The document contains information about material requirements planning (MRP) for four periods. In the first period, the MRP type is planned order (PD) with a safety stock of 40, economic order quantity of 70, and stock of 70. The second period switches to zero variable (ZV) with a required order point of 70, same safety stock and economic order quantity of 30, and stock of 70. The third period is similar to the second but with stock of 69. The fourth period returns to PD type with reduced stock of 39.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
48 views4 pages
MRP Type: PD, SS 40, Eoq 70, Stock 70
The document contains information about material requirements planning (MRP) for four periods. In the first period, the MRP type is planned order (PD) with a safety stock of 40, economic order quantity of 70, and stock of 70. The second period switches to zero variable (ZV) with a required order point of 70, same safety stock and economic order quantity of 30, and stock of 70. The third period is similar to the second but with stock of 69. The fourth period returns to PD type with reduced stock of 39.