Rate Analysis of PCC
(Plain Cement Concrete)
This is used at below any foundation to make a clean and level surface
for easy to work, away from sand, dust, mud, etc. This is the temporary
structure created to ease your work. PCC is not a Structural Member which
can bear any load or pressure. But this plays a very important role when
foundation work is going on. PCC will help to keep it as per measurement
and as per design.
Sometimes the natural ground has too much uneven surface, in those
situations, there is doing Plum concrete. That means 60% of Natural Hard
Stone and 40% of Plain Cement concrete will fill with doing some shuttering
work to control Size. This will help to create a plain Surface to ease the
work.
General Use of Plain Cement Concrete (PCC)
1. Below Footing
2. Below Raft
3. Below Concrete Road
4. Below Grade Slab
5. Below Box type Waterproofing
6. At Labour Camp
7. Work Station of Labour Like Steelyard, Cutting yard, etc.
8. In Godown or Store Room.
9. In Site office.
10. In Plum Concrete at uneven Surface.
In above location, PCC can be done at Normally to work easily.
but What about Plum Concrete Work. Plum Concrete is used at Uneven
surfaces to Fill it by Plum Concrete of 60% of Rubble and 40% of Plain
Cement Concrete.
sometimes plum concrete can be used at Low bearing capacity soil, but
This should be used for small structure not for Building, tower or any big
structure because Plum concrete is also not a structural member who can
bear load and pressure.
Here we have given some example of Rate analysis of Plum Concrete and
Plain Cement concrete (PCC).
Sensitivity: LNT Construction Internal Use
Rate Considered: (All Rate is Basic Rate Taxes and Transportation to
consider extra)
Cement: Rs. 265.00/Bag
Crush Sand: Rs. 1095.00/cum i.e. Rs. 3100/Brass
Course Aggregate 10mm: Rs. 953.00/cum i.e. Rs. 2700/Brass
Course Aggregate 20mm: Rs. 953.00/cum i.e. Rs. 2700/Brass
Fly Ash: Rs. 2.00/Kg
Admixture: Rs. 48/Liter up to M25 or Rs. 66/Liter above M30
Labour: Rs. 805/Cum
Extra Overheads: Rs.950/Cum (This cost considered Including
Transportation, Shifting, Water Electricity, Housekeeping, PF/ESIC.Etc.)
In General Condition Lot of builders and Subcontractors are sublating this
work on Sqft basis or Per Bag basis to Subcontractor or Concrete gang
Who can do it on PCC Rs. 6.00/ Sqft and Plum Concrete in 8.50 to 9.00
Rs. Per Cuft that is 300 Per Cum
PLUM CONCRETE (60:40)Ratio
Quantity : 1.00 Cum
Material Labour
Material Un Const Rate Amoun Total Labou Un Quan Rate Amoun Total
it ant t Amo r it tity t Amount
unt
Cement Ba 1.15 2 1311. Labour Cu 1.00 450.
gs 65 305.70 50 work m 00 450.00 981.60
for
RCC
Crush Cu 0.20 1,0 Materia 0.5% 6.56
Sand m 95 216.68 l
handlin
g
charge
s
Course Cu 0.10 9 Overhe Cu 1.00 525. 525.00
Aggregate m 53 99.08 ads m 00
10- 12 mm
Course Cu 0.25 9
Aggregat m 53 236.12
e 20 -25
mm
Fly ash Kg 33.60
2 50.40
Rubble Cu 0.60 403.54
m 673
Sensitivity: LNT Construction Internal Use
TOTAL RATE: Rs. 2293.10/Cum Say Rs.2294.00/Cum
(Shuttering Cost is Extra)
Rate And Material Analysis of PCC: Plain Cement
Concrete
PCC 05 (1:4:8)
Quantity: 1.00 Cum
Material Labour
Materi Un Const Rate Amount Total Labour Un Quan Rate Amoun Total
al it ant Amo it tity t Amount
unt
Cemen Ba 2.06 545 2208. Labour Cu 1.00 805.0 80 1,7
t gs 265 .90 51 work for m 847 5.08 66.1
RCC
Crush Cu 0.67 1, 729 Material 0.5% 1
Sand m 095 .82 handlin 1.04
g
charges
Course Cu 0.31 297 Overhe Cu 1.00 950.0 950.00
Aggreg m 953 .74 ads m 0
ate 10-
12 mm
Aggreg Cu 0.47 451
ate 20 m 953 .44
-25
mm
Fly ash Kg 84.00 126
2 .00
Admixt Kg 1.20 57
ure up 48 .60
to M30
TOTAL RATE: Rs. 3974.60/Cum Say Rs. 3975.00/Cum
(Shuttering Cost is Extra)
PCC M10 (1:3:6)
Quantity: 1.00 Cum
Material Labour
Materia Uni Consta Rate Amount Total Labour Uni Quanti Rate Amount Total
l t nt Amou t ty Amoun
nt
Cement Ba 2.88 2 764. 2327. Labour Cu 1.00 805.08 805. 1,
gs 65 26 54 work for m 47 08 6.7
RCC
Crush Cu 0.49 1,0 541. Material 0.5% 11.
Sand m 95 70 handling 64
charges
Course Cu 0.26 9 247. Overhea Cu 1.00 950.00 950.00
Aggreg m 53 69 ds m
ate 10-
12 mm
Sensitivity: LNT Construction Internal Use
Course Cu 0.62 9 590.
Aggreg m 53 29
ate 20
-25 mm
Fly ash Kg 84.00 126.
2 00
Admixtu Kg 1.20 57.
re up to 48 60
M30
TOTAL RATE: 4094.30 Say Rs. 4095.00/Cum
(Shuttering Cost is Extra)
PCC M15 (1:2:4)
Quantity : 1.00Cum
Material Labour
Material Uni Consta Rate Amount Total Labour Uni Quanti Rate Amount Total
t nt Amou t ty Amoun
nt
Cement Bag 4.94 2 1,310. 2967.2 Labour Cu 1.00 805.08 805. 1
s 65 16 4 work for m 47 08 9.9
RCC
Crush Cu 0.58 1,0 631. Material 0.5% 14.
Sand m 95 73 handling 84
charges
Course Cu 0.34 9 325. Overhea Cu 1.00 950.00 950.00
Aggrega m 53 98 ds m
te 10-
12 mm
Course Cu 0.56 9 531.
Aggrega m 53 52
te 20
-25 mm
Fly ash Kg 73.50 110.
2 25
Admixtu Kg 1.20 57.
re up to 48 60
M30
TOTAL RATE: 4737.20 Say Rs. 4740.00/Cum
(Shuttering Cost is Extra)
In above analysis, We have Considered the Material Density as
Follows.
1. Cruah Sand : 1600 Kg/Cum
2. 10mm Metal : 1560Kg/Cum
3. 20mm Metal: 1550kg/Cum
All the Details are given in mix design report which is prepared for your site
and the mix design depends on quarry material. Material Density can be
changed as per Quarry location and Material quality, as well as Cement
content, can be changed as per quarry Material quality.
Sensitivity: LNT Construction Internal Use
Generally A lot of Builders, contractors are using thumb rule when doing
PCC work.
General The market rate of PCC work.
PCC with Material: Rs. 3500-4000/Cum
PCC only Labour: Rs.400/Cum
100 to 150mm thick PCC only Labour: Rs.6.00/Sqft
Plum Concrete Only Labour: Rs.8.50-9.00/Cuft That is 300/Cum
Cement Bag: Rs.50- 60/Bag.
Shuttering With Material: Rs.450-550/ Sqm
Sensitivity: LNT Construction Internal Use