We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
AGENCIES
GENERAL AGENT
Address
Pic
Phones
Fax
E-mail addross
‘As per Appointment of Ships Owner
TBA
TBA
TBA
TBA
TBA
LOCAL AGENT
Address
Pic
Phone
Fax
E-mail address
[As per Appointment of General Agent
TBA
TBA
TBA
TBA
TBA
(GEOGRAPHY.
PILOT BOARDING STATION
4, BABARINA LOADING
POSITION
2 WOLOLOADING
POSITION
JETTY POSITION
TIDAL RANGE
(CHART NUMBER
SEAWATER DENSITY
DEEPT AREA LOADING POINT
ANCHORAGE
Lat 03°557900" S ~ Long 121* 167.888" E
A’ : Lat 03°53'086'S ~Long 121° 177180" E
"Br Lal 09°53'869'S ~Long 121° 177094" E
"Cr! : Lat 03°54" 217" S~Long 121° 17°.148"E
‘D* : Lat 03°54°760" S~Long 121° 17°310°E
"E ‘Lat 08 54°70" S —Long 121° 16" 820" E
"A : Lat 03°50" 476" S ~Long 121° 14°.486" E
“B : Lat 03°50" 710" S~Long 121° 14316" E
°C: Lat 09° 50-750" S ~Long 121° 14°070"E
41, BABARINIA JETTY = Lat 09°53"491" S ~Long 121° 167818" E
2.WOLO JETTY Lat 03°51" 036" S Long 121* 14" 486" E
0.95 ~ 1.00 Meters
Indonesian ChartNo. 152 & 154
41.020 Kgl = 1.022 Kgl
30-86 MrARRIVAL NOTICE,
INFORMATION REQUIRED
CherteretOwner's Advice
Master's Advice
Pilot
Pilot's Staion/Ofice
LightorefBargee + Tugboats
Priority
RADIO COMMUNICATION
TOWAGE
FLAG TO BE FLOWN BY
ARRIVING VESSEL
ARRIVING /DEPARTING
HOURS
LABORERS
MOBILE PHONE
7 days notice prior aval
7,8,3,2and 1 days notice prior arival
Plots Compulsory
+ One hour pir erival in VHF channel 08 (Shipper Port Control Channe)
Plot ima on 24 Hrs
Kolaka, but willbe ready on Site prior arival
‘Ange end prepare by shippelCN! prior anv for ready to load on env
Fst come frst served based on shipoer’s option
\VHE Marine Channel 08
Not compulsory but can be provided base on request
Indonesian leg,
Queranine Fiag
(One hour prior arrival / departure
(One day/Frosh ETA and wil be bearded aor Free Pratique Granted
‘Mobile Phone can be used to communicate at Loacing Point Anchorage although signal
very poor, but can be used
[JETTY AND LOADING TUNLOADI
“AGILITIES, METHODS AND DAILY CAPACITY
JETTY PERMIT No
JETTY CONDITIONS
JETTY LOADING / UNLOADING
LOADING METHODS FOR
CARRIERS
NUMBER OF GANGS:
DAILY LOADING CAPACITY
NOMOR KP 958 TAHUN 2017
4 Locations recleimed jetty desionated for barging transshipment wit depth 8-12 Mat
ws
Loadinglunloadng or into barge using dump truck though barges ramp door
4, Loading or in to carr is at designated loading points done by ore barges
2. Loading oe in to carrie’ holdsyhatch using vessel's gear (cranes or derricks)
4 (tout) gangs are usually used by vessel's valle gear (renes or derics) or more
engs used foatng crane I necessary stovedores canbe povided tobe 6 (st) gangs.
‘About 6000 MT (Metric Tons) per 24 hours per vessel depending onthe type of vessels
cargo gears or vessel gearess, weather condons et.