Bored Pile Construction Log

This document provides details on a bored pile project including the pile reference number, size, ground and cut-off levels, reinforcement details, concreting method used, inspection logs, and approvals from the builder's site representative, site supervisor, and qualified person.

Uploaded by

SS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Title: BORED PILE RECORD

Proj. Ref. No.: Time & Date of Casting:


Pile Ref No.: Pile Size:

BORING DETAILS Ground Level:

Cut-Off Level:

Pay Length:
Penetration:

Toe Level:

Time Boring Started


Time Boring Ended

BORE PILE DETAIL BORE LOG


Steel Casing Depth (m) Soil Description
Size (mm) Diameter:
Length (m):

Reinforcement
No. / Bar Size (mm):
Length (m):
Link Size / Spacing (mm):

Concreting Method: Dry / Tremie #


Concrete Grade (N/mm2):
No. of Cubes Taken:
Test Cube Ref. No:

INSPECTION
Builder's Site Rep.
Site Supervisor 1st 4 8
2nd 4 8
COMMENTS

Prepared by:
Name & Signature of Builder's Site Rep. Date

Confirmed by:
Name & Signature of Site Supervisor Date

Checked & approved by:


Name & Signature of QP Date
# Delete Accordingly
Note: This form serves as a guideline only