Page 1
By : DP GOMA ENGG & CONSULTANCY Project No: 1002
Date :25.10.2016 Client: Backbone Construction Pvt Ltd Doc.No.: Option-2
Chd : HM Project: Import-Export warehouse,ICD-Barhi,haryana Subject: Wind Load
Date :26.10.2016 Rev: 0
Wind Load Calculation for Wall
Maximum wind speed is considered for the design
Basic Wind Speed, Vb = 47 m/s
Probability Factor, k1 = 1
Terrain type = Category-1,
Class of Building = Class C
Terrain, Height & Structure size factor k2 = 0.99 (h =30m)
Topographical Factor, k3 = 1.00
Design wind speed Vz =Vbxk1xk2xk3 = 47*1*0.99*1
= 46.53 m/s
Design wind pressure p=0.6xVz2 = 0.6*46.53^2
= 1.32 kN/m²
Length of the building, l = 61.25 m
Width of the building, w = 35.00 m
Height of the building, h = 7.75 m
Height ratio 1/2< h/w <= 3/2 h /w = 0.22
Plan ratio 3/2 < l/w <= 4 l /w = 1.75
Pressure co- efficient : [ Refer IS : 875 ( part III) - 1987, table 4]
Z-direction: (Wind at 0 degree)
External pressure co.effe in windward side A 0.70
External pressure co.effe in leeward side B 0.25
External pressure co.effe in left & right side C&D 0.60
X-direction: (Wind at 90 degree)
External pressure co.effe in windward side C 0.70
External pressure co.effe in leeward side D 0.10
External pressure co.effe in left & right side A&B 0.50
SIDE A A
X
W SIDE D SIDE C
h
Z
SIDE B
D
1 8
W
Distance in X-Direction
Exposed width between grid- A & B = 8.75 m
Exposed width between grid- B & C = 8.75 m
Exposed width between grid- C & D = 8.75 m
Exposed width between grid- D & E = 8.75 m
Distance in Z-Direction
Exposed width between grid 1 & 2 = 10.00 m
Exposed width between grid 2 & 3 = 10.00 m
Exposed width between grid 3 & 4 = 10.00 m
Exposed width between grid 5 & 6 = 10.00 m
Exposed width between grid 6 & 7 = 10.00 m
Exposed width between grid 7 & 8 = 10.00 m
1
WIND LOAD IN +Z DIRECTION: (Ѳ=0⁰)
-0.6
SIDE C
Z
SIDE A SIDE B
X 0.7 -0.25
SIDE D -0.6
Wind load on Side-A (windward)
Load on column along Grid-A1 0.7*1.32*10*0.5 = 4.63 kN/m
Load on column along Grid-A2 0.7*1.32*(10+10)*0.5 = 9.27 kN/m
Load on column along Grid-A3 0.7*1.32*(10+10)*0.5 = 9.27 kN/m
Load on column along Grid-A4 0.7*1.32*(10+10)*0.5 = 4.63 kN/m
Load on column along Grid-A5 0.7*1.32*(10+10)*0.5 = 4.63 kN/m
Load on column along Grid-A6 0.7*1.32*(10+10)*0.5 = 9.27 kN/m
Load on column along Grid-A7 0.7*1.32*(10+)*0.5 = 9.27 kN/m
Load on column along Grid-A8 0.7*1.32*(10+)*0.5 = 4.63 kN/m
Wind load on Side-B (Leeward)
Load on column along Grid-B1 0.25*1.32*10*0.5 = 1.66 kN/m
Load on column along Grid-B2 0.25*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B3 0.25*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B4 0.25*1.32*(10+10)*0.5 = 1.66 kN/m
Load on column along Grid-B5 0.25*1.32*(10+10)*0.5 = 1.66 kN/m
Load on column along Grid-B6 0.25*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B7 0.25*1.32*(10+)*0.5 = 3.31 kN/m
Load on column along Grid-B8 0.25*1.32*(+)*0.5 = 1.66 kN/m
Wind load on Side-C
Load on column along Grid-A 0.6*1.32*8.75*0.5 = 3.48 kN/m
Load on column along Grid-B 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-C 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-D 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-E 0.6*1.32*8.75*0.5 = 3.48 kN/m
Wind load on Side- D
Load on column along Grid-A 0.6*1.32*8.75*0.5 = 3.48 kN/m
Load on column along Grid-B 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-C 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-D 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-E 0.6*1.32*8.75*0.5 = 3.48 kN/m
Page 3
WIND LOAD IN -Z DIRECTION:(Ѳ=180⁰)
-0.6
SIDE C
SIDE A SIDE B
Z
-0.25 0.7
SIDE D
-0.6
Wind load on Side-B (windward)
Load on column along Grid-B1 0.7*1.32*10*0.5 = 4.63 kN/m
Load on column along Grid-B2 0.7*1.32*(10+10)*0.5 = 9.27 kN/m
Load on column along Grid-B3 0.7*1.32*(10+10)*0.5 = 9.27 kN/m
Load on column along Grid-B4 0.7*1.32*(10+10)*0.5 = 4.63 kN/m
Load on column along Grid-B5 0.7*1.32*(10+10)*0.5 = 4.63 kN/m
Load on column along Grid-B6 0.7*1.32*(10+10)*0.5 = 9.27 kN/m
Load on column along Grid-B7 0.7*1.32*(10+)*0.5 = 9.27 kN/m
Load on column along Grid-B8 0.7*1.32*(10+)*0.5 = 4.63 kN/m
Wind load on Side-A (Leeward)
Load on column along Grid-A1 0.25*1.32*10*0.5 = 1.66 kN/m
Load on column along Grid-A2 0.25*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A3 0.25*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A4 0.25*1.32*(10+10)*0.5 = 1.66 kN/m
Load on column along Grid-A5 0.25*1.32*(10+10)*0.5 = 1.66 kN/m
Load on column along Grid-A6 0.25*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A7 0.25*1.32*(10+)*0.5 = 3.31 kN/m
Load on column along Grid-A8 0.25*1.32*(+)*0.5 = 1.66 kN/m
Wind load on Side-C
Load on column along Grid-A 0.6*1.32*8.75*0.5 = 3.48 kN/m
Load on column along Grid-B 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-C 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-D 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-E 0.6*1.32*8.75*0.5 = 3.48 kN/m
Wind load on Side- D
Load on column along Grid-A 0.6*1.32*8.75*0.5 = 3.48 kN/m
Load on column along Grid-B 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-C 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-D 0.6*1.32*8.75*0.5 = 6.95 kN/m
Load on column along Grid-E 0.6*1.32*8.75*0.5 = 3.48 kN/m
3
WIND LOAD IN -X DIRECTION:(Ѳ=90⁰)
SIDE C 0.7
X SIDE B
SIDE A
-0.5 -0.5
SIDE D -0.1
Wind load on Side C (wind ward)
Load on column along Grid-A 0.7*1.32*8.75*0.5 = 4.06 kN/m
Load on column along Grid-B 0.7*1.32*8.75*0.5 = 8.11 kN/m
Load on column along Grid-C 0.7*1.32*8.75*0.5 = 8.11 kN/m
Load on column along Grid-D 0.7*1.32*8.75*0.5 = 8.11 kN/m
Load on column along Grid-E 0.7*1.32*8.75*0.5 = 4.06 kN/m
Wind load on Side D (leeward)
Load on column along Grid-A 0.1*1.32*8.75*0.5 = 0.58 kN/m
Load on column along Grid-B 0.1*1.32*8.75*0.5 = 1.16 kN/m
Load on column along Grid-C 0.1*1.32*8.75*0.5 = 1.16 kN/m
Load on column along Grid-D 0.1*1.32*8.75*0.5 = 1.16 kN/m
Load on column along Grid-E 0.1*1.32*8.75*0.5 = 0.58 kN/m
Wind load on Side -A
Load on column along Grid-A1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-A2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
Load on column along Grid-A8 0.5*1.32*(+)*0.5 = 3.31 kN/m
Wind load on Side-B
Load on column along Grid-B1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-B2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
Load on column along Grid-B8 0.5*1.32*(+)*0.5 = 3.31 kN/m
Page 5
WIND LOAD IN +X DIRECTION:(Ѳ=270⁰)
SIDE C -0.1
SIDE A SIDE B
-0.5 -0.5
SIDE D 0.7
Wind load on Side D (windward)
Load on column along Grid-A 0.7*1.32*8.75*0.5 = 4.06 kN/m
Load on column along Grid-B 0.7*1.32*8.75*0.5 = 8.11 kN/m
Load on column along Grid-C 0.7*1.32*8.75*0.5 = 8.11 kN/m
Load on column along Grid-D 0.7*1.32*8.75*0.5 = 8.11 kN/m
Load on column along Grid-E 0.7*1.32*8.75*0.5 = 4.06 kN/m
Wind load on Side C (leeward)
Load on column along Grid-A 0.1*1.32*8.75*0.5 = 0.58 kN/m
Load on column along Grid-B 0.1*1.32*8.75*0.5 = 1.16 kN/m
Load on column along Grid-C 0.1*1.32*8.75*0.5 = 1.16 kN/m
Load on column along Grid-D 0.1*1.32*8.75*0.5 = 1.16 kN/m
Load on column along Grid-E 0.1*1.32*8.75*0.5 = 0.58 kN/m
Wind load on Side -A
Load on column along Grid-A1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-A2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
5
Load on column along Grid-A8 0.5*1.32*(+)*0.5 = 3.31 kN/m
Wind load on Side-B
Load on column along Grid-B1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-B2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
Load on column along Grid-B8 0.5*1.32*(+)*0.5 = 3.31 kN/m
Page 7
Internal Pressure (5 to 20% opening is assumed)
SIDE C
Z
0.5
X
SIDE A SIDE B
0.5 0.5
0.5
SIDE D
Internal Pressure co-efficient (Cpi) considering 5 to 20 % of opening 0.50
Wind load on Side C
Load on column along Grid-A 0.5*1.32*8.75*0.5 = 2.90 kN/m
Load on column along Grid-B 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-C 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-D 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-E 0.5*1.32*8.75*0.5 = 2.90 kN/m
Wind load on Side D
Load on column along Grid-A 0.5*1.32*8.75*0.5 = 2.90 kN/m
Load on column along Grid-B 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-C 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-D 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-E 0.5*1.32*8.75*0.5 = 2.90 kN/m
Wind load on Side -A
Load on column along Grid-A1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-A2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
Load on column along Grid-A8 0.5*1.32*(+)*0.5 = 3.31 kN/m
Wind load on Side-B
Load on column along Grid-B1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-B2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
7
Internal Suction (5 to 20% opening is assumed)
SIDE C
0.5
Z
SIDE A SIDE B
0.5 0.5
0.5
SIDE D
Internal Suction co-efficient (Cpi) considering 5 to 20 % of opening -0.50
Wind load on Side C
Load on column along Grid-A 0.5*1.32*8.75*0.5 = 2.90 kN/m
Load on column along Grid-B 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-C 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-D 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-E 0.5*1.32*8.75*0.5 = 2.90 kN/m
Wind load on Side D
Load on column along Grid-A 0.5*1.32*8.75*0.5 = 2.90 kN/m
Load on column along Grid-B 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-C 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-D 0.5*1.32*8.75*0.5 = 5.79 kN/m
Load on column along Grid-E 0.5*1.32*8.75*0.5 = 2.90 kN/m
Wind load on Side -A
Load on column along Grid-A1 0.5*1.32*10*0.5 = 3.31 kN/m
Load on column along Grid-A2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-A6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-A7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
Load on column along Grid-A8 0.5*1.32*(+)*0.5 = 3.31 kN/m
Wind load on Side-B
Load on column along Grid-B1 0.5*1.32*10*0.5 3.31 kN/m
Load on column along Grid-B2 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B3 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B4 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B5 0.5*1.32*(10+10)*0.5 = 3.31 kN/m
Load on column along Grid-B6 0.5*1.32*(10+10)*0.5 = 6.62 kN/m
Load on column along Grid-B7 0.5*1.32*(10+)*0.5 = 6.62 kN/m
Load on column along Grid-B8 0.5*1.32*(+)*0.5 = 3.31 kN/m