Dated:1 1 .10.2019.
Roc No:1809/201 8/E1
(Acl22 o'f 2012)
Sir,
NewBusstand-DharmapuriMunicipality-lnvitingsuggestionsandin
Sub
oUt""tions regarding the Construction
of New Busstand
Patnership mode on
Onur*rprri Municipality through Public Private
DBFOT basis-Regarding'
G.O(Ms) No.75 Municipal Administration
and Water supply
Ref
Department daled'.24 07 2OI8'
lnthereference'ldcited,Governmenthasaccordedprinciplepermissiontotakeupthe
constructionofNewBusstandthroughPublicPrivatePatnershipmodeonDBFoTbasisto
DharmaPuri MuniciPalitY'
had
of Municipal administration' Consultant
As per the directions of the Commissioner
crores
project report was prepared for Rs 39 14
been fixed by this Municipality and Detailed
for the above Pro.lect.
Development Act 2012 (Act 22 ot
2012)
Under the Tamil Nadu lnfrastructure
objections and suggestions invited in
written to this office with regards to the
Municipality through Public Private
Construction of New Busstand in Dharmapuri
of
period of 30 days from the date of oublr'calon
Patnership mode on DBFOT basis for a
this notice (uPto 1 5.1 1 .201 9)' 5nr:rx{,at
Commissioner,
DharmaPuri MuniciPality
Bus Stand ProPosal
0)K"rt1
Dharmapuri Municipality
Formalfor Publishing the Details P!y49 Jgtt!9E!!p JI9j94
1.00 G enera I Response
1 01 TNIDB Project lD
102 Name of the Project Construction of N nd for Dharmapuri Municipality
103 Sector Bus stand
1Q4 Sponsoring Agency co,nmiilion"r onarmaprri wlu. tv
1.05 Location of the project -- A) A. RAdi HailNillage, Sogathur Panchayath Survey No.456/6, 456/8, 467/1,
'to4l3, 104t4, 104t5, 456|1, 45613,45614, 45615,45617, 457 ' 460' 45911,99124'
105/2A, 99/381 , 99/2B, 105/28, 9S/3B2
B) Extent:'10.02 acres
106 Previous phases,if any Nil
2.00 Project Description
Brief description of the 1) The totaa;o of trips -ade by Mofussil buses arc 1704 per hour and 71 buses
2.01
project departs From the terminal per hour on a average and the peak hour departure of
Mofussil buses 774 buses (10am -'llam) and town buses are 48 (7pm - 8pm)'
to provide (57+10) 67 bus bays that
(2).Based on the above calculation it is proposed
will be sufficient for Mofussil buses and idle bays and Town buses respectively'
Hence this proposed bus terminal falls under the Grade I category The area required
per bus bay is a minimum 76 Sq.m ml as per Urban development Plans formulation &
lmplementation (UDPFI) guidetines Hence the area required for 57Bus bays (Mofussil
& Town Bus ) is 4332sqm the area required per idle bus bay is 145sqmt as per
UDPFI guidelines. Hence the area required for 10 idle bus bays is 1450sqm After the
detailed assessment of the conditions of the bus Stand and the results of all the
surveys, the development options were Finalized These options were develoPed for
the benefit of the commuters within the town & outside who pass through the town
Overall it was aimed at improving the social & economic standards of the town,
providing safe& comfortable departures / arrivals & avenues for generation of
income to the ULB
The Following are the Proiect components
1 .Terminal Building shoPs
2.Construction oI Drain
3.Construction of Two Wheeler & Car Parking(2 Nos) 4.construction of Sump
5.Construction of Bus bays
6.Providinq Sewer line Arrangements
7 .Provision for water supp'y Arrangements
IS.Construction ol collection well
lg.Provision for street light Arrangements with High mast light
110 Provision for External Electritication work
]11. tnternal cc roads
12.c51 12%
ll3.Labour welfare fund @ 't%
I l4.contiqencies
202 Justification for the lihe existlng bus terminal was constructed in the year 1980 at a total extent
project of 5.75 acre Lrnder the class A category with 52 number her of bus bays This bus
terminal is located at a prime location in the CBD area where all the live maior roads
from Salem, Krishnagri , Hosur Banglore and Chennai intersects with Dharmapuri
town area. This bus terminal lies within the Dharmapuri Municipality boundary and it
sereves for both Mofussil and localservices
2.The existing bus stand has two separate entrances and exits for lnterstate Bus
Terminal (ISBT) and local bus terminal, both the point are 30 meters wide The entry
point of both bus stations is from Salem Hosllr road. However, the approach road
-
for Mofussil and Locat bus terminal is 6Om wide due to heaw Bus movement and
lesser turning radius, traffic congestion and collision congestion persisls'
@ucture sector that facilitates the groMh of
business, seamless flow of investment, trade and tourism, with significant multiplier
effects across the economy. The road transport sector is one of the prime movers
for economic growth and astrategic element of employment generation, besides
providing bus transport for passengers and qoods. Rapidly expanding allied
infrastructure facilities will fLrel the growth of the economic status of Municipality.
The existing bus stand has several limitations such as space constraints traffic
congestion, diiapidated structures and several other discrepancies that were noted
and analysed during the site visit by our technical team comprising of a transport.
planner, urban planner, architect and civil engineer
4. The image of the existing bus terminal is not on par with the modern
architecture or any smart tech nologies. The bus termlnal buried away behind
adjoining shop units and has a minimal and insufficient public interface. The
building lacks natural ventilate on and it does not possess. Any sustainable
Ieatures. The concourse area is insufficiently wide in places, resulting internal
congestion. Transport interchanges provide one oI the first and last impressions for
a visitor to a city center and it is not considered that the existing bus station
provides a suitable gateway for Dharmapud town
5. Stakeholder consultations are a key stage of any project, as views of interested
parties will play a major role in the design process. lt is imperative that the views of
Stakeholders are reflected in the planning of any project. This is to ensure that all
affected parties / agencies have the required ownership of the project to ensure its
smooth execution and imptementation.
The proposal to shift the Mofussil Bus Stand from its existing location to the
proposed site is likely to have impacts on different stakeholders. Several different
government agencies will be involved in the process of constructing a new bus
stand and shifting bus services from the old facility: The Proiect learn has carried
out initial discussions with identified Stakeholders, including:
1) Directorate of Town and Country Planning
2) Tamil Nadu State Transport Department
3) Police Department
4) Tamil Nadu State Highways Department
5) National Highways Authority of lndia
6) Public and Bus operators
The site is located in A. Reddi Halli Village ,Sogathur Panchayat, Dharmapuri at an
extent of 10.02 acre. The distance between the existing bus stand and the proposed
site is 3.Okm. The connectivity between the existing bus stand and the proposed
location is via State Highways Pennagaram Road.
2.03 Estimated total project Rs.3914.00 Lakhs
cost
2.04 Tarqet population 1,50,000 Passengers/Day
2.05 Direct employment likely 400
to be generated by the
proiect
206 lndirect employment 2000
likely to be generated by
the proiect
2.07 Direct economic benefits Rs.60.00 Lakhs
of the oroiect
208 indirect economic Rs.200.00 l.akhs
benefits of the proiect
209 Project land available Yes
with Government
2.10 Land acquisition Not Necessary
required, if any
2.1 I Rehabilitation and No
Resettlement. if anv
2.12 Will the proiect have No
future phases ?
The Notice invited suggestions and objectlons with regard to the proposed development
\;'1-i'd" '-;' \
,) r-'
Commissioner
Dharmapuri Municipality