 COMPASS 5000.1 Build 81


Survey Report

Company: PDVSA SAN TOME Local Co-ordinate Reference: Well MFM-AF (GW-180)
Project: MAKIRITARE TVD Reference: EMR @ 560.4ft (GW-180)
Site: Macolla N4 MD Reference: EMR @ 560.4ft (GW-180)
Well: MFM-AF (GW-180) North Reference: Grid
Wellbore: Pozo Horizontal Survey Calculation Method: Minimum Curvature
Design: Pozo Horizontal Database: AYACUCHO

Survey

Measured Vertical Vertical Dogleg Build Turn


Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft) (°/100ft)

1,273.0 24.34 82.48 1,254.4 33.9 127.6 128.8 3.16 2.92 3.04

1,364.0 27.46 84.22 1,336.2 38.5 167.1 168.4 3.53 3.43 1.91
1,456.0 31.57 83.66 1,416.3 43.3 212.1 213.6 4.48 4.47 -0.61
1,544.0 35.66 81.71 1,489.6 49.5 260.4 262.1 4.81 4.65 -2.22
1,634.0 39.17 81.94 1,561.0 57.3 314.5 316.4 3.90 3.90 0.26
1,725.0 42.22 81.33 1,630.0 65.9 373.2 375.4 3.38 3.35 -0.67

1,817.0 47.32 81.35 1,695.3 75.7 437.3 439.8 5.54 5.54 0.02
1,908.0 50.32 81.21 1,755.2 86.0 505.0 507.8 3.30 3.30 -0.15
2,000.0 52.04 80.39 1,812.9 97.5 575.7 578.9 1.99 1.87 -0.89
2,089.0 57.53 79.51 1,864.2 110.2 647.3 650.9 6.22 6.17 -0.99
2,180.0 61.08 79.72 1,910.6 124.3 724.2 728.3 3.91 3.90 0.23

2,270.0 65.48 79.74 1,951.1 138.6 803.3 807.9 4.89 4.89 0.02
2,360.0 69.03 80.89 1,985.9 152.6 885.1 890.2 4.12 3.94 1.28
Inicio Tangente @ 2360.0' MD / 69.03° Inc. / 80.89° Az.
2,465.0 68.50 81.88 2,023.9 167.3 981.9 987.4 1.01 -0.50 0.94
Fin de tangente @ 2465.0' MD / 68.55° Inc. / 81.88° Az.
2,541.0 74.90 82.18 2,047.8 177.3 1,053.3 1,059.1 8.43 8.42 0.39
2,631.0 80.19 85.00 2,067.2 187.0 1,140.6 1,146.7 6.63 5.88 3.13

2,742.0 85.49 88.09 2,081.0 193.7 1,250.5 1,256.8 5.52 4.77 2.78
Ultimo survey fase 12-1/4" @ 2742.0' MD / 85.49° Inc. / 88.09° Az.
2,837.0 83.81 88.95 2,089.9 196.1 1,345.0 1,351.4 1.98 -1.77 0.91
2,928.0 87.35 89.53 2,096.9 197.3 1,435.7 1,442.1 3.94 3.89 0.64
3,019.0 87.77 89.36 2,100.8 198.2 1,526.7 1,532.9 0.50 0.46 -0.19
3,108.0 86.66 91.23 2,105.1 197.7 1,615.5 1,621.8 2.44 -1.25 2.10

3,198.0 90.12 91.56 2,107.6 195.5 1,705.5 1,711.5 3.86 3.84 0.37
3,289.0 91.79 89.66 2,106.1 194.6 1,796.4 1,802.4 2.78 1.84 -2.09
3,381.0 90.49 88.76 2,104.3 195.8 1,888.4 1,894.4 1.72 -1.41 -0.98
3,472.0 89.75 89.46 2,104.1 197.2 1,979.4 1,985.3 1.12 -0.81 0.77
3,563.0 90.06 89.54 2,104.2 198.0 2,070.4 2,076.3 0.35 0.34 0.09

3,654.0 89.07 90.33 2,104.9 198.1 2,161.4 2,167.2 1.39 -1.09 0.87
3,744.0 90.12 90.62 2,105.6 197.4 2,251.4 2,257.1 1.21 1.17 0.32
3,834.0 89.44 89.09 2,105.9 197.6 2,341.4 2,347.1 1.86 -0.76 -1.70
3,925.0 89.57 88.70 2,106.7 199.4 2,432.4 2,438.1 0.45 0.14 -0.43
4,015.0 89.20 90.05 2,107.7 200.4 2,522.4 2,528.0 1.56 -0.41 1.50

4,105.0 90.31 90.25 2,108.0 200.1 2,612.3 2,618.0 1.25 1.23 0.22
4,196.0 90.31 89.98 2,107.5 199.9 2,703.3 2,708.9 0.30 0.00 -0.30
4,286.0 91.36 90.83 2,106.2 199.3 2,793.3 2,798.8 1.50 1.17 0.94
4,375.0 90.43 91.85 2,104.8 197.2 2,882.3 2,887.6 1.55 -1.04 1.15
4,465.0 91.17 91.41 2,103.6 194.7 2,972.2 2,977.4 0.96 0.82 -0.49

4,556.0 88.83 90.54 2,103.6 193.1 3,063.2 3,068.3 2.74 -2.57 -0.96
4,641.0 87.96 89.35 2,106.0 193.2 3,148.2 3,153.2 1.73 -1.02 -1.40
4,731.0 86.79 89.92 2,110.1 193.8 3,238.1 3,243.0 1.45 -1.30 0.63
4,822.0 88.77 88.29 2,113.6 195.2 3,329.0 3,333.9 2.82 2.18 -1.79
4,912.0 90.74 89.26 2,114.0 197.1 3,419.0 3,423.9 2.44 2.19 1.08

9/22/2016 6:24:36PM Page 3 COMPASS 5000.1 Build 81


Survey Report

Company: PDVSA SAN TOME Local Co-ordinate Reference: Well MFM-AF (GW-180)
Project: MAKIRITARE TVD Reference: EMR @ 560.4ft (GW-180)
Site: Macolla N4 MD Reference: EMR @ 560.4ft (GW-180)
Well: MFM-AF (GW-180) North Reference: Grid
Wellbore: Pozo Horizontal Survey Calculation Method: Minimum Curvature
Design: Pozo Horizontal Database: AYACUCHO

Survey

Measured Vertical Vertical Dogleg Build Turn


Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate
(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft) (°/100ft)

5,002.0 90.99 90.15 2,112.6 197.6 3,509.0 3,513.9 1.03 0.28 0.99
5,105.0 87.65 90.73 2,113.9 196.8 3,611.9 3,616.8 3.29 -3.24 0.56
5,196.0 85.55 92.04 2,119.3 194.6 3,702.7 3,707.4 2.72 -2.31 1.44
Ultimo Survey Visto Fase 8-1/2" @ 5196.0' MD, c/Incl. 85.55°, Azi. 92.04°
5,272.0 84.50 93.00 2,125.8 191.3 3,778.4 3,782.9 1.87 -1.38 1.26
Proyeccion a fondo @ 5272.0' MD, c/Incl. 84.5°, Azi. 93.3°

Casing Points

Measured Vertical Casing Hole


Depth Depth Diameter Diameter
(ft) (ft) Name (in) (in)
595.0 13 3/8" 13.375 17.500
2,760.0 2,082.5 9 5/8" 9.625 12.250

Design Annotations

Measured Vertical Local Coordinates


Depth Depth +N/-S +E/-W
(ft) (ft) (ft) (ft) Comment

682.0 682.0 1.7 5.0 KOP @ 682' MD


2,360.0 1,985.9 152.6 885.1 Inicio Tangente @ 2360.0' MD / 69.03° Inc. / 80.89° Az.
2,465.0 2,023.9 167.3 981.9 Fin de tangente @ 2465.0' MD / 68.55° Inc. / 81.88° Az.
2,742.0 2,081.0 193.7 1,250.5 Ultimo survey fase 12-1/4" @ 2742.0' MD / 85.49° Inc. / 88.09° Az.
5,196.0 2,119.3 194.6 3,702.7 Ultimo Survey Visto Fase 8-1/2" @ 5196.0' MD, c/Incl. 85.55°, Azi. 92.04°
5,272.0 2,125.8 191.3 3,778.4 Proyeccion a fondo @ 5272.0' MD, c/Incl. 84.5°, Azi. 93.3°

Checked By: Approved By: Date: