Project Title:                                  BORED PILE RECORD
Proj. Ref. No.:                                                    Time & Date of Casting:
Pile Ref No.:                                                                   Pile Size:
BORING DETAILS                                                                  Ground Level:
                                                                                Cut-Off Level:
                                                  Pay Length:
 Penetration:
                                                                              Toe Level:
Time Boring Started
Time Boring Ended
BORE PILE DETAIL                                         BORE LOG
Steel Casing                                             Depth (m)                 Soil Description
Size (mm) Diameter:
Length (m):
Reinforcement
No. / Bar Size (mm):
Length (m):
Link Size / Spacing (mm):
Concreting Method:      Dry / Tremie #
Concrete Grade (N/mm2):
No. of Cubes Taken:
Test Cube Ref. No:
INSPECTION
Builder's Site Rep.
Site Supervisor                     1st 4 8
                                    2nd 4 8
COMMENTS
Prepared by:
                                      Name & Signature of Builder's Site Rep.                         Date
Confirmed by:
                                        Name & Signature of Site Supervisor                           Date
Checked & approved by:
                                              Name & Signature of QP                                  Date
#     Delete Accordingly
Note: This form serves as a guideline only