Dessicant Estimation Rev01

The document provides a formula and variables to calculate the amount of drying agent needed based on the volume, surface area, and duration of an enclosed space. It then applies the formula to calculate the drying agent needs for several building examples, including an E-gen building requiring 39.6kg, an electrical building requiring 231.5kg, and an LQ building with multiple levels requiring a total of 257.7kg of drying agent placed in bags. Additional comments provide guidance on bag size, placement, duration, and purchasing extra bags as spares.

Uploaded by

Tee Shi Feng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views3 pages

Dessicant Estimation Rev01

The document provides a formula and variables to calculate the amount of drying agent needed based on the volume, surface area, and duration of an enclosed space. It then applies the formula to calculate the drying agent needs for several building examples, including an E-gen building requiring 39.6kg, an electrical building requiring 231.5kg, and an LQ building with multiple levels requiring a total of 257.7kg of drying agent placed in bags. Additional comments provide guidance on bag size, placement, duration, and purchasing extra bags as spares.

Uploaded by

Tee Shi Feng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Calculation based on DIN 55474

n = 1/a · ( V · b + m · c + A · e · D · t )
n = number of the drying agent units (1 unit is 80g of drying agent in good condition)

a = amount of water vapour to be adsorbed by drying agent unit according to the permitted final moisture content
Final Moisture:
20 % RH a = 3 g
40 % RH a = 6 g
60 % RH a = 8 g

e = correction factor with regard to the final moisture:


for 20 % RH e = 0,9
for 40 % RH e = 0,7
for 60 % RH e = 0,6

v = volume inside the packaging in m³

b = humidity content per m³ air subject to the temperature and relative humidity during the packing, i.e. at 20°C and 85%RH b
= 15g/m³.

m = weight of the hygroscopic packing in kg

c = factor for moisture content per gram of the hygroscopic packing aid subject to the dry condition for wood, paper and
cardboard
with an undefined moisture content c = 140
with defined pre-desiccation c = 0

A = surface of the barrier foil in m²

D = water vapour permeability for the expected climate in g/m² D. Regulation in compliance with DIN 53122 or the
information supplied by the barrier foil manufacturer.

t = transport and storage time in t (days)


E-gen Building:
Comment [TSF1]: Considered only Air
n = 1/6 * ((4.5*8*4) * 15 + 80000 * 0 + 15 * 0.7 * 1 * 30) conditioned space. Additional measure 2 x
250g shall be put in each panel to enhance
the protection.
= 412.5 * 80g Comment [TSF2]: Consider 30 days for
visual check for whether the depletion of
the desiccant to be replaced.
= 33 kg of desiccant * (safety factor 1.2)

=39.6 kg

Electrical Building:
n = 1/6 *
(((1.91*15.2*5.2)+(1.85*15.2*5.2)+(1.55*15.2*5.2)+(1.3*15.2*5.2)+(1.7*14.5
Comment [TSF3]: Considered only Air
*5.2)+(1.98*14.5*5.2) +(1.48*9*4.26)+(1.7*12*4.26) )* 15 + 140000 * 0 + (15 conditioned space. Additional measure 2 x
* 0.7 * 1 * 30)) 250g shall be put in each panel to enhance
the protection.

= 2411.43 * 80g

= 192.9kg of desiccant * (safety factor 1.2)

=231.5 kg

LQ: 1
Level 1 interior area: 3674ft2 = 341.33m2

n = 1/a · ( V · b + m · c + A · e · D · t )
n= 1/6. (341.33*2.55 + 100 * 25 + 30* 0.7 * 1 * 30)
= 666.73 * 80g

= 53kg of desiccants * (safety factor 1.25)

=66.7kg of desiccant required.

Level 2 interior area: 3621ft2 = 336.4m2


n= 1/6. (336.4*2.55 + 100 * 25 + 30* 0.7 * 1 * 30)
= 664.64 * 80g

= 53.2kg of desiccants * (safety factor 1.25)

=66.5kg of desiccant required.

Level 3 interior area: 3562ft2 = 330.92 m2


n= 1/6. (330.92*2.55 + 100 * 25 + 30* 0.7 * 1 * 30)
= 662.3 * 80g
= 53kg of desiccants * (safety factor 1.25)

=66.2kg of desiccant required.

Level 4 interior area: 1544ft2 = 143.44 m2


n= 1/6. (143.44*2.55 + 100 * 25 + 30* 0.7 * 1 * 30)
= 582.62 * 80g

= 46.6kg of desiccants * (safety factor 1.25)

=58.3kg of desiccant required.

Total minimum weight of desiccants required = 66.7 + 66.5 +66.2+58.3 = 257.7 kg Comment [TSF4]: 1kg bag to be
purchased 260. Location to be on the floor
or hang on the panel. 30 days duration,
Number of panel/cabinet/ in level 1 ~= 10 inspection / replacement required after the
designated duration.
Number of panel/cabinet in level 2 ~= 23
Suggest to purchase 300 bags which the
remaining as spares.
Number of panel/cabinet in level 3 ~= 14
Comment [TSF5]: 2 * 250 g of
desiccants on each panel.
Number of panel/cabinet in level 4 ~= 30
Comment [TSF6]: 2 * 250 g of
desiccants on each panel.
Total of 250g bag required = 154
Comment [TSF7]: 2 * 250 g of
desiccants on each panel.
Comment [TSF8]: 2 * 250 g of
desiccants on each panel.
Comment [TSF9]: Suggest to purchase
200 bags which the remaining as spares.