0% found this document useful (0 votes)
81 views9 pages

Final Year Project MME: CEET University of The Punjab, Lahore Pakistan

This document provides welding procedure specifications for a final year project involving double V-butt welds. It specifies using gas tungsten arc welding in the manual mode for the root and hot passes using an ER70S-3 filler wire. The root opening should be 2mm, with a root face of 1.5-2.5mm and a groove angle of 30 degrees. Welding parameters for the root and hot passes are also provided, including voltage, amperage, travel speed and heat input. The document also describes material specifications, joint design details, preheat requirements and testing needed.

Uploaded by

Ahmad Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views9 pages

Final Year Project MME: CEET University of The Punjab, Lahore Pakistan

This document provides welding procedure specifications for a final year project involving double V-butt welds. It specifies using gas tungsten arc welding in the manual mode for the root and hot passes using an ER70S-3 filler wire. The root opening should be 2mm, with a root face of 1.5-2.5mm and a groove angle of 30 degrees. Welding parameters for the root and hot passes are also provided, including voltage, amperage, travel speed and heat input. The document also describes material specifications, joint design details, preheat requirements and testing needed.

Uploaded by

Ahmad Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

WELDING PROCEDURE

SPECIFICATION (WPS)

Final Year Project MME RECORD (PQR)

WELDER QUALIFICATION (WQR)

CEET University of the Punjab, Lahore Pakistan


PROJECT: Final Year Project PROJECT No: P1 QUALIFICATION NOTES:
PROJECT SPECIFICATION: TBW CONTRACT No:
WELDING CODE: ASME IX - 2010 CONSTRUCTION CODE: ASME VIII-Div 1

JOINT TYPE: DOUBLE VEE BUTT WELDING PROCESS: GTAW


EDGE PREPARATION: GRINDING TYPE (AUTO,MANUAL,SEMI-AUTO): MANUAL
INTER PASS CLEANING: CHIPPING AND WIRE BRUSH WELDING PROGRESSION: ↔
FLUID BACKING NO WELDING POSITION: 1G
BACKING MATERIAL TYPE: N/A MODE OF TRANSFER:
POWER SOURCE: DC JOINT DESIGN
WELDING: GTAW ROOT OPENING: 2mm
MACHINE/GUN: ROOT FACE: 1.5-2.5mm
GROOVE ANGLE: 30°
WELD JOINT PREPARATION DETAILS MATERIAL SPECIFICATION

MATERIAL TYPE: ASTMA516


α = β= 60 degree GROUP: 2 P NO 1
f = 1.5 – 2.5 THICKNESS: 40 mm
S1 = 19 CARBON EQUILENT: 0.45
S2 = 19 RANGE QUAL: 5-200 mm
T1 = 40 GRADE: 70
THERMAL TREATMENT
UNITS: mm PREHEAT °C: 180-200C
INTERPASS C°: 150-2000C (Root &Hoot 180-200oC)

P.W.H.T.: No
CONSUMABLE STROAGE PREHEAT SOAK TIME: NO
Hermetically design cylinders with heated oven POST WELD BAKEOUT: NO
Diffusible hydrogen 0.6% max BEFOR WELDING: Bright Metal Surface

WELD PASS DETAILS FILLER METAL DESCRIPTION FLUX PREHEAT HEAT WELDING PARAMETERS/CURREN
OR INTERPASS INPUT TIME LAPSE MAX
F/A GAS TEMP. C° KJ/mm SPEED
NO. SIDE POS. DIR TYPE SIZE SPEC. number AMPS VOLTS POL mm/min
1 Flat * wire 2.4mm ER70S3 6/1 Gas 180-200 2.0-3.3 Depend on Pre Heat 145-150 14 EN 40-50
2 Flat * wire 2.4mm ER70S3 6/1 Gas 180-200 2.5-3.3 Depend on Pre Heat 165-170 14-18 .00 40-50
EN

NOTES: PREPARED BY:


Root Opening as per Joint Design is 2mm TITLE:
All the Weld Beads in Hot pas follow the weld pass detail 1&2
TESTING REQUIRED
REPORT No:
SWPS for SMAW & GTAW for P #1 Gr # 2, use ER70S-2 with E7018

Sec IX MANDATORY APPENDICES E


COMPNAY APPROVAL CLIENT APPROVAL NOTES/STAMP
APPROVED BY: APPROVED BY:

DATE: DATE:
Welding Sequence

1st layer After Root Pass

Heat Input Kj/mm 2.5-3.3


Filler Wire Diameter mm 2.5
Travel Speed mm/min 40-50
Voltage 14
Amperage 145-150 DCEN

GTAW Process for Hot Pass

2nd Layer Hot Pass

Heat Input Kj/mm 2.4-3.7


Filler Wire Diameter mm 2.5
Travel Speed mm/min 40-50
Voltage 14-18
Amperage 165-170DCEN

GTAW Process for Hot Pass


WELDING PROCEDURE
SPECIFICATION (WPS)

Final Year Project MME RECORD (PQR)

WELDER QUALIFICATION (WQR)

CEET University of the Punjab, Lahore Pakistan


PROJECT: Final Year Project PROJECT No: P1 QUALIFICATION NOTES:
PROJECT SPECIFICATION: TBW CONTRACT No:
WELDING CODE: ASME IX - 2010 CONSTRUCTION CODE: ASME VII. Div 1

JOINT TYPE: DOUBLE VEE BUTT WELDING PROCESS: MMAW


EDGE PREPARATION: GRINDING TYPE (AUTO,MANUAL,SEMI-AUTO): MANUAL
INTER PASS CLEANING: CHIPPING AND WIRE BRUSH WELDING PROGRESSION: ↔
FLUID BACKING: NO WELDING POSITION: 1G
BACKING MATERIAL TYPE: N/A MODE OF TRANSFER:
POWER SOURCE: DC JOINT DESIGN
WELDING: SMAW ROOT OPENING: 2mm
MACHINE/GUN: ROOT FACE: 1.5-2.5mm
GROOVE ANGLE: 30°
WELD JOINT PREPARATION DETAILS MATERIAL SPECIFICATION

MATERIAL TYPE: ASTMA516


α = β= 60 GROUP: 2 P No.: 1
f = 1.5-2.5mm THICKNESS: 40 mm
S1 = 19mm CARBON EQUALENT: 0.45
S2 = 19mm RANGE QUAL: 5-200mm
T1 = 40mm GRADE: 70
THERMAL TREATMENT
PREHEAT C°: 180-200C
INTERPASS C°: 150-200C (Root &Hoot 180-200)

P.W.H.T.: No
CONSUMABLE STROAGE PREHEAT SOAK TIME NO
Hermetically design cylinders with heated oven POST WELD BAKEOUT NO
Diffusible hydrogen 0.6% max SURFACE BEFORE WELDING Bright T
PREHEAT
WELD PASS DETAILS FILLER METAL DESCRIPTION FLUX HEAT WELDING PARAMETERS/CURR
INTERPAS TIME LAPSE
OR INPUT
S TEMP. MAX
GAS KJ/mm
NO. SIDE POS. DIR TYPE SIZE SPEC. F/A #. C° AMPS VOLTS POL speed
1 Flat * Electrode 3.2mm E7018 4/1 N/A 150-200 2.4-3.0 Preheat 180-185 26 EP 80-85
2 Flat * Electrode 3.2mm E7018 4/1 N/A 150-200 2.0-2.7 Preheat 160-165 25 EP 80-85
3 Flat * Electrode 3.2mm E7018 4/1 N/A 150-200 2.4-3.0 Preheat 180-185 25 EP 80-85
mm/min
NOTES: PREPARED BY:
Root Opening as per Joint Design is 2mm TITLE:
All the Weld Beads in filling follow the weld pass detail 3-5
TESTING REQUIRED
SWPS for SMAW & GTAW for P #1 Gr # 2, use ER70S-2 with E7018 REPORT No:
Sec IX MANDATORY APPENDICES E

TEST PLATE IDENTIFICATION CONSUMABLES/DETAILS


COMPNAY APPROVAL CLIENT APPROVAL NOTES/STAMP
APPROVED BY: APPROVED BY:
DATE: DATE:
Welding Sequence

3rd Layer Filling SMAW

Heat Input Kj/mm 2.4-3.0


Filler Wire Diameter mm 3.2
Travel Speed mm/min 80-85
Voltage 26
Amperage 180-185 DCEP

4th Layer Filling SMAW

Heat Input Kj/mm 2.0-2.7


Filler Wire Diameter mm 3.2
Travel Speed mm/min 80-85
Voltage 25
Amperage 160-165 DCEP

5th Layer to onward SMAW

Heat Input Kj/mm 2.4-3.0


Filler Wire Diameter mm 3.2
Travel Speed mm/min 80-85
Voltage 25
Amperage 180-185 DCEP

Note: Aim is to overlap the existing bead 50% To 70% with proceeding bead in each layer.
Bead Sequence

The middle bead overlaps the right-hand bead by about 50% of the bead width, and that the remaining
heat-affected zone of the first bead is much smaller than the remaining heat-affected zone of the
middle bead. The left-hand bead overlaps the middle bead by about 10%, resulting in very little effect on
the heat-affected zone of the middle bead.