SUBGRADE LAYER - Section 305: Materials

A subgrade layer is constructed beneath other layers to improve quality and support. It can be made of soil treated with cement, untreated aggregates, blended calcium sulfate, or asphaltic concrete. The same material type must be used throughout the project. Acceptable materials include various aggregates, blended calcium sulfate that meets pH requirements, and soils containing less than 79% sand or 69% silt and a PI less than 25. Cement must be Type I, II or IP from an approved source. Water must meet specification requirements. Equipment depends on the material used and construction method. Quality control and documentation procedures depend on the specification section governing the material and construction method.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views4 pages

SUBGRADE LAYER - Section 305: Materials

A subgrade layer is constructed beneath other layers to improve quality and support. It can be made of soil treated with cement, untreated aggregates, blended calcium sulfate, or asphaltic concrete. The same material type must be used throughout the project. Acceptable materials include various aggregates, blended calcium sulfate that meets pH requirements, and soils containing less than 79% sand or 69% silt and a PI less than 25. Cement must be Type I, II or IP from an approved source. Water must meet specification requirements. Equipment depends on the material used and construction method. Quality control and documentation procedures depend on the specification section governing the material and construction method.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SUBGRADE LAYER - Section 305

A subgrade layer is composed of soil materials treated with Portland cement or Portland-
pozzolan cement, untreated aggregate materials, blended calcium sulfate, or asphaltic
concrete, as specified. A subgrade layer is constructed beneath a Class I Base Course
or other designated layers to improve the quality and increase the support value of the
top layer of material in the embankment.

After the contractor has selected the type of materials for the subgrade layer, the same
type shall be used throughout the project.

MATERIALS

ASPHALTIC CONCRETE
The materials selected and used for asphaltic concrete must conform to Specification
Section 501 or 502. Sampling, testing, approval, and other procedures shall be in
accordance with the Application for Quality Assurance for Asphaltic Concrete Mixtures.

PORTLAND CEMENT CONCRETE


Portland cement concrete is not an approved material for the construction of a
Subgrade Layer under Specification Section 305.

AGGREGATES FOR AGGREGATE SUBGRADE LAYER


Stone, shell, sand-shell, crushed slag, and recycled Portland cement concrete may be
used for subgrade layer without stabilization. These materials must meet all
specification requirements and be tested and approved prior to incorporation in the
project. If the contractor requests advance payment, the materials shall be placed in
dedicated stockpiles. For regulations for dedicated stockpiles, refer to page 10.

BLENDED CALCIUM SULFATE


Blended calcium sulfate may be used as an untreated subgrade layer. Blended calcium
sulfate must be blended with an approved aggregate for pH control and placed in
dedicated stockpiles. All sampling will be accomplished in accordance with Specification
Section 203, non-plastic embankment.
SOILS FOR TREATED SUBGRADE LAYER
To be acceptable for treatment, soils can contain no more than 79% sand or 69% silt.
The district laboratory will determine the percent sand or silt in accordance with DOTD
TR 407 from samples obtained by department personnel. Additionally, to be acceptable
for treatment, materials can have a P. I. no greater than 25. The district laboratory will
determine P.I. in accordance with DOTD TR 428 from samples obtained by department
personnel. When in-place materials do not meet these specifications, they shall be
removed and replaced with specification material under the appropriate bid item. It shall
be the responsibility of the contractor to locate and provide materials which meet the
specifications and which are appropriate for use.

CEMENT
Cement shall be Types 1, 1(B), Type II, or 1P meeting the requirements of Specification
Subsections 1001.01 or 1001.02 and be from an approved source listed in QPL 7.
Cement is to be delivered in bulk transports. It must be protected from dampness, water
or other contaminants. Cement that has partially set or has visible signs of moisture
damage shall not be used.

WATER
Water must meet the requirements of Specification Section 1018.

EQUIPMENT
When central plant mixing is used, all equipment shall meet the requirements for Class I
Base Course (Specification Section 301).

Equipment for asphaltic concrete subgrade layer shall conform to Specification Section
503.

Equipment for in-place treated subgrade layer shall conform to Specification Section
303.

Equipment for aggregate or blended calcium sulphate subgrade layer shall conform to
Specification Section 301.

CONSTRUCTION DETAILS

SUBGRADE LAYER CONSTRUCTED


WITH ASPHALTIC CONCRETE
Subgrade layers built with asphaltic concrete shall be constructed in accordance with
Specification Section 501 or 502. For construction details, refer to the appropriate
Application of Quality Assurance Specifications for Asphaltic Concrete Mixtures.
SUBGRADE LAYER CONSTRUCTED WITH AGGREGATE
Aggregate subgrade layer is to be constructed in accordance with Specification Section
302. For construction details, refer to Class II Base Course.

SUBGRADE LAYER CONSTRUCTED WITH TREATED


SOILS
When central plant mixing is used, Specification Section 301 will apply. Refer to Class I
Base Course.

When in-place mixing is used, Specification Section 303 will apply. Refer to In-place
Cement Stabilized Base Course.

Regardless of the mixing process, the mixture will be treated with 9% cement unless
adjusted by the project engineer and pulverized to meet the specification requirements
when tested in accordance with DOTD TR 431.

SUBGRADE LAYER CONSTRUCTED WITH


BLENDED CALCIUM SULFATE
When blended calcium sulfate is used, refer to Specification Sections 203, non-plastic
embankment, and 302, Class II Base Course.

QUALITY ASSURANCE

QUALITY CONTROL (QC)

Refer to the QC section for the appropriate type of construction listed in the preceding
section entitled Construction Details.

INSPECTION AND ACCEPTANCE


Refer to the Inspection and Acceptance section for the appropriate specification
reference listed in the preceding section entitled Construction Details.

QUALITY ASSURANCE DOCUMENTATION


The contractor shall maintain documentation of the QC program as required by the
engineer.

When a central mix plant is used, the documentation requirements for Class I Base
Course will apply.

For in-place treatment, the documentation requirements for Section 303 will apply.
For aggregate subgrade layer, the documentation requirements for Class II Base Course
will apply.

For asphaltic concrete subgrade layer, the documentation requirements for Part V of the
specifications will apply.

For blended calcium sulfate subgrade layer, the documentation requirements for non-
plastic embankment, Specification Section 203 and Class II Base Course, Specification
Section 302 will apply.