100% found this document useful (1 vote)
325 views70 pages

Connections 1

Uploaded by

huyenhvtc252
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
325 views70 pages

Connections 1

Uploaded by

huyenhvtc252
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 70

Finite Analysis of Connections

and Associated Failure


Mechanisms
B
O
X

P
I
N
API/IADC pipe-failure distribution

100
Pin End
Box End (w ith no Slip Cuts)
80
Records

60

40

20

0
0 10 20 30 40 50
Distance (inches) Pin/Box
API/IADC pipe-failure distribution

100
Pin End
Box End (w ith Slip Cuts)
80
Records

60

40

20

0
0 10 20 30 40 50
Distance (inches) Pin/Box
Finite Element Model Geometry Plot for 4-1/2" 16.60# E IEU
Drill Pipe

1.3
R = 0.5"

1.22
Stress Concentration

R = 2.0"
1.14

R = 5.0"
1.06

R = 10.0"
R = 12.0"
0.98
1 2 3 4
Miu (inches)

You might also like