No.
2J730-020E
INSTALLATION QUALITY CHECK SHEET
FOR
DIAGNOSTIC ULTRASOUND SYSTEM
MODELS SSA-320A/325A
(2J730-020E)
TOSHIBA CORPORATION 1998
ALL RIGHTS RESERVED
No. 2J730-020E
IMPORTANT!
1. No part of this manual may be copied or reprinted, in whole or in part,
without written permission.
2. The contents of this manual are subject to change without prior notice
and without our legal obligation.
C-1 *
No. 2J730-020E
REVISION RECORD
REV. DATE REASON PAGE SER. DOC.
(MM/YY) No. PRODUCT.
/AUTHOR CHANGED
INI. 09/'98 Mr. Uchida ------- TM-WW
R-1 *
No. 2J730-020E
Installation Quality Check Sheet
Model name : SSA-320A/325A Serial No. :
Customer name :
Subsidiary : (TAMS, TMSE, TAP, TCL, TMB)
* Indicate the responsible subsidiary
Distributor name :
Installation completion date (DD, MM, YY) :
Installation result : Pass/Fail
[Comments on the installation quality check]
- 1 -
No. 2J730-020E
* Column "Result": Check (OK) or fill in with measurements.
If some work has been done, indicate the type of work using the
corresponding number shown below.
1. Replaced, 2. Repaired, 3. Adjusted, 4. Tightened,
5. Cleaned, 6. Lubricated, 7. Other work done
Result
No. Item (Method) Standards [Work] Check method
1 Check the No missing parts, wrong [ ] [ ] Packing list
configuration. parts, or damaged parts
2 Check the external No scratches or damage [ ] [ ]
appearance. to the exterior
3 Check the installation Installati
conditions. on manual
[ ] [ ] (2C730-
1) Line voltage (±10%) Single-phase AC voltage
348E)
is constantly output
while the power supply
-------
is turned ON.
---------------------- [ ] [ ]
--- ------------------------
---
2) Check grounding.
It must be protectively
grounded.
4 Check the functions.
Check the panel operation.
1) Image display function
The image must be displayed [ ] [ ]
correctly.
-------------------------
--------------------------- -------
2) Position expand
function The image must be moved [ ] [ ]
normally.
-------------------------
--------------------------- -------
3) Measurement function [ ] [ ]
The distance must be
------------------------- measured correctly.
-------
---------------------------
4) Body-mark display [ ] [ ]
function The body mark must be
------------------------- displayed correctly. -------
---------------------------
5) Keyboard entry [ ] [ ]
function Characters must be
entered from the
keyboard correctly.
- 2 -
No. 2J730-020E
* Column "Result": Check (OK) or fill in with measurements. If some work has been
done, indicate the type of work using the corresponding number
shown below.
1. Replaced, 2. Repaired, 3. Adjusted, 4. Tightened,
5. Cleaned, 6. Lubricated, 7. Other work done
Result
No. Item (Method) Standards [Work] Check method
6) Initial setting The system must be set [ ] [ ]
function to the initial status.
(Press .)
-------
------------------------- --------------------------- [ ] [ ]
7) Print function The displayed image must
be printed out on the
printer.
5 Performance check
Check the displayed image.
1) Move a screwdriver while
it is in contact with A normal and complete [ ] [ ]
the ultrasound ultrasound image should be
transmitting surface of displayed.
the transducer and check
the reflected image. If
the image is not clear,
check performance using
the resolution phantom
(BF23-0377) or
sensitivity check
phantom (BF23-0387).
-------------------------
2) Check the noise in --------------------------- -------
operating status.
No noise in a specific [ ] [ ]
pattern
Transporting the system in the hospital
Instruct the user to avoid moving the system over a [ ]
slope, a large height difference, or a carpet with
extremely long fibers.
- 3 -
No. 2J730-020E
Peripheral devices
1) Record the types, models, and serial numbers of
peripheral devices that have been connected.
2) Attach actual data recorded after using the
peripheral devices that have been connected.
Individual setting conditions
Define individual sets of print data according to
the user's preferences, and record and attach these
settings.
- 4 -
No. 2J730-020E
Verifying Explanations Regarding Safe Operation
Model Name SSA-320A/325A Serial No.
One of the responsibilities of the person in charge of product installation at your
site is to verify that explanations are made regarding the safety and operating
precautions and check items. Please also verify that an explanation regarding the
following contents is presented.
Date of Person who Person who
explanation Contents provided received
(DD, MM, YY) explanation explanation
The following sections of the operation
manual
1. Safety precautions
---------- ----------
2. Important information
---------- ----------
3. Necessity of maintenance check, and
concrete explanation of check methods
o Check before and after use ----------- ----------
( Page)
o Periodic check ( Page) ----------- ----------
----------- ----------
Confirmation signature
(Administrator in hospital)
- 5 - E