Road Construction Plan NH-07

The document details the construction of a catch drain system using 100mm thick shotcrete with wire mesh. It will have 50mm drainage holes spaced at 4m centers in both directions, and 25mm self-drilling anchors at 2m spacing driven 5m into the ground and grouted.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views1 page

Road Construction Plan NH-07

The document details the construction of a catch drain system using 100mm thick shotcrete with wire mesh. It will have 50mm drainage holes spaced at 4m centers in both directions, and 25mm self-drilling anchors at 2m spacing driven 5m into the ground and grouted.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CATCH DRAIN CATCH DRAIN

100mm THK. SHOTCRETE (M-25) 100mm THK. SHOTCRETE (M-25)


WITH WIREMESH Ø5x150x150mm WITH WIREMESH Ø5x150x150mm

CATCH DRAIN
100mm THK. SHOTCRETE (M-25)
WITH WIREMESH Ø5x150x150mm CATCH DRAIN
100mm THK. SHOTCRETE (M-25)
WITH WIREMESH Ø5x150x150mm

CATCH DRAIN
100mm THK. SHOTCRETE (M-25)
WITH WIREMESH Ø5x150x150mm
Ø50mm, DRAINAGE HOLES, 2.0m LONG @ CATCH DRAIN
4.0m c/c, BOTHWAYS STAGGERED 100mm THK. SHOTCRETE (M-25)

30000

30000
Ø50mm, DRAINAGE HOLES, 2.0m LONG @
Ø25mm, SELF DRILLING ANCHOR WITH WIREMESH Ø5x150x150mm
4.0m c/c, BOTHWAYS STAGGERED
@ 5.0m LONG FULLY GROUTED (Fe 500)
@ 2.0m c/c STAGGERED BOTHWAYS Ø25mm, SELF DRILLING ANCHOR
@ 5.0m LONG FULLY GROUTED (Fe 500)
@ 2.0m c/c STAGGERED BOTHWAYS
CATCH DRAIN
100mm THK. SHOTCRETE (M-25) CATCH DRAIN
WITH WIREMESH Ø5x150x150mm
100mm THK. SHOTCRETE (M-25)
WITH WIREMESH Ø5x150x150mm

NSL
Ø50mm, DRAINAGE HOLES, 2.0m LONG @
4.0m c/c, BOTHWAYS STAGGERED NSL
Ø25mm, SELF DRILLING ANCHOR Ø50mm, DRAINAGE HOLES, 2.0m LONG @
@ 5.0m LONG FULLY GROUTED (Fe 500) 4.0m c/c, BOTHWAYS STAGGERED
@ 2.0m c/c STAGGERED BOTHWAYS
PROPOSED ROAD

PROPOSED ROAD
REFER SEPRATE DRG. REFER SEPRATE DRG. Ø25mm, SELF DRILLING ANCHOR
@ 5.0m LONG FULLY GROUTED (Fe 500)
CENTRE LINE

CENTRE LINE
SB 4 SB 4 @ 2.0m c/c STAGGERED BOTHWAYS
WMM 1 WMM 1
4000

4000
DBM DBM
1094.383 BC 2.5% 1094.900 BC 2.5%
(TYP.)

(TYP.)
1000

1000
1 1
6 6
2000 4 2000
1

SECTION @ CH - 452+180 SECTION @ CH - 452+190


0 3.75 7.5 m 0 3.75 7.5 m

NOTES:-
1. GRADE OF PLUM CONCRETE SHALL BE M20.
2. SIZE OF AGGREGATE SHALL NOT BE MORE THAN 80mm.

OWNER ENGINEERING : SAFETY CONSULTANT : EPC CONTRACTOR: PROOF CONSULTANT: PROJECT: TITLE : SLOPE PROTECTION MEASURES
DRAWN BY : DEEPAK
KQC GLOBAL CONSULTANTS PVT. LTD. CONSTRUCTION & UPGRADATION OF EXISTING ROAD SCHEME KM-452+160 TO 452+235
125 m TO 2-LANE WITH PAVED SHOULDERS FROM KM DESIGNED BY : SK
301 Kautilya, Sector 14, Dwarka, 430.000 TO KM 468.000 OF CHAMOLI TO PAINI
New Delhi, Delhi 110075 (EXCLUDING KM 437.625 TO KM 437.775, KM 458.900 TO
APPROVED BY : DK DRG. NO. : CP-SZ-PM-03
www.kqcglobalconsultants.com KM 459.475 AND KM 464.425 TO KM 464.525) OF NH-07
National Highways & Infrastructure MANOMAV ENGINEERS NKG INFRASTRUCTURE LTD. UNDER CHARDHAM PARIYOJNA ON EPC BASIS IN THE
PVT. LTD. MEPL 1:150 (A1)
Development Corporation Ltd. (NHIDCL) STATE OF UTTRAKHAND (PKG-III) REV. DATE DESCRIPTION SCALE : REVISION : R-0 FEB-2020