0% found this document useful (0 votes)
532 views8 pages

API 8 Round Connections

API 8 Round Connections

Uploaded by

i o
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
532 views8 pages

API 8 Round Connections

API 8 Round Connections

Uploaded by

i o
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

API 8 Round

API 8 Round Connections


Connections

Scope

Connection Specific Running Guidelines


These guidelines apply specifically to the use of API
8RD (STC, LTC, EUE, NUE) connections. This document
is based on API RP 5C1 which is the main document
applicable for this connection.

References
IDM Code GDL00389/3 / October 2019

.API RP 5C1: Recommended Practice for care and use of


.casing and tubing, latest edition.
API 5A3: Recommended practice on thread compounds

.for casing, tubing and line pipe.


ISO 13678: Petroleum and natural gas industries
-Evaluation and testing of thread compounds for use

.with casing, tubing, line pipe and drill stem elements.


API RP 5A5: Field inspection of new casing, tubing, and

.plain-end drill pipe.


API RP 5B1: Gauging and inspection of casing, tubing,

.and line pipe threads.


API 5B: Specification for Threading, Gauging and Thread

.Inspection of Casing, Tubing and Line Pipe Threads.


API TR5TP: Torque-Position Assembly Guidelines for API
RUNNING MANUAL

Casing and Tubing Connections.

Equipment, Material & Documents


1. Verify API modified thread compound is available.
TenarisHydril

2. If other compound is to be used, ensure it provides


adequate lubrication and sealability. Refer to API RP
5A3 or ISO 13678 for further details. 1
Pre-Running
API 8 Round Connections

1. If drifting the connections at the rig site it is


recommended to do so from box to pin end.

2. Ensure connections are cleaned and free of all debris


and / or contaminants.

3. Use high pressure water with detergent to clean


the connections, it is not advisable to use an oil based
Connection Specific Running Guidelines

solvent which may leave a residue on the threads.

4. Never move or handle pipe without the correct


thread protectors securely in place.

5. Visually inspect threads prior to running, ensuring no


damage is evident.

6. Verify compatibility of the API 8RD pipe with any


accessories such as pup joints.

7. Verify material grade of all accessories ensuring


compatibility with main string.

Inspection
1. Inspection criteria for all API connections is as
outlined in API RP 5A5.

2. Ensure the complete thread area has no tears,


gouges or raised metal.
RUNNING MANUAL

3. Black crested threads within the complete thread


length area must not exceed 25% of the circumference
of two (2) threads.

4. Complete thread length is indicated in API RP 5B1.


TenarisHydril

5. Any gouge or tear which traverses from the coupling


OD to the face is cause for rejection.
2
Thread Compound Application

API 8 Round Connections


1. Apply a thin coating of thread compound on pin
and box connections, fully covering all threads.

2. The thread form should be fully visible.

Connection Specific Running Guidelines


IDM Code GDL00389/3 / October 2019

3. During make up an API 8RD connection has high


interference between flanks, leading to high friction.
Hence, it is very important to apply dope correctly
on both ends to avoid galling. Due to connection
configuration the thread crests and roots are not in
contact, there is a gap to be filled by the running
compound.
RUNNING MANUAL
TenarisHydril

3
Thread Lock Application
API 8 Round Connections
Connection Specific Running Guidelines

1. Connections must be clean and dry when applying


thread lock.

2. Apply a thin coating of thread lock on 50% of the


pin threads furthest from the pipe body.

3. Do not apply thread compound to pin or box.


RUNNING MANUAL
TenarisHydril

4
Make Up

API 8 Round Connections


Make up process and torque values are referenced
in API RP 5C1.

Make Up with Optimum Torque

To achieve correct make up, apply optimum torque.


After reaching this value, it is necessary to verify the box
face position reaches the vanish point of the pin, with a

Connection Specific Running Guidelines


tolerance of ± two threads from the box face.
IDM Code GDL00389/3 / October 2019

No visible
Vanish point threads

Make Up with Maximum Torque

If after applying optimum torque there are several


threads visible beyond the box face, apply 25% more
torque to reach an acceptable final position. If after
RUNNING MANUAL

applying the additional torque there is more than


three threads exposed, the joint must be rejected as
questionable.
TenarisHydril

5
Make Up with Minimum Torque
API 8 Round Connections

If the box face surpasses thread vanish point by more


than two (2) thread turns without attaining 75%
of optimum torque, the joint should be treated as
questionable and rejected.

MAXIMUM
Connection Specific Running Guidelines

MAKE-UP
ACCEPTABLE
OPTIMUM ZONE

MINIMUM
TORQUE

2 threads out 2 threads inside

Casing sizes (≥ 4 ½") will have a 3/8" (0.375") equilateral


triangle stamped at the pin end, this triangle is solely an
aid to establish the location of the thread vanish point
and is not a basis for make up acceptance / rejection.
RUNNING MANUAL
TenarisHydril

6
Pulling

API 8 Round Connections


1. Automatic stabbing system or stabber is highly
recommended to maintain the pipe in a vertical position.

2. Apply the back up tong jaw on the lower part, over


the mill end of the coupling.

3. Apply power tong in low rpm (3-5 rpm) to break


out the connection, ensuring the pipe is stabilised

Connection Specific Running Guidelines


during the break and spin out process.

4. Visual inspection is recommended to classify the


thread condition. Any rejected connections should be
clearly marked and segregated for further investigation.

5. Apply clean, dry thread protectors after applying


IDM Code GDL00389/3 / October 2019

storage compound on clean, dry connections.

6. Storage / thread compound should always be


applied to connections post job, even rejects.

RUNNING MANUAL
TenarisHydril

7
API 8 Round Connections
Connection Specific Running Guidelines
RUNNING MANUAL

Tenaris has produced this manual for general information only. While every effort has been made to
ensure the accuracy of the information contained within this publication, Tenaris does not assume any
TenarisHydril

responsibility or liability for any loss, damage, injury resulting from the use of information and data
herein. Tenaris products and services are only subject to the Company’s standard terms and Conditions
or otherwise to the terms resulting from the respective contracts of sale, services or license, as the case
may be. The information in this publication is subject to change or modification without notice. For more
complete information please contact a Tenaris’s representative or visit our website at www.tenaris.com.
This manual supersedes Version 03 / March 2018. ©Tenaris 2019. All rights reserved.

You might also like