0% found this document useful (0 votes)
116 views20 pages

Geotechnical Report: Kalyan-Badlapur Rail Line

The document describes the results of a geotechnical investigation conducted for a proposed railway project between Kalyan and Badlapur stations, including boring logs from 3 borehole locations that note the layered soil and rock strata encountered at varying depths, along with samples collected and standard penetration test results. The boreholes encountered filled soil at the surface, underlain by various clay, silt and gravel layers, and finally basalt rock at depth, with one borehole extending to a depth of over 22 meters below ground level.

Uploaded by

Ajit Attree
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views20 pages

Geotechnical Report: Kalyan-Badlapur Rail Line

The document describes the results of a geotechnical investigation conducted for a proposed railway project between Kalyan and Badlapur stations, including boring logs from 3 borehole locations that note the layered soil and rock strata encountered at varying depths, along with samples collected and standard penetration test results. The boreholes encountered filled soil at the surface, underlain by various clay, silt and gravel layers, and finally basalt rock at depth, with one borehole extending to a depth of over 22 meters below ground level.

Uploaded by

Ajit Attree
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 20

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line

in between Kalyan and Badlapur Railway Stations of Central Railway.


CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB POL NO. 62/36-38 HM 62 / 8-9. In between Ambernath and Badlapur
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Depth Casing Thick- Log Sample SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
1.00 Filled up soil DS-1 0.00-1.00

1.0 1.95
0.95 Grayish to Brownish clayee UDS-1 1.50-1.95

2.0 Sp--1 1.95-2.50

1.05 Brownish Gray completely SPT -1 2.50-2.62


3.0 1---4 2.62-3.00

4.0 5--8 3.00-4.50

5.0 4.50 Gray Amygdaloidal fresh Basalt Rock.


9--13 4.50-6.00
6.0

7.0 14--20 6.00-7.50

8.0

9.0

10.0 Borehole is terminated at a depth of 7.50 m below G.L.

11.0

DS Disturbed Samples WS Wash Sample


UDS Undisturbed Sample SPT Standard Penetration Test
SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB POL NO. 62/36-38 HM 62 / 8-9.
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
0.75 0.75 Filled up soil DS-1 0.00-0.75

1.0
1--5 0.75-1.50

2.0
3.75 Brownish to Yellowish Gra 6--12+sp 1.50-3.00
3.0 Rock.

4.0 13-18+sp 3.00-4.50

5.0
19--23 4.50-6.00
6.0

7.0 4.50 Gray Amygdaloidal Moderate 24--29 6.00-7.50

8.0

30--34 7.50-9.00

9.0

10.0

11.0 Borehole is terminated at a depth of 9.00 m below G.L.


12.0

DS Disturbed Samples WS Wash Sample


UDS Undisturbed Sample SPT Standard Penetration Test

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB POL NO. 62/35-37 HM 62 / 8-9.
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
0.50 Filled up soil DS-1 0.00-0.50

1.0 UDS-1 0.50-0.95

4.50
2.0 SPT -1 1.50-1.95 4 6

4.00 Blackish Brown clay soil with gravels.


3.0 SPT -2 3.00-3.45 6 8

4.0
SPT -3 4.50-4.72
5.0 sp--1 4.72-6.00

6.0 SPT -4 6.00-6.10

7.0 2-4+sp 6.10-7.50

8.0

5-8+sp 7.50-9.00
9.0
10.0 10.50 Brownish Gray completely 9--13 9.00-10.50

11.0

14--17 10.50-12.00

12.0

13.0 18--22 12.00-13.50

14.0

23--30 13.50-15.00
15.0

16.0 31--39 15.00-16.50

17.0
6.00 Grayish Brown highly to 40--48 16.50-18.00
18.0 Amygdaloidal fractured Basalt Rock.

19.0 49--57 18.00-19.50

20.0
58--68 19.50-21.00
21.0

22.0 1.50 Gray Amygdaloidal fresh Ba 69--77 21.00-22.50

23.0

24.0

25.0 Borehole is terminated at a depth of 22.50 m below G.L.

26.0

DS Disturbed Samples WS Wash Sample


UDS Undisturbed Sample SPT Standard Penetration Test

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB POL NO. 62/35-37 Ambarnath (MIDC).
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
0.50 Filled up soil DS-1 0.00-0.50

1.0 UDS-1 0.50-0.95

2.0 2.50 Brownish clayee soil with g SPT -1 1.50-1.95 2 5

3.0 6.00 SPT -2 3.00-3.45 3 7

4.0
3.00 Brownish gray sandy soil w SPT -3 4.50-4.95 9 18

5.0

6.0
SPT -4 6.00-6.30
7.0
Sp-1 6.30-7.50
8.0

4.50 Brownish Gray completely 1-3+SP 7.50-9.00


9.0

10.0 4-5+SP 9.00-10.50

11.0

6--14 10.50-12.00

12.0

13.0 6.00 Grayish Moderately weath 15--22 12.00-13.50


fractured Basalt Rock.

14.0

23--34 13.50-15.00
15.0

16.0 35--44 15.00-16.50

17.0
1.50 Gray Amygdaloidal fresh Ba 45--46 16.50-18.00
18.0
19.0

20.0
Borehole is terminated at a depth of 18.00 m below G.L.
21.0

22.0
DS Disturbed Samples WS Wash Sample
UDS Undisturbed Sample SPT Standard Penetration Test

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB POL NO. 62/ 38 A- 40 HM 62 / 8-9.
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
1.00 Filled up soil DS-1 0.00-1.00

1.0
UDS-1 1.00-1.45

2.0 2.00 Brownish Gray sandy clay s SPT-1 1.45-1.95 3 6

3.0 SPT-2 3.00-3.26

4.0 1.64 Gray Brown completely we 1+ SP 3.26-4.50


SPT-3 4.50-4.64

5.0
2--9 4.64-6.00
6.0
7.0 4.36 Gray Amygdaloidal Moderate 10--14 6.00-7.50

8.0

15--22 7.50-9.00

9.0

10.0

11.0 Borehole is terminated at a depth of 9.00 m below G.L.

12.0

DS Disturbed Samples WS Wash Sample


UDS Undisturbed Sample SPT Standard Penetration Test

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB POL NO. 62/ 38 A- 40 HM 62 / 8-9.
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
1.00 Filled up soil DS-1 0.00-1.00

1.0 1.95
0.95 Brownish sandy clay soil. DS-2 1.00-1.50
2.0 UDS-1 1.50-1.95

SP--1 1.95-3.00
3.0 2.05 Yellowish Brown complete SPT-1 3.00-3.17

4.0 1--6 3.17-4.00

7--10 4.00-4.50

5.0
11--14 4.50-6.00
6.0
5.00 Gray Moderately to Slightly Basalt Rock.
7.0 15--24 6.00-7.50

8.0

25--33 7.50-9.00

9.0

10.0

11.0 Borehole is terminated at a depth of 9.00 m below G.L.

12.0

DS Disturbed Samples WS Wash Sample


UDS Undisturbed Sample SPT Standard Penetration Test

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
0.50 Filled up soil DS-1 0.00-0.50

1.0 UDS-1 0.50-0.95

2.0 3.50 Brownish clayee fine graine SPT -1 1.50-1.95 2 3

4.00
3.0 SPT -2 3.00-3.45 3 4

4.0 SPT -3 4.00-4.08


1+Sp 4.08-4.50
5.0
2--10 4.50-6.00
6.0

7.0 11-18+SP 6.00-7.50


8.00 Yellowish brown completely weathered rock.
8.0

19-35+SP 7.50-9.00
9.0

10.0 36-45+SP 9.00-10.50

11.0

46-53+SP 10.50-12.00

12.0

13.0 54---73 12.00-13.50

14.0
4.50 Yellowish Gray completely 74---83 13.50-15.00
15.0

16.0 SP 15.00-16.50

17.0

18.0
Borehole is terminated at a depth of 16.50 m below G.L.
19.0

20.0
DS Disturbed Samples WS Wash Sample
UDS Undisturbed Sample SPT Standard Penetration Test

SITE :Geotechnical Investigation and submitting report in connection with Proposed 3 rd & 4 th Line
in between Kalyan and Badlapur Railway Stations of Central Railway.
CLIENT : MRVC/ CENTRAL RAILWAY.
LOCATION : ROB
CASING : 100/150mm
BORING METHOD : ROTARY / DIAMOND
Log Sample
Depth Casing Thick- SPT
(m) (m) ness No. Depth 15 30
Soil/Rock Discription
(m) (m) Core Recovery
0.0 25 50
0.50 Filled up soil DS-1 0.00-0.50

1.0

2.0 4.00 3.50 Brownish clayey soil with g SPT -1 1.50-1.95 2 4

3.0 SPT -2 3.00-3.45 4 6

4.0 SPT -3 4.00-4.14


1--3 4.14-4.50
5.0
3.50 Brownish Yellow Completel 4--11 4.50-6.00
6.0

7.0 12--14 6.00-7.50

8.0

15--18 7.50-9.00
9.0 3.00 Grayish Amygdaloidal medium stiff compacted
grained slightly weathered rock.
10.0 19--22 9.00-10.50

11.0

23--34 10.50-12.00
12.0 3.00 Grayish Amygdaloidal basalt well compacted

Rock.

13.0 35--40 12.00-13.50

14.0

15.0 Borehole is terminated at a depth of 13.50 m below G.L.

16.0

DS Disturbed Samples WS Wash Sample


UDS Undisturbed Sample SPT Standard Penetration Test
G.W.L.
BH - 01

1.40 m
Date of Start 21.11.2019
Date of End 22.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

20.00 Nil
N>50

34.21 Nil

96.66 96.66

100 100

100 95.33

X -- Y Rock Piece No.


sp Small Pieces
Location L.C. No
G.W.L.
BH - 02

0.50 m
Date of Start 20.11.2019
Date of End 22.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

72.00 46.00

71.33 40.00

72.00 40.00

80.66 72.66

99.33 88.00

99.33 99.33
X -- Y Rock Piece No.
sp Small Pieces

Location L.C. No
G.W.L.
BH - 03

0.22 m
Date of Start 14.11.2019
Date of End 19.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

9 N=15

12 N=20

N>50
15.62 Nil

N>50

25.00 6.66

25.33 Nil
30.66 22.00

16.00 Nil

24.00 Nil

28.00 Nil

72.66 40.00

74.66 42.00

56.00 8.66

83.33 60.00

100 92.00

X -- Y Rock Piece No.


sp Small Pieces

Location L.C. No
G.W.L.
BH - 04
BH - 04

0.64 m
Date of Start 08.11.2019
Date of End 12.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

15 N=20

15 N=22

23 N=41

N>50

15.00 Nil

24.66 Nil

41.33 26.66

67.33 52.00

72.00 45.33

86.66 46.00

86.00 54.66

100 100
X -- Y Rock Piece No.
sp Small Pieces

Location L.C. No
G.W.L.
BH - 05

4.15 m
Date of Start 14.11.2019
Date of End 15.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

8 N=14

N>50

18.54 Nil
N>50

74.66 60.00
83.33 83.33

93.33 76.66

X -- Y Rock Piece No.


sp Small Pieces

Location L.C. No
G.W.L.
BH - 06

3.45 m
Date of Start 17.11.2019
Date of End 19.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100
9.25 Nil
N>50

48.19 Nil

78.00 50.00

88.66 88.66

89.33 62.66

92.00 72.00

X -- Y Rock Piece No.


sp Small Pieces

G.W.L.
BH - 07

0.80 m
Date of Start 4.11.2019
Date of End 7.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

3 N=6
7 N=11

N>50
30.95 23.80

36.66 7.33

53.33 Nil

66.00 Nil

48.00 Nil

50.66 25.33

78.00 Nil

50.00 14.00

23.33 Nil

X -- Y Rock Piece No.


sp Small Pieces

G.W.L.
BH - 08
BH - 08

0.70 m
Date of Start 9.11.2019
Date of End 11.11.2019
SPT N Core RQD
45 Value Recovery
Core Recovery (%) (%)
75 100

6 N=10

7 N=13

N>50
19.44 Nil

28.00 Nil

46.66 97.33

47.33 41.33

78.66 78.66

80.00 50.00

96.00 90.00

X -- Y Rock Piece No.