100% found this document useful (1 vote)
463 views49 pages

Pile Fundation

This document provides design details for a pile foundation, including: 1) Materials and dimensions of the pile, including a concrete strength of 37,000 kPa, diameter of 0.9m, and modulus of elasticity of 2.9x10^4 kPa. 2) Loads on the pile include a maximum load of 6.13kN and horizontal load of 12.62kN. 3) Formulas are presented for calculating the moment, shear, and deflection at different points along the pile based on the Winkler method using subgrade reaction. 4) Results are provided for the moment, shear, and deflection at 21 nodes along the pile depth. The

Uploaded by

Franklyn Genove
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
463 views49 pages

Pile Fundation

This document provides design details for a pile foundation, including: 1) Materials and dimensions of the pile, including a concrete strength of 37,000 kPa, diameter of 0.9m, and modulus of elasticity of 2.9x10^4 kPa. 2) Loads on the pile include a maximum load of 6.13kN and horizontal load of 12.62kN. 3) Formulas are presented for calculating the moment, shear, and deflection at different points along the pile based on the Winkler method using subgrade reaction. 4) Results are provided for the moment, shear, and deflection at 21 nodes along the pile depth. The

Uploaded by

Franklyn Genove
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 49

MZ & PARTNERS PROJECT

DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1

2.5.1 MATERIALS AND DIMENSIONS :

Concrete Strength @ 28 days, fc' = 37,000 KPa


Dimension of Pile, D = 0.90 m.
Lateral Subgrade Modulus Coefficient, Kh= 200,000 KPa/m.
Modulus of Elasticity of Piles, E = 2.9.E+04 KPa
Moment of Inertia of Piles, I = 0.0322 m.4
Extended Height of Pile, e = 0.10 m.

2.5.2 LOADS :

Load at Top of Pile : HINGED PILE


Pmax = 6.13 KN HEAD
Pmin = 0 KN
Horizontal Load, H = 12.62 KN
Moment @ Pile Top, Mo = 68 KN-m e
-x

2.5.3 FORMULA :
eqn 1 Above the Ground : d4y1
EI =0
dx4
eqn 2 Below the Ground : d4y1 where : P = KhBy2
EI +P=0
dx 4

eqn 6.39 Parameter, b = (KD/4EI) 1/4


= 2.64 m.-1 1/b = 0.378
+x
Pile Design Minimum Pile Length, L =p/b = 1.19 m.
Manual by
Tomlinson BY concept of the modulus of Subgrade Reaction (winkler's method)
and taking the derivatives of the above equations, the following
Formulas were derived:
MOMENT :
Moment Above the Ground : M1 = H(x+e+h')
Moment Below the Ground : M2 = H/be-bx(bh"cosbx + (1+bh')sinbx)
Location of Max. Moment : Xm = 1/btan-1(1/(1+2bh"))
Maximum Moment : Mmax = H/2be-blm((1+2bh")2+1)1/2

SHEAR :
Shear Above the Gro : V = H
Shear Below the Grou: V = He-bx(cosbx - (1+2bh")sinbx)

DEFLECTION:
Deflection Above the Ground : y1 = H/(6EIb3)(b3x3 + 3b3h"x2 - 3(1+2bh")bx + 3(1+bh"))
Deflection Below the Ground : y2 = H/(2EIb3)e-bx((1+bh")cosbx - bh"sinbx)
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1

EFFECTIVE PILE EXTENSION:


Equivalent Extension due to Mo, h' = Mo/H = 5.39 m.
Effective Pile Extension, h" = e + h' = 5.49 = 6.00 m.

2.5.4 RESULTS :

MOMENT DEFLECTION
NODE DEPTH,X (m) SHEAR (KN)
(KN-M) (mm)

1 -0.10 12.6 74.5 9.87


2 0.00 12.6 75.7 6.25
3 0.01 -0.5 75.8 5.87
4 0.20 -116.4 62.5 1.43
5 0.40 -122.8 37.3 -0.71
6 0.60 -84.6 16.2 -1.22
7 0.80 -43.4 3.6 -1.00
8 1.00 -14.8 -2.0 -0.59
9 1.20 0.0 -3.3 -0.25
10 1.40 5.2 -2.6 -0.05
11 1.60 5.2 -1.5 0.03
12 1.80 3.5 -0.7 0.05
13 2.00 1.8 -0.1 0.04
14 2.20 0.6 0.1 0.02
15 2.50 -0.2 0.1 0.01
16 3.00 -0.1 0.0 0.00
17 3.50 0.0 0.0 0.00
18 4.00 0.0 0.0 0.00
19 4.50 0.0 0.0 0.00
20 5.00 0.0 0.0 0.00
21 5.50 0.0 0.0 0.00
22 6.00 0.0 0.0 0.00

Xm = 0.012 m Mmax = 75.79 KN-m

Design Load : Pmax = 7.90 KN


Pmin = 1.70 KN
M= 75.79 KN-m
V= 123 KN

Ultimate Loads:
LF 1.50
Pumax = 8.79 KN
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1

Pumin = 2.55 KN
Mu= 113.69 KN-m
Vu = 184 KN

2.5.5 DIAGRAMS

SHEAR

1; 0.1
-500 0
3;2;-0.012
0 500
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

17; -3.5
SHEAR

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
16; -3

17; -3.5

18; -4
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar 19; -4.5
DATE : SEPT. 22, 1020
infostructural@mzandpartners.com
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1 20; -5

21; -5.5

22; -6

1; 0.1
2;
3; 0
-0.012
-100 0 100
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1

1; 0.1
2; 0
3; -0.012
-2.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2

15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1

2.6.2 TRANSVERSE REINFORCEMENT

Transverse reinforcement @ End Region :


F.1.1 Dimension at End Region :

Use bigger value of the following :


1. Le = max. cross section , D = 0.90 m.
2. Le= 1/6 clear height , H = 0.06 m.
3. Le= 18" or = 0.46 m. USE Le = 0.90 m.
Say 1.0 m
F.1.2 Spiral Ties/ Hoops :
Min. Axial Stress, Pumin/Ag = 0.0040 Mpa
10% of Conc. Strength, 0.10 fc' = 3,700.00 Kpa 0.10fc' > Pumin/Ag
Shear carried by Concrete, vc = 0.00 Kpa
Spiral Diam., f = 16.00 mm. h= 0.90 m fy = 420.00
Area/Leg, As1 = 201.06 mm2 bw = 0.90 m.
Total Area, Av = 402.12 mm2 d= 0.72 m.
Unit Shear vu = Vu/(fbwd) :
Vu = 184.22 KN vs = 334.45 KPa
vu = 334.45 KPa Spiral Spacing : sp= Avfy/(vsbw) = 0.561

F.1.3 Tranverse Reinforcement @ Plastic Zone :

Use bigger value of the following:


1. r = 0.45 (Ag/Ac -1) fc'/fy where : Ag = 0.64 m2 Ac=
r = 0.01744 Dc = 0.75 m Ds =
2. r = 0.12 x fc'/fy Concrete Cover = 0.075
r = 0.01057 adopt r = 0.0174
Spiral Spacing :
sp = 4 As/rDs = 0.063 m Finally adopt 16 @ 0.063 m. over Le

F.1.4 Transverse Reinforcement Outside End Region :


MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 1

Spiral Diam., f = 10.00 mm Shear Area, Av = 157.08 mm2


Bar Strength, fy = 420.00 MPa vs =vu -vc = -675.29 KPa
Area/Leg, As1 = 78.54 mm2 Minimum vs = 344.75 KPa
vu = 334.45 Kpa Governing vs = 344.75 KPa
vc=166(fc ')1/2 = 1,009.74 Kpa sp= Avfy/(vsbw) = 0.21 m.
USE sp= 0.21 m.
FOR SPIRAL: Adopt 16 mm. Dia. @ 0.06 over the first 0.90 m.
from top of pile, rest T10 @ 0.21 m. o.c.
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

Structur
al
Departm
ent

Mo
y1

y2

+ 3b3h"x2 - 3(1+2bh")bx + 3(1+bh"))


TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

SHEAR DIST. MOMENT DIST. DEFLECTDIST.


(KN) (m.) (KN- m.) (m.) (mm.) (m.)

0.1 13 0.1 74 0.1 9.87 0.1


0 13 0 76 0 6.25 0
0 0 0 76 0 5.87 -0.01
0 -116 -0.2 62 -0.2 1.43 -0.2
0 -123 -0.4 37 -0.4 -0.71 -0.4
-1 -85 -0.6 16 -0.6 -1.22 -0.6
-1 -43 -0.8 4 -0.8 -1.00 -0.8
-1 -15 -1 -2 -1 -0.59 -1
-1 0 -1.2 -3 -1.2 -0.25 -1.2
-1 5 -1.4 -3 -1.4 -0.05 -1.4
-2 5 -1.6 -2 -1.6 0.03 -1.6
-2 4 -1.8 -1 -1.8 0.05 -1.8
-2 2 -2 0 -2 0.04 -2
-2 1 -2.2 0 -2.2 0.02 -2.2
-3 0 -2.5 0 -2.5 0.01 -2.5
-3 0 -3 0 -3 0.00 -3
-4 0 -3.5 0 -3.5 0.00 -3.5
-4 0 -4 0 -4 0.00 -4
-5 0 -4.5 0 -4.5 0.00 -4.5
-5 0 -5 0 -5 0.00 -5
-6 0 -5.5 0 -5.5 0.00 -5.5
-6 0 -6 0 -6 0.00 -6

V= 13
V= 123
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

1; 0.1
8.00 10.00 12.00
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

MPa

m o.c.

0.44 m2
0.734 m
m.

0.063 m. over Le

0.10fc' > Pumin/Ag


0.10fc'< Pumin/Ag
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

0.21 m.
0.90 m.
0.21 m. o.c.
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 2

2.5.1 MATERIALS AND DIMENSIONS :

Concrete Strength @ 28 days, fc' = 37,000 KPa


Dimension of Pile, D = 0.90 m.
Lateral Subgrade Modulus Coefficient, Kh= 200,000 KPa/m.
Modulus of Elasticity of Piles, E = 2.9.E+04 KPa
Moment of Inertia of Piles, I = 0.0322 m.4
Extended Height of Pile, e = 0.10 m.

2.5.2 LOADS :

Load at Top of Pile : HINGED PILE


Pmax = 6.93 KN HEAD
Pmin = 0 KN
Horizontal Load, H = 16.11 KN
Moment @ Pile Top, Mo = 91.56 KN-m e
-x

2.5.3 FORMULA :
eqn 1 Above the Ground : d4y1
EI =0
dx4
eqn 2 Below the Ground : d4y1 where : P = KhBy2
EI +P=0
dx 4

eqn 6.39 Parameter, b = (KD/4EI) 1/4


= 2.64 m.-1 1/b = 0.378
+x
Pile Design Minimum Pile Length, L =p/b = 1.19 m.
Manual by
Tomlinson BY concept of the modulus of Subgrade Reaction (winkler's method)
and taking the derivatives of the above equations, the following
Formulas were derived:
MOMENT :
Moment Above the Ground : M1 = H(x+e+h')
Moment Below the Ground : M2 = H/be-bx(bh"cosbx + (1+bh')sinbx)
Location of Max. Moment : Xm = 1/btan-1(1/(1+2bh"))
Maximum Moment : Mmax = H/2be-blm((1+2bh")2+1)1/2

SHEAR :
Shear Above the Gro : V = H
Shear Below the Grou: V = He-bx(cosbx - (1+2bh")sinbx)

DEFLECTION:
Deflection Above the Ground : y1 = H/(6EIb3)(b3x3 + 3b3h"x2 - 3(1+2bh")bx + 3(1+bh"))
Deflection Below the Ground : y2 = H/(2EIb3)e-bx((1+bh")cosbx - bh"sinbx)
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 2

EFFECTIVE PILE EXTENSION:


Equivalent Extension due to Mo, h' = Mo/H = 5.68 m.
Effective Pile Extension, h" = e + h' = 5.78 = 6.00 m.

2.5.4 RESULTS :

MOMENT DEFLECTION
NODE DEPTH,X (m) SHEAR (KN)
(KN-M) (mm)

1 -0.10 16.1 95.0 12.60


2 0.00 16.1 96.7 7.98
3 0.01 -0.6 96.8 7.50
4 0.20 -148.6 79.7 1.83
5 0.40 -156.8 47.6 -0.91
6 0.60 -107.9 20.7 -1.56
7 0.80 -55.4 4.6 -1.27
8 1.00 -18.9 -2.6 -0.75
9 1.20 0.0 -4.2 -0.32
10 1.40 6.6 -3.4 -0.07
11 1.60 6.7 -2.0 0.04
12 1.80 4.5 -0.8 0.07
13 2.00 2.3 -0.2 0.05
14 2.20 0.7 0.1 0.03
15 2.50 -0.2 0.2 0.01
16 3.00 -0.2 0.0 0.00
17 3.50 0.0 0.0 0.00
18 4.00 0.0 0.0 0.00
19 4.50 0.0 0.0 0.00
20 5.00 0.0 0.0 0.00
21 5.50 0.0 0.0 0.00
22 6.00 0.0 0.0 0.00

Xm = 0.012 m Mmax = 96.75 KN-m

Design Load : Pmax = 8.70 KN


Pmin = 1.70 KN
M= 96.75 KN-m
V= 157 KN

Ultimate Loads:
LF 1.50
Pumax = 9.59 KN
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 2

Pumin = 2.55 KN
Mu= 145.13 KN-m
Vu = 235 KN

2.5.5 DIAGRAMS

SHEAR

1; 0.1
3;2;-0.012
0
-500 4; -0.2 0 500
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3
SHEAR
17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
14; -2.2
15; -2.5

16; -3

17; -3.5

MZ & PARTNERS 18; -4 PROJECT


DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar 19; -4.5
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT 20; -5 DESIGNED BY : AGL
CASE 2
21; -5.5

22; -6

1; 0.1
2;
3; 0
-0.012
-100 0 100 200
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 2

DISPLACEMENT

1; 0.1
2; 0
3; -0.012
-4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2

15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 2

2.6.2 TRANSVERSE REINFORCEMENT

Transverse reinforcement @ End Region :


F.1.1 Dimension at End Region :

Use bigger value of the following :


1. Le = max. cross section , D = 0.90 m.
2. Le= 1/6 clear height , H = 0.06 m.
3. Le= 18" or = 0.46 m. USE Le = 0.90 m.
Say 1.0 m
F.1.2 Spiral Ties/ Hoops :
Min. Axial Stress, Pumin/Ag = 0.0040 Mpa
10% of Conc. Strength, 0.10 fc' = 3,700.00 Kpa 0.10fc' > Pumin/Ag
Shear carried by Concrete, vc = 0.00 Kpa
Spiral Diam., f = 16.00 mm. h= 0.90 m fy = 420.00
Area/Leg, As1 = 201.06 mm2 bw = 0.90 m.
Total Area, Av = 402.12 mm2 d= 0.72 m.
Unit Shear vu = Vu/(fbwd) :
Vu = 235.16 KN vs = 426.94 KPa
vu = 426.94 KPa Spiral Spacing : sp= Avfy/(vsbw) = 0.440

F.1.3 Tranverse Reinforcement @ Plastic Zone :

Use bigger value of the following:


1. r = 0.45 (Ag/Ac -1) fc'/fy where : Ag = 0.64 m2 Ac=
r = 0.01744 Dc = 0.75 m Ds =
2. r = 0.12 x fc'/fy Concrete Cover = 0.075
r = 0.01057 adopt r = 0.0174
Spiral Spacing :
sp = 4 As/rDs = 0.063 m Finally adopt 16 @ 0.063 m. over Le

F.1.4 Transverse Reinforcement Outside End Region :


MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 2

Spiral Diam., f = 10.00 mm Shear Area, Av = 157.08 mm2


Bar Strength, fy = 420.00 MPa vs =vu -vc = -582.79 KPa
Area/Leg, As1 = 78.54 mm2 Minimum vs = 344.75 KPa
vu = 426.94 Kpa Governing vs = 344.75 KPa
vc=166(fc ')1/2 = 1,009.74 Kpa sp= Avfy/(vsbw) = 0.21 m.
USE sp= 0.21 m.
FOR SPIRAL: Adopt 16 mm. Dia. @ 0.06 over the first 0.90 m.
from top of pile, rest T10 @ 0.21 m. o.c.
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

Structur
al
Departm
ent

Mo
y1

y2

+ 3b3h"x2 - 3(1+2bh")bx + 3(1+bh"))


TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

SHEAR DIST. MOMENT DIST. DEFLECTDIST.


(KN) (m.) (KN- m.) (m.) (mm.) (m.)

16 0.1 95 0.1 12.60 0.1


16 0 97 0 7.98 0
-1 0 97 0 7.50 -0.01
-149 -0.2 80 -0.2 1.83 -0.2
-157 -0.4 48 -0.4 -0.91 -0.4
-108 -0.6 21 -0.6 -1.56 -0.6
-55 -0.8 5 -0.8 -1.27 -0.8
-19 -1 -3 -1 -0.75 -1
0 -1.2 -4 -1.2 -0.32 -1.2
7 -1.4 -3 -1.4 -0.07 -1.4
7 -1.6 -2 -1.6 0.04 -1.6
5 -1.8 -1 -1.8 0.07 -1.8
2 -2 0 -2 0.05 -2
1 -2.2 0 -2.2 0.03 -2.2
0 -2.5 0 -2.5 0.01 -2.5
0 -3 0 -3 0.00 -3
0 -3.5 0 -3.5 0.00 -3.5
0 -4 0 -4 0.00 -4
0 -4.5 0 -4.5 0.00 -4.5
0 -5 0 -5 0.00 -5
0 -5.5 0 -5.5 0.00 -5.5
0 -6 0 -6 0.00 -6

V= 16
V= 157
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

NT

1; 0.1
2; 0
0.012
10.00 12.00 14.00
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

MPa

m o.c.

0.44 m2
0.734 m
m.

0.063 m. over Le

0.10fc' > Pumin/Ag


0.10fc'< Pumin/Ag
TRAFFIC TECH
MODEL 9000 MM ARM
SEPT. 22, 1020

0.21 m.
0.90 m.
0.21 m. o.c.
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 3

2.5.1 MATERIALS AND DIMENSIONS :

Concrete Strength @ 28 days, fc' = 37,000 KPa


Dimension of Pile, D = 0.90 m.
Lateral Subgrade Modulus Coefficient, Kh= 200,000 KPa/m.
Modulus of Elasticity of Piles, E = 2.9.E+04 KPa
Moment of Inertia of Piles, I = 0.0322 m.4
Extended Height of Pile, e = 0.10 m.

2.5.2 LOADS :

Load at Top of Pile : HINGED PILE


Pmax = 9.50 KN HEAD
Pmin = 0 KN
Horizontal Load, H = 21.40 KN
Moment @ Pile Top, Mo = 125.16 KN-m e
-x

2.5.3 FORMULA :
eqn 1 Above the Ground : d4y1
EI =0
dx4
eqn 2 Below the Ground : d4y1 where : P = KhBy2
EI +P=0
dx 4

eqn 6.39 Parameter, b = (KD/4EI) 1/4


= 2.64 m.-1 1/b = 0.378
+x
Pile Design Minimum Pile Length, L =p/b = 1.19 m.
Manual by
Tomlinson BY concept of the modulus of Subgrade Reaction (winkler's method)
and taking the derivatives of the above equations, the following
Formulas were derived:
MOMENT :
Moment Above the Ground : M1 = H(x+e+h')
Moment Below the Ground : M2 = H/be-bx(bh"cosbx + (1+bh')sinbx)
Location of Max. Moment : Xm = 1/btan-1(1/(1+2bh"))
Maximum Moment : Mmax = H/2be-blm((1+2bh")2+1)1/2

SHEAR :
Shear Above the Gro : V = H
Shear Below the Grou: V = He-bx(cosbx - (1+2bh")sinbx)

DEFLECTION:
Deflection Above the Ground : y1 = H/(6EIb3)(b3x3 + 3b3h"x2 - 3(1+2bh")bx + 3(1+bh"))
Deflection Below the Ground : y2 = H/(2EIb3)e-bx((1+bh")cosbx - bh"sinbx)
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 3

EFFECTIVE PILE EXTENSION:


Equivalent Extension due to Mo, h' = Mo/H = 5.85 m.
Effective Pile Extension, h" = e + h' = 5.95 = 6.00 m.

2.5.4 RESULTS :

MOMENT DEFLECTION
NODE DEPTH,X (m) SHEAR (KN)
(KN-M) (mm)

1 -0.10 21.4 126.3 16.74


2 0.00 21.4 128.4 10.60
3 0.01 -0.8 128.5 9.96
4 0.20 -197.3 105.9 2.43
5 0.40 -208.3 63.2 -1.21
6 0.60 -143.4 27.5 -2.07
7 0.80 -73.6 6.1 -1.69
8 1.00 -25.1 -3.4 -1.00
9 1.20 0.0 -5.6 -0.43
10 1.40 8.7 -4.5 -0.09
11 1.60 8.9 -2.6 0.06
12 1.80 6.0 -1.1 0.09
13 2.00 3.0 -0.2 0.07
14 2.20 1.0 0.2 0.04
15 2.50 -0.3 0.2 0.01
16 3.00 -0.3 0.0 0.00
17 3.50 0.0 0.0 0.00
18 4.00 0.0 0.0 0.00
19 4.50 0.0 0.0 0.00
20 5.00 0.0 0.0 0.00
21 5.50 0.0 0.0 0.00
22 6.00 0.0 0.0 0.00

Xm = 0.012 m Mmax = 128.52 KN-m

Design Load : Pmax = 11.27 KN


Pmin = 1.70 KN
M= 128.52 KN-m
V= 208 KN

Ultimate Loads:
LF 1.50
Pumax = 12.16 KN
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 3

Pumin = 2.55 KN
Mu= 192.78 KN-m
Vu = 312 KN

2.5.5 DIAGRAMS

SHEAR

1; 0.1
3;2;-0.012
0
-500 4; -0.2 0 500
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6

SHEAR

1; 0.1
2;
3; 0
-0.012
-100 0 100 200
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE 1; 0.1 : SEPT. 22, 1020
2;
3; 0
-0.012
STRUCTURAL DEPARTMENT DESIGNED :
4; BY
-100 0 100 200
AGL
-0.2
CASE 3 5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6

1; 0.1
2; 0
3; -0.012
-5.00 0.00 5.00 10.00 15.00 20.00
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2

15; -2.5

16; -3

17; -3.5
1; 0.1
2; 0
3; -0.012
-5.00 0.00 5.00 10.00 15.00 20.00
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
MZ & PARTNERS 9; -1.2
10; -1.4
PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar 11; -1.6
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
12; -1.8
STRUCTURAL DEPARTMENT 13; -2 DESIGNED BY : AGL
CASE 3 14; -2.2

15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 3

2.6.2 TRANSVERSE REINFORCEMENT

Transverse reinforcement @ End Region :


F.1.1 Dimension at End Region :

Use bigger value of the following :


1. Le = max. cross section , D = 0.90 m.
2. Le= 1/6 clear height , H = 0.06 m.
3. Le= 18" or = 0.46 m. USE Le = 0.90 m.
Say 1.0 m
F.1.2 Spiral Ties/ Hoops :
Min. Axial Stress, Pumin/Ag = 0.0040 Mpa
10% of Conc. Strength, 0.10 fc' = 3,700.00 Kpa 0.10fc' > Pumin/Ag
Shear carried by Concrete, vc = 0.00 Kpa
Spiral Diam., f = 16.00 mm. h= 0.90 m fy = 420.00
Area/Leg, As1 = 201.06 mm2 bw = 0.90 m.
Total Area, Av = 402.12 mm2 d= 0.72 m.
Unit Shear vu = Vu/(fbwd) :
Vu = 312.38 KN vs = 567.14 KPa
vu = 567.14 KPa Spiral Spacing : sp= Avfy/(vsbw) = 0.331

F.1.3 Tranverse Reinforcement @ Plastic Zone :

Use bigger value of the following:


1. r = 0.45 (Ag/Ac -1) fc'/fy where : Ag = 0.64 m2 Ac=
r = 0.01744 Dc = 0.75 m Ds =
2. r = 0.12 x fc'/fy Concrete Cover = 0.075
r = 0.01057 adopt r = 0.0174
Spiral Spacing :
sp = 4 As/rDs = 0.063 m Finally adopt 16 @ 0.063 m. over Le

F.1.4 Transverse Reinforcement Outside End Region :


MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 3

Spiral Diam., f = 10.00 mm Shear Area, Av = 157.08 mm2


Bar Strength, fy = 420.00 MPa vs =vu -vc = -442.60 KPa
Area/Leg, As1 = 78.54 mm2 Minimum vs = 344.75 KPa
vu = 567.14 Kpa Governing vs = 344.75 KPa
vc=166(fc ')1/2 = 1,009.74 Kpa sp= Avfy/(vsbw) = 0.21 m.
USE sp= 0.21 m.
FOR SPIRAL: Adopt 16 mm. Dia. @ 0.06 over the first 0.90 m.
from top of pile, rest T10 @ 0.21 m. o.c.
MODEL 9000 MM ARM

Structur
al
Departm
ent

Mo
y1

y2

b3h"x2 - 3(1+2bh")bx + 3(1+bh"))


MODEL 9000 MM ARM

SHEAR DIST. MOMENT DIST. DEFLECTDIST.


(KN) (m.) (KN- m.) (m.) (mm.) (m.)

21 0.1 126 0.1 16.74 0.1


21 0 128 0 10.60 0
-1 0 129 0 9.96 -0.01
-197 -0.2 106 -0.2 2.43 -0.2
-208 -0.4 63 -0.4 -1.21 -0.4
-143 -0.6 28 -0.6 -2.07 -0.6
-74 -0.8 6 -0.8 -1.69 -0.8
-25 -1 -3 -1 -1.00 -1
0 -1.2 -6 -1.2 -0.43 -1.2
9 -1.4 -4 -1.4 -0.09 -1.4
9 -1.6 -3 -1.6 0.06 -1.6
6 -1.8 -1 -1.8 0.09 -1.8
3 -2 0 -2 0.07 -2
1 -2.2 0 -2.2 0.04 -2.2
0 -2.5 0 -2.5 0.01 -2.5
0 -3 0 -3 0.00 -3
0 -3.5 0 -3.5 0.00 -3.5
0 -4 0 -4 0.00 -4
0 -4.5 0 -4.5 0.00 -4.5
0 -5 0 -5 0.00 -5
0 -5.5 0 -5.5 0.00 -5.5
0 -6 0 -6 0.00 -6

V= 21
V= 208
MODEL 9000 MM ARM

MPa

m o.c.

0.44 m2
0.734 m
m.

0.063 m. over Le

0.10fc' > Pumin/Ag


0.10fc'< Pumin/Ag
MODEL 9000 MM ARM

0.21 m.
0.90 m.
0.21 m. o.c.
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 4

2.5.1 MATERIALS AND DIMENSIONS :

Concrete Strength @ 28 days, fc' = 37,000 KPa


Dimension of Pile, D = 1.10 m.
Lateral Subgrade Modulus Coefficient, Kh= 200,000 KPa/m.
Modulus of Elasticity of Piles, E = 2.9.E+04 KPa
Moment of Inertia of Piles, I = 0.0719 m.4
Extended Height of Pile, e = 0.10 m.

2.5.2 LOADS :

Load at Top of Pile : HINGED PILE


Pmax = 11.51 KN HEAD
Pmin = 0 KN
Horizontal Load, H = 24.15 KN
Moment @ Pile Top, Mo = 142.21 KN-m e
-x

2.5.3 FORMULA :
eqn 1 Above the Ground : d4y1
EI =0
dx4
eqn 2 Below the Ground : d4y1 where : P = KhBy2
EI +P=0
dx 4

eqn 6.39 Parameter, b = (KD/4EI) 1/4


= 2.27 m.-1 1/b = 0.440
+x
Pile Design Minimum Pile Length, L =p/b = 1.38 m.
Manual by
Tomlinson BY concept of the modulus of Subgrade Reaction (winkler's method)
and taking the derivatives of the above equations, the following
Formulas were derived:
MOMENT :
Moment Above the Ground : M1 = H(x+e+h')
Moment Below the Ground : M2 = H/be-bx(bh"cosbx + (1+bh')sinbx)
Location of Max. Moment : Xm = 1/btan-1(1/(1+2bh"))
Maximum Moment : Mmax = H/2be-blm((1+2bh")2+1)1/2

SHEAR :
Shear Above the Gro : V = H
Shear Below the Grou: V = He-bx(cosbx - (1+2bh")sinbx)

DEFLECTION:
Deflection Above the Ground : y1 = H/(6EIb3)(b3x3 + 3b3h"x2 - 3(1+2bh")bx + 3(1+bh"))
Deflection Below the Ground : y2 = H/(2EIb3)e-bx((1+bh")cosbx - bh"sinbx)
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 4

EFFECTIVE PILE EXTENSION:


Equivalent Extension due to Mo, h' = Mo/H = 5.89 m.
Effective Pile Extension, h" = e + h' = 5.99 = 6.00 m.

2.5.4 RESULTS :

MOMENT DEFLECTION
NODE DEPTH,X (m) SHEAR (KN)
(KN-M) (mm)

1 -0.10 24.2 142.5 10.88


2 0.00 24.2 144.9 7.31
3 0.016 -0.7 145.1 6.81
4 0.20 -176.7 125.9 2.27
5 0.40 -211.2 85.2 -0.36
6 0.60 -169.6 46.5 -1.32
7 0.80 -108.3 18.6 -1.36
8 1.00 -55.2 2.5 -1.02
9 1.20 -19.3 -4.6 -0.62
10 1.40 0.2 -6.3 -0.29
11 1.60 8.0 -5.3 -0.08
12 1.80 9.0 -3.5 0.02
13 2.00 7.1 -1.9 0.06
14 2.20 4.4 -0.7 0.06
15 2.50 1.4 0.1 0.03
16 3.00 -0.4 0.2 0.00
17 3.50 -0.2 0.0 0.00
18 4.00 0.0 0.0 0.00
19 4.50 0.0 0.0 0.00
20 5.00 0.0 0.0 0.00
21 5.50 0.0 0.0 0.00
22 6.00 0.0 0.0 0.00

Xm = 0.016 m Mmax = 145.09 KN-m

Design Load : Pmax = 14.25 KN


Pmin = 2.64 KN
M= 145.09 KN-m
V= 211 KN

Ultimate Loads:
LF 1.50
Pumax = 15.63 KN
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 4

Pumin = 3.95 KN
Mu= 217.63 KN-m
Vu = 317 KN

2.5.5 DIAGRAMS

SHEAR

1; 0.1
3;2;-0.016
0
-500 4; -0.2 0 500
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

SHEAR 17; -3.5

18; -4

19; -4.5

20; -5 1; 0.1
2;
3; 0
-0.016
-100 0 100 200
21; -5.5 4; -0.2
5; -0.4
22; -66; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
15; -2.5

16; -3

17; -3.5

18; -4
MZ & PARTNERS 19; -4.5
PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com 20; -5 DATE :
1; 0.1 SEPT. 22, 1020
2;
3; 0
-0.016
STRUCTURAL DEPARTMENT
-100 0 DESIGNED
100 BY 4; -0.2 : 200
AGL
21; -5.5
CASE 4 5; -0.4
22; -66; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2
15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6

1; 0.1
2; 0
3; -0.016
-2.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
9; -1.2
10; -1.4
11; -1.6
12; -1.8
13; -2
14; -2.2

15; -2.5

16; -3

17; -3.5
1; 0.1
2; 0
3; -0.016
-2.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00
4; -0.2
5; -0.4
6; -0.6
7; -0.8
8; -1
MZ & PARTNERS 9; -1.2
10; -1.4
PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
11; -1.6
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
12; -1.8
STRUCTURAL DEPARTMENT 13; -2 DESIGNED BY : AGL
CASE 4 14; -2.2

15; -2.5

16; -3

17; -3.5

18; -4

19; -4.5

20; -5

21; -5.5

22; -6
MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 4

2.6.2 TRANSVERSE REINFORCEMENT

Transverse reinforcement @ End Region :


F.1.1 Dimension at End Region :

Use bigger value of the following :


1. Le = max. cross section , D = 1.10 m.
2. Le= 1/6 clear height , H = 0.07 m.
3. Le= 18" or = 0.46 m. USE Le = 1.10 m.
Say 1.2 m
F.1.2 Spiral Ties/ Hoops :
Min. Axial Stress, Pumin/Ag = 0.0042 Mpa
10% of Conc. Strength, 0.10 fc' = 3,700.00 Kpa 0.10fc' > Pumin/Ag
Shear carried by Concrete, vc = 0.00 Kpa
Spiral Diam., f = 16.00 mm. h= 1.10 m fy = 420.00
Area/Leg, As1 = 201.06 mm2 bw = 1.10 m.
Total Area, Av = 402.12 mm2 d= 0.88 m.
Unit Shear vu = Vu/(fbwd) :
Vu = 316.80 KN vs = 385.02 KPa
vu = 385.02 KPa Spiral Spacing : sp= Avfy/(vsbw) = 0.399

F.1.3 Tranverse Reinforcement @ Plastic Zone :

Use bigger value of the following:


1. r = 0.45 (Ag/Ac -1) fc'/fy where : Ag = 0.95 m2 Ac=
r = 0.01351 Dc = 0.95 m Ds =
2. r = 0.12 x fc'/fy Concrete Cover = 0.075
r = 0.01057 adopt r = 0.0135
Spiral Spacing :
sp = 4 As/rDs = 0.064 m Finally adopt 16 @ 0.064 m. over Le

F.1.4 Transverse Reinforcement Outside End Region :


MZ & PARTNERS PROJECT
DESCRIPTION
:
:
TRAFFIC TECH
MODEL 9000 MM ARM
ARCHITECTURAL & ENGINEERING CONSULTANCY
Tel: 44 79 845-Fax: 44 79 673-POBox: 5785Doha-Qatar
infostructural@mzandpartners.com DATE : SEPT. 22, 1020
STRUCTURAL DEPARTMENT DESIGNED BY : AGL
CASE 4

Spiral Diam., f = 12.00 mm Shear Area, Av = 226.20 mm2


Bar Strength, fy = 420.00 MPa vs =vu -vc = -624.72 KPa
Area/Leg, As1 = 113.10 mm2 Minimum vs = 344.75 KPa
vu = 385.02 Kpa Governing vs = 344.75 KPa
vc=166(fc ')1/2 = 1,009.74 Kpa sp= Avfy/(vsbw) = 0.25 m.
USE sp= 0.251 m.
FOR SPIRAL: Adopt 16 mm. Dia. @ 0.06 over the first 1.10 m.
from top of pile, rest T10 @ 0.25 m. o.c.
MODEL 9000 MM ARM

Structur
al
Departm
ent

Mo
y1

y2

b3h"x2 - 3(1+2bh")bx + 3(1+bh"))


MODEL 9000 MM ARM

SHEAR DIST. MOMENT DIST. DEFLECTDIST.


(KN) (m.) (KN- m.) (m.) (mm.) (m.)

24 0.1 142 0.1 10.88 0.1


24 0 145 0 7.31 0
-1 0 145 0 6.81 -0.02
-177 -0.2 126 -0.2 2.27 -0.2
-211 -0.4 85 -0.4 -0.36 -0.4
-170 -0.6 46 -0.6 -1.32 -0.6
-108 -0.8 19 -0.8 -1.36 -0.8
-55 -1 3 -1 -1.02 -1
-19 -1.2 -5 -1.2 -0.62 -1.2
0 -1.4 -6 -1.4 -0.29 -1.4
8 -1.6 -5 -1.6 -0.08 -1.6
9 -1.8 -4 -1.8 0.02 -1.8
7 -2 -2 -2 0.06 -2
4 -2.2 -1 -2.2 0.06 -2.2
1 -2.5 0 -2.5 0.03 -2.5
0 -3 0 -3 0.00 -3
0 -3.5 0 -3.5 0.00 -3.5
0 -4 0 -4 0.00 -4
0 -4.5 0 -4.5 0.00 -4.5
0 -5 0 -5 0.00 -5
0 -5.5 0 -5.5 0.00 -5.5
0 -6 0 -6 0.00 -6

V= 24
V= 211
MODEL 9000 MM ARM

MPa

m o.c.

0.71 m2
0.934 m
m.

0.064 m. over Le

0.10fc' > Pumin/Ag


0.10fc'< Pumin/Ag
MODEL 9000 MM ARM

0.251 m.
1.10 m.
0.25 m. o.c.
PROJECT :
DESCRIPTION :
DATE :
DESIGNED BY :

A. MATERIALS AND DIMENSIONS :

1. Concrete Strength @ 28 days, fc' = 37.00 MPa


2. Min. Yied Strength of Reinf. Steel, fy = 420.00 MPa for f =or < 16
= 420.00 MPa for f = or > 20
3. Diameter of Pile, D = 0.90 m.
4. Minimum Concrete Cover, c = 0.075 m.

B. DESIGN FORCES :

B.1 Pile Forces Due to Forces Resulting from Plastic Hinging at the Bottom of Pier Column

Forces L.D. T.D. Forces L.D. T.D.


Moment, Muy 142.00 0.00 KN-m. Shear, Vux 0.00 0.00 KN
Moment, Muz 0.00 0.00 KN-m. Shear, VuDES 169.00 0.00 KN
Moment, Mudes 142.00 0.00 KN-m. Axial, Pumax. 8.82 0.00 KN
Shear, Vuy 169.00 0.00 KN. Axial, Pumin. 2.58 0.00 KN
NOTE : L.D. = Longitudinal Direction T.D. =Transverse Direction

B.2 Main Reinforcement ( rmin = .0075 for upper 2/3 of pile length)

FROM PCACOL : USE 100 - f 36 mm r = 2.68 %

B.3 Main Reinforcement ( r min = .0050 for lower 1/3 of pile length)

As = 3,181 mm2 USE 50 - f 36 mm r = 1.34%

B.4 Special Pile Requirement, AASHTO Art. 6.4.1

Bar diam. = 20.00 mm. Area, Ab = 314 mm.2 fy = 413,700 KPa

1. Confinement Length, Le = 2D = = 1.80 m.


2. Anchorage: Max. Tension, P = 1.25Asfy = 162.46 KN
3. Anchorage Length, La = 0.60*Abfy/fc' = 0.41 m.
La = 0.00005801fbfy = 0.48 m. USE La = 0.48 m.

C. TRANSVERSE REINFORCEMENT :

C.1 Transverse Reiforcement fy = 420,000 kPa


Spiral Size = 16.00 mm. As1 = 201.06 mm2
PROJECT :
DESCRIPTION :
DATE :
DESIGNED BY :

C.1.1 Transverse Reinforcement @ Plastic Zone, AASHTO Art. 8.4.1(D)

1. r = 0.45 (Ag/Ac -1) fc'/fy Ag = 0.64 m.2 Ac = 0.44 m.2


= 0.0174 Dc = 0.75 m. Ds = 0.73 m.

2. r = 0.12 x fc'/fy = 0.0106 adopt r = 0.0174

Spiral Spacing: SP =4As/rDs = 0.063 m.


Maximum Spiral Spacing, SP = 0.076 m. USE SP = 0.063 m.

C.1.2 Check Requirement from Shear Force :

Vp = 169.00 KN 0.10 fc' = 3,700.00 kPa


bw = 0.90 m. Pmin./Ag = 0.00 kPa
dv = 0.68 m. Av = 402.12 mm2

Shear carried by Concrete :


vc = 166(fc')1/2 = 1009.74 Kpa for Pmin/Ag > 0.10fc'
vc = 0.00 Kpa for Pmin/Ag < 0.10fc'
vc = 0.00 Kpa
vu =Vu/(fbwd) = 278.19 KPa
vs = vu - vc = 278.19 KPa
Minimum vs = 345.00 KPa use vs = 345 KPa
Spiral Spacing :
Sp = Avfy/vsbw = 0.54 m. Adopt Sp = 0.063 m. o.c.

C.2 Transverse Reinforcement Outside Plastic Zone

vs = vu - vc = 345.00 KPa
Spiral Spacing, Sp = 0.54 m.
Max.Spacing, Sp = 0.229 m. Adopt Sp = 0.229 m. o.c.

Finally adopt 16 mm. dia. spiral pitch @ 0.063 m. for the first
1.80 m. from footing underside, rest @ 16 mm. @
0.23 m. o.c.