0% found this document useful (0 votes)
106 views14 pages

Working Methodology-Cement Concrete Pavement: Punj Lloyd Limited

The document describes the working methodology for cement concrete pavement construction for the Belgaum-Maharashtra Border Road Project. It involves constructing unreinforced, dowel jointed plain cement concrete pavement according to specifications. It discusses the scope of work, materials used like cement, aggregates, water, and other materials like separation membrane and pre-molded filler boards. The cement is proposed to be procured from reputed manufacturers and proper storage methods are outlined. The aggregates and design mix are also described in detail.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views14 pages

Working Methodology-Cement Concrete Pavement: Punj Lloyd Limited

The document describes the working methodology for cement concrete pavement construction for the Belgaum-Maharashtra Border Road Project. It involves constructing unreinforced, dowel jointed plain cement concrete pavement according to specifications. It discusses the scope of work, materials used like cement, aggregates, water, and other materials like separation membrane and pre-molded filler boards. The cement is proposed to be procured from reputed manufacturers and proper storage methods are outlined. The aggregates and design mix are also described in detail.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 14

PUNJ LLOYD LIMITED

Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

A. Sc ope :

A1. T h e w o r k s ha l l c o ns is t o f co n s t r uc t i o n o f u n r e i n f o r c e d, d o w e l
j oi n t e d , p l ai n ce m e n t c on c r e t e p a v e me n t in ac co r d a n c e w i t h t h e
r e q u i r e m e n ts o f t h e t ec h n ic a l s p ec i fi c a ti o ns a n d i n co n f o r m i ty
w i t h t he l in e s , g r a d es a n d c r os s s ec t i o ns s ho w n o n t h e d r a w i ng s .

A2. Th e w o rk sh al l b e e xe cu te d in a cco rda n ce w i th fo ll o wi n g


C od e s / Sp e ci fi ca ti o n :

A 2 .1 Te ch n i ca l Spe ci fi ca tio n s fo r Ro a d an d Bri d g e wo rks pu b li sh e d


b y In d i an Ro a d Co n g re ss (III R e vi si o n ).

A 2 .2 Gu i d el i ne s fo r u se o f D LC a s Sub -Ba se fo r Ri gi d Pa ve men t


(IR C -SP-49 -1 9 98 ).

A 2 .3 Sta n d a rd Sp e ci fi ca ti o n a n d Co de o f Pra cti ce fo r C o n stru ctio n


o f Co n cre te R oa d s (IR C :IS- 20 0 2 ).

A 2 .4 C od e o f Pra cti ce fo r C u ri n g o f Ce men t Co n cre te Pa ve men t


(IR C :8 4 -19 8 3 ).

B. Ma te r ia ls :

B1. B as ic Ma te r ia ls :

B 1 .1 C em e nt : It is pro p o se d to u se Ordi n a ry Po rtl a nd Ce me n t o f


4 3 Gra d e a s p e r IS: 26 9 . Ce me n t sh a ll be p ro cu re d fro m
re p u ted ma nu fa ctu re s i n ce me n t ba g s o f 50 kg ea ch . Th e
C e me n t sha l l i ni ti a ll y be sto re d i n co ve re d ce me n t Go d o wn
a n d th e n tra n sfe rre d to ce me n t si lo s th ro u gh C e me n t B a g
Sp li tti n g Un i t o r ma n ua l fe e d in g i n Si lo s.

B 1 .2 OPC 4 3 Gra d e C e me n t sha l l no rma l l y be pro cu red fro m a n y o f


th e fo ll o wi n g Ma n u fa ctu re rs:
a) AC C b) C o ro ma n da l

B 1 .3 To e n su re re gu l a r un in te rru p te d su p p l y o f ce me n t, w e h a ve
e n te red in to Me mo ra nd u m of Un d e rsta nd i ng wi th the se
ma n u fa ctu re rs fo r co n tin u o u s a nd re g u la r su p p l y o f ce me n t.
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

B 1 .4 A ggr e ga te s : Agg re g a te s to b e use d fo r PQC sh a ll b e na tu ra l


ma te ri al co mp l yi n g w i th IS: 38 3 an d sh al l n o t b e a l ka l i re a cti ve .

Page 1

B 1 .5 C oa rs e A ggr e ga tes : C oa rse a gg re g a te sh a ll co n si st of


C ru sh e d sto ne . Ston e ag g re ga te s sh a ll b e p ro du ce d a t PL L ’ s
i n te g ra te d Sto n e C ru shi n g a nd Scre e n in g Pl a n ts e sta bl i sh ed
o n th e p roj e ct. Th e cru sh ed ag g reg a te sh a ll be ch e cke d fo r
p h ysi ca l p rop e rti e s su ch a s Ag g re g a te Imp a ct Val u e , Wa te r
a b so rp ti o n e tc., b e fo re a cce p ti n g fo r i n co rp o ra ti on in w o rks.
Th e ma xi mu m si ze o f co a rse ag g reg a te sh a ll be 25 mm.

B 1 .6 Fine A ggr e ga te : Th e fi n e a g g re g a te sh al l co n si st o f cl e a n ,
n a tu ral sa nd o r cru sh e d ston e sa nd o r a co mbi n a ti on o f tw o
a n d sh a ll co n fo rm to IS: 38 3 . Fi n e ag g reg a te sh al l be fre e
fro m so ft p a rti cle s, cl a y, sh al e , l oa m, ce me n te d p a rti cle s,
mi ca , o rg a n i c a n d o th e r fo rei g n ma tte r. It is p rop o se d to u se
cru sh ed sa n d p rod u ce d a t i n te g ra te d ston e cru sh in g an d
scre e ni n g p la n t se tu p on p ro je ct.

B 1 .7 D e si g n Mi x h a s be e n co n du cte d w i th b o th Cru sh ed S a nd
a lo n e an d al so C ru sh e d Sa n d b l en d e d w i th na tu ra l sa n d as
fi n e ag g reg a te . Th i s ha s b ee n do n e to co n ti n ue w i th wo rk in
ca se o f sh o rta g e o f sto n e d u st fro m sto ne cru sh e r i n sta ll e d a t
si te .

B1.8 A d m i x t u r e s : A d mi x t u r es c o n fo r m i n g t o IS : 69 2 5 a n d IS : 9 1 0 3
w i ll be us e d t o im p r o v e w o r k a bi l it y o f th e co n c r e t e o r ex t e ns i o n
o f s et t i n g ti m e , o n s a ti s f ac t o r y ev i d e nc e t h a t t h e y wi ll n o t h av e
a n y a dv e r s e e f f e c t o n t h e p r o p e r t i e s o f c o nc r e t e wi t h r es p e c t t o
s t r e n g t h , v ol u m e c ha n g e , d u r a b il i ty a n d h av e n o de l e t e r i o us
e f f ec t o n s te e l b a rs . S a ti s f ac t o r y p e r f o r m a nc e o f t h e ad m ix t u r e
s h al l b e p r o v e d b o t h o n t h e la b o r a t o r y c on c r e t e t r i al m ix es a n d
i n t r ia l p av i n g w o rk .

B1.9 W a t e r : Wa t e r us e d fo r m ix i ng a n d c u ri n g of co n c r e t e s h al l b e
c le a n and free from in j u r io u s a mo u n t s of o il s , sa l t , ac id ,
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

v e g et a b l e ma t t e r o r ot h e r su bs t a n c es h a r m f ul t o t h e fi n is h e d
c o nc r e t e . It is p r o p o s e d t o u s e u n d e r g r o u n d w a t e r a n d t h r o u g h
d e e p b o r e w el l s. T h e w a t e r s h al l b e te s t e d to c h ec k it s su it a b il i ty
f o r us e in co nc r e t e w o r k b e f o r e a c t u al st a r t of w o r k . Large
u n d e r g r o u n d w a te r s t o r a g e t a nk s h a ve b e e n co n s t r uc t e d at
l oc a t i o ns o f al l B a tc h i n g Pl a n ts w it h st o r a g e ca p ac i ty su f f ic i e nt
t o p r o d u ce S i ng l e d ay ’s c o nc r e t e r e q u i r e m e n ts .

Page 2

B2. Othe r Ma te r ia ls :

B 2 .1 Se pa r a tion Mem br a ne : Imp e rme ab l e Pl a sti c She e t o f12 5


Mi cron th i ckn e ss sh a ll be l ai d on D LC su rfa ce a fte r cl ea n i ng
o f DL C su rfa ce . Pol yth e n e sh ee ts o f a b ou t 5 m w id th sh a l l
b e u sed in tw o la ne s wi th ove rla p o f 30 0 mm. The Se p a ra tio n
Me mb ran e sha l l be na i le d to DL C la ye r wi th co n cre te n ai l a t
su i ta bl e i n te rval so as to e n su re th a t i t re mai n s in p o si ti o n
d u ri n g p a vi n g .

B2.2 Pre-moulded Filler Board: 2 0 m m t hi ck co m p r e ss i bl e Fi l l e r


B o a r d s a r e to b e u se d a t t h e lo c at i o n o f ex p a ns i o n jo i nt s . We
propose to use sy nt h e t ic c om p r e s si b l e Fi l le r Bo a r d of
“ S U P R E ME ” ma k e . T h e s e a r e n o n - d e g r a d a bl e a n d h av e lo n g
l if e . T h e s e sh a ll b e t es t e d fo r c om p r e s si o n a s p e r IS - 1 8 38 .
T h e h e i g ht o f t h es e b o a r d s sh a ll b e 2 5m m l es s th a n t h ic k ne ss
o f sl ab w it h i n a to l e r a n c e + 3 m m . H o l es t o h ou s e d o w e l b a r s
s h al l b e a cc u r a t e ly b a r e d o r p u n c h ed o u t t o gi v e a s li d i ng f i t o n
the bars.

B2.3 M i l d s t e e l b a r s f o r d o we l s a n d t i e b a r s : T h e s e sh a ll c on f o r m
t o t h e r e q ui r e m e n t s of I S : 4 3 2, I S : 1 1 39 a n d I S : 1 7 8 6 a s
r e l e va n t . T h e d o w e l b a r s s ha l l c o n f o r m t o Gr a d e S 4 1 5 .

B 2 .3 .1 D owe l Ba r : 3 2 mm Di a MS Do we l Ba rs o f 5 0 0 mm l e ng th a re
to be use d a t eve ry co n tra cti on jo i n t sp a ced a t 4 .5 m a nd a t
Exp a n si o n Joi n t. The Do w el Ba rs sh a ll be cu t smo o th wi th
Po we r Sa w / Be n d Saw i nsta l l ed a t th e Ce n tra l Re in fo rce me n t
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

Ya rd . Th e se sh al l b e cu t fro m fu ll le n g th MS R od s in
a d van ce a n d sto cke d in Re in fo rce me n t Ya rd .

B2.3.2 Tie Rods: T i e Ba r s o f 1 2m m / 8 m m di a H YS D S t e el a r e t o b e


p r o v id e d a t lo n g i t u di n a l j oi n ts a t d i ff e r e n t sp a ci n g s a s sp e ci f i e d
i n a p p r o v e d d r a w i n gs . T h e s e s h al l b e cu t t o th e r e q ui r e d le n g t h
o f 64 0 m m / 4 80 m m an d st a ck e d i n R e i n f o rc e m e n t Y a r d . M i d dl e
1 5 0 m m le n g t h o f D o w e l B a r sh a ll b e p ai n t e d w i th b i t u mi n o us
p a i n t f o r p r o t ec t io n f r o m c o r r o si o n . T h e bi t u m i no u s p ai n t sh a ll
b e d o n e w el l in a dv a n c e so t h a t th e p a i nt g e t s d ri e d b e f o r e us e
i n t he w o r k s .

B2.4 P V C S l e ev e s f o r C o n t r a c t i o n J o i n t : PV C S l e ev es o f m in i m u m
3 3 4 m m le n g t h a r e r e q ui r e d to b e p r o vi d e d o n D o w el B a r . T h es e
s h al l b e p r o c u r e d f r o m e st a b li s h e d v en d o r s a n d st oc k e d i n
C e n t r a l St o r e in a dv a n c e.

Page 3

B2.4.1 P u l l o u t T e s t : T h e Pu l l o u t T e s t a s sp e ci f i e d u n d e r Cl a u se N o .
6 0 2 . 6 . 5 of M O S T S p ec i f ic a ti o n s sh a ll b e d o n e t o c h ec k t h e
a v e r a g e b o n d s t r es s b e t w e e n P V C S le e v es an d D o w el Ba rs.
Th e te st h a s b ee n co n du cte d in th e Fi e l d La b o ra to ry a nd i t
h a s b ee n fo u n d th a t the bo n d stre ss be tw e en PVC Sl e e ve
a n d Do w el Ba r fo r a mo ve men t o f 0 .2 5 mm i s l e ss th a n
0 .1 4 Mpa as spe ci fi ed in Te ch n i cal Sp e ci fi ca ti o n s.

B2.5 PVC S l e ev e s for Expansion Joint: PVC Sl e e ve s for


E xp a n si o n J oi n t sh a ll b e 3 0 0 mm . F o r Ex p a ns i on J oi n t a cl os e ly
f i t ti n g ca p o f 1 0 0 mm l o n g PV C sh a ll b e p la c e d ov e r s h e at h e d
e n d o f D o w el Ba r . T h e e x p an s io n sp a c e o f 2 0 m m s ha l l b e
f o r m e d b e t w e e n en d o f ca p a n d a t th e e n d o f D o w el B a r b y
u si n g co m p r es s ib l e s p o n ge . T o b l oc k t h e e n t r y o f c e m e nt
s lu r r y b e t w e e n D o w el B a r a n d ca p , i t s h al l b e ta p e d .

B2.6 B a c k - u p R o d : S yn t h e t ic Ba ck - u p R o d o f 6 m m / 8m m Di a sh a ll
b e u se d i n C o nt r a c t i o n / E xp a n si o n / L o n gi t u di n a l Jo i n ts .

B2.7 De-bonding Strip: D e b o n di n g s t ri p s o f fo l lo w i n g si ze s a r e t o


b e u se d f o r v a r i ou s ty p e s of j oi n t s :
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

B2.7.1 C o n t r a c t i o n J o i n t – C o mp r e s si b l e de b o n d i n g s t r i p wi t h p a p e r
h o o k o f s iz e 10 m m x 5 m m .

B2.7.2 E x p a n s i o n J o i n t – C o mp r e s si b l e d e b o n di n g s t r i p w i t h p a p e r
b a ck o f si ze 2 0 m m x 1 – 2 mm s iz e

B2.7.3 L o n g i t u d i n a l J o i n t – C o m p r e ss i bl e d e b o n di n g st r i p w i t h pa p e r
b a ck o f si ze 8 m m x 1 – 2 m m.

B2.8 S e a l a n t : T h e j oi n t s ea l i ng c o m po u n d s ha l l be C o l d Po ly s ul p h i d e
t y p e c o n f o r mi n g t o BS : 5 2 1 2 h av i ng f l ex i bi l it y , r e si s ta n c e t o a g e
hardening an d d u r a b il i ty . P ol ys u l p hi d e S e al a n t sh a ll be
p r o c u r e d f r o m r e p u t e d ma n u f a ct u r e r s a n d s to r e d i n C e n t r a l
S t o r e s. T h i s is g e n e r a l ly a v ai l a bl e in 2 p a r t s a n d s ha l l b e
m ix e d b e f o r e a p pl ic a t i on .

C. Stor a ge of m a te r ia ls :

C1. F i n e a n d C oa r s e Ag g r e g a t e s sh a ll b e s to r e d a t p l a n t a r e a i n
S t ac k ya r d s se p a r a t e ly i d en t i fi e d for different si ze s of
a g g r e g a t es in su c h a manner so as to p r ev e n t their
d e t e r i o r a t io n and co n t a m in a t i o n by f o r e i gn m a tt e r and to
e n s u r e t he i r s a ti s f ac t o r y qu a l it y a n d fi t n es s f o r us e i n t h e
work. The st a ck y a r ds for these m a t e r i al s sh a ll have
a cc e ss i bi li t y f o r wi t h d r a w a l a n d in s pe c ti o n .

Page 4
C2. Ma te ri al s su ch a s PVC Sl e e ve s, de b on d in g stri p , sea l a n t e tc.
sh al l b e p ro cu re d i n b ul k an d sto re d i n Ce n tra l Sto re so a s to
p re ven t th e m fro m an y d a mag e d u e to h a rsh w ea th e r e tc.

D. Mix De s ign a nd Qua lity C ontr ol:

D1. M 4 0 G r a d e o f C on c r e t e i s sp e ci f i e d t o b e us e d f o r R ig i d
P av e m e n t o n th e P r o j ec t . T h e t r ia l mi x es s h al l be c o n d uc t e d
i n t he F i e l d La b o r a t o r y t o es t a b li s h D e s ig n M ix f o r M 4 0 Gr a d e
o f C o nc r e t e f o r th is w o r k . T h e im p o r t a n t p a r a m e t e r s th a t s ha l l
g u i d e t h e d es i g n mi x a r e :

i) C o n si s t e nc y o f M ix
ii) L o w S lu m p o f 3 0m m
i ii ) F l e xu r a l S t r e n g t h
iv) C o m p r e ss iv e S t r e n g t h
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

D1.1 W hi l e it i s p r o p o s e d t o u s e C r u s h e d sa n d a s F i n e A g g r e g a te ,
D e si g n M ix sh a ll a ls o b e co n d u c te d w i t h C r u sh e d S a n d bl e n d e d
w i t h R iv e r S a nd t o e ns u r e c on t i n ui t y o f w o r k in ca se o f
shortage of Crushed Sand. T h e p r o p o s e d D e si g n M ix sh a ll b e
s u bm i t t e d to C o n s ul t a n t f o r a p p r ov a l b e f o r e us e in w o r k s .

D2. Quality Control - T h e Qu a l i ty C o n t r o l of P QC P av e m e n t i s


v e r y c ri t ic a l a n d i m p o r t a n t f o r t he lo n g la s ti n g R i g id Pa v e m e nt .
T h e Q u a li t y C o n t r o l s ha l l b e e x e rc i se d as pe r C l a us e N o.
9 0 3 . 5 . 2 of M O S T S p ec i f ic a ti o n s .

D2.1 S a m p l i n g & T e s t i n g o f B e a m a n d C u b e s p e c i m e n : A tl e a s t t w o
b e a ms a n d t w o cu b e sp e ci m e n s, o n e e ac h f o r 7 a n d 2 8 da y
s t r e n g t h te s ti n g s ha l l be c as t f o r e ve r y 1 5 0 m 3 o f c o nc r e t e
p l ac e d a t si t e . At l e as t 3 p ai r s of b e am s a n d cu b es sh a ll be
m a d e f o r e ac h d ay ’s w o r k . Ea c h p ai r s h al l b e di f f e r e n t f r o m a
B a tc h of co n c r e t e . T h e r a t i o be t w e e n 7 a n d 2 8 d a y s t r e n gt h s
s h al l b e e s t a bl is h e d f o r t h e mi x to b e u se d i n sl a b i n a dv a n ce
b y t es t i n g b e a ms a nd cu b e s o n a t l e as t s ix b a t c he s o f t ri a l m ix .
T h e av e r a g e st r e n g t h o f 7 d ay sp e ci m e ns sh a ll be di vi d e d by
a v e r a g e s t r e n g th o f 2 8 d a y s pe c im e n s f o r e ac h b a t c h a n d r a t i o
“ R ” sh a ll b e d e t e r m in e d .

Page 5

D 2 . 2 I f d u r i n g co ns t r u c t io n o f t r i al l e n g th o r du r i n g n o r m a l w o r k i n g , th e
a v e r a g e v al u e o f an y f o u r co n s ec u t iv e 7 d ay s’ r es u l ts fa l ls be l o w
t h e r e q u i r e d 7 d ay s’ s t r e n g t h a s d e r iv e d f r o m va l u e o f “ R ” , t h e n
c e me n t co n t e n t of c o nc r e t e sh a ll be in c r e a se d by 5% in
c o ns u l ta t i o n w i t h E n gi n e e r a nd w o r k s ha l l b e e x ec u t e d w i t h
i nc r e a s e d ce m e n t co n t e n t u n t il four c o r r e s p o nd i n g 28 da y
s t r e n g t hs a r e i n co n f o r m a nc e w i t h T a r g e t Me a n S t r e n g t h .

D2.3 Workability: T h e w o r k a bi li t y o f co nc r e t e s h al l b e ch ec k e d bo t h
a t po i n t o f p r o d u c ti o n a nd le n g t h . T h e sl u mp t es t sh al l b e
c o n du c t e d as p e r I S - 1 1 9 9 an d i ts v al u e sh a ll b e m ai n t a i n ed i n t h e
range of 30 + 15mm. H o w e v e r , t h e sl um p a t B a tc h in g P la n t
l oc a t i o n s h al l b e co n t r o ll e d d e p e n di n g u p o n d is t a n c e be t w e e n
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

p a vi n g s it e a n d B at c hi n g pl a n t . I n it i a ll y S lu m p T e s t s h al l b e
c a r r i e d o u t o n ev e r y d u m p e r . H o w e v e r , t h e f r e q u e n cy sh a ll be
r e d u c e d on c e t h e c o ns is t e n cy o f sl u m p v al u e i s e s ta b l is h e d .

D 2 .4 In- Situ D e ns ity : Th e de n si ty o f the co n cre te l a id a t si te sh a ll


b e ch e cke d b y ta ki ng co re s a t si te an d th e sa me sh al l be
co mp a re d w i th th e o re ti ca l Ma xi mu m Dry De n si ty.

D 2 .5 Thic k ne s s : Th i ckn e ss sha l l b e con tro l l ed by ta ki n g l e ve l s o f


th e p a ved con cre te . Th i ckne ss o f th e sl ab a t a n y p oi n t sh a ll be
ma in ta i n ed wi th i n a to l e ra n ce of –5 mm to +25 mm of th e
sp e ci fi e d th i ckn e ss.

D 13 . Pos ition of Tie Ba r s : Th e po si ti on a n d a li g n men t o f Tie B a rs


sh al l b e ch e cked by dri ll i n g co re s. Th e po si ti on o f Ti e B a rs
sh al l be ch e cke d fo r th e ce n te r o f ea ch b a r w i thi n 5 0 mm o f th e
i n te nd e d p o si ti o n a nd mi n i mu m co ve r o f 3 0 mm be l o w jo i n t
g ro o ve .

E. Production and Transportation:

E1. B a t c h i n g a n d M i x i n g : T h e co n c r e t e f o r P QC s h al l b e p r o d u c e d i n
f u ll y a u t o m a ti c “ S T E T T E R ” m ak e C on c r e t e B a tc h i n g P la n t s o f
1 2 0 m 3 / h r . c a p ac i ty , t h at h av e be e n ha v e b e e n i ns t a ll e d at al l t h e
f o u r c a mp l oc a t i o ns . T h e m ax im u m B a tc h si ze t h e s e p l a n ts i s
3m3. H o w e ve r , s ma l le r B a tc h si ze s in t h e m ul t i pl e s o f 0 . 5 m 3 c a n
a ls o b e p r o d uc e d f r o m t h es e p l an t s . T h e pl a n ts a r e c a p ab l e o f
p r o p o r t i o n in g t h e m a t e ri a ls by w ei g h t a n d p r ov i di n g a u ni f o r m
h o m o g e n eo u s mi x . C em e n t f r o m Si l os s ha l l be w e i g h e d s e p a r a t el y
f r o m t he a g g r e g a t es . T h e b a tc h i ng a n d m ix in g is c a r r i e d o u t i n
f o r c e d ac t i on c e n t r al M ix e r o f t h e Pl a n t .

Page 6

E 1 . 1 T o ke e p th e t em p e r a t u r e o f c o nc r e t e p r o d uc e d w i t hi n 3 0 0 C , e ac h
C o n c r e t e B a tc h i n g Pl a n t h a s s ep a r a t e u ni t of C hi l li n g P l a nt so as
t o p r o vi d e c hi ll e d w a t e r t o e ns u r e t h a t t h e f i n al t e m p e r a t u r e o f
c o nc r e t e is w i t hi n 30 0 C . Si nc e th e ma x im u m te m p e r a t u r e in t he
p r o j ec t a r e i s g e n e r a ll y le ss t h a n 3 5 0 C , ma i n t ai n i n g te m p e r a t u r e
o f c on c r e t e sh a ll n o t b e a co ns t r a i n t .
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

E2. T r a n s p o r t a t i o n : P la n t m ix e d le a n c on c r e t e sh a ll b e t r a n s p o r t e d
f r o m p l a nt t o s it e in D u m p e r s co v e r e d wi t h t a r p a u li n . T h e mi x
s h al l b e u n l o a d ed i n f ron t o f PQC Pa ve r a t si te b y r e a r t i pp i n g .

F. Spr e a ding a nd C om pa c tion:

F1 . Fre sh l y mi xed co n cre te sh al l b e b ro ug h t in d u mpe rs in re ve rse


a n d th e d u mp e r d ri ve r sha l l be ca re fu l l y gu i de d to un l oa d
co n cre te in fro n t of Pa ve r in su ch a ma nn e r th a t it is
a p p ro xi ma tel y eq u al to q ua n ti ty req u i red fo r p a vi n g i .e . l a rge
h e ap s o f co n cre te are no t fo rmed . In i ti al l y co n cre te sh al l b e
d u mpe d a t tw o lo ca ti o n s in fron t o f Pa ve r. L a te r o n co n cre te
ma y b e d u mp e d i n mid d l e o f p a vin g w id th an d co n cre te sh al l b e
sp re ad in to fu l l w id th wi th sp re ad e r pro vid e d i n fro n t o f Co n cre te
Pa ve r. In ca se Sp rea d e r o f PQC Pa ve r ne e d s ma te ri al to b e
p u she d i n fro n t o f p a ve r sa me sh a ll be d o ne wi th Ru bb e r pa d de d
e xca va to r o r l oa d e r. Fo r sta rti n g PQC Pa vi ng fo r th e fi rst ti me ,
a sta rte r be a m sha l l be po si ti o ne d in fro n t o f PQC Pa ve r. Th i s
sta rte r be a m sh a ll ha ve fa ci li ty to h ol d Do we l Ba r a t spe ci fi e d
sp a ci n g o f 30 0 mm. Th e sta rte r be a m sh a ll be po si tio n e d i n
g ro un d b y sp i kin g .

F1 .1 “ W I R T G E N ” m a k e P QC C on c r e t e P a ve r c a pa b l e o f pa vi n g in
u n i f o r m t h ic kn e ss a n d w i dt h u p to 9 m s ha l l b e u s ed o n p r o j ec t .
T h i s P av e r h as b o t h Ve r t ic a l Gr a d e C o n t r o l a n d H o ri z o n t al
A li g n m e n t C o n t r o l . T h e r e f o r e , th e st r i n g l in e sh a ll be fi x e d a t a
s p ec i fi c d is t a nc e a nd p a r a ll e l t o C e n t e r l in e o f t h e p r o p o s e d
a li g n m e n t . O n c e t h e se n s o r wi r e is fi x ed a n d c he ck e d f o r l ev e ls
a n d h o r i z o nt a l a li g n m e n t , t h e P av e r s ha l l a u t o ma t ic a l ly c o n t r o l
p a vi n g as p e r g e o m e t r ic d es i g n . T h e se ns o r pe g s sh a ll b e
p r o v id e d o n b o t h s id es o f p av e m e n t . H o w ev e r , ho r i z o n t al
a li g n m e n t i s r e q ui r e d t o b e p r o v i d ed o nl y o n o n e si d e w h il e l ev e ls
a r e t o b e p r o v i de d o n b o t h t h e s e ns o r wi r e s . T h e Pa v e r ha s
o sc il l a ti n g be a m be h i n d s c re e d . T h e os ci l l at i n g b e a m c o mp a c ts
t h e c o nc r e t e a n d sm o o t h e ns t op su r f a c e o f P QC . The Super
s m oo t h e r b e hi n d os ci ll a t i ng b e am gi v es fi n a l f in i sh i n g t o u ch e s t o
P Q C s u r f ac e .

Page 7
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

F1 .2 Th e sl u mp o f co n cre te sh al l b e ke p t a s cl o se to 3 0 mm a s
p o ssi b l e so a s to en su re th a t si d e s o f p a ved co n cre te d o no t
co ll a p se . In ca se , th e sl u mp ob ta i ne d a t si te is h ig h an d i t is
fe l t th a t si de s ma y no t re ma i n ve rti cal , i n su ch a ca se , th e
si de s sha l l be sup p o rte d te mp o ra ri l y wi th ste el sh u tte ri n g to
a ll o w i ni ti a l se tti n g .

F1.3 I n s e r t i o n o f D o we l B a r : T h e P QC P av e r h as th e f ac il i ty o f
i ns e r t i n g D o w e l B a r at p r e - d e t e r m i n e d sp a ci n g i. e . 3 0 0 m m a n d
a t p r e - d e t e r mi n e d de p t h be l o w t o p su r f a c e . T h is c o m p on e n t of
m a ch i n e i s ca ll e d D o w el Ba r I ns e r t e r ( D B I ) . T h e l oc a t i o n o f
c o n t r ac t i o n j oi n ts a t e ve r y 4 .5 m ce n t e r to ce n t e r sh a ll b e
m a r k e d m a n u al ly o n t h e g r o u n d a s t h e p a vi n g p r oc e e d s. The
D o w e l Ba r s s ha l l be a u t o m a ti c al ly i ns e r t e d b y P QC Pa v e r o nc e
t h e D B I ha s r e ac h e d m a r k e d l oc a t i o n an d t h e o p e r a t o r p r e ss e s
a bu t t o n p r ov i d e d o n s id e of t h e p av e r . T h e D o w el Ba r s w i t h
P V C S le e v e s ha l l b e l o a de d in D o w el Ba r t r o ll e y i n a dv a n c e .
T h e D o w el Ba r I ns e r t e r w i ll au t o m a ti c al l y ke e p in po si t i o n t h e
r e q u i r e d n u m b e r o f D o w el B a rs i . e . 30 N o s . in t h is ca s e f o r n ex t
i ns e r t i o n a f te r ev e r y in s e r t io n o f D o w e l Ba r s is co m p l et e d .

F1.4 T i e B a r s : T h e T i e Ba r s s h al l be p r o v i de d i n t he T i e B a r
m a g az i n e p r o vi d e d at sp e ci f i e d l oc a ti o n s a l o ng t h e w i d th o f
p a vi n g behind DBI. The Ti e Ba r I ns e r t e r g e ts ac t iv a t e d
a u t o m a ti c al ly o n t h e a ct i o n o f D o w el Ba r I ns e r t e r a n d i ns e r t s
t h e T i e Ba r s a t p r e - d e t e r m i ne d s p ac i n g a l r e a d y f e d i n to t h e
C o m p u t e r i ns t al l e d al o n g w i th T i e B a r I ns e r t e r s .

F1.5 T h e d e p r es si o n s i n t h e C o n c r e t e p av i n g c a us e d d u e to D o w el
B a r an d T i e B a r I n s e r ti o n sh a ll be le v el l e d b y os ci l l at i n g b e a m
a n d su p e r s m o o th e r , w hi c h f o ll o w D o w e l Ba r a nd T i e B a r
I n s e r t e r s.

F1.6 Speed of machine: T h e P QC Pa v e r i s d es i g n ed t o p av e


@ 0 . 3 m a n d 1 . 2 m pe r mi n u t e . T h e C o n c r e t e p r o d uc t i o n sh al l
b e r e g u l a te d i n su c h a w a y t ha t p a vi n g is d o n e @ 1 m per
m i n ut e . H o w e v e r , ac t u al s p e e d s h al l b e r e g ul a t e d t o ma t c h th e
s p e ed o f c on c r e t e su p p ly .
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

Page 8

F1 .7 Te x tur ing a nd C ur ing: Te xtu rin g a n d cu ri n g sh al l b e d o ne


w i th TC M ma ch in e p ro vid e d b eh i n d th e PQC Pa ve r. Th i s i s a
se p a ra te un i t an d sh al l fo l lo w th e Pa ve r a t a spe ci fi e d
d i sta n ce . A 2 m wi de te xtu ri n g b ru sh h a s be e n pro vi de d ,
w hi ch sha l l au to ma ti cal l y te xtu re 2m w id th o f p a ve me n t. Fo r
th i s, TC M mo ve s i n in cre men ts o f 2 m a t a ti me an d te xtu ri ng
a n d cu ri ng b o th are do n e in in cre me n ts o f 2m a t a ti me . Fo r
cu rin g a sp ra y b a r o f 2m le n g th a nd 3 sp ra y no zzl e s i s
p ro vi d e d be hi n d th e te xtu ri n g bru sh . Th e a p p ro ve d Re si n
Ba se d C u ri n g Co mp ou n d sha l l b e fe d i n th e ta n k p ro vi d ed a t
to p o f TC M Ma ch i ne . Th e TC M al so ha s fa cil i ty fo r sp ra yi n g
cu rin g co mpo u n d a t tw o sid e s fo r wh i ch se p a ra te n o zzle s
h a ve b e en p ro vi d e d o n TC M. The cu rin g co mpo u n d sh a ll b e
ke p t i n a gi ta te d co n d i tio n w i th a gi ta to r p ro vi de d in cu rin g
co mp ou n d ta n k. The sp re a di n g ra te s sh a ll be as pe r
Ma n u fa ctu re rs’ Sp e ci fi ca ti o n , wh i ch is 0 .1 to 0 .2 l tr / m 2 .
Fu rth e r cu ri n g o f PQC pa ve men t sh a ll b e d o ne b y kee p i ng th e
su rfa ce mo i st w i th He ssia n clo th a n d w a te r. Fre sh co n cre te
su rfa ce sh al l b e p ro te cte d fo r a tl e a st 3 h o u rs b y co ve ri n g
w i th te n t in ca se o f ad ve rse we a th e r co nd i ti o n s.

G. Te m pe r a ture of C onc r e ting:

G1 . In ord e r to re d u ce sh ri n ka ge , cra cks e tc. in co n cre te , P QC


sh al l b e p ro du ce d a t Ba tch i n g Pla n t by u si n g chi l l ed wa te r.
As su ch , Ch i ll i ng Pl an ts ha ve be e n i n sta ll e d a t lo ca tio n o f
e a ch 12 0 m 3 Ba tch in g p l an t. Sin ce the te mpe ra tu re o n th e
p roj e ct si te ge n e ral l y d o e s no t e xcee d 3 5 0 C , ma in ta i ni n g
te mp e ra tu re o f co n cre te w i thi n 3 0 0 C sha l l n o t b e a p rob l e m.
In ca se , i t i s fe l t tha t i t i s a d vi sa b l e to a voi d di re ct su n li g h t,
co n cre te pa vi n g sha l l be sta rte d in th e e ven i n g s an d
co n ti nu e d th ro u g h ou t n ig h t fo r ma in ta i n in g be tte r qu a li ty o f
p a ve me n t. Fo r su ch a si tu a tio n su ffi cie n t l ig h ti n g
a rra ng e me n t sh al l b e ma de a t si te fo r ni g h t w o rki n g .
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

H. Se pa r a tion Mem br a ne :

H1. Imp e rme ab l e p la sti c sh e e ti ng , 1 25 mi cro n s th i ck sh al l b e l ai d


fl a t w i tho u t cre a se s o n to p o f p re vi o u sl y l a id D LC . Be fo re
p la ci n g th e se pa ra ti o n me mb ra n e , th e DL C Su rfa ce sha l l b e
sw ep t cl e a n of a ll th e e xtran e o u s ma te ri al s u sin g a ir
co mp re sso r. Th e o ve rl a p o f pl a sti c sh ee t sha l l b e kep t a t
l ea st 3 00 mm. Th e se pa ra ti o n me mb ra n e sh al l b e n ai l ed to
D LC la ye r w i th con cre te na il s.
Page 9

J. J oints :

J1 . In i ti al cu tti n g o f the j oi n ts, wh i ch sh al l be 3 mm wi d e an d 10 0 mm


d e ep (co n tra ctio n j oi n ts) sh al l be d on e a s so o n as i t i s p o ssib l e
to do so wi th o u t d a ma g i ng co n cre te su rfa ce a fte r pa vi ng .
N o rma l l y in i tia l cu tin g o f th e jo in ts sh a ll b e sta rte d a b ou t 10
h o u rs a fte r p a vin g o f con cre te . Th e con cre te slu rry fo rme d a fte r
j oi n t cu tti ng sh a l l be re mo ve d b y w a sh i ng th e jo i n t w i th se pa ra te
w a te r. Th e fi n al cu t o f jo in t a s sh ow n i n th e d ra wi n g sh al l b e
d o ne a t a bo u t 15 da ys a fte r th e d a te o f p a vin g . Th e fin a l cu t
sh al l be 8 – 1 0 mm wi d e a n d 20 -2 2 mm d e ep . Th e w id e ni n g o f
i ni ti a l 3 mm j oi n t to 8 – 1 0 mm w id th sh a ll be ma d e b y ma kin g on e
/ tw o p a sse s o f cu tti n g bl a d e on ei th e r si d e o f th e i n i tia l cu t.
Jo in t cu tti n g sh al l b e d on e w i th p e trol dri ve n Joi n t Cu tti n g
ma chi n e w i th d ia mo nd po i n te d cu tti ng di scs.

J2 . Th e j o in t sha l l b e cle a n ed wi th w a te r a n d ba ck up ro d sh a ll be
p ro vi d e d in th e g ro o ve so a s to p re ven t in g re ss o f a n y du st
p a rti cl e s. Su b se q u en tl y d e -bo n di n g stri p sh a ll b e p ro vid e d a fte r
fi n al cu t. Th e b a ck u p ro d , th e n sha l l b e pu sh e d b e lo w th e
w id e n ed cu t. Po l ysu l p hi d e Se a l an t, wh i ch i s a va i l ab l e in tw o
p a rts sha l l be mi xe d in a mi xe r a t si te an d sh a ll b e fil l ed i n
g ro o ve w i th a Sea l a n t Gu n . The to p su rfa ce o f th e Sea l a n t sha l l
b e sh ap e d w i th a sh ap i ng to ol . The sa me pro ce ss sh al l b e
fo l lo w e d fo r Exp a n si o n a nd Lo n gi tu d i na l Jo i n ts.

K. C o n s t r u c t i o n Se q u e n c e o f P QC :
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

K1. C l e a n th e D L C S u r f a ce w i t h C o m p r es s o r / M ec h a ni c al B r o o m o r
m a n u al ly .

K2. M a r k t h e b o u n d a r i es o f p av i n g wi d t h .

K3. S p r e a d Se p a r a t i o n M em b r a n e w i t h ov e r l a p o f 3 0 0 m m .

K4. F i x pe g s @ 1 0 m m ce n t e r t o ce n t e r o n b o t h si d es a t a fi x ed
d is t a n ce f r o m p a v em e n t e d g e .

K5. F i x st r i n g li n e at a f ix e d h ei g h t a b ov e p r o p o se d p a v em e n t s u r f ac e .

K6. S t a r t C h i ll i n g P la n t w e l l i n a dv a n c e t o h a ve ch il l e d w a t e r av a il a b l e
f o r c o nc r e t e p r o d u c ti o n .

K7. C h e ck t h e Ba t c hi n g P la n t f o r a ll i ts f u nc t i o ns .

Page 10

K8. K e e p r e q ui si t e n u m b e r o f 15 M T d u m p e r s r e a dy a f t e r c le a n in g a t
B a tc h i n g Pl a n t.

K9. C h e ck t h e P Q C Pa v e r f o r a ll f u nc t i o ns .

K 1 0 . C h e ck w a t e r t a nk o n P av e r a n d C u r i n g C o mp o u n d T a n k on T C M
f o r t h e i r co n t e n ts .

K 1 1 . C h e ck T C M s p r ay n o zz l es f o r p r o p e r s p r a y.

K 1 2 . P os i ti o n P Q C p a v e r a t St a r t i n g Po i n t . F i x po si t i o n o f T i e B a r
I n s e r t e r s o n P Q C P av e r . A ls o f e e d ne c es s a r y de t a il s in C o m p u t e r
r e g a r d i n g sp a ci n g o f T i e Ba r s .

K 1 3 . P os i ti o n W o r ki n g b r i d ge a n d T C M b e hi n d P av e r .

K 1 4 . P os i ti o n S t a r t e r b e a m fi t t e d wi t h D o w e l Ba r s a t St a r t p o i n t . I t
s h o ul d m a tc h w i th t h e f r o n t sh u t t e r o f P av e r .

K 1 5 . M a r k p os i ti o n o f C o n t r ac t i o n Jo in t s @ 4 . 5 m ce n t e r t o c en t e r f r o m
s t a r ti n g p o i nt o n D L C w i t h pa i n t .

K 1 6 . C h e ck Ma s o n , S ki ll e d W o r ke r s f o r t h e i r t o o ls in cl u d i ng 3 m s t r ai g h t
edge.

K 1 7 . P os i ti o n a t r a i n e d p e r s on in f r o n t o f P a ve r t o g u i d e D u m p e r d ri v e r
d u r i n g r e ve r s i n g .
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

K 1 8 . Ke e p Q u a li t y C o n t r ol t o o ls s uc h as S lu m p T e s t a p p a r a t u s , C ub e
m o u ld s , Be a m m o ul d s r e a dy a t si t e a nd B a tc h i n g Pl a n t .

K 1 9 . F i ll t h e D o w el B a r T r a y w i t h D o w el B a rs a n d T i e Ba r In s e r t e r w i t h
T i e B a rs .

K 2 0 . S t a r t p r o d uc t i o n o f C o n c r e t e , t r a ns p o r t i n d um p e r an d o n r e a c hi n g
s it e r e v e r s e t h e d u m p e r u p t o f r o n t o f P av e r .

K 2 1 . U n l o a d co nc r e t e i n f r o n t o f P a ve r a t t w o l oc a t i o ns .

K 2 2 . P us h c o nc r e t e w i t h W h e el L o a d e r / Ex c av a t o r u p t o Pa v e r sc r e e d .

K 2 3 . U s e Sp r e a d e r to s p r e a d co n c r e t e in f ul l w id t h .

K 2 4 . S t a r t P av e r m ov e m e n t .

K 2 5 . A f t e r p a vi n g of fi r s t 2 - 3 m P av e d C o n c r e t e s h al l b e c o m pa c t e d
e x t e r n al ly wi t h n ee d l e v ib r a t o r a n d s u r f ac e fi n is h e d m a n u al l y.
T h e r e a f t e r ma n u a l fi n is h in g i s n o t r e q u i r e d .

Page 11

K 2 6 . C o n t i n ue p a vi n g .

K 2 7 . I n s e r t D o w el B a r s at m a r k e d po s it i o n o f C on t r a c t i on J oi n t .

K 2 8 . T i e B a r sh a ll b e a u t om a t ic a ll y in s e r t e d a t sp ec i fi e d s p ac i ng a n d
l oc a t i o n.

K 2 9 . C h e ck t h e p av e d la y e r b e hi n d P av e r f o r a n y fi n is h i n g r e q u i r e d a n d
v e r t ic a li t y o f s id e ed g e s . I n ca s e o f e x t r a s lu m p , s u p po r t e d g es
w i t h si d e sh u t t e rs o f 3 0 0 m m h e i g h t .

K 3 0 . F i n is h t h e to p s u r f ac e w h e r e v e r r e q u i r e d by u si n g Wo r k i n g B ri d g e .

K 3 1 . S t a r t T e x tu r i n g o f C o nc r e t e s u r f ac e w h e n it i s f i t t o a p p ly b r u s h .

K 3 2 . C u r i n g sh a ll f o ll o w i m me d i a t el y a ft e r te x t u r i n g b y sp r a y in g c u r i ng
c o mp o u n d .

K 3 3 . M o n it o r te m p e r a t u r e , s lu m p o f C o nc r e t e r e c ei v e d at s it e .

K 3 4 . C o v e r t h e Pa v e d P Q C wi t h w e a t h e r p r o t ec t i o n sh e d .

K 3 5 . S t a r t in i t ia l cu t t i n g of J oi n t s ab o u t 8 – 1 0 h r s . a f t e r p av i n g .
PUNJ LLOYD LIMITED
Belgaum–Maharashtra Border Road Project (Km. 515 to Km. 592 of NH-4)

WORKING METHODOLOGY-CEMENT CONCRETE PAVEMENT

K 3 6 . Fi n is h p av i ng by p ut t i n g E n d S t o pp e r a t t h e en d a nd fi n is h i n g l as t
1 - 2m s t r e tc h m a n u al ly u si n g n e e dl e v ib r a t o r s .

K 3 7 . K e e p th e s u r f ac e m o is t w it h w e t H e ss i a n c lo t h .

K 3 8 . D o f i n al c ut t i n g of j oi n t s a ft e r 15 d a ys a n d fi ll t h e j oi n ts w i t h
s e al a n ts .

K 3 9 . O p e n to t r a f f ic a f t e r J oi n t s a r e co m pl e t e d .

L. Trial Length:

L1. T h e t r a i l st r e t c h o f P QC s h al l b e l a id o v e r t h e t ri a l st r e t c h o f D L C
i n t he p r e s e nc e o f C o ns u l t a n ts a n d Cl i e n ts . Al l ne c es s a r y t e s ts
s h al l b e c o n d uc t e d a t ti m e o f t h e t r i al s t r e tc h .