Details of Retirement / Replacement of more than 25 years old
Coal based Thermal Power Plants (as on 01.12.2017)
In order to conserve scarce natural resources like land, water and coal, Ministry of Power
advised CEA in August 2015 to explore the possibility of retiring /replacing the old inefficient thermal
generating units by installing new supercritical units.
In July 2016, CEA in consultation with various Power Utilities identified about 10,000 MW
capacity coal based thermal power plants in Govt. Sector, which are more than 25 years old (as on
31.03.2016) and could be retired / replaced by new super-critical units on the basis of un-economic
operation. Out of which, since Sept.'2015 to Nov.' 2017, coal based units in Govt. sector of total
capacity of 5745 MW have been retired and deleted from National Installed Capacity by CEA. The
details of these units are given at Table ‘A’.
In addition, 797.32 MW of private sector/ Gas based/ DG Set units have also been retired during
the same period. The details of these units are given at Table ‘B’.
Further, details of Coal based Thermal Power Units in Govt. Sector, which could be retired in
the remaining period of F.Y.17-18 & in the F.Y.18-19 are given below in Table ‘C’.
The status of the new super-critical thermal units (totaling 18560 MW capacity), which have
been proposed to be set up as replacement against the retired / proposed to be retired old subcritical
units (totaling 7738 MW capacity) is given at Table ‘D’.
Table ‘A’ : Coal based Thermal Units Retired [Since Sept.'15 to Nov.'17]
S.No. Name of the Utility Name of the Station Unit No. Capacity (MW)
1 MPPGCL Amarkantak TPS (2x120 MW) 3&4 240
2 HPGCL Panipat TPS (4x110 MW) 1 to 4 440
3 MSPGCL Koradi TPS (4x105 MW) 1 to 4 420
4 MSPGCL Chandrapur TPS (2X210 MW) 1&2 420
5 MSPGCL Parli TPS 3 210
6 DVC Durgapur TPS 3 140
7 DVC Chandrapur TPS 1 130
8 WBPDCL Santaldih TPS (4x120 MW) 1 to 4 480
9 PVUNL Patratu TPS 1 to 10 815
10 TANGEDCO Ennore TPS (2x60 + 3x110 MW) 1 to 5 450
11 GSECL Gandhinagar TPS (2x120 MW) 1&2 240
12 DPL DPL TPS (70 + 2x75 MW) 3,4 & 5 220
13 MSPGCL Koradi TPS 5 200
14 APGCL Chandrapur TPS (2x30 MW) 1&2 60
15 GSECL Sikka TPS 1 120
16 GSECL Ukai TPS (2 x 120 MW) 1&2 240
17 UPRVUNL Harduaganj 5 60
18 UPRVUNL Obra TPS (2X50 MW) 1&2 100
19 MSPGCL Bhusawal TPS 2 210
20 DVC Chandrapur TPS 2 130
21 DVC Bokaro TPS (2 x 210) 1&2 420
Total: 5745
Table ‘B’ : Additional Thermal Units Retired [Since Sept.'15 to Nov.'17]
Name of the
S.No. Name of the Station Unit No. Capacity (MW)
Utility
New Cossipore TPS
1. CESC 1 to 4 160
(2x30+2x50 MW)
Kozhikode DG
2. KSEB 1&4 32
(2x16 MW)
Brahmapuram DG
3. KSEB 2&3 42.64
(2x21.32 MW)
Maithon GT
4. DVC 1 to 3 90
(3x30 MW)
5. APGCL Lakwa GT TPS 1 15
Belgaum DG
6. KPCL 1 to 5 81.3
(5x16.26 MW)
7. Tata Power Trombay TPS 4 150
Utran CCPS
8. GSECL 1 135
(3 x 30 + 1 x 45 MW)
Chinakuri TPS (3x10 MW) 1,2,3 30
India Power Corp. Dishergarh TPS (1x3 + 3x5
9. 1,2,3,4 18
Ltd. (West Bengal) MW)
Seebpore TPS (1.5 + 1.88 + 2
1,2,3,4 8.38
+ 3 MW)
10. APGCL Lakwa GT TPS 4 15
11. APGCL Namrup CCPP 1 20
Total: 797.32
Table ‘C’:Coal based Units in Govt. Sector which could be retired by March,19
S. Name of the Name of the Station Unit No. Capacity Remarks
No. Utility (MW)
1 IPGCL Rajghat TPS 1&2 135 Closure Report submitted by
(2 x 67.5 MW) M/s IPGCL to Govt. of NCT of
Delhi. Decision by Govt. of
NCT of Delhi pending.
2 MPPGCL Satpura TPS 6&7 410 Retirement in process.
(200 + 210 MW)
3 MPPGCL Satpura TPS 8&9 420 Decided by the Utility to retire
(2 X 210 MW) w.e.f. 31.03.2018
4 PSPCL Ropar TPS 1,2,3 & 4 840 Utility is exploring possibility to
(4 X 210 MW) set up 3x800 MW super-critical
Unit as replacement.
5 PSPCL GND (Bathinda) TPS 1&2 220 Board approval by utility under
(2 X 110 MW) process.
6 CSPGCL Korba East TPS 1,2,3 & 4 200 Board approval by utility under
(4 x 50 MW) process.
7 UPRVUNL Obra TPS 8 94 Under s/d since 21.06.2011.
Deletion case pending wih
Govt. of U.P.
8 UPRVUNL Panki TPS 3&4 210 Board Approval for retirement
(2 x 105 MW) yet to be obtained.
Replacement Proposal under
consideration.
9 NTPC LTD. Badarpur TPS 1, 2 & 3 285 Units decided to be retired
(3 x 95 MW) w.e.f. June,2018.
10 NLC Nevyeli LigniteTPS-I 1 to 9 600 Units will be retired after
(6 x 50 + 3 x 100 MW) commissioning of first unit of
2x500 MW TPS.
11 TSPGCL Kothadudem TPS 1 to 8 720 Due to Power shortage in the
(4 x 60 + 4 x 120 MW) state, Utility wants to run the
plant till commissioning of 800
MW Super Critical unit for
12 TSPGCL Ramagundem-B TPS 1 62.5 which order has been placed &
which is expected to be
commissioned in 2018-19.
13 DVC Chandrapur TPS 3 130 To be retired after
augmentation of Transmission
scheme. Proposed to be
retired in 2019-20.
Total 4326.5
Table ‘D’ : Details of new thermal power projects adopting super-critical technology
proposed to be set up as replacement of old subcritical units
(D1) STATE SECTOR PROJECTS:
State Name of the Plant Name of the Capacity of Plant Proposed Status
Developer Retired / proposed for Capacity of new
Retirement (MW) plant (MW)
Haryana Panipat TPS HPGCL 440 1x800 TOR for Environment Clearance (EC) for 800 MW
unit obtained.
U.P. Harduaganj TPS UPRVUNL 290 1x660 Order for 660 MW unit placed to M/s Toshiba JSW
Power System Ltd on 08.09.2015.
U.P. Panki TPS UPRVUNL 210 1x660 EC obtained. Bid evaluation completed. Order yet to
be placed.
U.P. Obra TPS UPRVUNL 438 2x660 Order placed on M/s Doosan Power System India
Pvt. Ltd.
M.P. Amarkantak TPS MPPGCL 280 1x660 Setting up of super critical units is in proposal stage.
M.P. Satpura TPS MPPGCL 312.5 + 830 2x660 + 1x660 Setting up of super critical units is in proposal stage.
Maharashtra Nasik TPP MAHAGENCO 250 1x660 Land available, Water & Fuel tied up, PPA
agreement is available. Process for aviation and
MoEF clearance is in progress.
Maharashtra Bhusawal Unit 2 MAHAGENCO 62.5 1x660 EC for 660 MW unit-6 (Bhusawal) obtained in Nov.
& Paras Unit 2 62.5 2012. The ICB tender on EPC basis was invited and
the Bid evaluation completed. Order to be placed
shortly.
Gujarat Ukai TPS GSECL 240 1x660 Setting up of super critical units is in proposal stage.
Telangana Kothagudem TPS TSPGCL 782.5 1x800 EC obtained. Order placed. Zero date commenced on
Stage I to IV & 01/01/15.
Ramagundem’ B TPS
Tamilnadu Ennore TPS TANGEDCO 450 1x660 TOR obtained. Applied for EC which is under
process.
West Bengal DPL TPS DPL 280 1x660 Setting up of super critical units is in proposal stage.
Punjab Ropar TPS PSPCL 840 3x800 Setting up of super critical units is in proposal stage.
Jharkhand Patratu TPS PVUNL 360 + 480 5x800 EC for 3x800 MW capacity (Phase –I) is in process.
Bid evaluation has been done. Order likely to be
placed shortly.
Sub Total (D1): 6608 16580
(D2) CENTRAL SECTOR PROJECTS :
State Name of the Plant Name of the Capacity of Plant Proposed Current Status
Developer Retired / proposed for Capacity of new
Retirement (MW) plant (MW)
West Bengal DVC Durgapur DVC 350 1x660 Setting up of super critical units is in proposal stage.
Jharkhand DVC Chandrapura DVC 780 2x660 Setting up of super critical units is in proposal stage.
Sub Total (D2): 1130 1980
TOTAL (D1+D2): 7738 18560