Tumkur SCP
Tumkur SCP
KA-05-TUM
Page 1 of 92
INDIA SMART CITY MISSION
CHECKLIST
All fields in the SCP format document have to be filled. The chart below will assi st you in verifying
that all questions have been answered and all fields have been filled.
Q. No TICK
PART A: CITY P ROFILE
1. ✔ QUALITY OF LIFE
3. ✔ SWOT
7. ✔ SELF-ASSESSMENT: BASELINE
9. ✔ SUMMARY
19. ✔ SUMMARY
Page 2 of 92
INDIA SMART CITY MISSION
39. ✔ COS TS
Page 3 of 92
INDIA SMART CITY MISSION
INSTRUCTIONS
1. This document must be read along with the Smart City Mission Guidelines. An electronic version of
the SCPformat is also available on the website <smartcities.gov.in>
Follow: ‘Downloads’ > ‘Memos’.
2. The respons es must be within the word limits given. The font size must be 12 Arial, with 1.5 spacing,
left aligned paragraphs with one inch margins. All additional information must be given in 20 nos. A-4
size pages in Annexure 3.
3. For the A rea-Based Proposal, only one ‘Area’ should be selected. The A rea selected can be a
combination of one or more types of area-bas ed developments. This can be retrofitting or
redevelopment or greenfield alone or a combination of these, but the area delineated should be
contiguous and not at separate locations in the city.
4. The Area-bas ed Development must contain all the Essential Features as per para 6.2 of the Mission
Guidelines. Please fill out the following checklist.
5. Smart metering ✔ Pg 46
Page 4 of 92
INDIA SMART CITY MISSION
KC 03,12
13. Innovative use of open spaces ✔ Pg 36,39
KC 03 | Pg 36
14. Visible improvement in the A rea ✔
Pg 46
15. Safety of citizens especially children, women and elderly ✔
At least 80% buildings (in redevelopment and green-field) should NA
16.
be energy efficient and green buildings
Pg 46
18. Additional ‘smart’ applications, if any ✔
5. The pan-city Smart Solution should be IT enabled and improve governance or public services. Cities may
propose one or two such Smart Solution(s). If more than one solution is presented kindly use
supplementary template 'P an-City Proposal No 2'.
6. In order to make the proposal credible, all claims must be supported with government order, council
resolutions, legal changes, etc and such supporting documents must be attached as Annexure 4.
7. The Questions can be answered directly in this editable PDF file and can be saved on local computer,
before printing. Your submission in electronic form should contain:
1. The SCP in whole (92) pages
2. The Self Assessment Sheet (Annexure 2)
3. Additional 20 Sheets (Annexure 3)
4. Additional list of Documents (Annexure 4)
Electronic submission to be sent on DV D along wit h printed copies. 5 printed copies of the SCP
document (complet e in all respect) should be sent to MoUD along with the DVD containing the complete
electronic copy. The printed copies should be spiral bound as separate volumes.
It is advised to use latest version of Acrobat Reader (Acrobat XI or higher) to fill the form.
Acrobat Reader XI c an be downloaded from:
https://www.adobe.com/support/downloads/thankyou.jsp?ftpID= 5507&fileID=5519
Page 5 of 92
INDIA SMART CITY MISSION
SCORING DIVISION
CITY-LEVEL: 30
AREA-BASED DEVELOPMENT: 55
PAN-CITY SOLUTION: 15
S.No. Criteria %
1. ‘Smartness’ of solution 3
2. Citizen engagement 1
3. Results orientation 5
4. Process followed 1
5. Implementation framework, including feasibility 5
and cost-effectiveness
Page 6 of 92
INDIA SMART CITY MISSION
A. CITY PROFILE
1. QUALITY OF LIFE
In the last three years, what efforts have been made by the city to improve livability, sustainability and
economic development? Give specific examples along with improvement with KPIs that are in t he
public domain and/ or can be validated. Your answer should cover, but not be restricted to (Describe in
max. 50 words each, mentioning the source of the data):
1. One of the busiest industrial cities in the state served by two National and two State
highways connecting other districts and neighboring states.
2. Public transportation is available for local commutation and all districts of Karnataka.
■ Performance Improvements
→ Transport Bus fleet: 9 to 51 in the last 5 years (daily ridership: 32,571)
→ NMT: 23% Users (cycle-13% and pedestrian-10%) and Footpaths: 10 kms (20%)
→ 10 km length of main roads in ULB's jurisdiction have footpaths.
■ Problems: Encroached footpaths, on-street parking and lack of proper signage
■ Source: Comprehensive Mobility Plan, TCC, 2014 & Officials of KSRTC
1. Continuous pressurized water supply scheme was initiated in 2014 under UIDSSMT
targeting 62,500 connections (Existing coverage - 40%)
2. Stage-2 scheme for additional 50 MLD of supply (targeting 100 LPCD) - under
implementation
■ Performance Improvements
→ Continuity of supply: from once in 4 days to once in 2 days
→ Per capita supply: from 60 in 2012 to 90 LPCD in 2016
→ Existing NRW: 40%
■ Source : KUWDS&DB - AMRUT SLIPS, Officials of TCC
Page 7 of 92
INDIA SMART CITY MISSION
f. Housing situation in the city, specifically role of municipality in expediting building plan approvals,
enhancing property tax collection, etc
1. Housing shortage for slum households is being bridged through RAY and HFA (2766
no. of units from RAY and around 9500 no. of units from HFA)
2. Housing for Sweepers (72 HHs) approved and Rs. 5.5 crore sanctioned | 2 new slum
rehab projects proposed
3. The no of building plan approvals sanctioned in 2013 are 2076 and 2015 are 1907
■ Performance Improvements (last 3 years)
→ Building Plan Avg. Approval Period: 30 days (Online system is not yet operational)
→ Property Tax Collection:Increased by CAGR of 12% (No. of Properties by only 3%)
■ Source: Data from Slum Board Officials and Revenue Section, TCC
Page 8 of 92
INDIA SMART CITY MISSION
2. ADMINISTRATIVE EFFICIENCY
In the last three years, what have been the changes in Administrative Efficiency due to the use of
Information and Communication Technology (ICT) (Describe in max. 50 words each, mentioning the
source of the data):
OASIS: CMAK(Bengaluru) awarded 1st place in best practices among all Corporations
■ m-OASIS mobile application (launched in July 2015)
→ Focuses on citizen centric service delivery through innovative use of technology.
→ 56,890 residents have been registered.
■ TumkurOne Services
→ Online collection of taxes (Water tax and UGD charges | Property tax) and Bills
(like Electricity bills).
■ Grievance redressals: Increased from 85% to 98% (last two years)
■ Channels available: (1) App (2) Online (3) email (4) Phone (5) SMS (6) Fax (7) Paper
Page 9 of 92
INDIA SMART CITY MISSION
■ TCC website enables viewing property tax details, budgets, audit reports, new Bills
received for payment, expenditure, city town statistics, meeting proceedings and project
wise budget report. E-news on regular basis
Register complaints and track status update, get vehicle schedule for citizen services
like trash pickup etc.
TCC is planning integrated web and mobile apps to support better citizen centric
services in the areas of cleanliness issues, water issues, loss/wastage of public property,
etc.
Page 10 of 92
INDIA SMART CITY MISSION
3. SWOT
Based on the detailed city profiling, what are the strengths and developmental areas of the city?
Conduct a detailed SWOT analysis of the city with all relevant metrics and data. (max 1000 words):
■ STRENGTHS
→ STRATEGIC LOCATION AND CONNECTIVITY, A DRAW FOR BUSINESSES:
Tumakuru is located only 70kms (1.5 hr drive) from BENGALURU City. It is a
passage for atleast 15 DISTRICTS accessing Bengaluru through a high-speed
elevated corridor (NH-4). It is well connected by Rail and Road, including two
National Highways and one State Highway passing through the city. It lies enroute
the Bengaluru-Mumbai Economic Corridor (BMEC) and CHENNAI - Bengaluru -
Chittradurga industrial corridor (CBIC). The nearest Airport, BENGALURU
INTERNATIONAL AIRPORT is only 75 Km from Tumakuru. There are three
helipads located in the city. This strategic location of the city within the region is an
opportunity for large scale economic development and employment.
→ GROWING NUMBER OF INDUSTRIES: The Government of India, through the
Department of Industrial Policy & Promotion has proposed Tumakuru as a major
MANUFACTURING Corridor with a proposed investment of Rs. 22,000 Cr. It is
already an Industrial city with over Rs 1,800 Cr. investment in large, medium,
small and micro industries that provides employment to 1.4+ lakh people. The city is
a regional hub that serves as an important centre of trade for nearby villages and
towns. HAL has acquired 610 acres for setting up a Helicopter manufacturing plant.
90% of the total working population is employed in these industries in the city.
→ THRIVING EDUCATION AND UNIVERSITY HUB: The City has a university and is
famous for its technical educational institutes - 5 degree colleges, 6 engineering
colleges, 15 ITI colleges, 6 Polytechnic Colleges and 2 Medical Colleges. This
brings in a large number of youth that are potentially skilled. It has a Literacy rate of
80.66% well above the district average of 74.32%.
→ TRENDING SHIFT TOWARDS CLEAN ENERGY OPTIONS, PROPOSED 2000MW
SOLAR POWER PLANT: The city is shifting towards clean energy options
at a massive scale. The Solar Power Plant, proposed on a 10,000 acre land at
Pavagada taluka, will strengthen future economic activities along with generating
clean energy. There is over 3000 acres of rooftops (Industries and Institutions)
available within the city for Solar. Additionally, the Dabhol gas pipeline passes
through Tumakuru, providing an eco-friendly and dependable source of fuel for
industrial, and transportation sectors, in terms of city wide gas distribution system as
well as filling stations.
→ AVAILBILITY OF LAND FOR DEVELOPMENT AND EXPANSION: The city has
around 24% of land that is vacant for development. The roads are wide enough and
form a strong network with good capacity for future growth; it requires no land
acquisition/ or demolition of buildings for road widening. The city has already
proposed to invest Rs. 1550 Cr. for the development of a 32 km Peripheral Ring
Road (through acquiring 652 acres) and a 2.5 km Ring Road extension (Rs. 26 Cr.).
Additionally a Satellite Bus Stand has been proposed in the city.
→ INCREASED INTEREST FROM PRIVATE INVESTORS: Tumakuru has already
received EOIs from over 17 private players including companies like CISCO,
RUBENIUS, WIPRO, etc looking to invest in the city. The interest shown by industry
players, global entities, technology providers and young entrepreneurs promises a
tremendous future for the economic development and growth of Tumakuru.
Page 11 of 92
INDIA SMART CITY MISSION
■ OPPORTUNITIES
→ EMERGE AS AN ALTERNATIVE URBAN CENTRE TO BENGALURU: The
proximity to Bengaluru and the pattern of industrial growth in Tumakuru, can be
potentially channelled for direct benefit to the city. Consider the degrading quality of
life in Bengaluru, being in such close proximity, Tumakuru can offer a much higher
quality of living that is more affordable, thereby developing a pattern of Work in
Bengaluru and Stay in Tumakuru.
→ TALENT ATTRACTION AND RETENTION: The city has a potential to become an
Education and Innovation based economy as it is creating the skilled resource pool
in the multiple government and private Institutions.
→ ECONOMY BOOST AND JOB CREATION: The establishment of an NIMZ will spur
development which will provide a boost of economic activity in the vicinity of the
NIMZ and will also translate into an array of employment opportunity of over 5-6
lakhs. The helicopter manufacturing plant alone will create 5000 jobs and an
investment of around 3000 Crores.
→ PROVISION OF SKILLED HUMAN RESOURCE FOR THE EXISTING ECONOMY:
There are 5 Engineering colleges, 5 polytechnics, 38 Degree colleges, 2 Medical
colleges 5 degree colleges, and a Dental College in Tumakuru. It is anticipated there
will be more in the near future. These government and private colleges offer
opportunity for skill development; Incubation centres, Technology Park, technology
transfer, to cater to proposed industrial development.
→ REVIVING A DEAD LAKE: Tumakuru Amanikere lake can be used as a reservoir to
store, recharge ground water, feed into the city’s larger water system and in turn
determine the density of the settlement pattern. This in-turn can have a huge impact
on the revival of the 13 other lakes. Additionally developing the lakefront can lead
the way in creating the green network of the city and inturn alter the city’s
micro-climate
→ TAPPING 3000 ACRES OF ROOF TOP FOR HARNESSING SOLAR ENERGY:
The 3000 acres of roof top area available with the city’s Industries and Institutions
offers a huge opportunity for tapping of solar energy and in harvesting rainwater.
■ THREATS
→ INCREASE IN INFORMALITY: The city has seen an increase in migrant population,
which has resulted in several squatter settlements. There also exist a large number
of street vendors who encroach on footpaths and carriageways within the city.
→ ENVIRONMENTAL DEGRADATION OF NATURAL RESOURCES: With increase in
urban in-flow the impacts on the environment if not revived and protected can lead
to its pollution and consequent depletion.
→ REGIONAL COMPETITION FOR TALENT: Since the city is in close proximity to
Bengaluru, a city currently offering diverse opportunities and supports urban
lifestyles, it has led to the out-flow of people from Tumakuru to the Metro.
→ INCREASE IN PRIVATE VEHICLE POPULATION: Over the past 5 years, the city
has seen drastic increase in two-wheelers and cars, this is leading to multiple issues
regarding congestion, pollution, etc. in the city.
Page 13 of 92
INDIA SMART CITY MISSION
The Strategy and Blueprint of Tumakuru has been evolved through a systematic process
involving analysis of potential areas of improvement, findings from SWOT analysis and
extensive consultation with the community (incl. other city departments, political
representatives, domain experts, NGOs, Institutions and Citizens). The city aims to
leverage its strategic location (proximity to Bengaluru), connectivity within the region and
its reputation as a growing industrial and knowledge hub, ‘to transform itself from a mere
transitory edge destination and into the most preferred destination of for living’. In order to
achieve this, the city is focusing on being more inclusive, more livable and connected and
more sustainable – both economically and environmentally.
Based on the above principles and the feedback from the city’s robust engagement
process, focus areas of the city include:
Page 14 of 92
INDIA SMART CITY MISSION
Page 15 of 92
INDIA SMART CITY MISSION
Aligning with the key components of the vision, below are listed the Goals and Objectives
under four focus areas as follows:
■ 1-QUALITY OF LIFE
Renewing Public infrastructure and utilities like Water Supply, Sanitation facilities,
roads and other facilities and systems which keep the city functional and meets core
needs of people is elemental to improving Quality of Life. Ensuring these assets are
well maintained contributes to increased capacity, growth and investment.
Tumakuru city is faced with a unique situation of receiving multiple groups of people
apart from its local population. Improving the City Core which is used by all these
multiple groups of people (tourists, students, children, city locals, vendors, labourers,
etc.), will give it an identity of a safe, inclusive and vibrant City Centre. Therefor the
focus is to plan, build and maintain a city where its public infrastructure supports
growth and high quality of life, not only for its residents but all the diverse population
that frequent the city.
→ Enhance the inclusiveness of the community for all ages and backgrounds by
Promoting recreation and culture opportunities
→ Inclusive transformation and beatification of Public Spaces
→ Improve infrastructure and delivery of Public Utilities like water supply, sewerage
and storm water drains
→ Support community wellbeing through enhanced opportunities for active living and
community engagement
→ Foster a strong sense of place and identity through the development of the city
centre as a high quality, compact built form with convenient access to amenities, a
vibrant culture sector, and the conservation of resources
→ Urban regeneration through the redevelopment of inclusive affordable housing
The city already has a well-connected Bus Network and thereby the focus is on
upgrading the existing infrastructure and enabling better feeder systems.
While the city recognizes the significance of the car and two-wheelers in both the
existing and future system, the development of a multi-modal system of walking,
cycling and transit will provide the transportation balance we need. Diversifying the
methods by which people can get around increases not only universal accessibility but
even affordability.
As the city plans for in-flow, it acknowledges the importance of the ecology and
environment in maintaining a balance to become a sustainable city. Tumakuru will
foster rejuvenation and preservation of the natural environment, reducing its carbon
footprint and build the city in an environmentally sound manner that will benefit future
generations. The aim is to protect its environment and enable a sustainable future
through proactive stewardship.
Tumakuru will aim at developing an intensive strategy for enabling and implementing
‘smart city plan’. For this it will work towards continuously improving policies, capacity
building and ease of doing business. Continuing to hold the public's trust through
inclusive, transparent and fair decision making, responsible financial management,
superior service delivery and effective communications will ensure sustained growth
and a thriving city.
Page 17 of 92
INDIA SMART CITY MISSION
Page 18 of 92
INDIA SMART CITY MISSION
6. CITIZEN ENGAGEMENT
How has city leveraged citizen engagement as a tool to define its vision and goals? Specifically
describe (max 150 words each):
Tumakuru city adopted an extensive and inclusive citizen engagement process for
shaping the vision and goals. The vision and goals set out in the previous section are in
close sync with the responses received from citizens. Over 1.75 lakh of interactions were
encountered with citizens through various citizen engagement processes and the same
were analyzed to identify the citizens priorities and focus areas of improvements.
■ CITIZEN FEEDBACK:
→ Suggestion Drop Boxes: 256 suggestions from boxes placed at 6 Locations
→ Surveys: 16,220 responses from citizens on key issues in the city
→ Contests: Vision Statement & Tagline
(The inputs from the feedback of citizens were consolidated and analyzed through a
word cloud tool for a deeper understanding of the aspirations, priorities and key
concerns of the citizens.)
■ VISIONING EXERCISE:
→ A workshop was conducted by officials, academicians and experts headed by
1. Dr. A. Ravindra (Retd. C.S and Founder of India Smart Cities Foundation)
2. Prof. R.K. Mishra (Environmentalist)
(Based on responses from the citizens and insights from experts, vision statement
was framed based on the key strategic directions and goals for the city)
Page 19 of 92
INDIA SMART CITY MISSION
■ PUBLIC OUTREACH
→ Direct Connect: Door to Door Surveys | Suggestion Drop Boxes | Trade Fair
→ Media Platforms:
1. Conventional Platforms: Newspaper Articles | Corporation Website | Mobile SMS
2. Other Platforms : Web Page | Radio Jingles | MyGov Submissions
→ Social Media Platforms : Facebook | WhatsApp | Youtube | Google | Twitter
Page 20 of 92
INDIA SMART CITY MISSION
■ OUTREACH PROGRAM: Based on inputs from the citizens and insights from experts,
vision statement was framed based on the key strategic directions and goals for the
city.
■ KEY CONCERNS: Top issues of priority
→ Mobility: Traffic congestions, better infrastructure for transportation and lack of
support for non-motorized transportation
→ Service Delivery Improvement: Water Supply, sewerage and drainage facilities and
shortage of power supply
→ Cleanliness: Solid waste Management - timely collection and clean streets
→ Visible Improvement: Hawker encroachments, haphazard parking, need for
shaded walk and jog spaces (footpaths and jogging tracks)
→ Public Spaces: Lack of developed recreational and green spaces and degraded
water bodies
■ VISION STATEMENT: Based on city's characteristic, SWOT analysis and citizens
priorities, the theme incorporated into the city's vision and goals are - Connected City
(Mobility and Accessibility) | Quality of Life (better services, inclusive development and
increase in lively spaces) | Sustainable Living (ecological developments - water body
restoration and urban tree management)
Page 21 of 92
INDIA SMART CITY MISSION
7. SELF-ASSESSMENT: BASELINE
Define the baseline for your city based on self-assessment criteria given in Annexure 2 (column ‘H’).
Marks will be awarded based on how well you know y our city (Fill column ‘I’ in the self assessment
sheet in Annexure 2 with as many KPIs and "hard metrics" as possible; max 50 words per cell)
Page 22 of 92
INDIA SMART CITY MISSION
B. AREA-BASED PROPOSAL
The area-based proposal is the key element of the proposal. An area-based proposal will identify an area of
the city that has been selected t hrough desk research, analysis, meetings with public representatives,
prominent citizens, and citizen engagement, as the appropriate site for either of three types of development:
retrofitting (approx. 500 acres), redevelopment (approx. 50 acres) or Greenfield development (approx. 250
acres). This area will be developed into a ‘smart’ area, which incorporates all the Essential
Features/Elements prescribed in the Mission Guidelines and any additional features that are deemed to be
necessary and appropriate.
Mapping of information and data is a key part of your Smart City Proposal. Create a suitable Base Map of
your city with all the relevant systems and networks as they exist today, showing its physical, administrative
and other characteristics, such as natural features, heritage areas, areas prone to flooding, slums, etc. The
base map should show the regional context in which your city is located and should contain the spatial and
physical layout/morphology of your city, the street network, the open and green spaces, the geographical
features and landmarks and the infrastructure, including for transportation, water supply, sewerage,
electricity distribution and generation, and so on.
Using the base map, represent, with the most effective method available, as much information and data
about the ‘Area’ selected for area-based development. Only one ‘Area’ should be selected and attached
in the form of a map containing the spatial and physi cal layout/morphology of the Area, the street
network, the open and green spaces, the geographical features and landmarks and the
infrastructure, including for transportation, water supply, sewerage, electricity distribution and
generation, and so on. The Essential Elements and additional features that are propos ed to be part of the
area-based development should be included. Describe, using mainly graphic means (maps, diagrams,
pictures, etc.) the propos ed area-based development, including the project boundaries, connectivity,
significant relationships, etc.
(max. 2 nos. of A -3 size sheets)
Page 23 of 92
INDIA SMART CITY MISSION
9. SUMMARY
Summarize your idea for an area-based development. (max. 100 words )
Tumakuru envisions RETROFITTING 1354.97 acres of its CBD area (along with
Amanikere Lake) to be an inclusive and thriving space catering to all user groups.
The area for development is composed of two distinct components: City Centre (895.57
Acres) and Tumakuru Amanikere Lake (459.4 acres). Apart from the high floating
population (students, tourists, vendors and other people from the district) that frequents
the city center, the area includes a resident population of 43,941 people. The landuse
has a good mix of Water Body (33.9%), Residential (27.6%), Public/Semi-Public (13.9%),
Commercial (10.6%), Transportation (9%), Parks (4.1%) and other a small share of
industrial and Public Utility Areas. This along with a potential reservoir provides an
opportunity to develop the city core on the principles of Socio-Ecological Urbanism.
■ CITY PROFILE
Tumakuru is a medium sized town of about 50 sq km and a radius of approx. 5 km
which is located in close proximity to Bengaluru, the IT capital of India. It is extremely
well CONNECTED by rail and road to major cities like Bengaluru, Chennai, Pune and
Mumbai, etc. There are several investments in the INDUSTRIAL (Manufacturing)
sector. It also has the proposed industrial corridor (BMEC and CBIC) with GAIL
pipeline crossing it. The city also has 45 Institutions within the limits.
The city is anticipated to grow outward, spreading over 130 sq km and attain over 9.5
lakh population by 2031, as against the current population of 3.25 lakh. Relating to the
city context and its potential growth, the reasons for selecting the ABD area are:
→ This area is currently the most active part and the centre of the city with high
floating population
→ It reflects all typologies of land-use represented within it, i.e. Water, Residential,
Public/Semi-Public, Industrial, Commercial, Transportation and Parks
→ The transit hubs (Bus and Rail) and main highways pass through the Area
→ The CBD is the landing area for anyone who visits the city
→ Tumakuru Amanikere, the largest lake bed of the city is located here
[Refer: ANNEXURE 3.1 & 3.6]
Page 25 of 92
INDIA SMART CITY MISSION
→ SCP-ROUND 2:
›› Stakeholder Consultation | Gaps in the proposal were assessed and ways to
strengthen the proposal were presented at another stakeholder meeting held on
June 09, 2015.
›› Individual Cosultations | Additionally individual discussions with the Principal
Secretary (Mentor), DC and departments that are collaborators on the project
(TUDA, KSRTC, Traffic Police,etc.) were conducted to gauge gaps, assess
status and readiness of agencies towards execution of proposed projects.
[Refer Annexure 3.4]
Page 26 of 92
INDIA SMART CITY MISSION
For the ABD area, there are 15 key components that fall under the 4 strategic pillars.
■ 1-QUALITY OF LIFE
KC01: Public Utility Infrastructure Improvement and completion of water supply,
underground Sewerage networks, storm water drains and provision of natural
gas pipelines to households
KC02: Ensuring a SWACHH Tumakuru through extending 100% coverage and
collection, creating an integrated recycle centre and transfer point and provision
of adequate public toilets
KC03: Creating a link of lively and active Public Space in the city centre by developing
the lake front, re-developing the city library, creating vending zones, decluttering
by introducing underground ducting, provision of ‘Smart Lounges’ etc.
KC04: Ensuring affordable and accessible Super-Speciality health and emergency
services to all
KC05: Retro-fitting and redevelopment of affordable housing
Page 27 of 92
INDIA SMART CITY MISSION
■ THE CITY SPINE ROAD: Developing Ashoka road, Amanikere road and Railway
Station road into a uniting seam link through an organised street network that connects
- Transportation modes (Railway Station and Bust Terminal), Commercial activity
(Vending Zones, MG Rd, Mandipete) and Recreational activity (Amanikere Lake Front)
■ THE BLUE-GREEN ECOLOGICAL HUB: This involves the revival of the naturally-
oriented water cycle of the region, using existing water bodies and the creation of a
robust green infrastructure. This will lead to better water management and
futureproofing against the growing demand.
These blue-green spaces will also support biodiversity in the comparatively small scale
that a city provides. PROJECTS - Revival of the Amanikere Lake Bed, its feeder
channels, Construction of storm water drains that lead into the lake, Introducing
afforestation within the 75m buffer zone around the lake, Lining streets >=15m width
with trees, Planting 1m green buffers within Public buildings, Upgrading existing parks,
Monitoring the environment and creating awareness through the Environment Lab
■ THRIVING CITY CENTRE: Reinventing the city centre’s public assets towards a
proactive creation of well connected, universally accessible and inclusive public
spaces that promotes people's health, happiness, and well-being. PROJECTS -
Recreational and activity spaces around the lakefront, cinemas, city library; Vending
zones along high-activity streets, Walkable streets especially along commercial areas,
8 ‘you are here’ signboards and 6 Smart Lounges.
Page 28 of 92
INDIA SMART CITY MISSION
2 Swachh Bharat Mission (SBM) Total fund allocation: Rs. 4 crores relating to
[ongoing] municipal solid waste collection/ treatment/
disposal/ management to be converged with
Swachh Bharat Mission Initiative on PPP
mode.
Page 29 of 92
INDIA SMART CITY MISSION
TABLE 1
S.No Missi on/Programme/ How to achieve convergence
Scheme/Project
4 Pradhan Mantri Awas Yojana (Housing for All) Fund availability under the scheme:
[ongoing] Rs. 69 crores for in situ, and
Rs. 64 crores for ex situ development (approx.
40% for in situ, and 35% for ex situ has already
been spent).
Credit linked subsidy for EWS Housing
The projects relating to slum improvement,
Pucca houses, re/development proposed in the
SCP will be converged with SFPoA project.
6 14th Finance Commission Grant, GOI, and State Total grant over the next 5 years is: Rs. 60.44
Finance Commission Grant, GOK crore
State Grant during 2015-16 is: Rs. 68.90 crore
Page 30 of 92
INDIA SMART CITY MISSION
■ AMRUT: The Projects covered under AMRUT include water supply, UGD, storm water
drains, junction improvement, signage and street markings, cycle tracks and
upgradation of parks in the city. All these projects partly lie in the ABD area and will be
converged with AMRUT project by way of project components/ activities, targets, and
funding mechanism etc.
›› The total fund allocation/ availability is Rs. 160.00 crore
■ FC and SFC GRANTS: The 14th Finance Commission Grant from the Government of
India is available over the next 5 years. The State Finance Commission Grant,
Government of Karnataka has been granted during 2015-16 which may be assumed to
increase at 10% per annum.
›› 14th FC Grant is Rs. 60.44 crores
›› SFC Grant is Rs. 68.90 crores
■ SWACHH BHARAT MISSION (SBM): The project related to citizen led MSW
management can be converged with Swatchh Bharat Mission and be included in the
existing draft MSW Collection and Transport DPR for Tumakuru prepared by TCC in
May 2014.
›› SBM Fund available is Rs. 8.00 crores
■ SHELTER FOR ALL: There are 4 slum pockets with 353 households and 3802 EWS
housing within the ABD ares. Redevelopment of the slums and upgradation of EWS
housing into affordable housing stock will be converged with Shelter for All project,
which can also be include in the existing 'Slum Free City' plan of action prepared by
TCC in 2012.
›› Fund availability is Rs. 69.00 crores for in situ, and Rs. 64.00 crores for ex situ
development (approx. 40% for in situ, and 35% for ex situ has already been spent).
■ NATIONAL HEALTH MISSION: The upgradation of district hospital towards 200 bed
multi-/super specialty may be financed under smart city or converged under National
Health Mission or be implemented on PPP mode.
■ DIGITAL INDIA: TumakuruOne centres for public service delivery, free Wi-Fi at 6
locations, water metering, smart card for SWM and public grievances system can be
converged under Digital India on PPP mode.
Page 31 of 92
INDIA SMART CITY MISSION
Page 32 of 92
INDIA SMART CITY MISSION
15. RISKS
What are the three greatest risks that could prevent the success of the area-based proposal? In Table
2, describe each risk, its likelihood, the likely impact and the mitigation you propose. (max. 50 words
per cell)
TABLE 2
TABLE 2
Page 34 of 92
INDIA SMART CITY MISSION
TABLE 2
Page 35 of 92
INDIA SMART CITY MISSION
■ 1-QUALITY OF LIFE
KC01: Improvement of Public Utility Infrastructure
›› 1. 24X7 WATER SUPPLY : Water supply has been completed for the entire ABD
area, however 13 additional GSRs & ESRs, installation of 20 energy efficient
water pumps and online testing of quality of water at pumping station level for
improving quality of water supplied are proposed • AGENCIES: UIDSSMT &
KUWS&DB • STATUS: Tender has been called
›› 2. UNDERGROUND DRAINAGE: Completion of the UGD network has been already
been undertaken for the selected area and is currently on its way to completion
• AGENCIES: KUWS&DB • STATUS: On-going, 70% completed
›› 3. STORM WATER DRAINS: The area has no storm water drains, these are
proposed to be constructed throughout the 92.9 km road length and channeled
into Amanikere Lake. • AGENCIES: TCC • STATUS: Plan sanctioned - AMRUT
›› 4.PIPED NATURAL GAS SUPPLY: Under the CGD Network it has been proposed to
supply Piped Natural Gas (PNG) to residential consumers, CNG to automobiles
and PNG to Industries within Tumakuru District. • AGENCIES: TCC, PNGRB and
MEIL (private) • STATUS: DPR approved for Phase I (includes ABD Area)
KC03: Creating a link of lively and active Public Space in the City Centre.
›› 9. LAKE FRONT: Activating 2.5 kms of the Lakefront with various recreational
activities (i) 2 parks (ii) Open Air theatre (iii) Kalyani (iv) Musical Fountain (iv)
Glass House (v) Food Courts (vi) Smart Lounges (vii) Islands (viii) Environment
Lab (ix) Walking & cycling path. • AGENCIES: TUDA • STATUS: Phase I on-going
›› 10. CITY LIBRARY: Redevelopment of existing city library (2.25 acres) into a
state-of-the art library complex with ancillary facilities - amphitheatre, café, Smart
Page 36 of 92
INDIA SMART CITY MISSION
KC04: Ensuring affordable and accessible emergency and trauma services to all groups
›› 14. MULTI-SPECIALITY GOVERNMENT HOSPITAL AND TRAUMA CENTRE:
Re-development of the Govt. Hospital (17 acres) into a Smart Multi-Speciality
healthcare facility with ICU on wheels, maternity home and trauma centre
• AGENCIES: Health Dept. • STATUS: Approved under National Health Mission
›› 15. MEDICAL COLLEGE: A Medical College is proposed in the same campus as the
Hospital • AGENCIES: Health Dept. • STATUS: Sanctioned under Karnataka
Health System Development and Reform Project (KSHDRP)
Page 37 of 92
INDIA SMART CITY MISSION
KC09: Increasing the ease of Navigation and making the city more Legible
›› 25. ‘YOU ARE HERE’ MAPS: Analogue Maps will show landmarks, services, hotels,
recreational facilities, cafes, etc. that help in navigate the city centre. 8 maps
have been proposed in key strategic locations • AGENCIES: TCC
›› 26. SIGNAGE & STREET MARKINGS: Upgradation of existing and introduction of
new signage, making the city centre more legible. It includes direction and point
signage, street markings, textured paving and sound indicators. • AGENCIES:
TCC, Traffic Police • STATUS: Sanctioned under AMRUT
[Refer Annexure 3.8]
■ 3-ENVIRONMENT AND ECOLOGY
KC10: Ensuring integrated water resources management
›› 27. SUSTAINABLE LAKE BASIN REVIVAL: Cleaning of Amanikere lake bed, clearing
and strengthening inlet and outlet feeder channels, Stone pitching of Bund, Silt
traps, automatic coarse filters and provision of a storm water pump. • AGENCIES:
TCC, TUDA • STATUS: Feeder channels cleared and encroachment removed
›› 28. RAIN WATER HARVESTING: Installation of RWH systems on Rooftops of
Industrial and Institutional (Educational and Public) which results in a catchment
area of 60 Acres. • AGENCIES: TCC, Private and Public Institutions
›› 30. LED AND SOLAR STREET LIGHTS: Replacement of all street lights with LED
Lights and introduction of Solar Panels at regular intervals. • AGENCIES: TCC
• STATUS: 146 Lights have been replaced
KC13: Monitoring the Environment to control pollution levels and control exploitation
›› 35. ENVIRO-LAB: ‘Awareness Lab’ located at lakefront to measure, monitor and
showcase the quality of environment in Tumakuru and build awareness among
citizens especially children on the importance and protection of the environment.
• AGENCIES: TUDA, KSPCB and LDA
›› 36. POLLUTION MONITORING SENSORS AND WEATHER STATIONS: These
whether stations and monitoring sensors are proposed to be put up in 10 critical
locations that include junctions, around the lake, residential and institutional
areas. • AGENCIES: TUDA and KSPCB
[Refer Annexure 3.11 - 3.13]
■ 4-GOVERNANCE AND PUBLIC SERVICE MANAGEMENT
KC14: Supporting innovative business and small start-ups
›› 37. BUSINESS INNOVATION AND INCUBATION CENTRE: 2,93,310 sft of
co-working office space is proposed on 2.2 acres of land that contains integrated
facilities like fast Internet, conference rooms, IT services, parking, etc. It is built to
EMPOWER ENTREPRENEURS, STARTUPS & SMALL BUSINESSES. •
AGENCIES: TCC
Page 39 of 92
INDIA SMART CITY MISSION
The significant Critical Success Factors (CSFs) for ensuring success of the ABD
proposals is as follows:
■ CSF3: Capacity building for City SPV, Participating Agencies and Citizens
→ The City SPV and the participating agencies will need to identify/hire specialized
dedicated team for implementing the ABD initiative and managing the interface with
consultants, vendors and 3rd party service provider. Apart from the technical team it
would also be necessary to have a multi-disciplinary team to manage the legal and
commercial aspects of the various contracts.
→ Citizens and multiple stakeholders have have been extensively involved in the
process of formulating the Smart City Plan for Tumakuru. With over 1.75 Lakh
interactions, it is therefore required to further educate citizens on the ‘Smart’
Features of the proposal and strengthen their faith in the ULB by ensuring
smooth and quality execution of projects
Page 40 of 92
INDIA SMART CITY MISSION
Page 41 of 92
INDIA SMART CITY MISSION
a. Governance Impact (eg. improvement in service provision and recovery of charges due to establishment
of SPV)
b. Spatial Impact (eg. built form changed to incorporate more density or more public space)
→ Integration of the transport terminals, multi-level car park, organised street parking and
feeder systems will DECONGEST the city centre and ensure smooth flow of traffic. On
completion this can change the working pattern, movement pattern, linkages, etc. thus
impacting the built form, and the skyline
→ Revival of Tumakuru Amanikere lake as reservoir will help INTEGRATE it back into the
urban form and result in helping revive the other 14 dead lakes, increase the water
table of the area, alter the micro-climate and add tremendous recreational value to the
city centre
→ UPGRADING the neighbourhood including pedestrianisation of the CBD, cycle lanes,
creation of vending zones, clearance of overhead electric wires, installation
of solar lamps will bring welcome change in built form, restore the equality of modes
on the street and ensure universal accessibility.
→ The introduction of internationally practiced urban design/ control norms including high
density, high rise, compact, mixed use, transit oriented development etc will give rise
to a visually appealing city centre
→ The city gets a vibrant and active city centre with a balance of built and natural
environment and there by a unique identity
Page 42 of 92
INDIA SMART CITY MISSION
c. Economic Impact (eg. new commercial space created for organized economic activity)
→ Upgrading the Transport Hubs will not only support the current economic activity in
the city centre but attract more people from the region to do business in the city
centre.
→ The Business Innovation and Incubation Centre is expected to support start-ups and
new business to florish by providing co-working spaces and other services which
generate revenue and build a start-up culture for Tumakuru
→ On-street parking and MLCP will be charged and consequently be a source of
revenue
→ Organised Vending Zones in the city centre will help create a self-sufficient economic
model that will benefit the hawkers and the ULB
→ Over-all upgradation of the city centre with the rejuvenated Amanikere Lake, as an
integrated hub that sets the first impression and identity of the city, will help attract the
captive market and new investments in the city
Page 43 of 92
INDIA SMART CITY MISSION
e. Sustainability, including environmental impact (eg. int ensive 24X7 us e of public spaces results in reduced
traffic and reduced pollution)
Page 44 of 92
INDIA SMART CITY MISSION
19. SUMMARY
Summarize your idea(s ) for the pan-city proposal(s). (max. 100 words)
The ICMCC will be an integrated system that will operate and manage multiple city
service operations including real time monitoring and help in improving services delivery
& governance. The applications of ICMCC are:
→ Integration of existing control rooms for the existing
→ Smart Metering: Continuous monitoring of water supply and energy: availability,losses
and quality
→ Intelligent Traffic & Transport Management: Traffic management, offence tracking at
major junctions, VMS and smart parking
→ Smart SWM Monitoring: Tracking the collection and street sweeping of waste on a
daily basis across the city
→ Surveillance System: CCTV Camera Surveillance across the city
→ Emergency Response System: Incident Management System with support from
Hospitals, Fire, Police, Traffic, TCC and other departments
→ Environment Monitoring: Weather stations to monitor air quality, water, rain,
temperature and humidity.
[Refer Annexure 3.16]
Page 45 of 92
INDIA SMART CITY MISSION
20. COMPONENTS
List the key components of your pan-city proposal(s). (max. 250 words)
■ KEY COMPONENTS:
• CENTRALISED CONTROL ROOM: Fully equipped operations control rooms for
individual city sub-domains and large control room for multi-agency collaboration.
(Operator monitoring consoles, video-wall, two-way communication system,
hardware hosting facility, secondary control room)
• DOMAINS:
→ Smart Metering: Automatic Meter Readers (zonal and bulk consumers) - energy
and water, Remote pumping systems (for water), SCADA for system monitoring
and control, quality sensors, remote manhole status sensing system, GIS map with
complete asset mapping and On-line payment systems.
→ Intelligent public transport system: GIS Map with bus routes, bus stops, vehicle
mounted GPS device, LED passenger information boards, public bus transit
monitoring backend software and hardware
→ Intelligent parking system: GIS Map with parking lots, GPRS enabled handheld
devices with front-end software, LED information boards, parking management
backend software and hardware
→ Intelligent traffic management system: Traffic volume cameras, wi-fi enabled
Adaptive controllers, solar panels, central control software and hardware
→ Surveillance system: CCTV cameras (with IR), PTZ cameras, monitoring screens
in the control room, surveillance software
→ Emergency response system: GIS Map, Vehicle mounted GPS device, 2-way
communication system, Vehicle dispatch software and hardware
→ Waste Collection & Transportation monitoring system: GIS Map, collection routes,
Geo-fenced waste bin points, vehicle mounted GPS device, computerized,
weigh-bridge system, waste collection monitoring backend software and hardware
→ Street-light monitoring and management system: LED lights, GPRS
enabled controllers, backend street-light monitoring system and hardware
→ Environment Monitoring: Pollution Sensor, Rain Guage and Temperature sensors,
GIS enabled system, GSM/ ISM transceiver hub and outdoor displays
Page 46 of 92
INDIA SMART CITY MISSION
■ CITY PROFILE
The high level of investments and job creation in the city is bound to lead to rapid
urbanisation. The city is anticipated to grow almost 3 times its current size, spreading
over 130 sq km (from existing 50 sq km) and attain over 9.5 lakh population by 2031,
as against the current population of 3.25 lakh. This growth will lead to a stress not only
on key infrastructure (water, power, etc.) of the city but also in the management and
delivery of civic services. As seen in the context of Bengaluru and other Metro Cities,
unmanged and unplanned growth can lead to several issues like Congestion,
Pollution, Safety and Security, Affordability, Resource Depletion, etc. and there by
inorder to de-risk Tumakuru from following the same trend, it is essential to start
planning for the in-flow.
Through Schemes like AMRUT, SBA, DELP, etc., the city is already building its hard
infrastructure and therefore it becomes essential to develop an integrated approach
towards 'smart' management and delivery of these services alongside the construction.
Page 47 of 92
INDIA SMART CITY MISSION
Of these interventions, Integrated and Smart Governance was voted the highest
(67%) and was taken as the Primary Pan City initiative.
→ SCP-ROUND 2: At this stage the previous Pan-City proposal was assessed and
based on the city profile, issue areas suggested by citizens and the 7 areas of
interventions suggested, it was decided that an INTEGRATED CITY
MANAGEMENT CONTROL CENTRE (ICMCC) would be more comprehensive
and inclusive.
Page 48 of 92
INDIA SMART CITY MISSION
The Tumakuru City Corporation has unanimously resolved a resolution wide letter
TCC/Mayor/CR-54/2015-16 dated 05.12.15
→ SCP-ROUND 2: Post the stakeholder & individual discussions with departments,
the revised Pan City proposal were presented to the MLA and Council. TCC has
unanimously resolved adopting the Revised Smart City plan and proposal vide
Sl.No./TCC/KS/02/2016-17 dated 18.06.16
[Refer Annexure 4.4 & 4.5]
During SCP-ROUND 1, the city conducted a Technology Fair (November 05, 2015)
where it hosted over 41 reputed technology providers like Bosch, IBM, Renlys/
Rubenius, Wipro, Siemens, Airtel, Asian Healthcare Alliance, Selco India, etc. The
critical data concerning areas of their interest and the list of potential projects was
provided to them by TCC staff and other district officials for submission of Expressions
of Interest (EOIs). The city received EOI from around 17 companies that covered most
Integrated solutions for Smart city development - Urban mobility, green transport,
safety & security surveillance, sensor technology, intelligent traffic management roof
top solar energy, metering, etc.
The Confederation of India Industry (CII) has offered to sign an MoU with TCC to bring
world class technology solution providers for smart city projects. Additionally the
department of Infrastructural Development has deployed IDeCK consultants to help
TCC to formulate PPP Projects.
The specific issues to be resolved and the smart solution proposed are set out in the
table below:
→ SMART METERING
Issues: High leakages in the water supply system (both UFW and NRW) and AT&C
losses in energy, no planned maintenance schedules, Lack of data or response in
case of emergency repairs, Ineffective grievance readressal, no automated system
for project monitoring, Polluted water bodies and no active open areas for citizens.
Solutions: It is proposed to meter the entire water and energy network through a
combination of conventional meters and AMRs. The AMRs would be installed for bulk
consumers and at the distribution zones. Pressure sensors and water quality sensors
would be installed to monitor the service parameters across the network and SCADA
based monitoring of the entire system.
Continue on next page
Page 49 of 92
INDIA SMART CITY MISSION
Billing would be done using handhelds and payments would be enabled through web
and mobile. Since all of the above also requires physical infrastructure to be built, the
city would also implement a project monitoring module and approval workflow system
to ensure that the project is implemented in a timely manner.
→ INTELLIGENT PARKING
Issues: No information on location of parking lots, no real-time information on
availability of parking spaces, no parking charges being levied for on-street parking.
Solutions: Earmarking and specifying rated capacity for on-street and off-street
parking facilities, GPRS enabled handheld based ticketing system with real-time
parking availability updation of common backend system , Publishing of parking
information through VMS and city mobile application.
→ INTELLIGENT SIGNALLING
Issues: Increasing congestion on roads and key junctions
Solution: Implementation of traffic actuated intelligent signaling system would increase
the throughput of junctions and reduce congestion
→ SURVEILLANCE SYSTEM
Issue: No monitoring of the sensitive areas which witness crowd surges
Solution: CCTV surveillance of core-city area to monitor crowd movement and enable
early response in case of emergencies
→ EMERGENCY RESPONSE SYSTEM linking police, fire and medical services in the
city to respond to emergencies
Issues: No system for tackling incidents requiring coordination amongst different
agencies
Solutions: Quick response in case of emergencies based on GPS based tracking of
emergency vehicles, Two-way communication network between control room and field
fleet, Vehicle dispatch system for allocating field teams to address emergency
situations.
Page 50 of 92
INDIA SMART CITY MISSION
→ ENVIRONMENT MONITORING
Issues: Unable to identify the cause, scale and impact of environmental degradation
on health of the citizens.
Solutions: Setting up of weather stations across the key locations (decided based on
the land use and activity) to monitor the environmental pollution levels for air and
water and track the climate data. Also the aim is to build a data bank for better
environment planning for future.
Page 51 of 92
INDIA SMART CITY MISSION
23. INCLUSION
How inclusive is/are your pan-city proposal(s)? What makes it so? (max. 150 words)
The pan city initiative ICMCC for Tumakuru is inclusive for all socio-economic groups.
→ Smart Metering: Ensuring availability of power and continous supply of water to all the
households by distributing water equally to all the areas including water scarce area.
Reducing AT&C losses and NRW contribute to the addl. availability of water shall be
made available for weaker sections. Low income slum households with no piped
connections will be also be covered under AMRUT for water supply
→ Intelligent Public Transport System: Improves the availability, reliability and comfort for
passengers utilizing public transport. Physically disadvantaged persons will be
provided with wheel-chair friendly facility in the public transport fleet.
→ Intelligent Parking System: All households with vehicle ownership will be beneficiaries.
→ CCTV Surveillance & Emergency Response: Safety of women, children and
vulnerable sections of the society
→ Intelligent Signalling & Signage: All the citizens and visitors of Tumakuru. For people
with visually impairment, sound sensors shall be implanted at key crossings.
All the solutions under pan city initiative were proposed based on the outcomes of an
elaborate citizen engagement exercise. The proposed solution was designed for
targeting the benefits to maximum number of citizens and also covering all the segments
of the society making the solution truly inclusive.
TABLE 3
Page 52 of 92
INDIA SMART CITY MISSION
TABLE 3
Page 53 of 92
INDIA SMART CITY MISSION
TABLE 3
Sufficient awareness
building exercises will
be held to keep people
informed about solutions
being deployed and how
it can be best used.
Page 54 of 92
INDIA SMART CITY MISSION
SERVICE PROVIDERS: Preliminary interest was expressed by 17 firms (with local and
international presence and experience) during the smart city exhibition conducted during
first round of smart city challenge. Solutions for few projects such as Water supply, traffic
and transport and surveillance are expected to be carried out on PPP mode and the
savings (monetized incase of non revenue benefits) through this installation shall be
shared between the technology provider and the SPV based on the performance
EoIs for the same were received from these 17 firms and attached as Annexure 3.5
TABLE 4
S.No Missi ons/Programmes/Schemes/Projects How to achieve convergence
1 Digital India → Implementation of consumer redressal
portals
Page 56 of 92
INDIA SMART CITY MISSION
TABLE 4
S.No Missi ons/Programmes/Schemes/Projects How to achieve convergence
2 Integrated Power Development Scheme → Funding for rooftop solar panels and solar
DELP Scheme park in the city
Smart Metering of Energy distribution at zonal Collate data and push the same to generate
nodes and bulk consumers overall water and power utility operations
management capability in ICMMC.
SCADA for network management.
Page 57 of 92
INDIA SMART CITY MISSION
TABLE 4
S.No Missi ons/Programmes/Schemes/Projects How to achieve convergence
5 MNRE Solar City Programme → Preparation of a Master Plan within a year
along with few implementable Detailed
Project Reports .
------------------------------------------------------------------ ---------------------------------------------------------------
Nirbhaya Fund → Funding for city surveillance
------------------------------------------------------------------ --------------------------------------------------------------
→ Implementation funding
Page 58 of 92
INDIA SMART CITY MISSION
The significant Critical Success Factors (CSFs) for ensuring success of the pan-city
proposals is as follows
■ CSF1: Detailed Project Planning and Preparation
→ Prepare detailed system and functional requirements to minimize contract
variations and avoid integration issues and proprietary software/protocols
→ Prepare a detailed roll-out and integration plan and carry out rigorous testing
→ Prepare equitable performance linked contract
Page 59 of 92
INDIA SMART CITY MISSION
A well represented PMO will perform a quantitative assessment of smart city features
every six months after first year of implementation through a pre-planned marking
system. This will be compared against the base score captured at the start of
implementation.
Page 60 of 92
INDIA SMART CITY MISSION
a. Governance Impact (eg. government response time to citizen complaints halved, creating faster service
delivery overall)
COST SAVINGS: Service delivery can be achieved due to Intelligent public transport
system, Waste Collection & Transportation monitoring system, Street-light monitoring and
management system.
b. Impact on public services (eg. real-time monitoring of mosquito density in the atmosphere reduces
morbidity)
It is difficult to quantify today about the impact on the city life through these ICT
interventions and justify the same without necessary hard infrastructure on ground.
However few aspects of urban life that would be improved through proposed interventions
are set out below:
DE-CONGESTION: Intelligent Public Transport and Parking System
Impact: Reduction in congestion, signal waiting time and bus waiting time
Page 61 of 92
INDIA SMART CITY MISSION
D. IMPLEMENTATION PLAN
31. IMPLEMENTATION PLAN
In Table 5, describe the activities/components, targets, resources and timelines required to complete the
implementation of your area-based development and pan-city solution/s. This should include the items
mentioned as Essential Features in Q. No. 16 plus other ‘smart’ solutions, including accessible infrastructure
for differently-abled. (max. 50 words per cell)
Table 5
S Activity/component Indicator Baseline Target Resources Likely date
. (as on) required of
N completion
o
15/06/2016
5. Efficient management of MSW % of Door to door 63% 100% 4 Cr. (5, 6 & 7) 2017
collection Human: Operator,
6. Visible segregation and Number of black Unknown 0 NGOs 2019
Cleanliness spots
7. Zero Waste Campuses % reduction of 0% 10% 2019
total waste
8. Public Toilets No. toilets (seats) 5.2 seats / 12.8 seats / 1000 1 Cr. 2018
per 1000 persons 1000 persons persons
-------------------------------------------- ------------------------- --------------------- ------------------------ -------------------------- ------------------
Human: Manger;
Vendors
-------------------------------------------- ------------------------- --------------------- ------------------------ -------------------------- ------------------
Table 5
S Activity/component Indicator Baseline Target Resources Likely date
. (as on) required of
N completion
o
3 KC04: Ensuring affordable and
accessible emergency and
trauma services to all groups Financial (Rs in Cr)
14. Multi-Speciality Government No. of Cases 127 cases per 10-15 cases per 302 Cr. (14 & 15) 2020
Hospital And Trauma Centre shifted to B'lore month month
15. Medical College n/a n/a n/a Human: Managing 2020
& Administration
-------------------------------------------- ------------------------- --------------------- ----------------------- ------------------------- ------------------
18. Government And Private Bus Increase in No of 1019 1500 174 Cr. 2019
Stands trips (city buses)
19. Feeder System % Increase in 50% 75% 12 cr. 2018
Ridership
20. Junction Re-design Congestion n/a Smooth flowing 24 Cr. 2018
traffic
Human: Vendors
for feeder system
-------------------------------------------- ------------------------- --------------------- ----------------------- ------------------------- ------------------
21. Footpaths & Walkways No of Kms 0 kms 92.9 kms 81 Cr. 2019
Covered
22. Cycle lanes No of Kms 0 kms 13.5 kms (incl. 9 Cr. 2018
Covered 6.5 around the
lake)
25. ‘You are here’ Maps No. of Maps 0 8 0.16 Cr. 2018
26. Signage and Street Markings n/a n/a n/a 0.11 Cr. 2018
Page 63 of 92
INDIA SMART CITY MISSION
Table 5
S Activity/component Indicator Baseline Target Resources Likely date
. (as on) required of
N completion
o
6 KC10: Ensuring integrated water
resources management Financial (Rs in Cr)
27. Sustainable Lake Basin MLD of water in 0 MLD 18.12 MLD 76.5 Cr. 2020
Management the Lake
28. Rain Water Harvesting Ground water 600-900 ft 450 - 500 ft 5 Cr. 2018
levels
29. Solar Panels on Rooftops Roof Area covered 0 Acre 60 Acres 77 Cr. 2018
30. % of Street
30. LED and Solar Street lights Lights covered 10% 100% 15 Cr. 2018
35. Enviro-Lab n/a n/a n/a 1.5 Cr. (35 & 36) 2018
36. Pollution Monitoring Sensors Drop in Pollution 100-150 μg 60 μg 2018
and Weather Station Levels Human:
Curator
-------------------------------------------- ------------------------- --------------------- ----------------------- ------------------------- ------------------
37. Business Innovation and No. of businesses n/a 80-100 Micro 56 Cr. 2019
Incubation Centre incubated Businesses
Human: Managing
body
-------------------------------------------- ------------------------- --------------------- ----------------------- ------------------------- ------------------
Page 64 of 92
INDIA SMART CITY MISSION
Table 5
S Activity/component Indicator Baseline Target Resources Likely date
. (as on) required of
N completion
o
PAN-CITY SOLUTION
1 CENTRALISED CONTROL Financial (Rs in Cr)
ROOM
›› Command and control centre- ›› No. of No system ›› ULB and 5 33 Cr. 2019
Physical building participating present other
›› Video Wall- Operations Room agencies agencies
and video management ›› No. of systems ›› 10components
›› Operator Work Stations effectively (elaborated
›› Data Centre Build Up integrated into below)
›› Conference Facilities the control
›› Core Utility Operations room platform
Integration City Operation ›› Data ›› > 98%
Centre- Alerting, Monitoring integration
and major Incidence platform
Management uptime ›› > 98%
›› Radio
communication
uptime
01. Intelligent Public Transport No. of buses No system 100% bus 5 Cr. 2018
system covered, real-time present coverage,
information on web Functional Control
and mobile, centre, All
Operational control software system
centre aspects functional
-------------------------------------------- ------------------------- ------------------------ ------------------------- ------------------
02. Intelligent parking system No. of parking lots 100% coverage, 4 Cr. 2018
covered, No. of PIS Boards,
VMS Boards Control Centre
-------------------------------------------- ------------------------- ------------------------ ------------------------- ------------------
03. Intelligent traffic signaling No. of junctions 100% of major 8 Cr. 2018
system (incl. VMS) covered, junctions covered
Operational control Functional Control
centre Centre
-------------------------------------------- ------------------------- ------------------------ ------------------------- ------------------
04. Intelligent ticketing % of buses with 100% 16 Cr. 2018
fare reader system
% of parking lots 100%
accepting common
fare cards
05. Emergency response system ›› No of reported ›› 205 ›› <50 accidents 4 Cr. 2018
major accidents per year
accidents per year
along road
networks ›› 30 minutes ›› <15 minutes
›› Avg response
time from
call/alert to first
responder
reaching site
location.
-------------------------------------------- ------------------------ --------------------- ------------------------ ------------------------- ------------------
06. Surveillance system No. of cameras 12 110 7 Cr. 2018
Page 65 of 92
INDIA SMART CITY MISSION
Table 5
S Activity/component Indicator Baseline Target Resources Likely date
. (as on) required of
N completion
o
4 Financial (Rs in Cr)
07. Street-light monitoring and No of street lights 145 (Solar and 40,000 201 Cr. 2019
management system with LED and LED)
›› LED Street lights Solar Panels
›› Solar Panels
›› Remote Controllers and
sensors
›› Automated ›› 100%
payments
Page 66 of 92
INDIA SMART CITY MISSION
32. SCENARIOS
Using information from Table 5, describe the critical milestones, realistic timelines and sequencing of
efforts and events that you are projecting as the short -, medium- and long-t erm scenarios for your
smart city. If nec essary, include PERT and CPM charts in Annexure 3. (max. 500 words)
■ Sustainable O&M: The SPV will either handle the O&M on its own or delegate it to line
agencies or private service providers depending on the nature of arrangements for
implementing different components. This will be based on the terms of the working
arrangement between the SPV and line agencies as laid out in response to Q.no. 34.
A key role of the SPV will also be to interface with private service providers and
financing institutions to lock-in external financing and resource mobilisation options
identified. This is critical to implement some of the programs envisaged with non-grant
financing. Similarly, process and organisational improvements towards better O&M,
financial sustainability and asset management will also be identified and reflected in
the plan early on.
[Refer Annexure 3.17]
Page 67 of 92
INDIA SMART CITY MISSION
33. SPV
The SPV is a critical institution for t he implementation of the P roposal. Describe the SPV you propose
to create in your city, with details of its composition and structure, leadership and governanc e, and
holding pattern. Based on your responses in Table 6 describe how you envision the SPV to fulfill the
role set out in the Mission Guidelines. (max. 500 words)
Table 6
(CHECKLIST: supporting documents for 1-7 must be submitted in Annexure 4)
S. No. Acti vity Ye s/No
Agreement/s with Para Statal Bodies, Boards existing in the City for
3. implementing the full scope of the SCP and sustaining the pan-city and area- Yes
based developments.
If any other SPV is operational in the City, the institutional arrangement with
6.
the existing SPV Yes
Page 68 of 92
INDIA SMART CITY MISSION
■ SPV STRUCTURE: It is proposed that SPV will have minimum seven directors and
a maximum of 15 directors. Following persons shall be the initial Directors on the
Board of the SPV.
→ Director nominated by MoUD, Government of India – Director
→ Following 8 Directors nominated by GoK
• Chairman – Secretary Level Officer of GoK
• MD/CEO – an officer belonging to the cadre of IAS, Selection Scale KAS/KMAS
• MD, KUIDFC
• Director, Directorate of Municipal Administration
• MD, Karnataka Urban Water Supply and Drainage Board
• MD, Bengaluru Electricity Supply Company
• Two independent Directors
→ Six Directors nominated by TCC which shall include Commissioner, TCC
■ RAISING OF FINANCES AND ITS UTILISATION: The SPV will commence its
operations with a strong equity base which will help in taking up transformative
urban infrastructure projects of strategic importance and based on the city’s
requirements and utilisation of funds in line with Mission Guidelines. Projects will be
taken up after an independent and transparent cost-benefit analysis.
Page 69 of 92
INDIA SMART CITY MISSION
34. CONVERGENCE
In Table 7, give details of the government (Central, state/ULB) departments, parastatal organizations
and public agencies who will be involved with the time-bound execution of each of the project
activities/components (both area-based and pan-city) you have identified. (In Annexure 3, include a
flowchart showing the network/relationships that the SPV will form with government and non-
government agencies, and indicating the nature of connection with each entity.) (max. 50 words per
cell)
TABLE 7
S.No Acti vity/ Component Department/agency/ Role/responsibility
organization
1 Utilities Improvement SPV & TCC - Project preparation
1. 24/7 water supply KUWS&DB - Procurement
2. 100% Coverage of UGD PNGRB - Construction
3. 100% Coverage of SWD MoUD - Operations & Maintenance
4. Natural Gas for Domestic & Commercial - Vendor management
2 Traffic & Transportation SPV & TCC, Traffic Police, SPV in Consultation with TCC,
1. Redevelopment of Bus Terminal KSRTC, Private Operators KSRTC and Traffic Police
2. Encouragement of NMT - Project Preparation
3. Pedestrian Friendly Pathways - Tender Supervision
4. Parking Facilities - O&M
- Vendor management
------------------------------------------------------------ - Collection of revenues
Pan City: Intelligent parking system - Provision of space for
Intelligent Signalling installation of Variable
VMS message sign (VMS) boards
BESCOM
- Power supply for VMS boards
Traffic Police
- Regulation & enforcement
3 Visible Improvements SPV & TCC, TUDA, KPWD, - Design and Planning
1. Amanikere Lake Front Development BESCOM, Trade Union, - Procurement
2. Underground Ducting NGOs, RWAs, LDA, - Construction
3. Urban Tree Management KSPCB - Contract Monitoring
4. Vending Zones - Vendor Management
5. Waste Management
6. Public Toilets
-------------------------------------------------------------
Pan City: SWM Monitoring
Environment Monitoring
Page 70 of 92
INDIA SMART CITY MISSION
TABLE 7
S.No Acti vity/ Component Department/agency/ Role/responsibility
organization
4 PPP Projects: TCC & SPV, KSRTC - Technical Studies
1. MLCP - Preparation of Tender
2. Integrated Bus Terminal Documents
3. Business Incubation & Innovation Centres - Selection of Concessionaire
- Share of Revenue/Lease
Pan City: Rentals
Intelligent Street Light Monitoring
6 Pan City - ICMCC SPV &TCC, DeitY, Digital - Deployment of ICT tools
India, KSRTC, Traffic - Integration of platforms
Police, Health Dept., Police - Selection of Vendors
Dept., - Contract Monitoring
- Setting up of Control Room
- Capacity Building for ULB
Staff
Page 71 of 92
INDIA SMART CITY MISSION
TABLE 7
S.No Acti vity/ Component Department/agency/ Role/responsibility
organization
8 Health & Safety SPV & TMC, Health Dept., - Funding available under
1. Redevelopment of Govt. Hospital to Super National Urban Health National Health Mission
Speciality Hospital Mission, Nirbhaya (NHM)
2. Setting up of Medical College - Procurement of Pvt. Investors
3. Trauma Centre - Construction Monitoring
- Commencement of
Operations
-------------------------------------------------------------
Pan City: Emergency Response System
CCTV Surveillance System
10
11
Page 72 of 92
INDIA SMART CITY MISSION
35. PPP
In Table 8, give details of all the private companies/corporations/organizations that need to be
engaged with the execution and operations &maintenance of the various activities and
componentsenvisaged in this proposal, along with a description of their roles and responsibilities as
basic TORs. Use appropriate terms such as ‘vendor’, ‘concessionaire’, ‘JV partner’, etc. (max. 50
words per cell)
TABLE 8
S. Acti vity/ Component Company/corporation/ Role/responsibility
No organization (basi c TOR)
1 Vendors (Consultancy Services): AECOM, TCE, Black & • Preparation of Detailed
Veatch, HCP, Jacobs, Project Report
Consulting and advisory services. iDeCK, Mahindra Acres, • Tender documents
Hyder Consulting, • Bid Process Management
Handholding assistance to the Corporation in Feedback Ventures, DIMTS • Construction Supervision
1. Project preparation
2. Bid process
3. Implementation
monitoring
Page 73 of 92
INDIA SMART CITY MISSION
TABLE 8
S. Acti vity/ Component Company/corporation/ Role/responsibility
No organization (basi c TOR)
4 Contractors: L&T, HCC, Gammon, Project implementation and
Lake area redevelopment Bechtel, subsequent O&M
1. Basin Improvement
2. Lake front Development
3. Feeder Channel
Page 74 of 92
INDIA SMART CITY MISSION
TABLE 8
S. Acti vity/ Component Company/corporation/ Role/responsibility
No organization (basi c TOR)
8 Contractors: Siemens, Bosch, DIMTS, Project implementation and
Surveillance Systems ROLTA subsequent maintenance
Page 75 of 92
INDIA SMART CITY MISSION
Page 76 of 92
INDIA SMART CITY MISSION
E. FINANCIAL PLAN
The development of bankable proposals will be a key success factor in the Smart City Mission. In order to
arrange appropriate amounts and types of funding and financing for your SCP, you must keep financial
considerations always in mind while preparing your overall strategy and the pan-city and area-based
proposals. It is anticipated that innovative means of funding and financing the projects will be necessary. For
this purpose, you must evaluate the capacity of the ULB and the SPV to undertake self-funded development
projects, the availability of funds from other government schemes that will converge in your S CP (refer
Questions 13 and 26), and the finance that can be rais ed from the financial market.
The total estimated capital cost of the SCP is Rs. 2226.82 Crores towards Area Based
Development and Pan City Initiative. The central elements of the ABD and Pan City are:
■ ABD : Mobility | Quality of Life | Ecology | Economic Development & Governance
■ Pan City: Intelligent Systems - Water | Transport | Parking | Surveillance | Emergency
----------------------------------------------------------------------------------------------------------------------
PARTICULARS AMOUNT (in Rs. Crs)
■ AREA BASED DEVELOPMENT: Rs. 1892.03 Crores
• MOBILITY & ACCESSIBILITY
→ Development of Transit Hub and Feeder Systems.................................................210
→ Non Motorized Transport..........................................................................................90
→ Parking Facilities: MLCP & On street parking...........................................................27
• QUALITY OF LIFE
→ Public Utility Improvement: Water Supply, Sewage, SWD and Natural Gas..........633
→ Cleanliness: Solid Waste Management and Public Toilets.........................................5
→ Public Space Improvement: Lake front, Underground ducting, vending zones......292
→ Housing: Slum rehab and EWS housing...................................................................73
→ Health & Welfare: Medical College with Hospital and Trauma Centre....................302
• ECOLOGY & ENVIRONMENT
→ Water Resources Management: Lake Basin Revival & Rain water harvesting........84
→ Renewable Energy: Rooftop Solar and Energy Efficient Street Lighting..................92
→ Urban Tree Management: Plantations, Parks and Green buffer zones....................25
• ECONOMIC DEVELOPMENT AND GOVERNANCE.................................................60
■ PAN CITY SOLUTION: Rs. 334.79 Crores
• INTEGRATED CITY MANAGEMENT CONTROL CENTRE (ICMCC).....................335
Components: Control Room, Smart Metering, Intelligent traffic and
transportation system, Integrated ticketing, Smart Parking,
VMS, Emergency Response System, Street Light Controlling,
CCTV Surveillance System and Weather Stations
■ TOTAL COST OF THE PROJECT 2227
----------------------------------------------------------------------------------------------------------------------
Note: Soft Costs such as Escalations, Detailed planning, Preparation of DPRs and
Administrative Expenses are considered while estimating the above costs
(For detailed cost breakup of the sub components (projects) refer Annexure 3.20)
Page 77 of 92
INDIA SMART CITY MISSION
The smart city proposal for Tumakuru is aligned to the Smart City Misssion of Govt. of
India and is envisaged to be self-sustaining on a standalone basis and also contribute to
the development of the city in the future. The key elements of financial plan such as
funding pattern, convergence and PPP details and revenue sources are detailed below:
■ FUNDING PATTERN
---------------------------------------------------------------------------------------------------------------------
SOURCE | ABD | PAN CITY | ALLOCATION | %age
---------------------------------------------------------------------------------------------------------------------
→ SMART CITY GRANTS
(GoI & State Govt.) | 788 | 212 | 1000 | 45%
→ OWN SOURCES
(ULB Own Sources,
State Departments | 649 | - | 649 | 29%
& Other Schemes)
→ CENTRAL SCHEMES
(AMRUT, SBM, PMAY,
Digital India, Skill India, | 213 | 21 | 234 | 10%
Nirbhaya, DELP,
IPDS and MNRE)
---------------------------------------------------------------------------------------------------------------------
TOTAL COST | 1892 | 335 | 2227 | 100%
---------------------------------------------------------------------------------------------------------------------
■ CONVERGANCE PLAN
→ National Schemes: Rs. 233.5 Crores
1. AMRUT: SLIPs were approved for TCC and disbursement for first year has already
been completed. Also PDMCs were already appointed for 3 of the 5 components.
Proposed Smart City Projects: Water Supply | Sewerage | Storm Water | Junction
Improvements | Footpaths, Walkways and Bicycle
tracks | Park Development
Allocation for Smart City: Rs. 149.7 Crores
2. Swach Bharat: DPR is already prepared and under approval process for
sanctioning of funds for the entire city.
Proposed Smart City Projects: Setting up of DWCC, Bins at commercial roads and
streets with high floating population and providing a
additional vehicles for ensuring better collection and
segregation.
Allocation for Smart City: Rs. 3.9 Crores
Page 78 of 92
INDIA SMART CITY MISSION
3. Housing for All: Under RAY till last year, 1200 houses are being constructed at
Dibbur targeting to complete by March 2017. TCC is also targeting to support
another 256 houses for Credit Link Subsidy Scheme under Housing for All this
financial year by providing interest subsidy to the beneficiaries. Fresh surveys are
being planned for conducting the demand assessment.
Proposed Projects in ABD: Slum rehab: 353 houses for 3 slums in the ABD area
In situ development for 3802 houses in the ABD area
Allocation for Smart City: Rs. 32.9 Crores
4. Other Schemes:
Nirbhaya: Setting up of CCTV cameras & Emergency Response - Rs. 5.9 Crores
Solar City Mission, IPDS: Solar Roof Top with Grid Connectivity - Rs. 26.1 Crores
Digital India: Setting up of Control Room & Smart Louges - - Rs. 15.0 Crores
Others: DELP, Skill India and GCRSSPPP
■ PPP DETAILS
Many of the projects identified in the Smart City Proposal for Tumakuru have potential
to be financially viable either on a standalone basis or viable through providing some
viability gap funds.
Proposed Projects Envisaged through PPP
Page 79 of 92
INDIA SMART CITY MISSION
6. Internal Sources - ULB grant sources shall be utilized for meeting the subsequent
replacement expenditure for the projects under ABD, Pan City Initiatives and any
projects proposed in future. The existing grant sources of TCC in the last few years
are as mentioned below:
→ SFC: Untied, Basic, Incentives, Special and Drinking Water
→ 14th Finance Commission: Basic, Roads & Bridges and General Performance
→ Others: CMSMTDP, Nagarothana and Special Grants
Last 5 years: Total Allocation - Rs. 299.34 Crores | Average - Rs. 59.86 Crores
Avg. Allocation: SFC - 46% | FC - 11% | Other Schemes - 43%
(Portion of these funds shall be allocated for the SPV year on year)
■ REVENUE SOURCES
In order to maintain this initiative financially sustainable and enhance TCC's financial
situation, several revenue enhancers and new income sources were identified and
evaluated critically and a specific set of realistic and achievable options were
proposed and considered for estimating the financial viability of the project. The
proposed revenue options for the SPV are mentioned below:
1. Property Tax: Increase in the property taxes for the assessments in a phase-wise
manner subject to successful improvement in service delivery. ABD shall have a
different structure and incremental revenue proceeds shall be escrowed to SPV.
2. Increase in Stamp Duty & Land Conversion Charges
3. Lease Rentals: Land shall be given as a grant for projects such as Bus terminal
development, MLCP, On street Parking lots and business incubation centre
4. User Development Fees: Grants are initially given to the developer for
redevelopment of KSRTC bus terminal in the ABD area. These grants shall be
recovered through levy of development fees from the visitors by charging marginal
amount of Rs. 5/-
5. Savings from ICT Interventions: Savings realized from ICT interventions shall be
monetized and ploughed back to the SPV's account utilized for meeting O&M
expenses for the projects as well as for upcoming capital expenditure.
6. Parking: Revision of parking fees and differential parking shall be proposed. Also
through the smart parking proposed under ICMCC pan city initiative, leakages
shall be controlled. (Draft of the proposed Parking Policy is annexed to this report)
7. Land Related: 1. Building Bye Laws - Additional FAR post construction completion
2. Zonal Regulation - One time Rezoning Exercise
8. Others: Advertisement Revenue, Levy on vacant lands and Revenue from Feeder
Page 80 of 92
INDIA SMART CITY MISSION
39. COSTS
What is the lifetime cost estimated for your area-based development and your pan-city solution/s? A dd
O&M costs wherever applicable. (max 500 words)
SPV is proposed to take up 39 projects under Area Based Development and 1 project
under Pan City (with 11 domains). Out of these 40 projects, SPV will borne capital and
O&M expenses for 18 projects, only capital support for 10 projects and 11 projects to be
totally implemented under PPP mode. The lifetime costs of the projects (excl. the PPP
projects) for a 20 year period are estimated and detailed in the table below:
---------------------------------------------------------------------------------------------------------------------
COMPONENT | CAPITAL | REPLACEMENT | O&M | TOTAL
COST COST COST COST
---------------------------------------------------------------------------------------------------------------------
1. Mobility, Traffic & Transport 114.5 75.4 20.6 210.5
(Junctions, Footpaths, Feeder,
Walkways, Bicycle tracks,
Street Parking & Signages)
Page 81 of 92
INDIA SMART CITY MISSION
Note: 1. The above lifetime costs are assessed and presented in NPV terms with a
discount rate of 12% for a period of 20 years
2. 6% inflation was considered for estimating replacement costs and O&M
expenses.
3. The above lifetime costs does not include investment through private
developers for PPP projects in the case of projects such as Natural Gas
Project, Bus Terminal Development, Solar rooftop projects, Business incubation
centre, Smart Metering, Intelligent Street Light with Control System
4. Only capital support is considered for estimating lifetime costs incase of PPP
projects where SPV support is required
5. Also the above costs does not include O&M expenses for projects developed
under PPP mode.
The total cost of implementation of the proposal is Rs. 2227 Crores which shall be
funded from various sources.
*PPP is envisaged in projects such as bus terminal and MLCP, solar energy and street
lighting and business centres for incubation and innovation.
The revenue sources for SPV are categorized into two components:
1. Direct Income: Advertisement and Parking Revenue, Lease Rentals and UDF
2. Indirect Income: Incremental Tax Revenue and Escrow Savings from ICT Solutions
3. Capital Income: Share of SFC and FC receipts to support future capex of the SPV
The revenue generated from the above sources are sufficient to meet the O&M
expenses and generate enough cash surpluses and reserves for servicing the assets
perpetually and also provide replacement and upgradation in future.
Loans are not envisaged at this stage of development of the city. Incase of any shortfall
in raising enough funds for the project, KUIDFC the funding agency for the state and also
the nodal agency for Smart City Mission for Karnataka, supports ULBs by providing low
cost loans at an interest rate raging from 5% to 8% based on the category of projects.
These loans are generally project backed term loans and payback is ensured through
escrow mechanism. - KARNTAKA WATER AND SANITATION POOLED TRUST FUND
Upon generating some surpluses from the proposed SPV and implementing revenue
generating initiatives proposed in the proposal, loans could be sought as a leveraging
tool for replicating the same model in other parts of the city. TCC has already appointed
a rating agency for getting a credit rating and the same is under process.
Page 82 of 92
INDIA SMART CITY MISSION
A range of revenue sources will be tapped to address the additional O&M cost for the
citizens which includes Tax and other own funds, user charges in Water supply and
Sewerage, development charges, user charges/ rentals from commercial properties, pay
and use provisions and advertisement options for toilets, rental income from municipal
properties and public spaces, advertisement revenue, parking revenue, etc. Provisions
for annual revision of charges may also be considered instead of periodic revisions.
The project has a mix of remunerative and non-remunerative project components. The
revenue strategy is to earmark a portion of the revenue streams for ensuring
sustainability. The strategies for achieving reasonable levels of O&M sustainability for
each project component have been laid out below:
The city has separate plans for Operation and Maintenance for each of the component
which is detailed below:
→ Water Supply – The O&M for water supply will be met through user charges.
The city is planning to implement 24/7 Water Supply project and proposed to shift
from flat rate system to volumetric method. Higher number of commercial
connections in the ABD area will bring improved returns on the project. The city
has a high user charge collection efficiency with the lower cost recovery low at 50%.
Through metering all the connections and implementing the 'Smart Metering'
Pan City Solution for tracking the NRW. Reducing leakages, savings in pumping
costs and increase in revenue shall make the project more viable.
→ Solid waste management and Sanitation – TCC is currently collecting SWM Cess
from each property owner along with property tax. This SWM cess shall be increased
to meet the O&M expenditure which includes cost towards collection, transportation,
processing and disposal of waste. The cost towards meeting the same shall be met
through increased cess which shall be revised periodically.
→ Lease Rentals - The proposed ABD covers commercial exploitation of lands for office
spaces and parking lots which will contribute for the revenue through lease rentals.
→ Urban Tree Management - These components are generally non remunerative in
nature and are expected to be met through taxes and CSR funds.
→ Other Non-Remunerative Components - Maintenance of Roads and Junctions,
Open Space Maintenance, Storm Water Drains, etc. These components shall be
met through taxes and other indirect sources of revenue as detailed below:
Page 83 of 92
INDIA SMART CITY MISSION
2. Savings from ICT Interventions: Savings from proposed pan city interventions shall
be monetized and portions of the same shall be escrowed into the SPV account for
recurring investments of the smart city and future investments of replicating the
model in other parts of the city.
• Efficiency improvements in Water Supply: Reduction in NRW by curbing
• Reduction in Manpower: IT based technological interventions in sectors such as
traffic & transport, emergency services and streetlight control.
• Contract Monitoring of SWM: Reduction in leakages in the payments
3. SFC Salaries and Electricity: Funds towards salaries for employees and electricity
expenses shall be a pass through
4. Capital Income for Future Capex: Grant sources of ULB such as SFC untied and
special grants, 14th FC, etc. can be utilized to meet the cost towards future
investments. For this purpose 15% of the grants received by TCC, year on year shall
be allotted for future investments of the smart city initiative.
5. Land Related Interventions:
• Shared Selling of assets (land parcels) available with other PSUs such as
railways (MoR/IRSDC), KSRTC, etc. by providing additional FSI for development.
• One-time Rezoning Exercise
• Enhancement of land conversion charges
• Levy on Vacant Lands
Reinvestment:
The revenue generated from the above sources shall be utilized to meet the O&M
expenditure of the projects and also plough back the surpluses for reinvesting in the
developed projects as well as replicating the same model in other parts of the city. The
research and planning for future investments shall be initiated 2018 onwards. An
indicative list of areas for future improvement are mentioned below:
TCC is also looking forward to utilize the surpluses for scaling up the pan city initiatives
from monitoring of services at area/zonal/street level to household level and citizen level
in the subsequent years.
Page 84 of 92
INDIA SMART CITY MISSION
3. Financial Closure
- Procurement of the Contractors (Construction/PPP partners) Q4 FY2017
- Financial closure of the projects Q4 FY2017
Page 85 of 92
INDIA SMART CITY MISSION
→ In case there is a shortfall in financing the capital expenditure, either due to certain
funding sources not materializing as envisaged or owing to cost over-runs in the project
→ In case there is a shortfall in meeting the O&M requirements as against planned
revenue sources.
In the second case, since O&M expenses would be known once implementation bids are
finalized, gaps in O&M funding shall be bridged by garnering resources through user
charges/cess/taxes levied on visitors (preferred) and/or residents.
Other Risks
→ Poor Participation of Pvt. Sector:
• Restructuring the PPP mode after consultations with stakeholders
• Prefer only remunerative projects initially - Business Centre, MLCP and Bus Terminal
→ Shortfall/Delays in fund disbursements from other sources - Convergance
• Pooled Finance - Support from Karnataka Water & Sanitation Pooled Trust Fund
→ Shortfall in Expected Revenue from Taxes and User Charges
• Citizen engagement campaign for timely payment for improved services
• Strengthen the revenue administration through IT enabled mechanism
Also, the city would immediately take following steps to garner additional revenue:
1. Draw up an inventory of land assets by the city and leverage the same on a PPP
basis.
2. Prepare a parking plan and bid out packages on PPP. On street parking should
provide a reasonable steady cash flow to the city.
3. Prepare an outdoor advertising master plan for the city. Again bidding out as
zones/clusters should result in a reasonable steady cash flow to the city
The cash flows from these initiatives could be escrowed and leveraged to mobilize debt
funds for the city and/or used to meet shortfalls in O&M funding requirements.
Page 86 of 92
INDIA SMART CITY MISSION
ANNEXURE 1
S. No Feature Definition
A smart city has a robust and resilient economic base and growth
Economy and strategy that creates large-scale employment and increases
3.
employment opportunities for the majority of its citizens.
(Guideline 2.6 & 3.1.7 & 6.2)
A Smart City has sufficient and usable public open spaces, many of
which are green, that promote exercise and outdoor recreation for all
8. Open spaces age groups. Public open spac es of a range of sizes are dispersed
throughout the City so all citizens can have access. (Guidelines 3.1.4
& 6.2)
Housing and A Smart City has sufficient housing for all income groups and
9.
inclusiveness promotes integration among social groups. (Guidelines 3.1.2)
Page 87 of 92
INDIA SMART CITY MISSION
A Smart City has a reliable, 24/ 7 supply of wat er that meets national
16. Water supply
and global health standards. (Guidelines 2.4 & 6.2)
A Smart City treats all of its sewage to prevent the polluting of water
18. Water quality
bodies and aquifers. (Guideline 2.4)
A Smart City has air quality that always meets international safety
19. Air quality
standards. (Guideline 2.4.8)
Underground electric A Smart City has an underground electric wiring system to reduce
21.
wiring blackouts due to storms and eliminate unsightliness. (Guideline 6.2)
Page 88 of 92
INDIA SMART CITY MISSION
ANNEXURE 2
Self-Asse ssment Form
Attach self-a sse ssment format given in supplementary template (Excel sheet),
with columns I-L duly filled
Page 89 of 92
INDIA SMART CITY MISSION
ANNEXURE 3
Twenty sheets ( A-4 and A-3) of annexures, including
annexures mentioned in questions 32, 34, 36
S. No Particulars
Page 90 of 92
INDIA SMART CITY MISSION
ANNEXURE 4
(Supporting documents, such as government orders, council resolutions,
response to Question 33 may be annexed here)
S. No Particulars
Formation of HPSC and City Advisory Forum [Circular No. UDD 153 CSS 2015, dated
1
18.09.2015] ✔
14TH Finance Commission, GOI, ALLOCation Of Funds For Tumakuru [Circular No. UDD
2
245 SFC 2015, dated 17.07.2015] ✔
3 AMRUT for Tumakuru w.e.f 2015-16: Allocation of Funds (Rs. 200 cr) [Circular No.
F.No.K-14012/103/2015-SC-II, dated July 24, 2015] ✔
Resolution of Tumakuru Council Authorizing TCC Commissioner to act on their behalf for
4
Smart City Project Tumakuru (Round 1) ✔
Resolution of Tumakuru Council Authorizing TCC Commissioner to act on their behalf for
5
Smart City Project Tumakuru (Round 2) ✔
6 Resolution/ Approval to Financial Plan, SPV Structure, Organogram, institutional- and HR
requirement of the SPV ✔
7 Notification from Government of Karnataka for setting up SPV for National Investment
Manufacturing Zone (NIMZ) ✔
8 Consent Letter from Tumakuru Urban Development Authority (TUDA) for providing 2 ha
land for Modular STP and usage of Tumakuru Manikere Lake as reservoir ✔
9 Consent Letter from Karnataka State Road Transport Corporation (KSRTC) for assuming
Roles & Responsibilities, allowing financial convergence & Others ✔
10 Consent Letter from Siddaganda Institute of Technology (SIT) Tumakuru to allow rooftop
solar harvesting, Development of Tech. Park under PPP & Skill Development Programs ✔
11 Consent Letter from Sri Siddhartha Institute of Technology (SSIT), Tumakuru to allow
rooftop solar harvesting under PPP Mode ✔
12 Consent Letter from SIET, Tumakuru to allow rooftop solar harvesting, Development of
Technology Park under PPP Mode, and Skill Development Program ✔
13 Consent Letter from Tumakuru Urban Development Authority (TUDA) for assuming Roles
& Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
14 Consent Letter from Cauvery Neeravari Nigam Limited (CNNL) for assuming Roles &
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
15 Consent Letter from Forest Department, Tumakuru Division, GOK for assuming Roles &
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
16 Consent Letter from Department of Transport, Tumakuru Division, GOK for assuming
Roles & Responsibilities, allowing financial convergence and Others ✔
17 Consent Letter from Pre-University Education Department, Tumakuru District, GOK for
assuming Roles & Responsibilities, allowing financial convergence & Others ✔
18 Consent Letter from Karnataka Power Transmission Corporation Limited (KPTCL) for
assuming Roles & Responsibilities, allowing financial convergence and Others
✔
19 Consent Letter from Karnataka Slum Development Board (KSDB) for assuming Roles &
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
20 Consent Letter from Karnataka State Highways Improvement Project (KSHIP) for assuming
Roles & Responsibilities, financial convergence, Rooftop Solar Harvesting & Others ✔
Page 91 of 92
INDIA SMART CITY MISSION
21 Consent Letter from Karnataka Urban Water Supply & Drainage Board (KUWSDB) for
assuming Roles & Responsibilities, allowing financial convergence & others ✔
22 Consent Letter from Panchayath Raj Engineering Division (PRED) for assuming Roles &
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
23 Consent Letter from Public Works Department (PWD) for assuming Roles &
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
24 Consent Letter from Water Resources Department (WRD), Minor Irrigation for assuming
Roles & Responsibilities, allowing financial convergence, Rooftop Solar Harvesting & Other ✔
Consent Letter from Tumakuru City Corporation (TCCC) for assuming Roles &
25
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
Consent Letter from District Health Office (DHO), Tumakuru Division for assuming Roles &
26
Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
Consent Letter from Deputy Director for Public Instructions (DDPI), Tumakuru Division for
27
assuming Roles & Responsibilities, allowing financial convergence & others ✔
Consent Letter from Superintendent of Police (SP), Tumakuru District for assuming Roles
28
& Responsibilities, allowing financial convergence, Rooftop Solar Harvesting and Others ✔
Consent Letter from National Highways Authority of India (NHAI), Tumakuru Division for
29
assuming Roles & Responsibilities, allowing financial convergence & others ✔
EOIs: RUBENIUS, BOSCH, Asian Health Alliance, Indus Towers, Rytangle, Ayyappa
30
Masagi, CISCO, Teamlease Services Ltd, Greetude Energy Pvt Ltd, Fi-Mesh Networks ✔
31
32
33
34
35
36
37
38
39
40
Page 92 of 92