Description               Dia        No Col     No of Bar       Length         Length       Total length      Unit wt    Quantity
ft            m               m             kg/m        kg
                                                      For Mess of Reinforcement Below Column
            X-axis                       12         2             6            5.00          1.52              18.24       0.89        16.23
            Y axis                       12         2             6            5.00          1.52              18.24       0.89        16.23
    Ground Floor
0   For column
0   Longitudinal Bar                     12          2           4            7.00            2.13             17.04       0.89        15.17
0   Development Length                   12          2           4            2.36            0.72              5.76       0.89         5.13
0   Longitudinal Bar                     16          2           4            7.00            2.13             17.04       1.58        26.92
0   Development Length                   16          2           4            3.15            0.96              7.68       1.58        12.13
0   Lateral ties (outer)                  8          2          22            4.00            1.22             53.68       0.39        20.94
0   Lateral ties (outer)                  8          2          22            3.00            0.91             40.04       0.39        15.62
0   For Beam
0   Longitudinal Bar                     12          4           4          26.50             8.08            129.28       0.89       115.06
0   Development Length                   12          4           4           2.36             0.72             11.52       0.89        10.25
0   Lateral ties (outer)                  8          4          67           3.00             0.91            243.88       0.39        95.11
    Description            8 dia              12 dia   16 dia      20 dia            25 dia          32 dia                        Total
    Ground Floor                    131.67      178.07       39.05              -               -                 -                  348.79
                                                      Rainas Municipality
                                               Office of the Municipal Executive
                                    Tinpiple, Lamjung, 4 No. Province, Nepal
                                                           BOQ
Name of Project: Rainas Municipality Information Room                                      Date:-2077-05-15
Location: Rainas - 5
    S.N.                 Description of work               Quantity      units     Rate         Amount        Remarks
     1        Earthwork in excavation in medium rock             0.11   Cum         2,441.10        268.52
     2        PCC(M10))1:3:6 (Column)                            2.83   Cum        10,970.45     31,046.37
     3        Iron Work                                         93.32   Kg            135.60     12,654.19
     4        Colar Cgi Sheet 0.45 mm                            0.70   Boundle    12,898.95      9,029.27
     5        Upvc 6 mm Thick                                   33.34   Cum         6,784.94    226,209.90
     6        Almunium Heavy Door Set (3'*7')                    1.00   Nos        15,600.00     15,600.00
                                          Total                                                 294,808.25
Prepared By:                                              Checked By:                                        Approved By:
Manju Bhandari / Narendra Kumal                        Bhim Prasad Dahal                              Ram Chandra Adhikari
                                                   Rainas Municipality
                                            Office of the Municipal Executive
                                           Tinpiple, Lamjung, 4 No. Province, Nepal
                                                           Detail Estimate
Name of Project: Rainas Municipality Information Room                                                                   Date:-2077-05-15
Location: Rainas - 5
   S.N.              Description of work              Nos.      length       Breadth              Height       Quantity      units     Remarks
     1       Earthwork in excavation in medium                                                                   0.11        Cub.m
             rock including 10 m lead and 1.5m lift
             (Column)                                  4.00           0.30               0.30           0.30
     2       PCC(M10))1:3:6 (Column)                   4.00           0.25               0.25           0.30     0.08        Cub.m
     3       PCC(M10))1:3:6 Floor                      1.00           3.35               2.74           0.30     2.75        Cub.m
                                                                                                Total            2.83        Cub.m
     4       2" Square Pipe                            4.00                       9.72                          38.88         Kg
     5       Truss
             Long Side                                 2                 10.1115513562938                       20.22         Kg
             Short Side                                4                 8.55592807071015                       34.22         Kg
                                                                                                    Total       93.32         Kg
     6       Colar Cgi Sheet 0.45 mm                   1                          0.7                            0.70       Boundle
     7       Upvc 6 mm Thick
             Long Side                                 2      3.3526363913                      2.895458702     19.41         Sqm
             Deduction Door(3'*7')                     1      0.9143553795                      2.133495885     -1.95         Sqm
             Short Side                                2      2.7430661384                      2.895458702     15.88         Sqm
                                                                                                Total           33.34
     8       Almunium Heavy Door Set (3'*7')           1                                                         1.00         Nos
                                                                                                                                  Approved By:-
   Prepared By:-                                                Checked By :-
                                                                                                                            Ram Chandra Adhikari
   Manju Bhandari / Narendra Kumal                            Bhim Prasad Dahal
Norms no                2-1.2.2,2-1.8 and 2-1.9          Norms Unit            1.00
Items Description :          Earthwork in excavation in medium rock including 10 m lead and 1.5m lift
                      a)   Ordinary soil
                             Description        Quantity    Unit
                                Skilled
      Labour
                              Unskilled          3.00       md          790.00
Tools and plants @
 3 % of labour cost
                                                                                       Total
                                                                                 Rate per unit
Norms no              41 - 11                                     Norms Unit                     1.00
                      Cement concrete work. It includes all labour and material required for mixing, placing in position,
                      vibrating, compacting, finishing, curing and all other incidentals required to produce concrete of specified
                      strength as per the Specifications. The rate includes the work of making, fixing and removing of all centres
Items Description :   and forms required for the work.
                      Work in foundation
                      a - M 10 Grade (1:3:6 mix by volume)
                             Description             Quantity            Unit               Rate
                                Skilled                 1.00             md               1090.00
      Labour
                              Unskilled                 4.00             md                790.00
                               cement                   4.40             bag               960.50
     Materials                aggrigate                 0.89              m 3
                                                                                          1815.00
                                 Sand                   0.47              m3              1870.00
                                                                                            Total
                                                                                    Rate per unit
                    Cu.m
 ding 10 m lead and 1.5m lift
                         Amount
                         2370.00
                          71.10
                         2441.10
                         2441.10
                            m3
equired for mixing, placing in position,
 uired to produce concrete of specified
making, fixing and removing of all centres
                         Amount
                         1090.00
                         3160.00
                         4226.20
                         1615.35
                          878.90
                        10970.45
                        10970.45