Improvement to Phaltan,Pusegon, Aundh, Gopij, Nimsod , Mhasurne, Road SH - 147 KM 0+000 to
PN-40         89+000 Dist Satara (Part-2 Pusegon To Mhasurne KM 47+000 to 92+670 ) Under Maharashtra Road
                       Improvement Programme-MRIP Under Hybrid Annuity Mode
Client                                        Maharashtra P W D
Independent Engineer                          Unison Consultant- Pune
E P C Contractor                              Raj Path Infracon Pvt. Ltd.
                                                FIELD DENSITY OF DBM/BC WORKS
                                                 (Core cutting Method ASTM :D -1599)
RFI No.                :                                                        Date of Laying :
                                                                                Date of
Chainage               :                                                                       :
                                                                                Sampling
Descreption of Layer :                                                          Date Testing   :
                                                                                Width of the
Thickness of Layer     :                                                                       :
                                                                                Layer
GMM                    :
     Core No.                    (a)                 1                  2   3          4             5             6
                           Chainage km (b)
         Location
                           Offset from kerb
                             Edge,m ( c )
  Thikness (mm)                  (d)
  Wt in Air (gm)                 (e)
    Wt in Water                  (f)
   SSD Wt (gm)                   (g)
 Field Bulk Density           h=e/(g-f)
 % of Compaction
                           I = (h/A) x 100
     achieved
 % of Compaction
                                                                                Avg. Compaction % :
    Required
Remark:
EPC Contractor Representative                                                          Authority Engineer Representative