Inspection Plan for Engineers

This document provides an inspection and test plan for installing rotating equipment at the Bangkanai GEPP (Peaker) Stage 2 power plant. It outlines 5 key inspection items to check during material receipt, pre-installation, equipment installation, and final documentation. Inspections will verify equipment identification, foundation preparation, equipment alignment and leveling, grouting, and mechanical completion. The subcontractor, PP-Wartsila, and PLN/PLNE may attend inspections which will be documented through records like checklists, measurements, and punch lists.

Uploaded by

Mari Belajar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
859 views3 pages

Inspection Plan for Engineers

This document provides an inspection and test plan for installing rotating equipment at the Bangkanai GEPP (Peaker) Stage 2 power plant. It outlines 5 key inspection items to check during material receipt, pre-installation, equipment installation, and final documentation. Inspections will verify equipment identification, foundation preparation, equipment alignment and leveling, grouting, and mechanical completion. The subcontractor, PP-Wartsila, and PLN/PLNE may attend inspections which will be documented through records like checklists, measurements, and punch lists.

Uploaded by

Mari Belajar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ITP FOR ROTATING EQUIPMENT

Owner :

Consultant :

Sub Contractor :

Consortium PP-Wärtsilä

BANGKANAI GEPP (PEAKER) STAGE 2 (140 MW)

DOCUMENT NO :
BKN2-PP-ITP-003

PURPOSE :

ISSUED FOR REVIEW

0 Issued for Review 12/05/2017 SP

Rev. Description Date Prepared Checked Approved


BANGKANAI GEPP (PEAKER) STAGE 2 (140 MW)
Consortium PP-Wärtsilä

INSPECTION & TEST PLAN FOR INSTALLATION OF ROTATING EQUIPMENT


Inspection test Method of Reference Measurement Inspection attendance
No
item/activity inspection Document record Sub-con PP-Wärtsilä PLN / PLNE
1 Document/Procedure
Eng & Vendor
1.1 Design & drawing Review N/A H (R)H R
drawing
Method statement
Eng & Vendor
1.2 installation of Review N/A H (R)H R
drawing
Mechanical Equipment

2 Material Receipt
Check equipment tag
2.1 Visual Packinglist N/A (Check only) H (W)H,W R
number identification
Check incoming
2.2 Visual Packinglist N/A (Check only) H (W)H,W W
material

3 Pre-Installation

Check Foundation for


location & orientation
of anchor bolts,leveling Eng drawing MT,DC &
3.1 Visual H (W)H,W W
bolts pocket,sole plates installation flashlight
and axis mark of
foundation

Check cleaning and


painting of foundation
3.2 Visual Engineering spec N/A H (W)H,W R
surface under base
plate
Check cleanliness of
3.3 Visual Engineering spec N/A H (W)H,W R
pocket
Check base plate
3.4 Visual Drawing spec MT & theodolite H (W)H,W R
elevation

4 Installation of equipment

Check
MT&WP.
verticality,oreintation & Eng drawing
Inspection Form
4.1 the equipment leveling Visual installation & H (W)H,W W
for Equipment
after tightening of Eng Spec
Installation
anchor bolts

DG&WP.
Eng drawing
Check Coupling Inspection form
4.2 Visual installation & Eng H (W)H,W W
alignment Note (1) for main coupling
Spec
(EGset)
Equipment base Eng drawing &
4.3 Visual MT&WP H (W)H,W W
grouting spec
BANGKANAI GEPP (PEAKER) STAGE 2 (140 MW)
Consortium PP-Wärtsilä

INSPECTION & TEST PLAN FOR INSTALLATION OF ROTATING EQUIPMENT


Inspection test Method of Reference Measurement Inspection attendance
No
item/activity inspection Document record Sub-con PP-Wärtsilä PLN / PLNE
Ensure all mechanical
Eng drawing &
4.5 completion check list is Visual N/A H (W)H,W W
spec
complete

5 Final Documentation
5.1 Red-Pen drawings Review Red-Pens dwg. N/A H (R) H R
5.2 Punch List Review N/A Punch List Form H (H,R) H R

LEGENDS:
VC : Vernier caliper WP: waterpass
MT : Measuring tape DG : Dial gauge
DC : Depth caliper
WFG : Weld filler gage
H : Hold point (Hold Inspection)
R : Review (Review of Document or Report)
W : Witness (During normal Supervision of the installation; not a Hold Inspection)
Note (1): Not applicable for Pumps inside Wartsila Skids