0% found this document useful (0 votes)
47 views2 pages

Govt. of India

The document discusses comments on an agency's work progress for a road repair project in Delhi. [1] It lists 9 letters sent by assistant and executive engineers between February and May 2018 requesting the agency to start and expedite work, citing no hindrances from the department. [2] It also lists 7 letters sent between October 2018 and February 2019 again requesting work to start without delay, noting slow progress, and directing the agency to complete the project immediately. The letter is sent to notify the recipient and require necessary action.

Uploaded by

JUNIOR ENGINEER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views2 pages

Govt. of India

The document discusses comments on an agency's work progress for a road repair project in Delhi. [1] It lists 9 letters sent by assistant and executive engineers between February and May 2018 requesting the agency to start and expedite work, citing no hindrances from the department. [2] It also lists 7 letters sent between October 2018 and February 2019 again requesting work to start without delay, noting slow progress, and directing the agency to complete the project immediately. The letter is sent to notify the recipient and require necessary action.

Uploaded by

JUNIOR ENGINEER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Hkkjr ljdkj Office of the Assistant Engine

dk;kZy; Lkgk;d vfHk;URkk-3 Govt. of India Construction Division-6, CP


fuekZ.k eaMy-6]dsUnzh; yksd fuekZ.k foHkkx] Outer Ring Road, LNJN-NICFS, Sector-3, Rohini, New Delhi-11
vkmVj fjax jksM, LNJN - NICFS , LkSDVj-3,
jksfg.kh, ubZ fnYyh & 110085
No. 23( 05 )/ Lk0v0-3/ fu0e0-6/2020-21/ fnukad % 15.10.2020
Lskok es] दिनांक:30.06.2020
dk;Zikyd vfHk;URkk]
fuekZ.k eaMy-6]
ds0yks0fu0fo0] vkbZ0 ih0 Hkou]
ubZ fnYyh&110002
विषय : Special Repair of Premix Carpeting, Maintaining of Camber & fixing interlocking paver block and
laying of NP2 pipes at LNJN-NICFS at Sector-3, Rohini, Delhi.
Regarding E.O.T.
Agency : Mohd. Arshad
Agreement No. : 16/EE/CDVI/2017-18

lanHkZ % vkids dk;kZy; dk i=kad


20¼172½Mh0ch0@fu0ea0&6@2020&21@1616 fnukad 15@10@2020

egksn;]
mijksDr fo’k; ds laca/k es ekWaxs x, comments fuEu izdkj ls gS %

1- Bsdsnkj ds i= la[;k “kwU; fnukad 23-09-2020 ds dze la[;k&1 ij of.kZr comments ds


laca/k es voxr djk;k tkrk gS fd ml le; dk;Zjr lgk;d vfHk;ark us fnukad 16-01-2018 ls
20-02-2018 rd dh vM+pu dks justified fd;k x;k gS mieaMy dk;kZy; ds fjdkMZ ds
vuqlkj lgk;d vfHk;ark o dk;Zikyd vfHk;ark }kjk Bsdsnkj dks fy[ks x,s i=ksa dk fooj.k
bl izdkj gS %

A. Assistant Engineer has requested to Agency to start the work immediately on dated
26.02.2018. As there is no hindrances at site (Letter copy enclosed)
B. Assistant Engineer again requested to Agency to start the work immediately on
27.02.2018 (Letter copy enclosed)
C. In reference to above letters Executive Engineer has directed to Agency that do work as
per CPWD and complete the work as soon as earliest. (Letter copy enclosed)
D. Assistant Engineer has requested to Agency on dated 03-03-2018 to bring the material as
per agreement conditions and CPWD specification and speed up the work immediately
(Letter copy enclosed)
E. In reference to Assistant Engineer letter dated 3.3.2018 Executive Engineer directed to
Agency to do the work as per CPWD specification and complete the work timely (Letter
copy enclosed)
F. Executive Engineer again directed to Agency on dated 5/3/2018 to bring the material as
per approved list of material of NIT and complete the work immediately. (Letter copy
enclosed)
G. Executive Engineer intimated to Agency on dated 20.04.2018 that progress of work is
very slow and speed up and complete the work immediately. (Letter copy enclosed)
H. Assistant Engineer has again requested to Agency on dated 27-04-2018 to immediately
deployed labour to remove the defects pointed out to you (Letter copy enclosed)
I. Executive Engineer again directed to Agency on dated 16.05.2018 to complete the work
immediately as client department has been facing much problems. (Letter copy enclosed)
Bsdsnkj ds i= la[;k “kwU; fnukad 23-09-2020 ds dze la[;k&2 ij of.kZr comments ds
laca/k es voxr djk;k tkrk gS fd

A. Assistant Engineer has requested to Agency on dated 03-10-2018 to work of relaying


of Bituminous road should be started immediately without any delay. (Letter copy
enclosed).
B. Executive Engineer has directed to Agency on dated 10.10.2018 to complete the work
immediately as there is no hindrance from the department at site. (Letter copy
enclosed)
C. Assistant Engineer has requested to Agency on dated 10-10-2018 to start the work of
relaying of Bituminous road immediately without any delay. (Letter copy enclosed).
D. Assistant Engineer has again requested to Agency on dated 15-10-2018 to start the
work of relaying of Bituminous road immediately without any delay but the
contractor has not found any interest to start the work (Letter copy enclosed).
E. Assistant Engineer has justified the hindrance from 25/12/2018 to 04-01-2019 due to
DPCC order work is stopped.
F. Executive Engineer has directed to Agency on dated 23.02.2019 to start the work
immediately as client department facing many problems
G. Assistant Engineer has again requested to Agency on dated 28-02-2019 that the
progress of work is very unsatisfactory, so complete the work immediately.(Letter
copy enclosed).

;g i= vkidks lwpukFkZ ,oa vko”;d dk;Zokgh gsrq izsf’kr gS A

Lkgk;d vfHk;URkk-3
fuekZ.k eaMy-6]
dsUnzh; yksd fuekZ.k foHkkx]
ubZ fnYyh&110085