Tilal Mall and Hotel Sharjah, UAE: Detail 1

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
457 views22 pages

Tilal Mall and Hotel Sharjah, UAE: Detail 1

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
CONDUCTOR SIZE
GENERAL NOTES:
No. OF CPC
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
CPC SIZE METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
X X ARCHITECT/ENGINEER.
DB-TGR-601 DB-TGR-603 DB-TGR-605 DB-TGR-607 DB-TGR-609 DB-TGR-611 DB-TGR-613 DB-DGR-615 DB-TGR-602 DB-TGR-604 DB-DGR-606 DB-TGR-608 DB-TGR-610 DB-TGR-612 DB-TGR-614 DB-TGR-616 DB-DGR-618 DB-TGR-620 DB-HT-6F-WL DB-HT-5F-WP
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52kW TCL: 7.34 kW TCL: 1.10 kW TCL: 2.48 kW 2. DO NOT SCALE FROM THIS DRAWING.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
X OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
No. OF CORE
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
(SINGLE-CORE/MULTI-CORE)
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
CABLE TYPE ONLY.
A = Cu/PVC/AWA/PVC 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
B = Cu/PVC/SWA/PVC FOR ALL MEP SERVICES BASED ON FINAL SELECTED
C = Cu/XLPE/AWA/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
D = Cu/XLPE/SWA/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
E = Cu/XLPE/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x16 1x16
F = Cu/FRT/SWA/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
G = Cu/FRT/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
H = Cu/MICS/LSF DRAWINGS.
Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4
Dx2
J = Cu/MICS
SPACE SPACE K = Cu/PVC/LSF
L = Cu/PVC/PVC
M = Cu/LSF
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE

(E)MDB - MALL - XX - X

40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT PANEL/EQUIPMENT NO.
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN ZONE NO.
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 RYB7 RYB8 R9 Y9 B9
CP1 - CAR PARK 1
CP2 - CAR PARK 2
400A TPN+E BUSBAR CP3 - CAR PARK 3
35kA @ 1 SEC. A A A 400:5A
MALL OR HOTEL
415V/240V
FORM 2b TYPE 2 L1 L2 L3
PANEL/EQUIPMENT TYPE
300A TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
TPN PFC - POWER FACTOR CORRECTOR
SMDB-HT-6F-W UPS - UNINTERRUPTIBLE POWER SUPPLY
SERVING GUEST ROOMS - WEST WING ELMDB - EMERGENCY LIGHTING MAIN DB
LOCATION: EE ROOM, 6TH FLOOR CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
TCL : 136.27 kW V SS SYNC - SYNCHRONIZING POWER SUPPLY
MDL : 83.44 kW HVSG - HIGH VOLTAGE SWITCHGEAR
EMU 400:5A
DF : 0.61 - - - - -
(E)SMDB MZ1 01 X BL (L) X

PANEL/EQUIPMENT NO.
1
L - LIGHTING
TM-ARC-HT-DR-E0-ZZ-8125 P - POWER

LEVEL
FED FROM BL - BASEMENT
MDB-HOTEL-04 GF - GROUND
FF - FIRST FLOOR
5TH FLOOR LEVEL RL - ROOF
P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
1 DETAIL P5 - PARKING LEVEL 5
NTS
- SMDB-HT-6F-W
OWNERSHIP
L - LANDLORD
T - TENANT
REFERENCE DRAWINGS:
CORE
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
ZONE NO. SYMBOLS AND ABBREVIATIONS
MZ1 - MALL ZONE 1
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 NOTES
CH - CHILLER 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
CP1 - CAR PARK 1 MISCELLANEOUS DETAILS 0021
CP2 - CAR PARK 2 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
CP3 - CAR PARK 3 TO 1213
PANEL/EQUIPMENT TYPE 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
SMDB - SUBMAIN DISTRIBUTION BOARD TO 2213
ESMDB - ESSENTIAL SUBMAIN 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DB-HT-L 7F-SP DB-HT-L 7F-SL DB-HT-L 7F-KP1 DB-HT-L 7F-KP2 DISTRIBUTION BOARD
TO 5213
TCL: 39.42 kW TCL: 5.23 kW TCL: 23.47 kW TCL: 36.39 kW MCC - MOTOR CONTROL CENTER

UPS - UNINTERUPTIBLE POWER SUPPLY


ELCP - EMERGENCY LIGHTING PANEL

DRAWING NOTES: A 20/01/2019 SEWA SUBMISSION


Rev. Date Authority Description
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
1x35 1x16

1x10 1x10

1x16 1x16

1x25 1x16
3. DO NOT SCALE ON THE DRAWING.
P01 20/12/18 FIRST ISSUE
Dx4

Dx4

Dx4

Dx4

SPACE SPACE 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER Rev. Date Description
RELEVANT DOCUMENTS AND DRAWINGS. Purpose of Issue :

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


FOR TENDER
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT Initial/Current Issue Signatures
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Original
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Size A0 Designed By: FD
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK. Datum - Checked By: EC
100AT 63AT 63AT 80AT
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Grid - Approved By: MJ
TPN TPN TPN TPN
MCCB MCCB MCCB MCCB Client : Tilal Mall L.L.C
LV SCHEMATIC NOTES:
P.O. Box 5995
Sharjah, UAE
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
Tel: +971 (6) 5560055
1 2 3 4 5 6 THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Fax: +971 (6) 5560033
300A TPN+E BUSBAR 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
35kA @ 1 SEC. A A A 300:5A MANUFACTURER. Lead Consultant :
Design & Consultancy
415V/240V 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. for natural and
built assets
FORM 2b TYPE 2 L1 L2 L3
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Dubai, UAE Fax: +971 (4) 3242531
225A
SMDB-HT-7F-W TPN 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. Sub-Consultant :
LOCATION: EE ROOM, 7TH FLOOR 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
TCL : 104.51 kW
V SS 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
MDL : 83.61 kW Architect / Engineer of record :
DONE ON ACTUAL INSTALLATION.
DF : 0.80 Design & Consultancy
EMU for natural and
300:5A 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT built assets
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT P.O. Box. 1779
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS Copyright © Arcadis 2018 Sharjah, UAE
OF CABLES AND UP.
1 Project Name:
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
TM-ARC-HT-DR-E0-ZZ-8125
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
Tilal Mall and Hotel
FED FROM
MDB-HOTEL-04
RELAYS.
Sharjah,UAE
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
Plot Number/Area 7040 / JWAIZEI
IN MECHANICAL DESIGN.
7TH FLOOR LEVEL
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL Drawing Title
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
HOTEL
SPECIALISTS INFORMATION OR DETAIL.
2 DETAIL 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
ELECTRICAL
NTS
- SMDB-HT-7F-W PER SEWA. SCHEMATIC DIAGRAM
SHEET 20

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8140 T1
Date Plotted: 5/6/2019 2:32:01 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
CONDUCTOR SIZE
No. OF CPC
P1-LIFT P2-LIFT P3-LIFT S1-LIFT S2-LIFT
CPC SIZE
18.00 kW 18.00 kW 18.00 kW 30.00 kW 30.00 kW BY NOMINATED
SPECIALIST X X
M M M M M CONTRACTOR
EPO EPO EPO EPO EPO
X
GENERAL NOTES:

BY ELECTRICAL 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


80A 80A 80A 160A 160A
CONTRACTOR No. OF CORE METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
TPN TPN TPN TPN TPN
(SINGLE-CORE/MULTI-CORE) VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
CABLE TYPE
2. DO NOT SCALE FROM THIS DRAWING.
A = Cu/PVC/AWA/PVC
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
B = Cu/PVC/SWA/PVC
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
C = Cu/XLPE/AWA/LSF
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
D = Cu/XLPE/SWA/LSF
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
E = Cu/XLPE/LSF
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
F = Cu/FRT/SWA/LSF
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
G = Cu/FRT/LSF
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT

1x25 1x16

1x25 1x16

1x25 1x16

1x70 1x35

1x70 1x35
H = Cu/MICS/LSF
ONLY.
J = Cu/MICS
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
K = Cu/PVC/LSF
FOR ALL MEP SERVICES BASED ON FINAL SELECTED

Dx4

Dx4

Dx4

Dx4

Dx4
L = Cu/PVC/PVC
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
SPACE M = Cu/LSF
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
(E)MDB - MALL - XX - X CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.

PANEL/EQUIPMENT NO.
TO BMS
ZONE NO.
300mA 300mA 300mA 300mA 300mA MZ1 - MALL ZONE 1
ELR+ ELR+ ELR+ ELR+ ELR+ MZ2 - MALL ZONE 2
SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP
MZ3 - MALL ZONE 3
80AT 80AT 80AT 160AT 160AT CH - CHILLER
TPN TPN TPN TPN TPN CP1 - CAR PARK 1
MCCB MCCB MCCB MCCB MCCB CP2 - CAR PARK 2
CP3 - CAR PARK 3

MALL OR HOTEL
1 2 3 4 5 6

300A TPN+E BUSBAR PANEL/EQUIPMENT TYPE


TX - TRANSFORMER
35kA @ 1 SEC. A A A 300:5A
MDB - MAIN DISTRIBUTION BOARD
415V/240V PFC - POWER FACTOR CORRECTOR
FORM 2b TYPE 2 L1 L2 L3 UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
250A ACB - AIR CIRCUIT BREAKER PANEL
TPN SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
SMDB-HT-9F-LIFT
LOCATION: 9TH FLOOR EE ROOM - - - - -
(E)SMDB MZ1 01 X BL (L) X
TCL : 114.00kW
V SS
MDL : 102.60 kW PANEL/EQUIPMENT NO.
DF : 0.90 EMU 300:5A L - LIGHTING
P - POWER
1
LEVEL
TM-ARC-HT-DR-E0-ZZ-8125 BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
FED FROM RL - ROOF
MDB-HOTEL-04 P1 - PARKING LEVEL 1
9TH FLOOR LEVEL P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
1 DETAIL
NTS
- SMDB-HT-9F-LIFT OWNERSHIP
L - LANDLORD
T - TENANT

CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2 REFERENCE DRAWINGS:
CP3 - CAR PARK 3 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
PANEL/EQUIPMENT TYPE SYMBOLS AND ABBREVIATIONS
SMDB - SUBMAIN DISTRIBUTION BOARD 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
ESMDB - ESSENTIAL SUBMAIN NOTES
DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
KIDS POOL MAIN POOL JACUZZI MCC - MOTOR CONTROL CENTER MISCELLANEOUS DETAILS 0021
CONTROL PANEL CONTROL PANEL CONTROL PANEL BY NOMINATED 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
UPS - UNINTERUPTIBLE POWER SUPPLY
PROVISION PROVISION PROVISION SPECIALIST ELCP - EMERGENCY LIGHTING PANEL TO 1213
10kW 20kW CONTRACTOR
40kW 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
DRAWING NOTES: TO 2213
6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
TO 5213
BY ELECTRICAL WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
40A 100A 63A CONTRACTOR WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
TPN TPN TPN STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
3. DO NOT SCALE ON THE DRAWING.

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.
1x16 1x16

1x50 1x25

1x25 1x16

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
Dx4

Dx4

Dx4

CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE


ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR P01 20/12/18 FIRST ISSUE
TO COMMENCING WORK. Rev. Date Description
SPACE
Purpose of Issue :
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES.
FOR TENDER
Initial/Current Issue Signatures
LV SCHEMATIC NOTES: Original
Size A0 Designed By: FD
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. EC
40AT 100AT 63AT
Datum - Checked By:
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Grid - Approved By: MJ
TPN TPN TPN
MANUFACTURER.
MCCB MCCB MCCB
Client : Tilal Mall L.L.C
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
P.O. Box 5995
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Sharjah, UAE
1 2 3 4 SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Tel: +971 (6) 5560055
Fax: +971 (6) 5560033
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
200A TPN+E BUSBAR
Lead Consultant :
35kA @ 1 SEC. A A A 200:5A 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. Design & Consultancy
415V/240V for natural and
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE built assets
FORM 2b TYPE 2 L1 L2 L3 DONE ON ACTUAL INSTALLATION. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
200A 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT Sub-Consultant :
TPN BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
SMDB-HT-7F-POOL OF CABLES AND UP.
LOCATION: 7TH FLOOR
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
TCL : 70.00 kW Architect / Engineer of record :
V SS
MDL : 56.00 kW 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Design & Consultancy
RELAYS. for natural and
DF : 0.80 EMU 200:5A built assets
P.O. Box. 1779
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Copyright © Arcadis 2018 Sharjah, UAE
1 IN MECHANICAL DESIGN.
TM-ARC-HT-DR-E0-ZZ-8125 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL Project Name:

FED FROM
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL. Tilal Mall and Hotel
MDB-HOTEL-04
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.
Sharjah,UAE
Plot Number/Area 7040 / JWAIZEI
7TH FLOOR LEVEL
Drawing Title
HOTEL
2 DETAIL ELECTRICAL
NTS
- SMDB-HT-7F-POOL SCHEMATIC DIAGRAM
SHEET 21

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8141 T1
Date Plotted: 5/6/2019 2:32:08 PM
KEYPLAN

BOILER CIRCULATING
CABLE LEGEND KEY:

TCL: 14.92 kW

PUMP (DUTY)
TCL: 8.00 kW
NO. OF SETS
CONDUCTOR SIZE

(DUTY)
BP-02
No. OF CPC
CPC SIZE

M M X X
GENERAL NOTES:

CHEMICAL DOZING PUMP


X
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN

BOILER CIRCULATING

BOILER CIRCULATING
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE

PUMP (STANDBY)
No. OF CORE ARCHITECT/ENGINEER.
(SINGLE-CORE/MULTI-CORE) 2. DO NOT SCALE FROM THIS DRAWING.

TCL: 14.92 kW

TCL: 14.92 kW

SHUNT PUMP
SHUNT PUMP

PUMP (DUTY)
TCL: 5.60 kW

TCL: 5.60 kW

TCL: 3.73 kW

TCL: 3.73 kW

TCL: 0.75 kW

TCL: 0.75 kW

TCL: 5.00 kW

TCL: 5.00 kW

TCL: 2.50 kW

TCL: 2.50 kW

TCL: 0.55 kW
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH

TCL: 8.00 kW

TCL: 8.00 kW
TCL: 0.55 kW
CABLE TYPE

TCL: 0.10 kW
(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)
A = Cu/PVC/AWA/PVC OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,

HW-CP-03

HW-CP-04

HW-CP-01

HW-CP-02
B = Cu/PVC/SWA/PVC LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT

BOILER

BOILER
(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN

(DUTY)
C = Cu/XLPE/AWA/LSF

TP-11

TP-12

BP-01

BP-03
BP-4

BP-5
D = Cu/XLPE/SWA/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
E = Cu/XLPE/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
F = Cu/FRT/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
G = Cu/FRT/LSF ONLY.
M M M M M M M M M M M M M M M M M H = Cu/MICS/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
BY NOMINATED J = Cu/MICS FOR ALL MEP SERVICES BASED ON FINAL SELECTED
SPECIALIST K = Cu/PVC/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
EPO EPO EPO EPO EPO EPO EPO EPO EPO L = Cu/PVC/PVC APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
CONTRACTOR
M = Cu/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS N = Cu/MICA/XLPE/SWA/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
EQUIPMENT NOMENCLATURE CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.
BY ELECTRICAL (E)MDB - MALL - XX - X
32A 32A 32A 32A 125A 32A 32A 80A 32A CONTRACTOR
TPN TPN TPN TPN TPN TPN TPN TPN TPN
PANEL/EQUIPMENT NO.

ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2

1x10 1x10

1x50 1x25

1x25 1x16
1x6

1x6

1x6

1x6

1x6

1x6
MZ3 - MALL ZONE 3
CH - CHILLER
SPACE SPACE SPACE
CP1 - CAR PARK 1

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
1x6

1x6

1x6

1x6

1x6

1x6
CP2 - CAR PARK 2
CP3 - CAR PARK 3

MALL OR HOTEL

TO BMS
PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
30mA 30mA 30mA 30mA 30mA 30mA 30mA 30mA 30mA PFC - POWER FACTOR CORRECTOR
ELCB ELCB ELCB ELCB ELR+ ELCB ELCB ELCB ELCB UPS - UNINTERRUPTIBLE POWER SUPPLY
SHUNT TRIP ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
32AT 32AT 32AT 32AT 125AT 32AT 32AT 80AT 32AT ACB - AIR CIRCUIT BREAKER PANEL
TPN TPN TPN TPN TPN TPN TPN TPN TPN SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
1 MCCB 2 MCCB 3 MCCB 4 MCCB 5 MCCB 6 MCCB 7 MCCB 8 MCCB 9 MCCB 10 11 12
(E)SMDB - MZ1 - 01 - X - BL - (L) X
200A TPN+E BUSBAR
35kA @ 1 SEC. A A A 200:5A PANEL/EQUIPMENT NO.
415V/240V L - LIGHTING
P - POWER
FORM 2b TYPE 2 L1 L2 L3
LEVEL
125A BL - BASEMENT
ESMDB-HT-10F-PH GF - GROUND
TPN
LOCATION: MEP PLANT ROOM FF - FIRST FLOOR
10TH LEVEL RL - ROOF
TCL : 64.07 kW P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
MDL : 51.26 kW V SS P3 - PARKING LEVEL 3
DF : 0.80 P4 - PARKING LEVEL 4
EMU 200:5A P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
2 T - TENANT

TM-ARC-HT-DR-E0-ZZ-8137 CORE
ZONE NO.
FED FROM MZ1 - MALL ZONE 1
ESMDB-HT-6F-W MZ2 - MALL ZONE 2
10TH FLOOR LEVEL MZ3 - MALL ZONE 3
CH - CHILLER REFERENCE DRAWINGS:
CP1 - CAR PARK 1
CP2 - CAR PARK 2 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
1 DETAIL CP3 - CAR PARK 3 SYMBOLS AND ABBREVIATIONS
NTS 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
- ESMDB-HT-10F-PH PANEL/EQUIPMENT TYPE NOTES
SMDB - SUBMAIN DISTRIBUTION BOARD
ESMDB - ESSENTIAL SUBMAIN 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
MCC - MOTOR CONTROL CENTER 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213
UPS - UNINTERUPTIBLE POWER SUPPLY
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
ELCP - EMERGENCY LIGHTING PANEL
TO 2213
ISOL-JP-01 ISOL-RP-01 ISOL-RP-02
DRAWING NOTES: 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
JOCKEY PUMP RECIRCULATING RECIRCULATING TO 5213
5.00 kW 0.60 kW 0.60 kW 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
DUTY DUTY DUTY BY NOMINATED
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
SPECIALIST
M M M CONTRACTOR STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
EPO EPO EPO
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS A 20/01/2019 SEWA SUBMISSION
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS. Rev. Date Authority Description

32A 20A 20A BY ELECTRICAL 3. DO NOT SCALE ON THE DRAWING.


TPN TPN TPN CONTRACTOR
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
RELEVANT DOCUMENTS AND DRAWINGS.

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
Rev. Date Description
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK. Purpose of Issue :
FOR TENDER
1x6

1x4

1x4

6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES.


Initial/Current Issue Signatures
Original
A0
Fx4

Fx4

Fx4
1x6

1x4

1x4

SPACE Size Designed By: FD


LV SCHEMATIC NOTES:

1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Datum - Checked By: EC
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Grid - Approved By: MJ
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
MANUFACTURER. Client : Tilal Mall L.L.C
ELS + ELS + ELS +
P.O. Box 5995
ALARM ALARM ALARM 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Sharjah, UAE
TO BMS Tel: +971 (6) 5560055
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Fax: +971 (6) 5560033
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
32AT 20AT 20AT
TPN TPN TPN 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. Lead Consultant :
MCCB MCCB Design & Consultancy
MCCB for natural and
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. built assets

P.O. Box. 52750 Tel: +971 (4) 3193333


7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Copyright © Arcadis 2018
1 2 3 4 Dubai, UAE Fax: +971 (4) 3242531
DONE ON ACTUAL INSTALLATION.
Sub-Consultant :
200A TPN+E BUSBAR 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
35kA @ 1 SEC. A A A 200:5A BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
415V/240V OF CABLES AND UP.
FORM 2b TYPE 2 Architect / Engineer of record :
L1 L2 L3
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
Design & Consultancy
for natural and
40A 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE built assets
RELAYS. P.O. Box. 1779
TPN Copyright © Arcadis 2018 Sharjah, UAE
ESMDB-HT-CP1-FP
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
LOCATION: BASEMENT LEVEL
IN MECHANICAL DESIGN. Project Name:
TCL : 6.20 kW
MDL : 6.20 kW
V SS 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
Tilal Mall and Hotel
DF : 1.00 EMU 200:5A SPECIALISTS INFORMATION OR DETAIL. Sharjah,UAE
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Plot Number/Area
1 7040 / JWAIZEI
PER SEWA.
TM-ARC-HT-DR-E0-ZZ-8125 Drawing Title
HOTEL
FED FROM
MDB-HOTEL-04 ELECTRICAL
BASEMENT LEVEL SCHEMATIC DIAGRAM
SHEET 22
2 DETAIL
NTS
- ESMDB-HT-CP1-FP
Scales Drawn By Suitability Code Project Stage
NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8142 T1
Date Plotted: 5/3/2019 1:38:02 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
CONDUCTOR SIZE
No. OF CPC
CPC SIZE

X X GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
(SINGLE-CORE/MULTI-CORE)
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE

(E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.

ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3

MALL OR HOTEL
LV ROOM

PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
SEE LV SCHEMATIC SEE LV SCHEMATIC SEE LV SCHEMATIC SEE LV SCHEMATIC ACB - AIR CIRCUIT BREAKER PANEL
DWG NO. TM-ARC-HT-DR-E0-ZZ-8122 DWG NO. TM-ARC-HT-DR-E0-ZZ-8123 DWG NO. TM-ARC-HT-DR-E0-ZZ-8124 DWG NO. TM-ARC-HT-DR-E0-ZZ-8125 SYNC - SYNCHRONIZING POWER SUPPLY
FOR DETAILS FOR DETAILS FOR DETAILS FOR DETAILS
HVSG - HIGH VOLTAGE SWITCHGEAR

(E)SMDB - MZ1 - 01 - X - BL - (L) X

PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER

LEVEL
BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
TX-HOTEL-SPARE RL - ROOF
P1 - PARKING LEVEL 1
TX-HOTEL-01 TX-HOTEL-02 TX-HOTEL-03 TX-HOTEL-04 P2 - PARKING LEVEL 2
TX ROOM

TCL = 2292.40 kW TCL = 1755.96 kW TCL = 1743.05 kW TCL = 1699.04 kW P3 - PARKING LEVEL 3
MDL = 1146.20 kW MDL = 1247.02 kW MDL = 1165.56 kW MDL = 1171.13 kW P4 - PARKING LEVEL 4
11KV/0.415KV, 50Hz 11KV/0.415KV, 50Hz 11KV/0.415KV, 50Hz 11KV/0.415KV, 50Hz P5 - PARKING LEVEL 5
2000KVA 2000KVA 2000KVA 2000KVA
DRY TYPE DRY TYPE DRY TYPE DRY TYPE OWNERSHIP
L - LANDLORD
T - TENANT
3C 95SQMM
Cu/XLPE/SWA/LSF CORE
(TYP)
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
REFERENCE DRAWINGS:
MZ3 - MALL ZONE 3
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
1 2 3 4 5 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
NOTES
PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
FEEDER FEEDER FEEDER FEEDER FEEDER SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT ESMDB - ESSENTIAL SUBMAIN
RELAY RELAY RELAY RELAY RELAY DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
MCC - MOTOR CONTROL CENTER TO 1213
FMR FMR FMR FMR FMR 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
FIXED TYPE FIXED TYPE FIXED TYPE FIXED TYPE FIXED TYPE ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
630A 630A 630A 630A 630A TO 5213
SF6C.B SF6C.B SF6C.B SF6C.B SF6C.B DRAWING NOTES:

1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE


SF6 PT'S SF6 PT'S SF6 PT'S SF6 PT'S SF6 PT'S WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
SWITCH SWITCH SWITCH SWITCH SWITCH WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
630A 630A 630A 630A 630A STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
HV SWITCH ROOM

SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.


A A A 630A A A A
BC 3. DO NOT SCALE ON THE DRAWING.

SS V SS V 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.
T1 02/05/19 TENDER ISSUE
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT P02 20/12/18 DESIGN FURTHER DEVELOPED
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 25/01/18 100% SCHEMATIC DESIGN ISSUE
FMR FMR
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
FEEDER
MANAGEMENT 630A ELECTRO 630A
FEEDER
MANAGEMENT
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
RELAY 25kA/1sec MECHANICAL 25kA/1sec RELAY Initial/Current Issue Signatures
INTERLOCK 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
Size A0 Designed By: FD
PT'S PT'S
LV SCHEMATIC NOTES: Datum - Checked By: EC

1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
TCL : 4048.36 kW TCL : 3442.09 kW Client : Tilal Mall L.L.C
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
MDL = 2393.22 kW MDL = 2336.69 kW P.O. Box 5995
DF = 0.59 MANUFACTURER.
DF = 0.68 Sharjah, UAE
HVSG-HOTEL HV SWITCHGEAR DESIGN TO BE CONFIRMED BY Tel: +971 (6) 5560055
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
SEWA. Fax: +971 (6) 5560033
LOCATION : MAIN LV ROOM AT BASEMENT LEVEL
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
Design & Consultancy
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
CABLE TO BE PROCURED AND CONNECTED BY built assets
SEWA.
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
FROM SEWA HV NETWORK Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. Sub-Consultant :

8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BASEMENT LEVEL BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
Architect / Engineer of record :
OF CABLES AND UP.
Design & Consultancy
for natural and
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
P.O. Box. 1779
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
RELAYS.
Project Name:
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
IN MECHANICAL DESIGN.
Tilal Mall and Hotel
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
Plot Number/Area 7040 / JWAIZEI
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
HOTEL
ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 01

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8121 T1
Date Plotted: 5/6/2019 2:29:57 PM
KEYPLAN

CABLE LEGEND KEY: (E)SMDB - MZ1 - 01 - X - BL - (L) X DRAWING NOTES:


NO. OF SETS
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
CONDUCTOR SIZE PANEL/EQUIPMENT NO. WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
L - LIGHTING WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
No. OF CPC P - POWER STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
CPC SIZE
LEVEL 2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
BL - BASEMENT SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
X X GF - GROUND
FF - FIRST FLOOR 3. DO NOT SCALE ON THE DRAWING.
X RL - ROOF
P1 - PARKING LEVEL 1 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
P2 - PARKING LEVEL 2 RELEVANT DOCUMENTS AND DRAWINGS. GENERAL NOTES:
P3 - PARKING LEVEL 3
No. OF CORE P4 - PARKING LEVEL 4 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
(SINGLE-CORE/MULTI-CORE) P5 - PARKING LEVEL 5 PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
CABLE TYPE WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT VERIFIED ON SITE AND APPROVED BY THE
A = Cu/PVC/AWA/PVC CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE ARCHITECT/ENGINEER.
OWNERSHIP
B = Cu/PVC/SWA/PVC ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR 2. DO NOT SCALE FROM THIS DRAWING.
L - LANDLORD
C = Cu/XLPE/AWA/LSF TO COMMENCING WORK. 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
T - TENANT
D = Cu/XLPE/SWA/LSF OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
E = Cu/XLPE/LSF CORE 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
F = Cu/FRT/SWA/LSF SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
G = Cu/FRT/LSF ZONE NO. THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
H = Cu/MICS/LSF MZ1 - MALL ZONE 1 LV SCHEMATIC NOTES: BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
J = Cu/MICS MZ2 - MALL ZONE 2 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
K = Cu/PVC/LSF MZ3 - MALL ZONE 3 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL ONLY.
L = Cu/PVC/PVC CH - CHILLER THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
M = Cu/LSF CP1 - CAR PARK 1 FOR ALL MEP SERVICES BASED ON FINAL SELECTED
N = Cu/MICA/XLPE/SWA/LSF CP2 - CAR PARK 2 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
EQUIPMENT NOMENCLATURE CP3 - CAR PARK 3 MANUFACTURER. APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
(E)MDB - MALL - XX - X PANEL/EQUIPMENT TYPE
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
SMDB - SUBMAIN DISTRIBUTION BOARD CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
ESMDB - ESSENTIAL SUBMAIN DRAWINGS.
PANEL/EQUIPMENT NO. 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
DISTRIBUTION BOARD
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
MCC - MOTOR CONTROL CENTER
ZONE NO.
MZ1 - MALL ZONE 1 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
UPS - UNINTERUPTIBLE POWER SUPPLY
MZ2 - MALL ZONE 2 ELCP - EMERGENCY LIGHTING PANEL
MZ3 - MALL ZONE 3 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
CH - CHILLER
CP1 - CAR PARK 1 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
CP2 - CAR PARK 2 DONE ON ACTUAL INSTALLATION.
CP3 - CAR PARK 3
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
MALL OR HOTEL BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
OF CABLES AND UP.
PANEL/EQUIPMENT TYPE
TX - TRANSFORMER 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
UPS - UNINTERRUPTIBLE POWER SUPPLY RELAYS.
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
ACB - AIR CIRCUIT BREAKER PANEL IN MECHANICAL DESIGN.
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.

13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.

MDB-HOTEL-03
TCL : 117.74 kW
MDL : 56.29 kW
DF : 0.48
1
B
2
TM-ARC-HT-DR-E0-ZZ-8124
TM-ARC-HT-DR-E0-ZZ-8126

3
MDB-HOTEL-02 MDB-HOTEL-04
TCL : 755.39 kW TCL : 348.55 kW TM-ARC-HT-DR-E0-ZZ-8126
MDL : 504.93kW MDL : 188.61 kW 1
DF : 0.67 DF : 0.49
1 TM-ARC-HT-DR-E0-ZZ-8126 MCC-HT-BL-Z3-1 MCC-HT-BL-Z3-2 (DUTY) MCC-HT-BL-Z3-3 (STANDBY)
A C 1
TCL: 1772.40 kW TCL: 260.00 kW TCL: 260.00 kW
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8125 MDL: 886.20 kW MDL: 260.00 kW MDL: 0.00 kW
DF: 0.50 DF: 1.00 DF: 0.00

REFERENCE DRAWINGS:
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
SPACE SPACE

2500A TPN+E COPPER BUSBAR


SPACE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MISCELLANEOUS DETAILS 0021
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213

2x240 1x240

1x630 1x630
4x300 1x630

1x240 1x120

2x300 1x300

2x240 1x240
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201

Dx4
Dx4

Kx1
Fx4

Fx4

Fx4

NOTE: DURING FIRE SCENARIO, ALL LIFE SAFETY TO 5213


LOADS SHALL BE PRIORITIZED

A 20/01/2019 SEWA SUBMISSION


Rev. Date Authority Description

1600AT 300AT 800AT 630AT 630AT


2000AT 1000AT
TP TP TP 4P 4P
4P TP
ACB MCCB ACB ACB MCCB MCCB ACB
1000AT P02 20/12/18 DESIGN FURTHER DEVELOPED
TP P01 25/01/18 100% SCHEMATIC DESIGN ISSUE
PFI ISOL. Rev. Date Description
1 2 3 4 1 2 3 4 5 6 Purpose of Issue :

2500A TPN+E BUSBAR 3200A TPN+E BUSBAR


FOR TENDER
Initial/Current Issue Signatures
65kA @ 3 SEC. A A A 2500:5A 65kA @ 3 SEC. 3200:5A
A A A Original
415V/240V 415V/240V Size A0 Designed By: FD
FORM 4 TYPE 2 L1 L2 L3 FORM 4 TYPE 2 L1 L2 L3
Datum - Checked By: EC
OC SC EF U-V 2500:5A 3200:5A
OC SC EF U-V
Grid - Approved By: MJ
TO BMS EMU 3200:5A
Client : Tilal Mall L.L.C
2500AT 3200AT P.O. Box 5995
4P 4P Sharjah, UAE
ACB ACB Tel: +971 (6) 5560055
Fax: +971 (6) 5560033
V SS SET @ 0.9
V SS Lead Consultant :
GMDB-HOTEL MDB-HOTEL-01 Design & Consultancy
LOCATION: SUBSTATION AT BASEMENT LEVEL LOCATION: SUBSTATION AT BASEMENT LEVEL for natural and
built assets
TCL : 1221.68 KW (SERVING CHILLERS)
TCL : 2292.40 kW (DUTY+STANDBY) P.O. Box. 52750 Tel: +971 (4) 3193333
MDL : 749.83 KW Copyright © Arcadis 2018
TCL : 1146.20 kW (DUTY) PFC-HOTEL-01 Dubai, UAE Fax: +971 (4) 3242531
DF : 0.61 MDL : 1146.20 kW SEWA TARIFF 500kVAR MULTISTEP
DF : 0.50 KWH 3200:5A Sub-Consultant :
METERING AUTO PFC

Architect / Engineer of record :


3 SETS (4 - 1C 630mm² + 1C 300mm²) FIRE RATED CABLE
Design & Consultancy
for natural and
GCP built assets
1500 KVA, 415V 15 X 1C 630 mm² Cu/XLPE/PVC P.O. Box. 1779
D (COORDINATE WITH SEWA) Sharjah, UAE
3PH, 50Hz Copyright © Arcadis 2018
TX-HOTEL-01
DIESEL GENSET 2000kVA, 50Hz
Project Name:
11000-415/240V
(BY SEWA)
Tilal Mall and Hotel
Sharjah,UAE
BASEMENT LEVEL BASEMENT LEVEL Plot Number/Area 7040 / JWAIZEI

Drawing Title
HOTEL
ELECTRICAL
DETAIL SCHEMATIC DIAGRAM
1 NTS
2 DETAIL SHEET 02
- GMDB-HOTEL
NTS
- TX-HOTEL-01

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8122 T1
Date Plotted: 5/6/2019 2:30:03 PM
KEYPLAN

ROOF LEVEL CABLE LEGEND KEY:


NO. OF SETS
ELECTRICAL ROOM RISER
CONDUCTOR SIZE
1
SMDB-HT-10F-MECH No. OF CPC
TM-ARC-HT-DR-E0-ZZ-8130 TCL: 65.00 kW
MDL: 65.00 kW CPC SIZE
DF: 1.00
10TH FLOOR LEVEL GENERAL NOTES:
X X
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
5 VERIFIED ON SITE AND APPROVED BY THE
EMCC-HT-10F-1
ARCHITECT/ENGINEER.
TCL(DUTY): 103.50kW
TM-ARC-HT-DR-E0-ZZ-8128 2. DO NOT SCALE FROM THIS DRAWING.
MDL: 20.00 kW
No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
DF: 0.19 (SINGLE-CORE/MULTI-CORE)
9TH FLOOR LEVEL OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
MCC-HT-9F-1
2 EMCC-HT-9F-1 4 C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
TCL(DUTY): 8.75 kW
TCL(DUTY): 35.50 kW D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
TM-ARC-HT-DR-E0-ZZ-8130 MDL: 8.75 kW TM-ARC-HT-DR-E0-ZZ-8128
MDL: 0.75 kW E = Cu/XLPE/LSF ONLY.
DF: 1.00
DF: 0.02 F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
8TH FLOOR LEVEL G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE

7TH FLOOR LEVEL (E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.

ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
6TH FLOOR LEVEL MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3

MALL OR HOTEL

5TH FLOOR LEVEL PANEL/EQUIPMENT TYPE


TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
4TH FLOOR LEVEL SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR

(E)SMDB - MZ1 - 01 - X - BL - (L) X

PANEL/EQUIPMENT NO.
L - LIGHTING
3RD FLOOR LEVEL P - POWER

LEVEL
BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
2ND FLOOR LEVEL P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
T - TENANT
1ST FLOOR LEVEL
CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2 REFERENCE DRAWINGS:
MZ3 - MALL ZONE 3
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
GROUND FLOOR LEVEL
CP2 - CAR PARK 2 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
SMDB-HT-BL-Z2 SMDB-HT-BL-Z3 ESMDB-HT-BL-Z1Z2 ESMDB-HT-BL-MECH CP3 - CAR PARK 3 NOTES
ESMDB-HT-BL-Z3 ESMDB-HT-BL-ICT
(BASEMENT ZONE 2) (BASEMENT ZONE 3) (BASEMENT ZONE 1 & 2) (BASEMENT ZONE 3) (BASEMENT) TCL(DUTY): 152.26 kW 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
PANEL/EQUIPMENT TYPE
TCL: 126.68 kW TCL: 149.15 kW TCL: 131.14 kW TCL: 123.58 kW TCL: 104.91 kW MDL: 139.96 kW EMCC-HT-BL-Z3-1 4 SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
MDL: 101.34 kW MDL: 123.31 kW MDL: 99.61 kW MDL: 98.87 kW MDL: 73.44 kW DF: 0.92 (BASEMENT ZONE 3)
ESMDB - ESSENTIAL SUBMAIN 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
DF: 0.80 DF: 0.83 DF: 0.76 DF: 0.80 DF: 0.70 TCL(DUTY): 15.50 kW TM-ARC-HT-DR-E0-ZZ-8129
2 3 1
DISTRIBUTION BOARD TO 1213
MDL: 10.00 kW
MCC - MOTOR CONTROL CENTER
DF: 0.65 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TM-ARC-HT-DR-E0-ZZ-8127 TM-ARC-HT-DR-E0-ZZ-8127 TM-ARC-HT-DR-E0-ZZ-8128 UPS-HOTEL UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
150 kVA, 415V, 3:3 ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
4 MODULAR TYPE UPS
3 TO 5213
TM-ARC-HT-DR-E0-ZZ-8127 USMDB-HT-BL-UPS
TM-ARC-HT-DR-E0-ZZ-8128 (LOCATED AT UPS ROOM BASEMENT)
TCL: 89.00 kW
1 MDL: 62.30 kW
MCC-HT-BL-Z3-4 1
I/O DF: 0.70 A 20/01/2019 SEWA SUBMISSION
TM-ARC-HT-DR-E0-ZZ-8127 (BASEMENT ZONE 3) 2
TM-ARC-HT-DR-E0-ZZ-8131 Rev. Date Authority Description
SMDB-HT-BL-Z1 TCL: 305.50 kW M.BYPASS
SMDB-HT-BL-MECH TM-ARC-HT-DR-E0-ZZ-8128
(BASEMENT ZONE 1) MDL: 155.50 kW
TCL(DUTY): 59.00 kW DF: 0.51
TCL: 286.49 kW MDL: 59.00 kW 3 4
MDL: 229.19 kW DF: 1.00
DF: 0.80 TM-ARC-HT-DR-E0-ZZ-8130 TM-ARC-HT-DR-E0-ZZ-8130
DRAWING NOTES:

1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE P02 20/12/18 DESIGN FURTHER DEVELOPED

1x150

1x300

1x300
1x240

1x120

1x150
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND

1x16
1x300

1x70

1x35
1x630

1x300

1x240

1x120

1x50

1x70

1x16

P01 25/01/18 100% SCHEMATIC DESIGN ISSUE


WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
Rev. Date Description
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
Purpose of Issue :

1x300

3x185

3x185
2x240

1x240

1x120

1x300

1x35
3x185

1x70
2x630

2x300

2x240

1x240

1x120

Fx4

Fx4

Fx4

Fx4
Dx4
FOR TENDER
Fx4

Fx4

Fx4

Fx4
1x95

1x16

Dx4
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
Kx1

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SPACE SPACE SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
Initial/Current Issue Signatures
Original
3. DO NOT SCALE ON THE DRAWING. Size A0 Designed By: FD
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
RELEVANT DOCUMENTS AND DRAWINGS. Datum - Checked By: EC

Grid - Approved By: MJ


5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
800AT PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT
1200AT 630AT 300AT 300AT 160AT 200AT 63AT Client :
4P 300AT 300AT 225AT 400AT 100AT 250AT 100AT 300AT 300AT WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Tilal Mall L.L.C
TP 4P 4P 4P 4P 4P 4P
1200AT 4P 4P 4P 4P 4P 4P 4P 4P 4P CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE P.O. Box 5995
ACB MCCB MCCB MCCB MCCB ACB
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR Sharjah, UAE
TP
TO COMMENCING WORK. Tel: +971 (6) 5560055
PFI ISOL. Fax: +971 (6) 5560033
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lead Consultant :
LV SCHEMATIC NOTES: Design & Consultancy
3200A TPN+E BUSBAR for natural and
3200AT 1600:5
built assets
65kA @ 3 SEC. A A A
A A A 3200:5 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
415V/240V 4P P.O. Box. 52750 Tel: +971 (4) 3193333
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Copyright © Arcadis 2018
FORM 4 TYPE 2 ACB L1 L2 L3 Dubai, UAE Fax: +971 (4) 3242531
L1 L2 L3
N/C 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
Sub-Consultant :
OC SC EF U-V 1600:5 MANUFACTURER.
OC SC EF U-V 3200:5
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
TO BMS EMU
3200AT 1600AT
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Architect / Engineer of record :
4P 4P SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
TO BMS M M TO BMS Design & Consultancy
ACB ACB for natural and
EM 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. built assets
MDB-HOTEL-02 ESSENTIAL LOAD N/O P.O. Box. 1779
(SERVING COMMON FACILITIES) TCL : 755.39 kW V SS 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. Copyright © Arcadis 2018 Sharjah, UAE
V SS
LOCATION: SUBSTATION AT BASEMENT LEVEL MDL : 504.93 kW
TCL : 1755.96 kW DF : 0.67 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Project Name:
MDL : 1247.02 kW DONE ON ACTUAL INSTALLATION.
PFC-HOTEL-02 DF = 0.71
SEWA TARIFF 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
Tilal Mall and Hotel
600kVAR MULTISTEP
AUTO PFC METERING KWH BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
Sharjah,UAE
OF CABLES AND UP. Plot Number/Area 7040 / JWAIZEI
15 X 1C 630 mm² Cu/XLPE/PVC 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
Drawing Title
(COORDINATE WITH SEWA) HOTEL
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
TX-HOTEL-02 RELAYS.
2000kVA A ELECTRICAL
11000-415/240V
(BY SEWA) TO GMDB-HOTEL LOCATED AT
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
IN MECHANICAL DESIGN.
SCHEMATIC DIAGRAM
BASEMENT LEVEL
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
SHEET 03
BASEMENT LEVEL CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.

13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Scales Drawn By Suitability Code Project Stage
PER SEWA.
NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8123 T1
Date Plotted: 5/6/2019 2:30:10 PM
KEYPLAN

ROOF LEVEL

ELECTRICAL ROOM RISER

10TH FLOOR LEVEL CABLE LEGEND KEY:


NO. OF SETS
2 630A CONDUCTOR SIZE
TM-ARC-HT-DR-E0-ZZ-8136 SMDB-HT-9F-E TAP-OFF No. OF CPC
TCL: 212.64 kW 2x240 1x240
CPC SIZE
MDL: 138.36 kW Dx4
DF: 0.65 X X
GENERAL NOTES:
9TH FLOOR LEVEL X 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
1 VERIFIED ON SITE AND APPROVED BY THE
630A ARCHITECT/ENGINEER.
No. OF CORE
TM-ARC-HT-DR-E0-ZZ-8136 SMDB-HT-8F-E TAP-OFF (SINGLE-CORE/MULTI-CORE) 2. DO NOT SCALE FROM THIS DRAWING.
CABLE TYPE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
TCL: 240.60 kW 2x240 1x240 OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
A = Cu/PVC/AWA/PVC
MDL: 159.95 kW Dx4 LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
B = Cu/PVC/SWA/PVC
C = Cu/XLPE/AWA/LSF SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
DF: 0.66 THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
D = Cu/XLPE/SWA/LSF
E = Cu/XLPE/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
8TH FLOOR LEVEL 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
F = Cu/FRT/SWA/LSF
G = Cu/FRT/LSF ONLY.
2 H = Cu/MICS/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
400A FOR ALL MEP SERVICES BASED ON FINAL SELECTED
J = Cu/MICS
TM-ARC-HT-DR-E0-ZZ-8135 SMDB-HT-7F-E TAP-OFF K = Cu/PVC/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
L = Cu/PVC/PVC APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
TCL: 176.26 kW 1x300 1x150
M = Cu/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
MDL: 108.48 kW Dx4 LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DF: 0.62
DRAWINGS.
(E)MDB - MALL - XX - X
7TH FLOOR LEVEL
PANEL/EQUIPMENT NO.
1 400A
ZONE NO.
TM-ARC-HT-DR-E0-ZZ-8135 SMDB-HT-6F-E TAP-OFF ESMDB-HT-6F-E MZ1 - MALL ZONE 1
TCL: 87.99 kW MZ2 - MALL ZONE 2
TCL: 182.18 kW 1x300 1x150 MDL: 31.39 kW 2
MZ3 - MALL ZONE 3
MDL: 113.29 kW Dx4 DF: 0.36 TM-ARC-HT-DR-E0-ZZ-8132 CH - CHILLER
DF: 0.62 CP1 - CAR PARK 1
CP2 - CAR PARK 2
6TH FLOOR LEVEL CP3 - CAR PARK 3

MALL OR HOTEL
2 400A
TM-ARC-HT-DR-E0-ZZ-8134 SMDB-HT-5F-E TAP-OFF PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
TCL: 180.89 kW 1x300 1x150
MDB - MAIN DISTRIBUTION BOARD
MDL: 112.25 kW Dx4 PFC - POWER FACTOR CORRECTOR
DF: 0.62 UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
5TH FLOOR LEVEL ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
1 400A
TM-ARC-HT-DR-E0-ZZ-8134 TAP-OFF (E)SMDB - MZ1 - 01 - X - BL - (L) X
SMDB-HT-4F-E
TCL: 180.71 kW 1x300 1x150
Dx4 PANEL/EQUIPMENT NO.
MDL: 122.73 kW
L - LIGHTING
DF: 0.68 P - POWER

4TH FLOOR LEVEL LEVEL


BL - BASEMENT
GF - GROUND
2 400A FF - FIRST FLOOR
4
TM-ARC-HT-DR-E0-ZZ-8133 TAP-OFF RL - ROOF
SMDB-HT-3F-E P1 - PARKING LEVEL 1
TM-ARC-HT-DR-E0-ZZ-8132
TCL: 178.63 kW 1x300 1x150 P2 - PARKING LEVEL 2
MDL: 121.06 kW Dx4 P3 - PARKING LEVEL 3
1 P4 - PARKING LEVEL 4
DF: 0.68 P5 - PARKING LEVEL 5
TM-ARC-HT-DR-E0-ZZ-8132
3RD FLOOR LEVEL OWNERSHIP
L - LANDLORD
T - TENANT
1 225A MCC-HT-2F-1 ESMDB-HT-2F-E EMCC-HT-2F-1 3
TCL(DUTY): 75.00 kW TCL: 24.25 kW TCL: 5.50 kW CORE
TM-ARC-HT-DR-E0-ZZ-8133 SMDB-HT-2F-E TAP-OFF TM-ARC-HT-DR-E0-ZZ-8132
MDL: 75.00 kW MDL: 19.40 kW MDL: 5.50 kW
DF: 0.80 ZONE NO.
TCL: 112.89 kW 1x120 1x70 DF: 1.00 DF: 1.00
MZ1 - MALL ZONE 1
MDL: 72.65 kW Dx4 MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
DF: 0.64 REFERENCE DRAWINGS:
CH - CHILLER
CP1 - CAR PARK 1
2ND FLOOR LEVEL 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP2 - CAR PARK 2
SYMBOLS AND ABBREVIATIONS
CP3 - CAR PARK 3
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
PANEL/EQUIPMENT TYPE NOTES
SMDB - SUBMAIN DISTRIBUTION BOARD
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
BB-HT-01-E ESMDB - ESSENTIAL SUBMAIN
MISCELLANEOUS DETAILS 0021
TCL = 1464.81 kW DISTRIBUTION BOARD
MDL = 948.77 kW MCC - MOTOR CONTROL CENTER 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
DF = 0.65 TO 1213
UPS - UNINTERUPTIBLE POWER SUPPLY 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
ELCP - EMERGENCY LIGHTING PANEL TO 2213
1st FLOOR LEVEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DRAWING NOTES:
TO 5213
5 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
TM-ARC-HT-DR-E0-ZZ-8132 WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
6 A 20/01/2019 SEWA SUBMISSION
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
Rev. Date Authority Description
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
TM-ARC-HT-DR-E0-ZZ-8132
3. DO NOT SCALE ON THE DRAWING.
GROUND FLOOR LEVEL
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
MCC-HT-BL-Z1-1 RELEVANT DOCUMENTS AND DRAWINGS.
SMDB-HT-BL-CRAC
BB-HT-01-E 5000A TPN+E COPPER BUSBAR

TCL(DUTY): 22.00 kW TCL: 63.50 kW


MDL: 22.00 kW MDL: 63.50 kW 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
DF: 1.00 PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P02 20/12/18 DESIGN FURTHER DEVELOPED
DF: 1.00
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT P01 25/01/18 100% SCHEMATIC DESIGN ISSUE
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Rev. Date Description
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
Purpose of Issue :
TO COMMENCING WORK.
FOR TENDER
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES.
1x630

1x25

1x95

1x95

1x16

1x16
1x50
Initial/Current Issue Signatures
Original
Size A0 Designed By: FD
LV SCHEMATIC NOTES:
1x185

1x150
2x630

1x50
Dx4

1x35

1x35
1x95
Dx4

Dx4

Dx4
Kx1

Dx4

Fx4
Datum - Checked By: EC
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Grid - Approved By: MJ
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Client :
MANUFACTURER. Tilal Mall L.L.C
P.O. Box 5995
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Sharjah, UAE
Tel: +971 (6) 5560055
1200AT 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Fax: +971 (6) 5560033
TP 2000 AT 100AT 300AT 250AT 100AT 200AT 80AT SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
1200AT ACB 4P 4P 4P 4P 4P 4P 4P
MCCB MCCB MCCB MCCB MCCB MCCB Lead Consultant :
TP MCCB 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
Design & Consultancy
for natural and
PFI ISOL. built assets
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
P.O. Box. 52750 Tel: +971 (4) 3193333
1 2 3 4 6 7 8 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
DONE ON ACTUAL INSTALLATION.
3200A TPN+E BUSBAR Sub-Consultant :
3200AT 400:5 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
65kA @ 3 SEC. A A A 3200:5 A A A
4P BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
415V/240V BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
ACB L1 L2 L3 OF CABLES AND UP.
FORM 4 TYPE 2 L1 L2 L3
N/C Architect / Engineer of record :
OC SC EF U-V 400:5 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
OC SC EF U-V 3200:5 Design & Consultancy
for natural and
built assets
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
TO BMS EMU
RELAYS.
P.O. Box. 1779
3200AT 300AT Copyright © Arcadis 2018 Sharjah, UAE
4P 4P 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
TO BMS M TO BMS M
Project Name:
ACB MCCB IN MECHANICAL DESIGN.
EM
MDB-HOTEL-03
V SS
N/O
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL Tilal Mall and Hotel
(SERVING EAST SIDE) V SS CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
LOCATION: SUBSTATION AT BASEMENT LEVEL ESSENTIAL LOAD
SPECIALISTS INFORMATION OR DETAIL. Sharjah,UAE
TCL = 1743.05 kW TCL : 117.74 kW 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Plot Number/Area 7040 / JWAIZEI
PFC-HOTEL-03 MDL = 1165.56 kW MDL : 56.29 kW PER SEWA.
600kVAR MULTISTEP SEWA TARIFF
Drawing Title
AUTO PFC
DF = 0.67 DF : 0.48
METERING
KWH HOTEL
ELECTRICAL
15 X 1C 630 mm² Cu/XLPE/PVC
(COORDINATE WITH SEWA)
SCHEMATIC DIAGRAM
SHEET 04
TX-HOTEL-03
C
2000kVA
11000-415/240V TO GMDB-HOTEL LOCATED
Scales Drawn By Suitability Code Project Stage
(BY SEWA) AT BASEMENT LEVEL
BASEMENT LEVEL NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8124 T1
Date Plotted: 5/6/2019 2:30:16 PM
ELECTRICAL ROOM RISER KEYPLAN
SERVING HOTEL WEST SIDE
EQUIPMENT NOMENCLATURE DRAWING NOTES:

ESMDB-HT-10F-PH (E)MDB - MALL - XX - X 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE


1 WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
TCL: 64.07 kW
MDL: 51.26 kW WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
TM-ARC-HT-DR-E0-ZZ-8142 PANEL/EQUIPMENT NO. STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
DF: 0.80
10TH FLOOR LEVEL
ZONE NO. 2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
1 MZ1 - MALL ZONE 1 SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
MZ2 - MALL ZONE 2
TM-ARC-HT-DR-E0-ZZ-8141 MZ3 - MALL ZONE 3 3. DO NOT SCALE ON THE DRAWING.
SMDB-HT-9F-LIFT CH - CHILLER
1x185 1x95 CP1 - CAR PARK 1
TCL: 114.00 kW 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
Dx4 CP2 - CAR PARK 2 RELEVANT DOCUMENTS AND DRAWINGS.
MDL: 102.60 kW CP3 - CAR PARK 3
DF: 0.90 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT GENERAL NOTES:
MALL OR HOTEL
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT
9TH FLOOR LEVEL WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
PANEL/EQUIPMENT TYPE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR VERIFIED ON SITE AND APPROVED BY THE
TX - TRANSFORMER
TO COMMENCING WORK. ARCHITECT/ENGINEER.
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR 2. DO NOT SCALE FROM THIS DRAWING.
2
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
TM-ARC-HT-DR-E0-ZZ-8140
CBU - CENTRAL BATTERY UNIT LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
8TH FLOOR LEVEL LV SCHEMATIC NOTES: SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
250A 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
HVSG - HIGH VOLTAGE SWITCHGEAR
TAP-OFF THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
2 ONLY.
(E)SMDB - MZ1 - 01 - X - BL - (L) X 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
SMDB-HT-7F-W TM-ARC-HT-DR-E0-ZZ-8141 MANUFACTURER. FOR ALL MEP SERVICES BASED ON FINAL SELECTED
(WEST SIDE COMMON AREAS) SMDB-HT-7F-POOL PANEL/EQUIPMENT NO. MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
225A 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
TCL: 104.51 kW TCL: 70.00 kW L - LIGHTING
TAP-OFF 1x120 1x70 WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
MDL: 83.61 kW MDL: 56.00 kW P - POWER
Dx4 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
7TH FLOOR LEVEL DF: 0.80 DF: 0.80 SAME BRAND ALLTHROUGH OUT THE INSTALLATION. CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
LEVEL
DRAWINGS.
BL - BASEMENT
200A 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
GF - GROUND
TAP-OFF FF - FIRST FLOOR
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
RL - ROOF
1x95 1x50
P1 - PARKING LEVEL 1
Dx4 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
2 P2 - PARKING LEVEL 2
DONE ON ACTUAL INSTALLATION.
1 P3 - PARKING LEVEL 3
ESMDB-HT-6F-W P4 - PARKING LEVEL 4
300A TM-ARC-HT-DR-E0-ZZ-8137 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TM-ARC-HT-DR-E0-ZZ-8140 TCL: 34.18 kW P5 - PARKING LEVEL 5
TAP-OFF SMDB-HT-6F-W BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
MDL: 30.35 kW BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
TCL: 136.27 kW
1x185 1x95 OWNERSHIP OF CABLES AND UP.
DF: 0.89
Dx4 MDL: 83.44 kW L - LANDLORD
6TH FLOOR LEVEL DF: 0.61 T - TENANT 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
CORE 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
2 RELAYS.
300A ZONE NO.
TAP-OFF TM-ARC-HT-DR-E0-ZZ-8139 MZ1 - MALL ZONE 1
SMDB-HT-5F-W MZ2 - MALL ZONE 2 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
1x185 1x95 TCL: 136.27 kW MZ3 - MALL ZONE 3 IN MECHANICAL DESIGN.
Dx4 MDL: 83.44 kW CH - CHILLER
CP1 - CAR PARK 1 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
DF: 0.61 CP2 - CAR PARK 2 CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
5TH FLOOR LEVEL CP3 - CAR PARK 3

PANEL/EQUIPMENT TYPE 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
SMDB - SUBMAIN DISTRIBUTION BOARD PER SEWA.
1 ESMDB - ESSENTIAL SUBMAIN
300A
DISTRIBUTION BOARD
TAP-OFF SMDB-HT-4F-W TM-ARC-HT-DR-E0-ZZ-8139
MCC - MOTOR CONTROL CENTER
1x185 1x95 TCL: 124.91 kW
Dx4 UPS - UNINTERUPTIBLE POWER SUPPLY
MDL: 84.72 kW
ELCP - EMERGENCY LIGHTING PANEL
DF: 0.68
4TH FLOOR LEVEL

3
300A
TAP-OFF SMDB-HT-3F-W TM-ARC-HT-DR-E0-ZZ-8138
1x185 1x95 TCL: 121.93 kW
Dx4 MDL: 83.43 kW
DF: 0.68
3RD FLOOR LEVEL
630A
TAP-OFF 2x240 1x240 1
Dx4 SMDB-HT-2F-K1 TM-ARC-HT-DR-E0-ZZ-8138
TCL: 202.98 kW
MDL: 162.38 kW
DF: 0.80 ESMDB-HT-2F-W
400A
TCL: 56.85 kW
TAP-OFF 1x300 1x150 2
MDL: 45.45 kW
Dx4 SMDB-HT-2F-K2 REFERENCE DRAWINGS:
TM-ARC-HT-DR-E0-ZZ-8138 DF: 0.80
TCL: 162.68 kW 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
MDL: 130.15 kW SYMBOLS AND ABBREVIATIONS
2ND FLOOR LEVEL DF: 0.80
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
1 MISCELLANEOUS DETAILS 0021
TM-ARC-HT-DR-E0-ZZ-8137 FP-01 (HOTEL) 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
LOCATED AT CARPARK TO 1213
1st FLOOR LEVEL TCL : 168.0 kW 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
2 TO 2213
BY NOMINATED M
4 SPECIALIST ESMDB-HT-CP1-FP TM-ARC-HT-DR-E0-ZZ-8142 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
140A FP LOCATED AT CARPARK TO 5213
CONTRACTOR
TAP-OFF SMDB-HT-GF-1 TM-ARC-HT-DR-E0-ZZ-8138 CONTROLLER TCL: 6.20 kW
1x300 1x150
TCL: 140.93 kW MDL: 6.20 kW
Dx4 MDL: 112.75 kW 1600AT DF: 1.00
BY ELECTRICAL
GROUND FLOOR LEVEL DF: 0.80 CONTRACTOR 3P

BB-HT-01-W A 20/01/2019 SEWA SUBMISSION


TCL: 1314.49 kW ESMDB-HT-BL-CBS LOCAKABLE IN Rev. Date Authority Description
TCL: 13.50 kW "ON" POSITION
MDL: 982.52 kW
DF: 0.75 MDL: 13.50 kW EMCC-HT-BL-Z1-1
DF: 1.00
TCL(DUTY): 40.00 kW
CBU RATING: 15 KVA MDL: 40.00 kW
BB-HT-01-W 5000A 3PN+E COPPER BUSBAR

CBU LOCATED AT CENTRAL DF: 1.00


BATTERY ROOM
LOCATED AT
ELECTRICAL 3
ROOM
TM-ARC-HT-DR-E0-ZZ-8142
P01 20/12/18 FIRST ISSUE
Rev. Date Description
1x630

1x630
1x95

1x95

1x50

1x16

1x35
1x16
Purpose of Issue :
FOR TENDER
2x630

1x150

1x150

4x300
1x95

1x35

1x70
1x35
Dx4

Dx4
Kx1

Fx4

Fx4

Fx4

Fx4
Fx4
Initial/Current Issue Signatures
SPACE SPACE Original
Size A0 Designed By: FD

Datum - Checked By: EC

TO BMS Grid - Approved By: MJ


ELS +
ALARM Client : Tilal Mall L.L.C
2000AT 160AT 200AT 200AT 100AT 100AT
1200AT P.O. Box 5995
TP 4P 4P 160AT Sharjah, UAE
4P 4P 4P 1600AT 4P
1200AT ACB 4P Tel: +971 (6) 5560055
ACB MCCB MCCB MCCB MCCB 4P MCCB MCCB
TP Fax: +971 (6) 5560033
ACB
PFI ISOL.
Lead Consultant :
1 2 3 4 5 6 7 8 9 10 11 Design & Consultancy
for natural and
built assets
3200A TPN+E BUSBAR P.O. Box. 52750 Tel: +971 (4) 3193333
3200AT 800:5 Copyright © Arcadis 2018
65kA @ 3 SEC. A A A 3200:5 A A A Dubai, UAE Fax: +971 (4) 3242531
4P
415V/240V
ACB L1 L2 L3 Sub-Consultant :
FORM 4 TYPE 2 L1 L2 L3
N/C
OC SC EF U-V 800:5
OC SC EF U-V 3200:5

TO BMS EMU Architect / Engineer of record :


3200AT 800AT Design & Consultancy
for natural and
4P 4P built assets
TO BMS M M TO BMS P.O. Box. 1779
ACB ACB
EM Copyright © Arcadis 2018 Sharjah, UAE
MDB-HOTEL-04 N/O
(SERVING WEST SIDE, NORMAL & ESSENTIAL LOAD) V SS V SS Project Name:
LOCATION: SUBSTATION AT BASEMENT LEVEL
TCL : 1699.04 kW
ESSENTIAL LOAD
TCL : 348.55 kW
Tilal Mall and Hotel
PFC-HOTEL-04
600kVAR MULTISTEP
MDL : 1171.13 kW MDL : 188.61 kW
SEWA TARIFF KWH
Sharjah,UAE
AUTO PFC DF : 0.69 DF : 0.49
METERING Plot Number/Area 7040 / JWAIZEI

Drawing Title
HOTEL
ELECTRICAL
15 X 1C 630 mm² Cu/XLPE/PVC
(COORDINATE WITH SEWA)
SCHEMATIC DIAGRAM
SHEET 05
TX-HOTEL-04
B
2000kVA
11000-415/240V TO GMDB-HOTEL LOCATED
BASEMENT LEVEL (BY SEWA) AT BASEMENT LEVEL Scales Drawn By Suitability Code Project Stage
NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8125 T1
Date Plotted: 5/6/2019 2:30:23 PM
KEYPLAN

CHILLER ROOM AT BASEMENT LEVEL

CABLE LEGEND KEY:


ISOL-CHILLER-HT-BS-01 ISOL-CHILLER-HT-BS-02 ISOL-SCHWP-HT-BL-01 ISOL-CTWP-HT-BL-01 NO. OF SETS
(DUTY) (STANDBY) CHILLED CONDENSER
TCL: 886.20 kW TCL: 886.20 kW BY CONDUCTOR SIZE
PUMP PUMP NOMINATED
No. OF CPC
(DUTY) (DUTY) SPECIALIST
BY NOMINATED BY NOMINATED
CONTRACTOR CPC SIZE
M SPECIALIST CONTRACTOR M SPECIALIST CONTRACTOR 150.00 kW 110.00 kW

M M X X GENERAL NOTES:
EPO EPO
BY
2000A 2000A 400A 400A ELECTRICAL X 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
BY ELECTRICAL BY ELECTRICAL
TPN TPN TPN TPN CONTRACTOR METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
CONTRACTOR CONTRACTOR
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
No. OF CORE 2. DO NOT SCALE FROM THIS DRAWING.
(SINGLE-CORE/MULTI-CORE) 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
CABLE TYPE OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
A = Cu/PVC/AWA/PVC LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
B = Cu/PVC/SWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
C = Cu/XLPE/AWA/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
D = Cu/XLPE/SWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
E = Cu/XLPE/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
F = Cu/FRT/SWA/LSF ONLY.

6x240 1x630

6x240 1x630
G = Cu/FRT/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS

1x300 1x150

1x300 1x150
H = Cu/MICS/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
J = Cu/MICS MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
K = Cu/PVC/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
Dx4

Dx4
L = Cu/PVC/PVC WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND

Dx4

Dx4
M = Cu/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
TO FACP TO FACP N = Cu/MICA/XLPE/SWA/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
EQUIPMENT NOMENCLATURE DRAWINGS.

(E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.
CONTROLS CONTROLS
SECTION SEE SEE SECTION
MECH MECH ZONE NO.
ELR + UVR + ELR + UVR + PLANS PLANS MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
CONTACTOR + CONTACTOR + MZ3 - MALL ZONE 3
TO BMS
SHUNT TRIP SHUNT TRIP 30mA ELR+ 30mA ELR+ CH - CHILLER
SHUNT TRIP SHUNT TRIP CP1 - CAR PARK 1
CP2 - CAR PARK 2
EMU
CP3 - CAR PARK 3
EMU
2000AT 2000AT 400AT, TPN 400AT, TPN
MALL OR HOTEL
TPN TPN MCCB MCCB
TO BMS
ACB ACB
EM PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
1 2 MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
2000A TPN+E BUSBAR 800A TPN+E BUSBAR ELMDB - EMERGENCY LIGHTING MAIN DB
50kA @ 1 SEC. A A A 2000:5A 35kA @ 1 SEC. A A A 800:5A CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
415V/240V 415V/240V
SYNC - SYNCHRONIZING POWER SUPPLY
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 HVSG - HIGH VOLTAGE SWITCHGEAR
TYPE 2 TYPE 2
2000AT 630A (E)SMDB - MZ1 - 01 - X - BL - (L) X
MCC-HT-BL-Z3-1 TPN MCC-HT-BL-Z3-2
TPN
LOCATION: BASEMENT CHILLER ROOM ACB LOCATION: BASEMENT CHILLER ROOM
TCL : 1772.40 kW TCL : 260.00 kW PANEL/EQUIPMENT NO.
MDL : 886.20 kW MDL : 260.00 kW L - LIGHTING
DF : 0.50 DF : 1.00 P - POWER
V SS V SS
LEVEL
EMU 2000:5A EMU 800:5A BL - BASEMENT
TO BMS GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
1 1 P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
TM-ARC-HT-DR-E0-ZZ-8122 TM-ARC-HT-DR-E0-ZZ-8122
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
FED FROM FED FROM
MDB-HOTEL-01 MDB-HOTEL-01 OWNERSHIP
L - LANDLORD
BASEMENT BASEMENT T - TENANT

CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
CH - CHILLER
1 DETAIL 2 DETAIL CP1 - CAR PARK 1 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
NTS ISOL-CHWP-HT-BL-02 ISOL-CTWP-HT-BL-02 NTS CP2 - CAR PARK 2 SYMBOLS AND ABBREVIATIONS
- MCC-HT-BL-Z3-1 - MCC-HT-BL-Z3-2 CP3 - CAR PARK 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CHILLED CONDENSER
NOTES
PUMP PUMP PANEL/EQUIPMENT TYPE
BY NOMINATED SMDB - SUBMAIN DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
(STANDBY) (STANDBY) SPECIALIST MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
150.00 kW 110.00 kW CONTRACTOR DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
MCC - MOTOR CONTROL CENTER TO 1213
EPO
M EPO
M
UPS - UNINTERUPTIBLE POWER SUPPLY 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
400A 400A ELCP - EMERGENCY LIGHTING PANEL TO 2213
BY ELECTRICAL
TPN TPN CONTRACTOR 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DRAWING NOTES: TO 5213

1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE


WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
A 20/01/2019 SEWA SUBMISSION
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS Rev. Date Authority Description
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.

3. DO NOT SCALE ON THE DRAWING.


1x300 1x150

1x300 1x150

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.
Dx4

Dx4

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
TO FACP WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR Purpose of Issue :
TO COMMENCING WORK. FOR TENDER
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Initial/Current Issue Signatures
Original
SEE SEE
CONTROLS
SECTION
Size A0 Designed By: FD
MECH MECH LV SCHEMATIC NOTES:
PLANS PLANS Datum - Checked By: EC

TO BMS 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL


Grid - Approved By: MJ
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
30mA ELR+ 30mA ELR+
SHUNT TRIP SHUNT TRIP Client :
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Tilal Mall L.L.C
MANUFACTURER. P.O. Box 5995
400AT, TPN 400AT, TPN Sharjah, UAE
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Tel: +971 (6) 5560055
MCCB MCCB
Fax: +971 (6) 5560033
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
Lead Consultant :
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. Design & Consultancy
1 2 for natural and
built assets
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
800A TPN+E BUSBAR P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
A A A 800:5A Dubai, UAE Fax: +971 (4) 3242531
35kA @ 1 SEC. 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
415V/240V DONE ON ACTUAL INSTALLATION.
Sub-Consultant :
FORM 4a L1 L2 L3 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TYPE 2 BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
630A BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
MCC-HT-BL-Z3-3 OF CABLES AND UP. Architect / Engineer of record :
TPN
LOCATION: BASEMENT CHILLER ROOM
Design & Consultancy
TCL : 260.00 kW 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 for natural and
MDL : 0.00 kW built assets
DF : 0.00 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE P.O. Box. 1779
V SS RELAYS. Copyright © Arcadis 2018 Sharjah, UAE

EMU 800:5A 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Project Name:
IN MECHANICAL DESIGN.

12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL


Tilal Mall and Hotel
1
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
Sharjah,UAE
Plot Number/Area 7040 / JWAIZEI
TM-ARC-HT-DR-E0-ZZ-8122
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.
Drawing Title
FED FROM HOTEL
MDB-HOTEL-01
ELECTRICAL
BASEMENT
SCHEMATIC DIAGRAM
SHEET 06

3 DETAIL Scales Drawn By Suitability Code Project Stage


NTS NTS EB S4 TENDER
- MCC-HT-BL-Z3-3
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8126 T1
Date Plotted: 5/6/2019 2:30:29 PM
KEYPLAN

FP-HT-GF-01
(LOCATED AT
LANDSCAPE AREA)
TCL: 2.50 kW

CABLE LEGEND KEY:


GROUND LEVEL NO. OF SETS
FP-HT-BL-01
CONDUCTOR SIZE
(LOCATED AT
DB-HT-BL-Z1L1 DB-HT-BL-Z1L2 DB-HT-BL-Z1P1 DB-HT-BL-Z1P2 DB-HT-BL-Z1P3 DB-HT-BL-Z1P4 DB-HT-BL-Z1P5 DB-HT-BL-Z1KP1 DB-HT-BL-Z1KP2 DB-HT-BL-BRL DB-HT-BL-Z2L DB-HT-BL-Z2P1 DB-HT-BL-Z2P2 DB-HT-BL-Z2KP1 DB-HT-BL-Z2KP2 LANDSCAPE AREA) No. OF CPC
TCL: 3.26 kW TCL: 14.25 kW TCL: 33.49 kW TCL: 26.24 kW TCL: 26.30 kW TCL: 23.48 kW TCL: 21.40 kW TCL: 90.34 kW TCL: 34.87 kW TCL: 12.87 kW TCL: 4.72 kW TCL: 22.74 kW TCL: 13.00 kW TCL: 48.62 kW TCL: 32.60 kW TCL: 2.50 kW
CPC SIZE

X X GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
No. OF CORE
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
(SINGLE-CORE/MULTI-CORE)
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN

1x50 1x25

1x50 1x25
1x16 1x16

1x25 1x16
1x95 1x50

1x25 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
B = Cu/PVC/SWA/PVC

1x35 1x16
1x25 1x16
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF

Dx4

Dx4
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
ONLY.

Dx4
Dx4
SPACE SPACE SPACE SPACE SPACE F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE

63 AT 80 AT 63 AT 63 AT 63 AT 200 AT 80 AT 63 AT 63 AT 63 AT 63 AT 100 AT 80AT 63AT 63AT


63 AT 63 AT
TPN TPN (E)MDB - MALL - XX - X
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
PANEL/EQUIPMENT NO.

ZONE NO.
5 6 7 8 9 10 11 12 6 7 8 9 10 MZ1 - MALL ZONE 1
1 2 3 4 1 2 3 4 5
MZ2 - MALL ZONE 2
800A TPN+E BUSBAR 400A TPN+E BUSBAR MZ3 - MALL ZONE 3
35kA @ 1 SEC. 35kA @ 1 SEC. CH - CHILLER
A A A 800:5A A A A 400:5A CP1 - CAR PARK 1
415V/240V FORM 2b 415V/240V FORM 2b
TYPE 2 TYPE 2 CP2 - CAR PARK 2
CP3 - CAR PARK 3
L1 L2 L3 L1 L2 L3
MALL OR HOTEL

630A 300A
SMDB-HT-BL-Z1 TPN SMDB-HT-BL-Z2 TPN PANEL/EQUIPMENT TYPE
SERVING BASEMENT - ZONE 1 SERVING BASEMENT - ZONE 2 TX - TRANSFORMER
LOCATION: EE ROOM, BASEMENT LEVEL LOCATION: EE ROOM, BASEMENT LEVEL MDB - MAIN DISTRIBUTION BOARD
TCL : 286.49 kW TCL : 126.68 kW PFC - POWER FACTOR CORRECTOR
MDL : 229.19 kW V SS MDL : 101.34 kW V SS UPS - UNINTERRUPTIBLE POWER SUPPLY
DF : 0.80 DF : 0.80 ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
EMU 800:5A EMU 400:5A ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR

1 1 (E)SMDB - MZ1 - 01 - X - BL - (L) X

TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123
PANEL/EQUIPMENT NO.
L - LIGHTING
FED FROM FED FROM
P - POWER
MDB-HOTEL-02 MDB-HOTEL-02
LEVEL
BASEMENT LEVEL BASEMENT LEVEL BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
1 DETAIL 2 DETAIL P2 - PARKING LEVEL 2
NTS NTS P3 - PARKING LEVEL 3
- SMDB-HT-BL-Z1 - SMDB-HT-BL-Z2 P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
T - TENANT

CORE
ZONE NO.
MZ1 - MALL ZONE 1
FAHU-HT-BS-01 FAHU-HT-BS-01 FAHU-HT-BS-01 FAHU-HT-BS-01 FAHU-HT-BS-02 FAHU-HT-BS-02 FAHU-HT-BS-02 FAHU-HT-BS-02 FAHU-HT-BS-03 FAHU-HT-BS-03 FAHU-HT-BS-03 FAHU-HT-BS-03 MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
5.50 kW 5.50 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 5.50 kW 5.50 kW 7.50 kW 7.50 kW 3.00 kW 3.00 kW
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
M M M M M M M M M M M M BY NOMINATED CP2 - CAR PARK 2
SPECIALIST 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO CONTRACTOR NOTES
PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
32A 32A 20A 20A 20A 20A 32A 32A 40A 40A 20A 20A DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN BY ELECTRICAL TO 1213
TPN MCC - MOTOR CONTROL CENTER
CONTRACTOR
S4-LIFT 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
JBA-17
18.00 kW UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
21.90 kW
ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
(KITCHEN
EQUIPMENT) M BY NOMINATED TO 5213
DRAWING NOTES:
SPECIALIST
JBA-17
DB-HT-BL-Z3P2 DB-HT-BL-Z3KP1 DB-HT-BL-Z3KP2 DB-HT-BL-Z3KP3 DB-HT-BL-Z3KP4 EPO CONTRACTOR
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
TCL: 21.70 kW TCL: 20.37 kW TCL: 6.41 kW TCL: 23.42 kW TCL: 2.50 kW WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL

1x10 1x10

1x10 1x10
1x6

1x6

1x4

1x4

1x4

1x4

1x6

1x6

1x4

1x4
80A 80A STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
TPN TPN BY ELECTRICAL Rev. Date Authority Description
CONTRACTOR 2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
1x6

1x6

1x4

1x4

1x4

1x4

1x6

1x6

1x4

1x4
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
TO FACP
3. DO NOT SCALE ON THE DRAWING.

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.

CONTROLS 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


1x10 1x10

1x10 1x10

1x25 1x16

P01 20/12/18 FIRST ISSUE


1x25 1x16

1x16 1x16

1x25 1x16

1x25 1x16

SECTION PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT


WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
FOR TENDER
Dx4

Dx4

Dx4

ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR


Dx4

Dx4

Dx4

Dx4

SPACE TO BMS TO COMMENCING WORK.


Initial/Current Issue Signatures
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA Size A0 Designed By: FD
ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+
TO BMS SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP LV SCHEMATIC NOTES: Datum - Checked By: EC
300mA 300mA
ELR+ ELR+ 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
SHUNT TRIP SHUNT TRIP THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
32AT, TPN 32AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 32AT, TPN 32AT, TPN 40AT, TPN 40AT, TPN 20AT, TPN 20AT, TPN
63AT 63AT 63AT 63AT 63AT 80AT 80AT Client : Tilal Mall L.L.C
TPN TPN TPN TPN TPN TPN TPN MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
P.O. Box 5995
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MANUFACTURER.
Sharjah, UAE
Tel: +971 (6) 5560055
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
Fax: +971 (6) 5560033
1 2 3 4 5 6 7 8 9 10 11 12
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
3 4 5 6 7 8 9 10
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
200A TPN+E BUSBAR Design & Consultancy
200:5A 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
400:5A 35kA @ 1 SEC. A A A built assets
A A A
415V/240V 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
L1 L2 L3 Dubai, UAE Fax: +971 (4) 3242531
L1 L2 L3 FORM 4a
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
TYPE 2
DONE ON ACTUAL INSTALLATION. Sub-Consultant :
160A
300A 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TPN
TPN BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
SMDB-HT-BL-MECH BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
Architect / Engineer of record :
LOCATION: AHU ROOM OF CABLES AND UP.
BASEMENT LEVEL Design & Consultancy
V SS for natural and
V SS 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
TCL(DUTY)= 59.00 kW
P.O. Box. 1779
MDL : 59.00 kW EMU 200:5A 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Sharjah, UAE
Copyright © Arcadis 2018
EMU 400:5A DF : 1.00 RELAYS.
Project Name:
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED

1
1 IN MECHANICAL DESIGN.
Tilal Mall and Hotel
TM-ARC-HT-DR-E0-ZZ-8123
TM-ARC-HT-DR-E0-ZZ-8123 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
FED FROM Plot Number/Area 7040 / JWAIZEI
FED FROM
MDB-HOTEL-02 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
MDB-HOTEL-02
PER SEWA. Drawing Title
HOTEL
BASEMENT LEVEL
ELECTRICAL
3 DETAIL 4 DETAIL SCHEMATIC DIAGRAM
NTS
- SMDB-HT-BL-Z3
NTS
- SMDB-HT-BL-MECH SHEET 07

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8127 T1
Date Plotted: 5/6/2019 2:30:36 PM
KEYPLAN

2 EDB-HT-1F-1
TCL: 3.56 kW
TM-ARC-HT-DR-E0-ZZ-8129 CABLE LEGEND KEY:
NO. OF SETS

1ST FLOOR LEVEL CONDUCTOR SIZE


No. OF CPC
EDB-HT-GF-1 3
1 CPC SIZE
TCL: 4.39 kW
TM-ARC-HT-DR-E0-ZZ-8129
TM-ARC-HT-DR-E0-ZZ-8129
X X GENERAL NOTES:

GROUND FLOOR LEVEL 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
FIRE COMMAND EQPT ISOL-WWT-1 EDB-HT-BL-Z3L EDB-HT-BL-Z3P EDB-HT-BL-SEC EDB-HT-BL-Z3KP EDB-HT-BL-Z3PH EDB-HT-BL-TX EDB-HT-BL-LV X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
EDB-HT-BL-Z1L EDB-HT-BL-Z1P EDB-HT-BL-Z2L EDB-HT-BL-Z2P EDB-HT-BL-Z1KP EDB-HT-BL-Z2PH EDB-HT-BL-FC 50.00 kW TCL: 4.03 kW TCL: 6.60 kW TCL: 3.20 kW TCL: 41.22 kW TCL: 62.63 kW TCL: 2.00 kW TCL: 3.90 kW VERIFIED ON SITE AND APPROVED BY THE
TCL: 6.40 kW TCL: 9.08 kW TCL: 33.16 kW TCL: 3.00 kW UDB-HT-BL-SER UDB-HT-BL-AV UDB-HT-BL-SEC
TCL: 6.43 kW TCL: 11.69 kW TCL: 3.43 kW (ICT RACKS) (ICT RACKS) ARCHITECT/ENGINEER.
(ICT RACKS)
TCL: 11.00 kW 2. DO NOT SCALE FROM THIS DRAWING.
M BY NOMINATED TCL: 74.00 kW TCL: 4.00 kW No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
SPECIALIST (SINGLE-CORE/MULTI-CORE)
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
EPO CONTRACTOR CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
200A D = Cu/XLPE/SWA/LSF
BY ELECTRICAL 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
TPN E = Cu/XLPE/LSF
CONTRACTOR ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF

1x16 1x16
1x16 1x16
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE

1x70 1x35

1x16 1x16
1x16 1x16

1x16 1x16

1x16 1x16

1x70 1x35

1x16 1x16
1x50 1x25
J = Cu/MICS

1x35 1x16
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY

1x95 1x50
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED

Fx4
Dx4
Fx4

Dx4
Dx4

Dx4

Dx4

Dx4
Fx4
Dx4
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP

Fx4
SPACE
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Fx4

Dx4
SPACE N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE

(E)MDB - MALL - XX - X

TO BMS PANEL/EQUIPMENT NO.


300mA
ELR+ ZONE NO.
160AT 63AT 63AT 63AT 63AT 63AT 100AT 160AT 63AT 63AT MZ1 - MALL ZONE 1
SHUNT TRIP
63AT 63AT 63AT 63AT 63AT 100AT 63AT 63AT 63AT 200AT TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN MZ2 - MALL ZONE 2
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN MZ3 - MALL ZONE 3
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
1 2 3 1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9 10 11 MALL OR HOTEL
400A TPN+E BUSBAR 400A TPN+E BUSBAR
400A TPN+E BUSBAR
35kA @ 1 SEC. 35kA @ 1 SEC. A A A 400:5A 35kA @ 1 SEC. A A A 400:5A
400:5A PANEL/EQUIPMENT TYPE
415V/240V A A A 415V/240V 415V/240V TX - TRANSFORMER
FORM 2b TYPE 2 FORM 2b TYPE 2 FORM 2b TYPE 2 MDB - MAIN DISTRIBUTION BOARD
L1 L2 L3 L1 L2 L3
L1 L2 L3 PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
300A 300A ELMDB - EMERGENCY LIGHTING MAIN DB
350A USMDB-HT-BL-UPS ESMDB-HT-BL-Z3 CBU - CENTRAL BATTERY UNIT
ESMDB-HT-BL-Z1Z2 TPN TPN
TPN ACB - AIR CIRCUIT BREAKER PANEL
SERVING BASEMENT - ZONE 2 SERVING BASEMENT - ZONE 3
SERVING BASEMENT - ZONE 1 & 2 SYNC - SYNCHRONIZING POWER SUPPLY
LOCATION: EE ROOM, BASEMENT LEVEL LOCATION: UPS ROOM, BASEMENT LEVEL LOCATION: EE ROOM, BASEMENT LEVEL HVSG - HIGH VOLTAGE SWITCHGEAR
TCL : 131.14 kW TCL= 89.00 kW TCL : 123.58 kW
V SS V SS
MDL : 99.61 kW
V SS MDL= 62.30 kW MDL : 98.87 kW
(E)SMDB - MZ1 - 01 - X - BL - (L) X
DF : 0.76
DF= 0.70 EMU 400:5A DF : 0.80 EMU 400:5A
EMU 400:5A PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
1 1
1 LEVEL
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123 BL - BASEMENT
TM-ARC-HT-DR-E0-ZZ-8123 GF - GROUND
FF - FIRST FLOOR
FED FROM FED FROM RL - ROOF
FED FROM MDB-HOTEL-02 MDB-HOTEL-02 P1 - PARKING LEVEL 1
MDB-HOTEL-02 BASEMENT LEVEL P2 - PARKING LEVEL 2
BASEMENT LEVEL P3 - PARKING LEVEL 3
BASEMENT LEVEL
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
3 DETAIL
NTS
1 DETAIL - ESMDB-HT-BL-Z3 OWNERSHIP
NTS 2 DETAIL L - LANDLORD
- ESMDB-HT-BL-Z1Z2 NTS T - TENANT
- USMDB-HT-BL-UPS
CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
REFERENCE DRAWINGS:
MZ3 - MALL ZONE 3
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
BY NOMINATED NOTES
ISOL-SEF-HT-10F-01 ISOL-SEF-HT-10F-02 ISOL-SEF-HT-10F-03 ISOL-MAF-HT-10F-01 ISOL-MAF-HT-10F-02 ISOL-SPF-HT-10F-01 ISOL-SPF-HT-10F-02 ISOL-LPF-HT-10F-01 ISOL-LPF-HT-10F-02 ISOL-AHU-HT-10F-01
0.75 kW 15.00 kW 0.75 kW 0.75 kW 0.75 kW 15.00 kW 15.00 kW 18.50 kW 18.50 kW 18.50 kW SPECIALIST PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CONTRACTOR SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
ISOL-SEF-HT-9F-01 ISOL-SEF-HT-9F-02 ISOL-SEF-HT-9F-03 ISOL-MAF-HT-6F-01 ISOL-SPF-HT-9F-01 BY NOMINATED DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
0.75 kW 4.00 kW 15.00 kW 0.75 kW 15.00 kW SPECIALIST MCC - MOTOR CONTROL CENTER TO 1213
DUTY DUTY DUTY DUTY DUTY CONTRACTOR EPO
20A EPO
80A EPO
20A EPO
20A EPO
20A EPO
80A EPO
80A EPO
80A EPO
80A EPO
80A 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
BY ELECTRICAL
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN CONTRACTOR UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
EPO
20A EPO
20A EPO
80A EPO
20A EPO
80A TO 5213
BY ELECTRICAL DRAWING NOTES:
TPN TPN TPN TPN TPN CONTRACTOR
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
1x25 1x16

1x25 1x16

1x25 1x16

1x25 1x16

1x25 1x16

1x25 1x16

1x25 1x16

1x25 1x16
3. DO NOT SCALE ON THE DRAWING.
1x4

1x4

1x4

1x4

1x4
1x4

1x4

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.
Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4
1x4

1x4

1x4

1x4

1x4
Fx4

Fx4

Fx4
1x4

1x4

TO FACP SPACE SPACE TO FACP 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
CONTROLS CONTROLS Initial/Current Issue Signatures
SECTION SECTION 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
Size A0 Designed By: FD

LV SCHEMATIC NOTES: Datum - Checked By: EC


TO BMS TO BMS
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + Client : Tilal Mall L.L.C
ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
P.O. Box 5995
TO BMS TO BMS MANUFACTURER.
Sharjah, UAE
Tel: +971 (6) 5560055
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
Fax: +971 (6) 5560033
20AT, TPN 20AT, TPN 80AT, TPN 20AT, TPN 80AT, TPN 20AT, TPN 80AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 80AT, TPN 80AT, TPN 80AT, TPN 80AT, TPN 63AT, TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
Design & Consultancy
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
built assets

1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
6 11 12 Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
200A TPN+E BUSBAR 300A TPN+E BUSBAR DONE ON ACTUAL INSTALLATION. Sub-Consultant :
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 300:5A
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
415V/240V 415V/240V
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
Architect / Engineer of record :
TYPE 2 TYPE 2 OF CABLES AND UP.
100A 250A Design & Consultancy
for natural and
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
TPN TPN P.O. Box. 1779
EMCC-HT-9F-1 EMCC-HT-10F-1
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
LOCATION: EE ROOM, 9TH LEVEL LOCATION: EE ROOM, 10TH LEVEL
RELAYS.
TCL(DUTY)= 35.50 kW TCL(DUTY) = 103.50 kW Project Name:
V SS V SS 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
MDL : 0.75 kW
DF : 0.02 200:5A
MDL = 20.00 kW
DF = 0.19 300:5A
IN MECHANICAL DESIGN. Tilal Mall and Hotel
EMU EMU
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
Plot Number/Area 7040 / JWAIZEI
4 5 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8123 HOTEL

FED FROM FED FROM ELECTRICAL


MDB-HOTEL-02 MDB-HOTEL-02
SCHEMATIC DIAGRAM
9TH FLOOR LEVEL BASEMENT LEVEL
SHEET 08
4 DETAIL
NTS 5 DETAIL
- EMCC-HT-9F-1 NTS
- EMCC-HT-10F-1
Scales Drawn By Suitability Code Project Stage
NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8128 T1
Date Plotted: 5/6/2019 2:30:42 PM
KEYPLAN

TCL: 8.00 kW
(DUTY)
TP-9
CABLE LEGEND KEY:
NO. OF SETS
M

TCL: 1.87 kW

TCL: 3.73 kW

TCL: 3.73 kW

TCL: 0.03 kW

TCL: 0.03 kW

TCL: 0.03 kW

TCL: 5.60 kW

TCL: 5.60 kW

TCL: 8.00 kW

TCL: 3.00 kW

TCL: 3.00 kW

TCL: 8.00 kW

TCL: 8.00 kW

TCL: 3.73 kW

TCL: 3.73 kW

TCL: 1.49 kW

TCL: 0.03 kW

TCL: 0.03 kW
TCL: 3.28 kW
CONDUCTOR SIZE

(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)
HW-CP-10

HW-CP-10

HW-CP-10

HW-CP-10

HW-CP-10
(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)
No. OF CPC

GWP-1

GWP-2
SEP-1

SEP-2

TP-10
SP-5

SP-1

SP-7
SP-4
TP-6

TP-7

TP-8
GI-1
CPC SIZE

M M M M M M M M M M M M M M M M M M M GENERAL NOTES:
X X
BY NOMINATED BY NOMINATED
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
SPECIALIST SPECIALIST
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
CONTRACTOR CONTRACTOR
VERIFIED ON SITE AND APPROVED BY THE
SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
(SINGLE-CORE/MULTI-CORE) OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
BY ELECTRICAL BY ELECTRICAL
20A 20A 20A 20A 20A CONTRACTOR 32A 32A 20A 63A 20A 20A 20A 20A 20A CONTRACTOR CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS

1x16 1x16
1x4

1x4

1x4

1x4

1x4

1x6

1x6

1x4

1x4

1x4

1x4

1x4

1x4
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4
1x4

1x4

1x4

1x4

1x4

1x6

1x6

1x4

1x4

1x4

1x4

1x4

1x4
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE
TO BMS TO BMS
(E)MDB - MALL - XX - X

30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD PANEL/EQUIPMENT NO.

ZONE NO.
20AT 20AT 20AT 20AT 20AT 32AT 32AT 20AT 63AT 20AT 20AT 20AT 20AT 20AT MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
MZ3 - MALL ZONE 3
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB CH - CHILLER
RYB1 RYB2 RYB3 RYB4 RYB9 RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
200A TPN+E BUSBAR 200A TPN+E BUSBAR
35kA @ 1 SEC. 35kA @ 1 SEC. MALL OR HOTEL
415V/240V 415V/240V
FORM 2b TYPE 2 FORM 2b TYPE 2 PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
63A 100A PFC - POWER FACTOR CORRECTOR
TPN EDB-HT-BL-Z2PH TPN UPS - UNINTERRUPTIBLE POWER SUPPLY
SERVING BASEMENT - ZONE 2 ELMDB - EMERGENCY LIGHTING MAIN DB
EDB-HT-BL-Z1P
LOCATION: EE ROOM, BASEMENT LEVEL CBU - CENTRAL BATTERY UNIT
SERVING BASEMENT - ZONE 1
TCL= 33.16 kW ACB - AIR CIRCUIT BREAKER PANEL
LOCATION: EE ROOM, BASEMENT LEVEL
MDL= 26.53 kW SYNC - SYNCHRONIZING POWER SUPPLY
TCL= 11.69 kW
DF= 0.80 HVSG - HIGH VOLTAGE SWITCHGEAR
MDL= 9.35 kW
DF= 0.80
(E)SMDB - MZ1 - 01 - X - BL - (L) X

PANEL/EQUIPMENT NO.
1 1 L - LIGHTING
P - POWER
TM-ARC-HT-DR-E0-ZZ-8128 TM-ARC-HT-DR-E0-ZZ-8128
LEVEL
BL - BASEMENT
FED FROM FED FROM GF - GROUND
ESMDB-HT-BL-Z1Z2 ESMDB-HT-BL-Z1Z2 FF - FIRST FLOOR
BASEMENT LEVEL BASEMENT LEVEL RL - ROOF
P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
1 DETAIL 2 DETAIL P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
NTS NTS
- EDB-HT-BL-Z1P - EDB-HT-BL-Z2PH P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
T - TENANT

CORE
ZONE NO.
MZ1 - MALL ZONE 1
ISOL-SEF-HT-GF-01 ISOL-MAF-HT-GF-01 ISOL-EAF-HT-BS-01A ISOL-EAF-HT-BS-01B ISOL-EAF-HT-BS-01C ISOL-EAF-HT-BS-01D ISOL-EF-HT-BS-01 ISOL-EF-HT-BS-02 ISOL-EF-HT-BS-03 ISOL-EF-HT-BS-04 BY NOMINATED MZ2 - MALL ZONE 2
SPECIALIST MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
5.50 kW 4.00 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CONTRACTOR CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
TCL: 13.0 kW

CP2 - CAR PARK 2


2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
EPO
32A EPO
20A EPO
20A EPO
20A EPO
20A EPO
20A EPO
20A EPO
20A EPO
20A EPO
20A NOTES
(DUTY)

BY ELECTRICAL
PANEL/EQUIPMENT TYPE
TP-4

TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN CONTRACTOR 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
M DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TCL: 13.0 kW

TCL: 13.0 kW

TCL: 0.03 kW

TCL: 0.03 kW

TCL: 0.03 kW

TCL: 0.03 kW
TCL: 5.60kW

TCL: 5.60kW

TCL: 7.46kW

TCL: 7.46kW

TCL: 7.46kW

TCL: 7.46kW

TCL: 7.46kW

TCL: 21.5kW

TCL: 21.5kW

MCC - MOTOR CONTROL CENTER TO 1213


(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)

(STANDBY)

HW-CP-10

HW-CP-10

HW-CP-10

HW-CP-10

5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201


(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)

(DUTY)
GWP-3

GWP-4
SEP-3

SEP-4

UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213


SP-3

SP-4

TP-1

TP-2

TP-3

TP-5
GI-2

ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201


TO 5213
M M M M M M M M M M M M M M M DRAWING NOTES:
BY NOMINATED
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
SPECIALIST
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
CONTRACTOR
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL

1x6

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4
SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4
1x6

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4
BY ELECTRICAL SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
20A 32A 32A 32A 100A 63A 20A 20A 20A 20A CONTRACTOR TO FACP
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN 3. DO NOT SCALE ON THE DRAWING.

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


1x35 1x16

1x16 1x16

CONTROLS
1x4

1x6

1x6

1x6

1x4

1x4

1x4

1x4

PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SECTION
PLANS PLANS PLANS PLANS PLANS PLANS PLANS PLANS PLANS WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4

Fx4
1x4

1x6

1x6

1x6

1x4

1x4

1x4

1x4

TO BMS
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
Initial/Current Issue Signatures
100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + Size A0 Designed By: FD
TO BMS ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM
TO BMS LV SCHEMATIC NOTES: Datum - Checked By: EC

30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
32AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Client : Tilal Mall L.L.C
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
20AT 32AT 32AT 32AT 100AT 63AT 20AT 20AT 20AT 20AT 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY P.O. Box 5995
MANUFACTURER. Sharjah, UAE
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
Tel: +971 (6) 5560055
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Fax: +971 (6) 5560033
RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 1 2 3 4 5 6 7 8 9 10
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
200A TPN+E BUSBAR 200A TPN+E BUSBAR Design & Consultancy
A A A 200:5A 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
35kA @ 1 SEC. 35kA @ 1 SEC. built assets
415V/240V 415V/240V 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
FORM 2b TYPE 2 FORM 4a TYPE 2 L1 L2 L3 Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. Sub-Consultant :
160A 100A
EDB-HT-BL-Z3PH TPN TPN 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
EMCC-HT-BL-Z3-1
SERVING BASEMENT - ZONE 3 BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
LOCATION: EE ROOM, BASEMENT LEVEL LOCATION: ZONE 3, BASEMENT LEVEL BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS Architect / Engineer of record :
TCL= 62.63 kW OF CABLES AND UP.
TCL(DUTY)= 15.50 kW Design & Consultancy
MDL= 50.10 kW V SS for natural and
DF= 0.80 MDL= 10.00 kW 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
P.O. Box. 1779
DF= 0.65 EMU 200:5A
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
RELAYS.
Project Name:
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
3 1 IN MECHANICAL DESIGN. Tilal Mall and Hotel
TM-ARC-HT-DR-E0-ZZ-8123
TM-ARC-HT-DR-E0-ZZ-8128 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
FED FROM FED FROM Plot Number/Area 7040 / JWAIZEI
ESMDB-HT-BL-Z3 MDB-HOTEL-02
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
BASEMENT LEVEL BASEMENT LEVEL PER SEWA. Drawing Title
HOTEL

3 DETAIL 4 DETAIL ELECTRICAL


NTS NTS
- EDB-HT-BL-Z3PH - EMCC-HT-BL-Z3-1 SCHEMATIC DIAGRAM
SHEET 09

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8129 T1
Date Plotted: 5/6/2019 2:30:49 PM
KEYPLAN

FAHU-HT-10F-01 FAHU-HT-10F-01 FAHU-HT-10F-01 FAHU-HT-10F-01 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-03 FAHU-HT-10F-03 FAHU-HT-10F-03 FAHU-HT-10F-03 BY NOMINATED
4.00 kW 4.00 kW 3.00 kW 3.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 5.50 kW 5.50 kW 4.00 kW 4.00 kW ISOL-EU-HT-9F-01 ISOL-MAU-HT-9F-01 ISOL-EF-HT-9F-01
4.00 kW 4.0 kW 0.75 kW SPECIALIST
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CONTRACTOR
DUTY DUTY DUTY
CABLE LEGEND KEY:
M M M M M M M M M M M M M M M M BY NOMINATED
SPECIALIST NO. OF SETS
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO CONTRACTOR EPO EPO 20A EPO 20A CONDUCTOR SIZE
20A BY ELECTRICAL
TPN TPN TPN No. OF CPC
CONTRACTOR

20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 32A 32A 20A 20A CPC SIZE
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN BY ELECTRICAL
CONTRACTOR GENERAL NOTES:
X X
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
(SINGLE-CORE/MULTI-CORE)
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
CABLE TYPE
1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x6

1x6

1x4

1x4
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT

1x4

1x4

1x4
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x4

1x6

1x6

1x4

1x4
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.

Dx4

Dx4

Dx4
1x4

1x4

1x4
SPACE D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
TO FACP TO FACP E = Cu/XLPE/LSF ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
CONTROLS L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
CONTROLS
SECTION M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
SEE MECH SEE MECH SEE MECH SECTION
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
PLANS PLANS PLANS EQUIPMENT NOMENCLATURE

TO BMS TO BMS (E)MDB - MALL - XX - X

100mA ELCB 100mA ELCB 100mA ELCB


100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA 100mA PANEL/EQUIPMENT NO.
ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+ ELR+
SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP ZONE NO.
TO BMS MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 32AT, TPN 32AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN CH - CHILLER
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3

MALL OR HOTEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4
PANEL/EQUIPMENT TYPE
200A TPN+E BUSBAR 200A TPN+E BUSBAR TX - TRANSFORMER
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 200:5A MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
415V/240V 415V/240V UPS - UNINTERRUPTIBLE POWER SUPPLY
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 ELMDB - EMERGENCY LIGHTING MAIN DB
TYPE 2 TYPE 2 CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
200A 63A
SYNC - SYNCHRONIZING POWER SUPPLY
TPN TPN HVSG - HIGH VOLTAGE SWITCHGEAR
MCC-HT-9F-1
SMDB-HT-10F-MECH (E)SMDB - MZ1 - 01 - X - BL - (L) X
LOCATION: AHU ROOM LOCATION: EE ROOM, 9TH LEVEL
BASEMENT LEVEL V SS TCL(DUTY)= 8.75 kW SS
V
TCL(DUTY)= 65.00 kW PANEL/EQUIPMENT NO.
MDL : 8.75 kW
MDL : 65.00 kW L - LIGHTING
EMU 200:5A EMU 200:5A
DF : 1.00 DF : 1.00 P - POWER

LEVEL
BL - BASEMENT
1 1 GF - GROUND
FF - FIRST FLOOR
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123 RL - ROOF
P1 - PARKING LEVEL 1
FED FROM P2 - PARKING LEVEL 2
FED FROM
MDB-HOTEL-02 P3 - PARKING LEVEL 3
MDB-HOTEL-02
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
10TH FLOOR LEVEL 9TH FLOOR LEVEL
OWNERSHIP
L - LANDLORD
1 DETAIL 2 DETAIL T - TENANT
NTS NTS
- SMDB-HT-10F-MECH CORE
- MCC-HT-9F-1
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
NOTES
ISOL-CRAC-01 ISOL-CRAC-01 ISOL-CRAC-02 ISOL-CRAC-02 PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
BY NOMINATED ISOL-CRAC-01 (HUMIDIFIER) (ELECTRIC HETING) ISOL-ACCU-HT-B-01A ISOL-ACCU-HT-B-01B ISOL-CRAC-02 (HUMIDIFIER) (ELECTRIC HETING) ISOL-ACCU-HT-B-02 ISOL-ACCU-HT-03A ISOL-ACCU-HT-03B ISOL-ACCU-HT-03C ISOL-ACCU-HT-03D ISOL-ACCU-HT-03E ISOL-ACCU-HT-03F SMDB - SUBMAIN DISTRIBUTION BOARD
ISOL-CT-HT-GF-01 ISOL-CT-HT-GF-02 ISOL-PU-HT-01 MISCELLANEOUS DETAILS 0021
SPECIALIST 46.00 kW 11.30 kW 15.00 kW 4.80 kW 4.80 kW 17.50 kW 6.00 kW 12.00 kW 2.70 kW 5.36 kW 5.36 kW 5.36 kW 5.36 kW 5.36 kW 5.36 kW ESMDB - ESSENTIAL SUBMAIN
150.00 kW 150.00 kW 5.50 kW DUTY DUTY DUTY (STANDBY) (STANDBY) DUTY DUTY DUTY STANDBY DUTY DUTY DUTY DUTY DUTY DUTY 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
DUTY STANDBY DUTY CONTRACTOR DISTRIBUTION BOARD
MCC - MOTOR CONTROL CENTER TO 1213
M M M M M M M M M M M M M M M 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
BY NOMINATED
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO SPECIALIST UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
EPO EPO EPO ELCP - EMERGENCY LIGHTING PANEL
630A 630A 32A BY ELECTRICAL CONTRACTOR 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TPN TPN TPN CONTRACTOR TO 5213
DRAWING NOTES:
200A 63A 80A 32A 32A 80A 32A 63A 20A 32A 32A 32A 32A 32A 32A
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
BY ELECTRICAL
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
CONTRACTOR
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.

3. DO NOT SCALE ON THE DRAWING.


1x95 1x50

1x16 1x16

1x25 1x16

1x25 1x16

1x16 1x16
2x150 1x150

2x150 1x150

1x6

1x6

1x6

1x4

1x6

1x6

1x6

1x6

1x6

1x6
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
1x6

RELEVANT DOCUMENTS AND DRAWINGS.


Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
Fx4

Fx4

Fx4

Fx4

Fx4

Fx4
1x6

1x6

1x6

1x4

1x6

1x6

1x6

1x6

1x6

1x6
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
Dx4

Dx4

Dx4
1x6

SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
TO FACP TO FACP WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
Initial/Current Issue Signatures
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
CONTROLS CONTROLS Size A0 Designed By: FD
SEE SEE SEE SECTION SECTION
MECH MECH MECH LV SCHEMATIC NOTES: EC
PLANS PLANS PLANS
Datum - Checked By:

TO BMS 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
TO BMS THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Client : Tilal Mall L.L.C
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
P.O. Box 5995
ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + MANUFACTURER.
Sharjah, UAE
ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM
Tel: +971 (6) 5560055
TO BMS TO BMS 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
Fax: +971 (6) 5560033
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
630AT, TPN 630AT, TPN 32AT, TPN 200AT, TPN 63AT, TPN 80AT, TPN 32AT, TPN 32AT, TPN 80AT, TPN 32AT, TPN 63AT, TPN 20AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB Design & Consultancy
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
built assets

6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 16 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. Sub-Consultant :

800A TPN+E BUSBAR 400A TPN+E BUSBAR 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
35kA @ 1 SEC. A A A 800:5A 35kA @ 1 SEC. A A A 400:5A BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
415V/240V 415V/240V Architect / Engineer of record :
OF CABLES AND UP.
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 Design & Consultancy
for natural and
TYPE 2 TYPE 2 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
630A 400A P.O. Box. 1779
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
TPN TPN RELAYS.
ESMDB-HT-BL-MECH
Project Name:
MCC-HT-BL-Z3-4 LOCATION: BASEMENT LEVEL 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
LOCATION: ZONE 3
BASEMENT LEVEL V SS TCL(DUTY)= 152.26 kW V SS
IN MECHANICAL DESIGN. Tilal Mall and Hotel
TCL= 305.50 kW
MDL= 155.50 kW
EMU 800:5A
MDL : 139.96 kW
EMU 400:5A
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
DF= 0.51 DF : 0.92 SPECIALISTS INFORMATION OR DETAIL.
Plot Number/Area 7040 / JWAIZEI
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
1 1 HOTEL
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123
ELECTRICAL
FED FROM FED FROM
SCHEMATIC DIAGRAM
MDB-HOTEL-02 MDB-HOTEL-02 SHEET 10
BASEMENT LEVEL BASEMENT LEVEL

Scales Drawn By Suitability Code Project Stage


3 DETAIL 4 DETAIL NTS EB S4 TENDER
NTS NTS
- MCC-HT-BL-Z3-4 - ESMDB-HT-BL-MECH Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8130 T1
Date Plotted: 5/6/2019 2:30:56 PM
KEYPLAN

GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
ONLY.
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
FOR ALL MEP SERVICES BASED ON FINAL SELECTED
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.

EDB-HT-RL-GSM
(GSM ROOM) EQUIPMENT NOMENCLATURE
ROOF LEVEL TCL: 25.00 kW
(E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.
10TH FLOOR LEVEL
EDB-HT-9F-P ZONE NO.
(ICT RACKS) MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
TCL: 3.23 kW
9TH FLOOR LEVEL MZ3 - MALL ZONE 3
CH - CHILLER
EDB-HT-8F-P
CP1 - CAR PARK 1
(ICT RACKS)
CP2 - CAR PARK 2
TCL: 3.43 kW CP3 - CAR PARK 3
8 FLOOR LEVEL
EDB-HT-7F-P MALL OR HOTEL
(ICT RACKS)
7TH FLOOR LEVEL TCL: 3.55 kW
PANEL/EQUIPMENT TYPE
EDB-HT-6F-P TX - TRANSFORMER
(ICT RACKS) MDB - MAIN DISTRIBUTION BOARD
6TH FLOOR LEVEL TCL: 3.23 kW PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
EDB-HT-5F-P ELMDB - EMERGENCY LIGHTING MAIN DB
(ICT RACKS) CBU - CENTRAL BATTERY UNIT
TCL: 3.43 kW ACB - AIR CIRCUIT BREAKER PANEL
5TH FLOOR LEVEL
SYNC - SYNCHRONIZING POWER SUPPLY
EDB-HT-4F-P HVSG - HIGH VOLTAGE SWITCHGEAR
(ICT RACKS)
4TH FLOOR LEVEL TCL: 3.43 kW (E)SMDB - MZ1 - 01 - X - BL - (L) X

EDB-HT-3F-P
(ICT RACKS) PANEL/EQUIPMENT NO.
TCL: 3.23 kW L - LIGHTING
3RD FLOOR LEVEL
P - POWER
EDB-HT-2F-P
(ICT RACKS) LEVEL
2ND FLOOR LEVEL TCL: 4.49 kW BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
EDB-HT-1F-P
RL - ROOF
(ICT RACKS)
1ST FLOOR LEVEL P1 - PARKING LEVEL 1
TCL: 4.43 kW
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
EDB-HT-GF-P P4 - PARKING LEVEL 4
(ICT RACKS)
P5 - PARKING LEVEL 5
GROUND FLOOR LEVEL TCL: 5.46 kW

EDB-HT-BL-GSM EDB-HT-BL-P OWNERSHIP


EDB-HT-BL-TEL
(MAIN TELECOM ROOM) (MAIN GSM ROOM) (ICT RACKS) L - LANDLORD
TCL: 10.40 kW TCL: 26.20 kW TCL: 5.40 kW T - TENANT
REFERENCE DRAWINGS:
CORE 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
ZONE NO. SYMBOLS AND ABBREVIATIONS
MZ1 - MALL ZONE 1 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MZ2 - MALL ZONE 2 NOTES
MZ3 - MALL ZONE 3
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
CH - CHILLER
MISCELLANEOUS DETAILS 0021
CP1 - CAR PARK 1
CP2 - CAR PARK 2 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
CP3 - CAR PARK 3 TO 1213
1x16 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x16 1x16

5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201


PANEL/EQUIPMENT TYPE
TO 2213
SMDB - SUBMAIN DISTRIBUTION BOARD
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
Dx4

Dx4

Dx4

Dx4
Dx4

SPACE ESMDB - ESSENTIAL SUBMAIN 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201


SPACE SPACE SPACE
DISTRIBUTION BOARD TO 5213
MCC - MOTOR CONTROL CENTER

UPS - UNINTERUPTIBLE POWER SUPPLY


ELCP - EMERGENCY LIGHTING PANEL
A 20/01/2019 SEWA SUBMISSION
DRAWING NOTES:
Rev. Date Authority Description
63AT 100AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
TPN TPN TPN WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3. DO NOT SCALE ON THE DRAWING. P01 20/12/18 FIRST ISSUE
300A TPN+E BUSBAR
Rev. Date Description
35kA @ 1 SEC. 300:5A 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
A A A Purpose of Issue :
RELEVANT DOCUMENTS AND DRAWINGS.
415V/240V FOR TENDER
FORM 2b TYPE 2 L1 L2 L3 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT Initial/Current Issue Signatures
Original
225A
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
Size A0 Designed By: FD
ESMDB-HT-BL-ICT ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TPN Datum - Checked By: EC
SERVING BASEMENT - ZONE 2 TO COMMENCING WORK.
LOCATION: UPS ROOM, BASEMENT LEVEL Grid - Approved By: MJ
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES.
TCL : 104.91 kW
V SS Client : Tilal Mall L.L.C
MDL : 73.44 kW
LV SCHEMATIC NOTES: P.O. Box 5995
DF : 0.70 EMU 300:5A Sharjah, UAE
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Tel: +971 (6) 5560055
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Fax: +971 (6) 5560033

1 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY


MANUFACTURER. Lead Consultant :
Design & Consultancy
TM-ARC-HT-DR-E0-ZZ-8123 for natural and
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. built assets

P.O. Box. 52750 Tel: +971 (4) 3193333


FED FROM 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Copyright © Arcadis 2018
MDB-HOTEL-02 Dubai, UAE Fax: +971 (4) 3242531
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
BASEMENT LEVEL Sub-Consultant :
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.

6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.

1 DETAIL 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Architect / Engineer of record :
NTS DONE ON ACTUAL INSTALLATION. Design & Consultancy
- ESMDB-HT-BL-ICT for natural and
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT built assets
P.O. Box. 1779
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS Copyright © Arcadis 2018 Sharjah, UAE
OF CABLES AND UP.
Project Name:
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
Tilal Mall and Hotel
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
RELAYS. Sharjah,UAE
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Plot Number/Area 7040 / JWAIZEI
IN MECHANICAL DESIGN.
Drawing Title
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL HOTEL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 11

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8131 T1
Date Plotted: 5/6/2019 2:31:02 PM
KEYPLAN

ELECTRICAL RISER EDB-HT-10F-1 EDB-HT-10F-BMU


TCL: 4.36 kW TCL: 50.00 kW
ELECTRICAL RISER MDL: 3.49 kW MDL: 10.00 kW

CABLE LEGEND KEY:


6TH FLOOR LEVEL 10TH FLOOR LEVEL
NO. OF SETS

EDB-HT-5F-E EDB-HT-9F-E CONDUCTOR SIZE


TCL: 4.60 kW TCL: 4.55 kW No. OF CPC
MDL: 3.68 kW MDL: 3.64 kW CPC SIZE

X X GENERAL NOTES:
5TH FLOOR LEVEL 9TH FLOOR LEVEL 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
X
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
EDB-HT-4F-E EDB-HT-8F-E VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
TCL: 4.55 kW TCL: 4.93 kW No. OF CORE 2. DO NOT SCALE FROM THIS DRAWING.
MDL: 3.64 kW MDL: 3.94 kW (SINGLE-CORE/MULTI-CORE) 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
CABLE TYPE OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
A = Cu/PVC/AWA/PVC LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
B = Cu/PVC/SWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
4TH FLOOR LEVEL 8TH FLOOR LEVEL C = Cu/XLPE/AWA/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
D = Cu/XLPE/SWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
E = Cu/XLPE/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
EDB-HT-3F-E EDB-HT-7F-E EDB-HT-7F-BMU F = Cu/FRT/SWA/LSF ONLY.
TCL: 10.19 kW TCL: 4.55 kW TCL: 15.00 kW G = Cu/FRT/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
H = Cu/MICS/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
MDL: 8.15 kW MDL: 3.64 kW MDL: 3.00 kW J = Cu/MICS MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
K = Cu/PVC/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
L = Cu/PVC/PVC WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
M = Cu/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
3RD FLOOR LEVEL 7TH FLOOR LEVEL N = Cu/MICA/XLPE/SWA/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
EQUIPMENT NOMENCLATURE DRAWINGS.
EDB-HT-2F-E EDB-HT-6F-E (E)MDB - MALL - XX - X
TCL: 4.92 kW TCL: 4.60 kW
MDL: 3.93 kW MDL: 3.68 kW PANEL/EQUIPMENT NO.

ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x50 1x25
CP3 - CAR PARK 3

MALL OR HOTEL
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
Dx4

Dx4

Dx4

Dx4
Dx4
SPACE SPACE SPACE PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 125AT
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN (E)SMDB - MZ1 - 01 - X - BL - (L) X

MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
1 2 3 4 5 6 1 2 3 4 5 6 7 8
LEVEL
BL - BASEMENT
200A TPN+E BUSBAR 200A TPN+E BUSBAR GF - GROUND
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 200:5A FF - FIRST FLOOR
RL - ROOF
415V/240V 415V/240V P1 - PARKING LEVEL 1
L1 L2 L3
FORM 2b TYPE 2 L1 L2 L3 FORM 2b TYPE 2 P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
100A 200A P4 - PARKING LEVEL 4
ESMDB-HT-2F-E ESMDB-HT-6F-E P5 - PARKING LEVEL 5
TPN TPN
LOCATION: 2ND FLOOR EE ROOM LOCATION: 6TH FLOOR EE ROOM
OWNERSHIP
TCL : 24.25 kW TCL : 87.99 kW L - LANDLORD
MDL : 19.40 kW MDL : 31.39 kW V SS T - TENANT
V SS
DF : 0.80 DF : 0.36
CORE
EMU 200:5A EMU 200:5A
ZONE NO.
MZ1 - MALL ZONE 1
1 1 MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8124 CH - CHILLER
CP1 - CAR PARK 1 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP2 - CAR PARK 2 SYMBOLS AND ABBREVIATIONS
FED FROM FED FROM
CP3 - CAR PARK 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MDB-HOTEL-03 MDB-HOTEL-03
2ND FLOOR LEVEL 6TH FLOOR LEVEL PANEL/EQUIPMENT TYPE
NOTES
SMDB - SUBMAIN DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
ESMDB - ESSENTIAL SUBMAIN MISCELLANEOUS DETAILS 0021

1 DETAIL 2 DETAIL DISTRIBUTION BOARD


MCC - MOTOR CONTROL CENTER
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
NTS NTS TO 1213
- ESMDB-HT-2F-E - ESMDB-HT-6F-E 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
UPS - UNINTERUPTIBLE POWER SUPPLY
ELCP - EMERGENCY LIGHTING PANEL TO 2213
6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DRAWING NOTES: TO 5213
ISOL-LPF-HT-2F-01
ISOL-CRAC-01 ISOL-CRAC-02
5.50 kW ISOL-AHU-HT-2F-01 ISOL-MAU-HT-2F-01 ISOL-EU-HT-2F-01 BY NOMINATED 46.00 kW 17.50 kW BY NOMINATED 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
BY NOMINATED
DUTY 15.00 kW 30.0 kW 30.00 kW SPECIALIST DUTY DUTY SPECIALIST WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
SPECIALIST BY NOMINATED
DUTY DUTY DUTY CONTRACTOR CONTRACTOR ISOL-EU-HT-BS-01 ISOL-MAU-HT-BS-01 WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
CONTRACTOR SPECIALIST
CRAC-01 CRAC-02 11.00 kW 11.00 kW STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
DUTY DUTY CONTRACTOR A 20/01/2019 SEWA SUBMISSION
EPO
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS Rev. Date Authority Description
32A EPO 80A EPO 160A EPO 160A EPO 200A EPO 80A
BY ELECTRICAL BY ELECTRICAL BY ELECTRICAL SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
TPN CONTRACTOR TPN TPN TPN TPN TPN
CONTRACTOR CONTRACTOR EPO
63A EPO
63A BY ELECTRICAL 3. DO NOT SCALE ON THE DRAWING.
TPN TPN CONTRACTOR
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
RELEVANT DOCUMENTS AND DRAWINGS.
1x25 1x16

1x70 1x35

1x70 1x35

1x95 1x50

1x25 1x16

1x16 1x16

1x16 1x16
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
1x6

PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
SPACE SPACE SPACE Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
SPACE SPACE SPACE TO FACP TO FACP TO FACP SPACE TO FACP ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR Purpose of Issue :
Fx4
1x6

TO COMMENCING WORK. FOR TENDER


6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Initial/Current Issue Signatures
Original
Size A0 Designed By: FD

CONTROLS CONTROLS CONTROLS CONTROLS LV SCHEMATIC NOTES:


SEE Datum - Checked By: EC
SECTION SEE MECH SEE MECH SEE MECH SECTION SEE MECH SEE MECH SECTION SEE MECH SEE MECH SECTION
MECH PLANS PLANS PLANS PLANS PLANS PLANS PLANS 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
PLANS Grid - Approved By: MJ
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
TO BMS TO BMS TO BMS TO BMS Client :
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Tilal Mall L.L.C
MANUFACTURER. P.O. Box 5995
100mA 100mA 100mA 100mA 100mA 100mA ELCB 100mA ELCB
Sharjah, UAE
ELS + ELR + ELR + ELR + ELR + ELR + 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Tel: +971 (6) 5560055
ALARM SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP Fax: +971 (6) 5560033
TO BMS TO BMS TO BMS TO BMS 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
Lead Consultant :
32AT, TPN 80AT, TPN 160AT, TPN 160AT, TPN 200AT, TPN 80AT, TPN 63AT, TPN 63AT, TPN 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. Design & Consultancy
for natural and
MCCB MCCB MCCB MCCB MCCB built assets
MCCB MCCB MCCB
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION.
Sub-Consultant :
1 2 3 1 2 3 4 1 2 3 4 1 2 3
4
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
200A TPN+E BUSBAR 300A TPN+E BUSBAR 300A TPN+E BUSBAR 200A TPN+E BUSBAR BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 300:5A 35kA @ 1 SEC. A A A 300:5A 35kA @ 1 SEC. A A A 200:5A OF CABLES AND UP. Architect / Engineer of record :
415V/240V 415V/240V 415V/240V 415V/240V Design & Consultancy
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 for natural and
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 built assets
TYPE 2 TYPE 2 TYPE 2 TYPE 2 P.O. Box. 1779
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
Copyright © Arcadis 2018 Sharjah, UAE
80A 250A 300A 100A RELAYS.
TPN TPN TPN TPN 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
EMCC-HT-2F-1 MCC-HT-2F-1 SMDB-HT-BL-CRAC Project Name:
IN MECHANICAL DESIGN.
LOCATION: MEP PLANT ROOM,
2ND LEVEL
LOCATION: PLANT ROOM,
2ND LEVEL
LOCATION: MCC ROOM,
BASEMENT LEVEL
MCC-HT-BL-Z1-1
LOCATION: ZONE 1, BASEMENT LEVEL
Tilal Mall and Hotel
TCL : 5.50 kW 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
MDL : 5.50 kW V SS TCL : 75.00 kW V SS TCL : 63.50 kW V SS TCL(DUTY)= 22.00 kW V SS CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
Sharjah,UAE
DF : 1.00 MDL : 75.00 kW MDL : 63.50 kW MDL : 22.00 kW
200:5A 300:5A 300:5A EMU 200:5A Plot Number/Area 7040 / JWAIZEI
EMU EMU EMU DF : 1.00
DF : 1.00 DF : 1.00 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.
Drawing Title
HOTEL
1 1 1 1
ELECTRICAL
TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8124
SCHEMATIC DIAGRAM
FED FROM FED FROM FED FROM FED FROM SHEET 12
MDB-HOTEL-03 MDB-HOTEL-03 MDB-HOTEL-03 MDB-HOTEL-03
BASEMENT LEVEL
2ND FLOOR LEVEL 2ND FLOOR LEVEL 2ND FLOOR LEVEL

Scales Drawn By Suitability Code Project Stage


3 DETAIL 4 DETAIL 5 DETAIL 6 DETAIL NTS EB S4 TENDER
NTS NTS NTS NTS
- MCC-HT-2F-1 - MCC-HT-2F-1 - MCC-HT-BL-Z1-1
- EMCC-HT-2F-1 Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8132 T1
Date Plotted: 5/6/2019 2:31:09 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
DB-1AA-401 DB-DGR-407 DB-DGR-409 DB-1AA-415 DB-TGR-402 DB-DGR-404 DB-TGR-420 DB-1AA-410 DB-2AP-418 DB-HT-4F-WL DB-HT-4F-WP CONDUCTOR SIZE GENERAL NOTES:
TCL: 19.92 kW TCL: 7.52 kW TCL: 7.52 kW TCL: 19.92 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 19.92kW TCL: 24.43 kW TCL: 1.00 kW TCL: 2.48 kW
No. OF CPC 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
CPC SIZE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
X X 2. DO NOT SCALE FROM THIS DRAWING.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
X
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
No. OF CORE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
(SINGLE-CORE/MULTI-CORE) 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
ONLY.

1x16 1x16

1x35 1x16

1x35 1x16
1x35 1x16

1x16 1x16

1x16 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
CABLE TYPE
A = Cu/PVC/AWA/PVC 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
B = Cu/PVC/SWA/PVC FOR ALL MEP SERVICES BASED ON FINAL SELECTED
C = Cu/XLPE/AWA/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE

Dx2

Dx4

Dx4
Dx4

Dx2

Dx2

Dx4

Dx2

Dx2

Dx4

Dx4
SPACE SPACE SPACE SPACE D = Cu/XLPE/SWA/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
E = Cu/XLPE/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
F = Cu/FRT/SWA/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
G = Cu/FRT/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
H = Cu/MICS/LSF DRAWINGS.
J = Cu/MICS
K = Cu/PVC/LSF
L = Cu/PVC/PVC
M = Cu/LSF
63AT 40AT 40AT 63AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT N = Cu/MICA/XLPE/SWA/LSF
TPN SPN TPN EQUIPMENT NOMENCLATURE
TPN SPN SPN SPN SPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB (E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.
RYB1 R2 Y2 B2 RYB3 R4 Y4 B4 RYB5 RYB6 RYB7 RYB8 R9 Y9 B9
ZONE NO.
400A TPN+E BUSBAR MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
35kA @ 1 SEC. A A A 400:5A MZ3 - MALL ZONE 3
415V/240V CH - CHILLER
CP1 - CAR PARK 1
FORM 2b TYPE 2 L1 L2 L3
CP2 - CAR PARK 2
CP3 - CAR PARK 3
300A
MALL OR HOTEL
SMDB-HT-4F-W TPN
SERVING GUEST ROOMS - WEST WING
PANEL/EQUIPMENT TYPE
LOCATION: EE ROOM, 4TH FLOOR TX - TRANSFORMER
TCL : 124.91 kW V SS MDB - MAIN DISTRIBUTION BOARD
MDL : 84.72 kW PFC - POWER FACTOR CORRECTOR
EMU UPS - UNINTERRUPTIBLE POWER SUPPLY
DF : 0.68 400:5A ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
1 HVSG - HIGH VOLTAGE SWITCHGEAR
TM-ARC-HT-DR-E0-ZZ-8125
(E)SMDB - MZ1 - 01 - X - BL - (L) X

FED FROM
MDB-HOTEL-04 PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
4TH FLOOR LEVEL
LEVEL
BL - BASEMENT
GF - GROUND
1 DETAIL FF - FIRST FLOOR
NTS RL - ROOF
- SMDB-HT-4F-W P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
T - TENANT
REFERENCE DRAWINGS:
CORE 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
ZONE NO.
MZ1 - MALL ZONE 1 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MZ2 - MALL ZONE 2 NOTES
MZ3 - MALL ZONE 3 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
CH - CHILLER MISCELLANEOUS DETAILS 0021
CP1 - CAR PARK 1
CP2 - CAR PARK 2 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
CP3 - CAR PARK 3 TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
PANEL/EQUIPMENT TYPE TO 2213
SMDB - SUBMAIN DISTRIBUTION BOARD
ESMDB - ESSENTIAL SUBMAIN 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DISTRIBUTION BOARD TO 5213
MCC - MOTOR CONTROL CENTER

UPS - UNINTERUPTIBLE POWER SUPPLY


DB-TGR-501 DB-TGR-503 DB-TGR-505 DB-TGR-507 DB-TGR-509 DB-TGR-511 DB-TGR-513 DB-DGR-515 DB-TGR-502 DB-TGR-504 DB-DGR-506 DB-TGR-508 DB-TGR-510 DB-TGR-512 DB-TGR-514 DB-TGR-516 DB-DGR-518 DB-TGR-520 DB-HT-5F-WL DB-HT-5F-WP ELCP - EMERGENCY LIGHTING PANEL
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 1.10 kW TCL: 2.48 kW
A 20/01/2019 SEWA SUBMISSION
DRAWING NOTES:
Rev. Date Authority Description
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.

3. DO NOT SCALE ON THE DRAWING. P01 20/12/18 FIRST ISSUE


Rev. Date Description
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x16 1x16

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS. Purpose of Issue :
FOR TENDER
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4
Dx2

SPACE SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT


Initial/Current Issue Signatures
Original
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Size A0 Designed By: FD
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
Datum - Checked By: EC
TO COMMENCING WORK.
Grid - Approved By: MJ
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES.
Client : Tilal Mall L.L.C
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT LV SCHEMATIC NOTES: P.O. Box 5995
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN Sharjah, UAE
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Tel: +971 (6) 5560055
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Fax: +971 (6) 5560033

2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY


Y2 MANUFACTURER. Lead Consultant :
R1 Y1 B1 R2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6
RYB7 RYB8 R9 Y9 B9 Design & Consultancy
for natural and
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. built assets
400A TPN+E BUSBAR
P.O. Box. 52750 Tel: +971 (4) 3193333
35kA @ 1 SEC. A A A 400:5A 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
415V/240V SAME BRAND ALLTHROUGH OUT THE INSTALLATION.

FORM 2b TYPE 2 L1 L2 L3 Sub-Consultant :


5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
300A 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
TPN
SMDB-HT-5F-W 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Architect / Engineer of record :
SERVING GUEST ROOMS - WEST WING DONE ON ACTUAL INSTALLATION. Design & Consultancy
for natural and
LOCATION: EE ROOM, 5TH FLOOR built assets
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT P.O. Box. 1779
TCL : 136.27 kW V SS BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
Copyright © Arcadis 2018 Sharjah, UAE
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
MDL : 83.44 kW
OF CABLES AND UP.
EMU 400:5A Project Name:
DF : 0.61
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
Tilal Mall and Hotel
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
1 RELAYS. Sharjah,UAE
TM-ARC-HT-DR-E0-ZZ-8125 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Plot Number/Area 7040 / JWAIZEI
IN MECHANICAL DESIGN.
FED FROM Drawing Title
MDB-HOTEL-04 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL HOTEL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
5TH FLOOR LEVEL
SPECIALISTS INFORMATION OR DETAIL.
ELECTRICAL
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.
SCHEMATIC DIAGRAM
SHEET 13
2 DETAIL
NTS
- SMDB-HT-5F-W

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8133 T1
Date Plotted: 5/6/2019 2:31:15 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
CONDUCTOR SIZE
No. OF CPC
CPC SIZE

X X

X GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
No. OF CORE VERIFIED ON SITE AND APPROVED BY THE
(SINGLE-CORE/MULTI-CORE)
ARCHITECT/ENGINEER.
CABLE TYPE 2. DO NOT SCALE FROM THIS DRAWING.
DB-TGR-417 DB-TGR-435 DB-2AP-422 DB-1AA-423 DB-DGR-425 DB-DGR-427 DB-TGR-430 DB-TGR-432 DB-DGR-440 DB-DGR-442 DB-1AA-433 DB-1AA-438 DB-1AB-446 DB-HT-4F-EL DB-HT-4F-EP A = Cu/PVC/AWA/PVC 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
TCL: 7.34 kW TCL: 7.34 kW TCL: 24.43 kW TCL: 19.92 kW TCL: 7.52 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.52 kW TCL: 19.92 kW TCL: 19.92 kW TCL: 21.27 kW TCL: 3.72 kW TCL: 12.56 kW B = Cu/PVC/SWA/PVC OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
C = Cu/XLPE/AWA/LSF LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
D = Cu/XLPE/SWA/LSF SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
E = Cu/XLPE/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
F = Cu/FRT/SWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
G = Cu/FRT/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
H = Cu/MICS/LSF ONLY.
J = Cu/MICS 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
K = Cu/PVC/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
L = Cu/PVC/PVC MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
M = Cu/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
N = Cu/MICA/XLPE/SWA/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
EQUIPMENT NOMENCLATURE
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED

1x16 1x16

1x16 1x16

1x35 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x35 1x16

1x35 1x16

1x35 1x16

1x16 1x16

1x16 1x16
- - - CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
(E)MDB MALL XX X
DRAWINGS.

Dx2

Dx2

Dx4

Dx4

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4

Dx4

Dx4

Dx4
SPACE SPACE SPACE PANEL/EQUIPMENT NO.

ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
40AT 40AT 63AT 63AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT 63AT
SPN SPN TPN TPN SPN SPN SPN SPN SPN SPN TPN TPN TPN TPN TPN MALL OR HOTEL
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
R1 Y1 B1 RYB2 RYB3 R4 Y4 B4 R5 Y5 B5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
400A TPN+E BUSBAR
ELMDB - EMERGENCY LIGHTING MAIN DB
35kA @ 1 SEC. A A A 400:5A CBU - CENTRAL BATTERY UNIT
415V/240V ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
FORM 2b TYPE 2 L1 L2 L3 HVSG - HIGH VOLTAGE SWITCHGEAR
400A
(E)SMDB - MZ1 - 01 - X - BL - (L) X
TPN
SMDB-HT-4F-E
SERVING GUEST ROOMS - EAST WING PANEL/EQUIPMENT NO.
L - LIGHTING
LOCATION: EE ROOM, 4TH FLOOR
P - POWER
TCL : 180.71 kW V SS
MDL : 122.73 kW LEVEL
EMU 400:5A BL - BASEMENT
DF : 0.68 GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
1 P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
TM-ARC-HT-DR-E0-ZZ-8124 P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
FED FROM
MDB-HOTEL-03 OWNERSHIP
L - LANDLORD
4TH FLOOR LEVEL T - TENANT

CORE
ZONE NO.
1 DETAIL MZ1 - MALL ZONE 1
NTS MZ2 - MALL ZONE 2
- SMDB-HT-4F-E MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2 REFERENCE DRAWINGS:
CP3 - CAR PARK 3 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
PANEL/EQUIPMENT TYPE
SMDB - SUBMAIN DISTRIBUTION BOARD 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
ESMDB - ESSENTIAL SUBMAIN NOTES
DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MCC - MOTOR CONTROL CENTER MISCELLANEOUS DETAILS 0021

UPS - UNINTERUPTIBLE POWER SUPPLY 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201


ELCP - EMERGENCY LIGHTING PANEL TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
DRAWING NOTES: TO 2213
6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DB-TGR-517 DB-TGR-519 DB-DGR-521 DB-TGR-523 DB-TGR-525 DB-DGR-527 DB-TGR-529 DB-TGR-531 DB-TGR-533 DB-TGR-535 DB-TGR-522 DB-TGR-524 DB-TGR-526 DB-DGR-528 DB-TGR-530 DB-TGR-532 DB-DGR-534 DB-TGR-536 DB-DGR-538 DB-1SA-542 DB-DGR-544 DB-1SB-546 DB-HT-5F-EL DB-HT-5F-EP 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE TO 5213
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.52 kW TCL: 9.60 kW TCL: 0.90 kW TCL: 12.06 kW WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
3. DO NOT SCALE ON THE DRAWING.

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR P01 20/12/18 FIRST ISSUE
Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4
SPACE SPACE SPACE TO COMMENCING WORK. Rev. Date Description
Purpose of Issue :
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. FOR TENDER
Initial/Current Issue Signatures
LV SCHEMATIC NOTES: Original
Size A0 Designed By: FD
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Datum - Checked By: EC
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT
40AT Grid
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY - Approved By: MJ
SPN MANUFACTURER.
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB Client :
MCCB Tilal Mall L.L.C
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
P.O. Box 5995
Sharjah, UAE
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 Tel: +971 (6) 5560055
RYB9 RYB10 RYB11 SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
Fax: +971 (6) 5560033
400A TPN+E BUSBAR 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
35kA @ 1 SEC. A A A 400:5A Lead Consultant :
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. Design & Consultancy
415V/240V for natural and
built assets
FORM 2b TYPE 2 L1 L2 L3 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
400A Dubai, UAE Fax: +971 (4) 3242531
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TPN BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT Sub-Consultant :
SMDB-HT-5F-E
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
SERVING GUEST ROOMS - EAST WING OF CABLES AND UP.
LOCATION: EE ROOM, 5TH FLOOR
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
TCL : 180.89 kW V SS Architect / Engineer of record :
MDL : 112.25 kW 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Design & Consultancy
for natural and
EMU 400:5A RELAYS. built assets
DF : 0.62 P.O. Box. 1779
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Copyright © Arcadis 2018 Sharjah, UAE
IN MECHANICAL DESIGN.
1 Project Name:
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
TM-ARC-HT-DR-E0-ZZ-8124 CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
Tilal Mall and Hotel
FED FROM 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Sharjah,UAE
MDB-HOTEL-03 PER SEWA.
Plot Number/Area 7040 / JWAIZEI
5TH FLOOR LEVEL
Drawing Title
HOTEL

2 DETAIL ELECTRICAL
- SMDB-HT-5F-E
NTS SCHEMATIC DIAGRAM
SHEET 14

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8134 T1
Date Plotted: 5/6/2019 2:31:22 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
CONDUCTOR SIZE
DB-TGR-617 DB-TGR-619 DB-DGR-621 DB-TGR-623 DB-TGR-625 DB-DGR-627 DB-TGR-629 DB-TGR-631 DB-TGR-633 DB-TGR-635 DB-TGR-622 DB-TGR-624 DB-TGR-626 DB-DGR-628 DB-TGR-630 DB-TGR-632 DB-DGR-634 DB-TGR-636 DB-DGR-638 DB-1SA-642 DB-DGR-644 DB-1SB-646 DB-HT-6F-EL DB-HT-6F-EP
No. OF CPC
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.52 kW TCL: 9.60 kW TCL: 1.89 kW TCL: 12.36 kW
CPC SIZE
GENERAL NOTES:
X X
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
X VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
No. OF CORE OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
(SINGLE-CORE/MULTI-CORE) LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
CABLE TYPE SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
A = Cu/PVC/AWA/PVC
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE

1x16 1x16

1x16 1x16
B = Cu/PVC/SWA/PVC BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
C = Cu/XLPE/AWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
D = Cu/XLPE/SWA/LSF ONLY.
Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4
SPACE SPACE SPACE E = Cu/XLPE/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
F = Cu/FRT/SWA/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
G = Cu/FRT/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
H = Cu/MICS/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
J = Cu/MICS WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
K = Cu/PVC/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
L = Cu/PVC/PVC CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
M = Cu/LSF DRAWINGS.
N = Cu/MICA/XLPE/SWA/LSF
40AT 40AT 40AT 40AT 40AT EQUIPMENT NOMENCLATURE
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN (E)MDB - MALL - XX - X
SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB
PANEL/EQUIPMENT NO.

R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 ZONE NO.
RYB9 RYB10 RYB11 MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
400A TPN+E BUSBAR MZ3 - MALL ZONE 3
35kA @ 1 SEC. A A A 400:5A CH - CHILLER
CP1 - CAR PARK 1
415V/240V
CP2 - CAR PARK 2
FORM 2b TYPE 2 L1 L2 L3 CP3 - CAR PARK 3

400A MALL OR HOTEL


TPN
SMDB-HT-6F-E
PANEL/EQUIPMENT TYPE
SERVING GUEST ROOMS - EAST WING TX - TRANSFORMER
LOCATION: EE ROOM, 6TH FLOOR MDB - MAIN DISTRIBUTION BOARD
V SS PFC - POWER FACTOR CORRECTOR
TCL : 182.18 kW
UPS - UNINTERRUPTIBLE POWER SUPPLY
MDL : 113.29 kW ELMDB - EMERGENCY LIGHTING MAIN DB
EMU 400:5A CBU - CENTRAL BATTERY UNIT
DF : 0.62
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
1
(E)SMDB - MZ1 - 01 - X - BL - (L) X
TM-ARC-HT-DR-E0-ZZ-8124
PANEL/EQUIPMENT NO.
FED FROM L - LIGHTING
MDB-HOTEL-03 P - POWER

6TH FLOOR LEVEL LEVEL


BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
2 DETAIL RL - ROOF
P1 - PARKING LEVEL 1
NTS
- SMDB-HT-6F-E P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
T - TENANT

CORE
ZONE NO.
MZ1 - MALL ZONE 1
REFERENCE DRAWINGS:
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CH - CHILLER SYMBOLS AND ABBREVIATIONS
CP1 - CAR PARK 1
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP2 - CAR PARK 2
NOTES
CP3 - CAR PARK 3
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
PANEL/EQUIPMENT TYPE MISCELLANEOUS DETAILS 0021
SMDB - SUBMAIN DISTRIBUTION BOARD
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
ESMDB - ESSENTIAL SUBMAIN
TO 1213
DISTRIBUTION BOARD
MCC - MOTOR CONTROL CENTER 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
DB-TGR-723 DB-TGR-727 DB-TGR-726 DB-DGR-728 DB-DGR-738 DB-1SA-742 DB-TGR-744 UPS - UNINTERUPTIBLE POWER SUPPLY 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DB-TGR-717 DB-TGR-719 DB-DGR-721 DB-TGR-725 DB-TGR-729 DB-TGR-731 DB-TGR-733 DB-TGR-735 DB-TGR-722 DB-TGR-724 DB-TGR-730 DB-TGR-732 DB-DGR-734 DB-TGR-736 DB-1SB-746 DB-HT-7F-EL DB-HT-7F-EP
ELCP - EMERGENCY LIGHTING PANEL TO 5213
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.34 kW TCL: 9.60 kW TCL: 2.07 kW TCL: 6.62 kW
DRAWING NOTES:

1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE


WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL A 20/01/2019 SEWA SUBMISSION
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. Rev. Date Authority Description

2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS


SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.

3. DO NOT SCALE ON THE DRAWING.


1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
RELEVANT DOCUMENTS AND DRAWINGS.

P01 20/12/18 FIRST ISSUE


Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
SPACE SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT Rev. Date Description
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Purpose of Issue :
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
FOR TENDER
TO COMMENCING WORK. Initial/Current Issue Signatures
Original
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Size A0 Designed By: FD

Datum - Checked By: EC


40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT
40AT LV SCHEMATIC NOTES:
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN Grid - Approved By: MJ
SPN
MCCB MCCB MCCB MCCB MCCB 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Client : Tilal Mall L.L.C
P.O. Box 5995
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Sharjah, UAE
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 MANUFACTURER.
RYB9 RYB10 RYB11 Tel: +971 (6) 5560055
Fax: +971 (6) 5560033
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
400A TPN+E BUSBAR
35kA @ 1 SEC. A A A 400:5A 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Lead Consultant :
415V/240V SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Design & Consultancy
for natural and
FORM 2b TYPE 2 L1 L2 L3 built assets
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
P.O. Box. 52750 Tel: +971 (4) 3193333
400A Copyright © Arcadis 2018
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. Dubai, UAE Fax: +971 (4) 3242531
TPN
SMDB-HT-7F-E 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Sub-Consultant :
SERVING GUEST ROOMS - EAST WING DONE ON ACTUAL INSTALLATION.
LOCATION: EE ROOM, 7TH FLOOR 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TCL : 176.26 kW V SS BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT Architect / Engineer of record :
MDL : 108.48 kW BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
OF CABLES AND UP. Design & Consultancy
EMU 400:5A for natural and
DF : 0.61 built assets
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 P.O. Box. 1779
Copyright © Arcadis 2018 Sharjah, UAE
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
1 RELAYS.
Project Name:
TM-ARC-HT-DR-E0-ZZ-8124 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
IN MECHANICAL DESIGN.
Tilal Mall and Hotel
FED FROM
MDB-HOTEL-03 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL Sharjah,UAE
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
Plot Number/Area 7040 / JWAIZEI
SPECIALISTS INFORMATION OR DETAIL.
7TH FLOOR LEVEL
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Drawing Title
PER SEWA.
HOTEL
2 DETAIL ELECTRICAL
NTS
- SMDB-HT-7F-E SCHEMATIC DIAGRAM
SHEET 15

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8135 T1
Date Plotted: 5/6/2019 2:31:29 PM
KEYPLAN

DB-TGR-817 DB-TGR-819 DB-DGR-821 DB-TGR-823 DB-TGR-825 DB-TGR-827 DB-TGR-829 DB-TGR-831 DB-TGR-833 DB-TGR-835 DB-TGR-822 DB-TGR-824 DB-TGR-826 DB-DGR-828 DB-TGR-830 DB-TGR-832 DB-DGR-834 DB-TGR-836 DB-DGR-838 DB-1SA-842 DB-TGR-844 DB-1SB-846 DB-HT-8F-EL DB-HT-8F-EP DB-HT-8F-SN
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.34 kW TCL: 9.60 kW TCL: 4.46 kW TCL: 38.57 kW TCL: 30.00 kW

GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN

1x16 1x16

1x25 1x16

1x25 1x16
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4

Dx4
SPACE SPACE SPACE ONLY.
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
FOR ALL MEP SERVICES BASED ON FINAL SELECTED
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 80AT 80AT
40AT
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN TPN
SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB

R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8
RYB9 RYB10 RYB11 RYB12

800A TPN+E BUSBAR


35kA @ 1 SEC. A A A 800:5A
415V/240V
FORM 2b TYPE 2 L1 L2 L3

630A
TPN
SMDB-HT-8F-E
SERVING GUEST ROOMS - EAST WING
LOCATION: EE ROOM, 8TH FLOOR
TCL : 240.60 kW V SS
MDL : 159.95 kW
EMU 800:5A
DF : 0.66

1
TM-ARC-HT-DR-E0-ZZ-8124

FED FROM
MDB-HOTEL-03

8TH FLOOR LEVEL

2 DETAIL
NTS
- SMDB-HT-8F-E

REFERENCE DRAWINGS:
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MISCELLANEOUS DETAILS 0021
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
DB-TGR-917 DB-DGR-919 DB-TGR-921 DB-TGR-923 DB-TGR-925 DB-TGR-927 DB-TGR-929 DB-TGR-931 DB-TGR-933 DB-TGR-935 DB-TGR-922 DB-TGR-924 DB-TGR-926 DB-DGR-928 DB-TGR-930 DB-1SA-934 DB-DGR-936 DB-DGR-938 DB-1SA-942 DB-TGR-944 DB-1SB-946 DB-HT-9F-EL DB-HT-9F-EP DB-HT-10F-EP DB-HT-10F-EL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 10.42 kW TCL: 7.52 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.34 kW TCL: 9.60 kW TCL: 2.24 kW TCL: 12.46 kW TCL: 28.60 kW TCL: 4.54 kW TO 5213

A 20/01/2019 SEWA SUBMISSION


Rev. Date Authority Description
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x25 1x16

1x16 1x16
Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4

Dx4

Dx4
SPACE SPACE SPACE SPACE SPACE P01 20/12/18 FIRST ISSUE
Rev. Date Description
Purpose of Issue :
FOR TENDER
Initial/Current Issue Signatures
Original
Size A0 Designed By: FD

40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT 80AT 63AT
40AT Datum - Checked By: EC
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN TPN TPN
SPN
Grid - Approved By: MJ
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB
Client : Tilal Mall L.L.C
P.O. Box 5995
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8
RYB9 RYB10 RYB11 RYB12 RYB13 RYB14 Sharjah, UAE
Tel: +971 (6) 5560055
800A TPN+E BUSBAR Fax: +971 (6) 5560033
35kA @ 1 SEC. A A A 800:5A
415V/240V Lead Consultant :
Design & Consultancy
FORM 2b TYPE 2 L1 L2 L3 for natural and
built assets
630A P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
TPN Dubai, UAE Fax: +971 (4) 3242531
SMDB-HT-9F-E
SERVING GUEST ROOMS - EAST WING Sub-Consultant :

LOCATION: EE ROOM, 9TH FLOOR


TCL : 212.64 kW V SS
MDL : 138.36 kW Architect / Engineer of record :
EMU 800:5A Design & Consultancy
DF : 0.65 for natural and
built assets
P.O. Box. 1779
Copyright © Arcadis 2018 Sharjah, UAE
1
TM-ARC-HT-DR-E0-ZZ-8124 Project Name:

FED FROM
Tilal Mall and Hotel
MDB-HOTEL-03 Sharjah,UAE
9TH FLOOR LEVEL Plot Number/Area 7040 / JWAIZEI

Drawing Title
HOTEL
2 DETAIL
NTS ELECTRICAL
SMDB-HT-9F-E
SCHEMATIC DIAGRAM
-

SHEET 16

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8136 T1
Date Plotted: 5/6/2019 2:31:35 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
CONDUCTOR SIZE
No. OF CPC
GENERAL NOTES:
CPC SIZE
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
X X VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
X 2. DO NOT SCALE FROM THIS DRAWING.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
No. OF CORE SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
(SINGLE-CORE/MULTI-CORE) THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
CABLE TYPE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
A = Cu/PVC/AWA/PVC 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
B = Cu/PVC/SWA/PVC ONLY.
C = Cu/XLPE/AWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
D = Cu/XLPE/SWA/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
E = Cu/XLPE/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
F = Cu/FRT/SWA/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
G = Cu/FRT/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
H = Cu/MICS/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
J = Cu/MICS CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
K = Cu/PVC/LSF DRAWINGS.
L = Cu/PVC/PVC
M = Cu/LSF
EDB-HT-5F-W N = Cu/MICA/XLPE/SWA/LSF
TCL: 1.46 kW EQUIPMENT NOMENCLATURE
MDL: 1.17 kW
DF: 0.80 ELECTRICAL RISER (E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.

5TH FLOOR LEVEL ZONE NO.


MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
EDB-HT-4F-W MZ3 - MALL ZONE 3
TCL: 1.46 kW CH - CHILLER
MDL: 1.17 kW CP1 - CAR PARK 1
DF: 0.80 CP2 - CAR PARK 2
CP3 - CAR PARK 3
S3/FIREMAN'S LIFT MALL OR HOTEL
TCL: 30.00 kW
4TH FLOOR LEVEL
MDL: 27.00 kW
BY NOMINATED
DF: 0.90 PANEL/EQUIPMENT TYPE
EDB-HT-3F-W SPECIALIST
M CONTRACTOR TX - TRANSFORMER
TCL: 2.77kW
EPO MDB - MAIN DISTRIBUTION BOARD
MDL: 2.22 kW
PFC - POWER FACTOR CORRECTOR
DF: 0.80
UPS - UNINTERRUPTIBLE POWER SUPPLY
160A ELMDB - EMERGENCY LIGHTING MAIN DB
TPN BY ELECTRICAL CBU - CENTRAL BATTERY UNIT
10TH FLOOR LEVEL CONTRACTOR ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
3RD FLOOR LEVEL
9TH FLOOR LEVEL (E)SMDB - MZ1 - 01 - X - BL - (L) X

PANEL/EQUIPMENT NO.
L - LIGHTING
TCL: 0.37 kW

P - POWER
TCL: 0.37 kW
(STANDBY)
HW-CP-05

HW-CP-06

8TH FLOOR LEVEL


(DUTY)

LEVEL
EDB-HT-7F-S BL - BASEMENT
TCL: 3.12 kW GF - GROUND
M M MDL: 2.50kW FF - FIRST FLOOR
DF: 0.80 RL - ROOF
BY NOMINATED 7TH FLOOR LEVEL P1 - PARKING LEVEL 1
SPECIALIST P2 - PARKING LEVEL 2
EDB-HT-2F-KP1 EDB-HT-2F-KP2 EPO
CONTRACTOR EDB-HT-2F-K EDB-HT-6F-W
TCL: 6.35 kW TCL: 0.52 kW P3 - PARKING LEVEL 3
TCL: 43.91 kW TCL: 1.07 kW
MDL: 5.08 kW MDL: 0.42 kW P4 - PARKING LEVEL 4
MDL: 35.13 kW MDL: 0.85 kW
DF: 0.80 DF: 0.80 P5 - PARKING LEVEL 5
DF: 0.80 DF: 0.80

BY ELECTRICAL OWNERSHIP
32A CONTRACTOR L - LANDLORD
TPN T - TENANT

CORE
REFERENCE DRAWINGS:
ZONE NO.
MZ1 - MALL ZONE 1 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x50 1x25

1x16 1x16

1x70 1x35

1x16 1x16
SYMBOLS AND ABBREVIATIONS
1x6

MZ2 - MALL ZONE 2


MZ3 - MALL ZONE 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CH - CHILLER NOTES
Dx4

Dx4

Dx4

Dx4

Dx4
Dx4

Dx4

Dx4

Dx4
Fx4
1x6

CP1 - CAR PARK 1


3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SPACE SPACE CP2 - CAR PARK 2
SPACE SPACE SPACE MISCELLANEOUS DETAILS 0021
CP3 - CAR PARK 3
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
PANEL/EQUIPMENT TYPE TO 1213
SMDB - SUBMAIN DISTRIBUTION BOARD
ESMDB - ESSENTIAL SUBMAIN 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
DISTRIBUTION BOARD TO 2213
TO BMS ELS + TO BMS MCC - MOTOR CONTROL CENTER 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
30mA ELCB ALARM TO 5213
TO BMS UPS - UNINTERUPTIBLE POWER SUPPLY
ELCP - EMERGENCY LIGHTING PANEL
100AT 63AT 63AT 32AT 63AT 63AT 63AT 63AT 160AT 63AT
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN DRAWING NOTES:
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB A 20/01/2019 SEWA SUBMISSION
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND Rev. Date Authority Description
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
200A TPN+E BUSBAR 200A TPN+E BUSBAR SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 200:5A 3. DO NOT SCALE ON THE DRAWING.
415V/240V 415V/240V
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER P01 20/12/18 FIRST ISSUE
FORM 2b TYPE 2 L1 L2 L3 FORM 2b TYPE 2 L1 L2 L3
RELEVANT DOCUMENTS AND DRAWINGS.
Rev. Date Description
160A 200A 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT Purpose of Issue :
ESMDB-HT-2F-W TPN ESMDB-HT-6F-W TPN PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT FOR TENDER
LOCATION: 6TH FLOOR EE ROOM WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
LOCATION: 2ND FLOOR EE ROOM Initial/Current Issue Signatures
TCL : 34.18 kW CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
Original
TCL : 56.85 kW
MDL : 30.35 kW
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
Size A0 Designed By: FD
MDL : 45.55 kW V SS V SS
DF : 0.83
DF : 0.80 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Datum - Checked By: EC
EMU 200:5A EMU 200:5A Grid - Approved By: MJ
LV SCHEMATIC NOTES:
1 1 Client : Tilal Mall L.L.C
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL P.O. Box 5995
TM-ARC-HT-DR-E0-ZZ-8125 TM-ARC-HT-DR-E0-ZZ-8125
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Sharjah, UAE
Tel: +971 (6) 5560055
FED FROM FED FROM 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Fax: +971 (6) 5560033
MDB-HOTEL-04 MDB-HOTEL-04 MANUFACTURER.
2ND FLOOR LEVEL 6TH FLOOR LEVEL
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Lead Consultant :
Design & Consultancy
for natural and
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE built assets
1 DETAIL 2 DETAIL SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
P.O. Box. 52750 Tel: +971 (4) 3193333
NTS NTS Copyright © Arcadis 2018
- ESMDB-HT-2F-W - ESMDB-HT-6F-W Dubai, UAE Fax: +971 (4) 3242531
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
Sub-Consultant :
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.

7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE


DONE ON ACTUAL INSTALLATION.
Architect / Engineer of record :
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
Design & Consultancy
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT for natural and
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS built assets
OF CABLES AND UP. P.O. Box. 1779
Copyright © Arcadis 2018 Sharjah, UAE
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
Project Name:
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
RELAYS. Tilal Mall and Hotel
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
IN MECHANICAL DESIGN.
Sharjah,UAE
Plot Number/Area 7040 / JWAIZEI
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
Drawing Title
SPECIALISTS INFORMATION OR DETAIL. HOTEL
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 17

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8137 T1
Date Plotted: 5/6/2019 2:31:42 PM
KEYPLAN

EQUIPMENT NOMENCLATURE DRAWING NOTES:

(E)MDB - MALL - XX - X 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE


WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
PANEL/EQUIPMENT NO. STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
ZONE NO. 2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
MZ1 - MALL ZONE 1 SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 3. DO NOT SCALE ON THE DRAWING.
DB-HT-2F-KP1 DB-HT-2F-KP3 DB-HT-2F-WP DB-HT-2F-KP2 DB-HT-2F-KP4 DB-HT-2F-KP5 DB-HT-2F-KL CH - CHILLER
TCL: 76.79 kW TCL: 91.65 kW TCL: 34.54 kW TCL: 57.33 kW TCL: 66.72 kW TCL: 33.82 kW TCL: 4.82 kW CP1 - CAR PARK 1 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
CP2 - CAR PARK 2 RELEVANT DOCUMENTS AND DRAWINGS.
CP3 - CAR PARK 3 GENERAL NOTES:

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
MALL OR HOTEL
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT VERIFIED ON SITE AND APPROVED BY THE
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE ARCHITECT/ENGINEER.
PANEL/EQUIPMENT TYPE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR 2. DO NOT SCALE FROM THIS DRAWING.
TX - TRANSFORMER
TO COMMENCING WORK. 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
CBU - CENTRAL BATTERY UNIT THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE

1x95 1x50

1x70 1x35

1x70 1x35

1x35 1x16

1x10 1x10
1x150 1x95

1x35 1x16
LV SCHEMATIC NOTES: BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL ONLY.
HVSG - HIGH VOLTAGE SWITCHGEAR

Dx4

Dx4

Dx4

Dx4

Dx4
Dx4

Dx4
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
SPACE SPACE SPACE FOR ALL MEP SERVICES BASED ON FINAL SELECTED
(E)SMDB - MZ1 - 01 - X - BL - (L) X 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
MANUFACTURER. APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
PANEL/EQUIPMENT NO. WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
L - LIGHTING
P - POWER CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE DRAWINGS.
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
LEVEL
200AT 250AT 100AT 160AT 160AT 100AT 40AT BL - BASEMENT
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
GF - GROUND
TPN TPN TPN TPN TPN TPN TPN FF - FIRST FLOOR
MCCB MCCB MCCB MCCB MCCB 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
MCCB MCCB RL - ROOF
P1 - PARKING LEVEL 1
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
P2 - PARKING LEVEL 2
DONE ON ACTUAL INSTALLATION.
P3 - PARKING LEVEL 3
1 2 3 4 1 2 3 4 5 6 P4 - PARKING LEVEL 4
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
P5 - PARKING LEVEL 5
800A TPN+E BUSBAR 400A TPN+E BUSBAR BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
35kA @ 1 SEC. A A A 800:5A 35kA @ 1 SEC. A A A 400:5A OWNERSHIP OF CABLES AND UP.
415V/240V 415V/240V L - LANDLORD
T - TENANT 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
FORM 2b TYPE 2 L1 L2 L3 FORM 2b TYPE 2 L1 L2 L3
CORE 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
630A 400A ZONE NO. RELAYS.
SMDB-HT-2F-K1 TPN SMDB-HT-2F-K2 TPN MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
SERVING KITCHEN SERVING KITCHEN & WEST COMMON AREAS IN MECHANICAL DESIGN.
MZ3 - MALL ZONE 3
LOCATION: EE ROOM, 2ND FLOOR LOCATION: EE ROOM, 2ND FLOOR CH - CHILLER
CP1 - CAR PARK 1 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
TCL : 202.98 kW V SS TCL : 162.68 kW V SS CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
CP2 - CAR PARK 2
MDL : 162.38 kW MDL : 130.15 kW CP3 - CAR PARK 3 SPECIALISTS INFORMATION OR DETAIL.
DF : 0.80 EMU 800:5A EMU 400:5A
DF : 0.80 PANEL/EQUIPMENT TYPE 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
SMDB - SUBMAIN DISTRIBUTION BOARD PER SEWA.
ESMDB - ESSENTIAL SUBMAIN
DISTRIBUTION BOARD
1 1
MCC - MOTOR CONTROL CENTER
TM-ARC-HT-DR-E0-ZZ-8125 TM-ARC-HT-DR-E0-ZZ-8125
UPS - UNINTERUPTIBLE POWER SUPPLY
ELCP - EMERGENCY LIGHTING PANEL
FED FROM FED FROM
MDB-HOTEL-04 MDB-HOTEL-04

2ND FLOOR LEVEL 2ND FLOOR LEVEL

1 DETAIL 2 DETAIL
NTS NTS
- SMDB-HT-2F-K1 - SMDB-HT-2F-K2

REFERENCE DRAWINGS:
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MISCELLANEOUS DETAILS 0021
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
DB-HT-1F-L DB-HT-1F-P1 DB-HT-1F-P2 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TCL: 8.85 kW TCL: 24.67 kW TCL: 21.60 kW TO 5213

DB-2AP-301 DB-DGR-309 DB-1AA-315 DB-TGR-302 DB-DGR-304 DB-TGR-320 DB-1AA-310 DB-2AP-318 DB-HT-3F-WL DB-HT-3F-WP
TCL: 24.43 kW TCL: 7.52 kW TCL: 19.92 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 19.92 kW TCL: 24.43 kW TCL: 1.03 kW TCL: 2.48 kW
1ST FLOOR LEVEL
A 20/01/2019 SEWA SUBMISSION
DB-HT-GF-L DB-HT-GF-P1 DB-HT-GF-P2 DB-HT-GF-KP Rev. Date Authority Description
TCL: 12.34 kW TCL: 24.20 kW TCL: 11.40 kW TCL: 37.88 kW
1x16 1x16
1x35 1x16

1x16 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x35 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x16 1x16
P01 20/12/18 FIRST ISSUE
Rev. Date Description
Purpose of Issue :
Dx2
Dx4

Dx2

Dx4

Dx2

Dx2

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4

Dx4
SPACE SPACE SPACE SPACE SPACE SPACE SPACE FOR TENDER
Initial/Current Issue Signatures
Original
Size A0 Designed By: FD

Datum - Checked By: EC

Grid - Approved By: MJ


63AT 40AT 63AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 100AT 63AT 63AT 63AT
TPN SPN TPN SPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN Client : Tilal Mall L.L.C
SPN SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB P.O. Box 5995
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
Sharjah, UAE
Tel: +971 (6) 5560055
Fax: +971 (6) 5560033
RYB1 R2 Y2 B2 RYB3 R4 Y4 B4 RYB5 RYB6 RYB7 RYB8 R9 Y9 B9 1 2 3 4 5 6 7 9 10
Lead Consultant :
400A TPN+E BUSBAR 400A TPN+E BUSBAR Design & Consultancy
400:5A 35kA @ 1 SEC. for natural and
35kA @ 1 SEC. A A A A A A 400:5A built assets
415V/240V 415V/240V
P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
FORM 2b TYPE 2 L1 L2 L3 FORM 2b TYPE 2 Dubai, UAE Fax: +971 (4) 3242531
L1 L2 L3
Sub-Consultant :
300A 400A
SMDB-HT-3F-W TPN TPN
SERVING GUEST ROOMS - WEST WING SMDB-HT-GF-1
Architect / Engineer of record :
LOCATION: EE ROOM, 3RD FLOOR LOCATION: EE ROOM, GROUND LEVEL
Design & Consultancy
TCL : 121.93 kW V SS TCL : 140.93 kW V SS for natural and
built assets
MDL : 83.43 kW MDL : 112.75 kW P.O. Box. 1779
EMU 400:5A DF : 0.80 EMU 400:5A Copyright © Arcadis 2018 Sharjah, UAE
DF : 0.68

Project Name:
1 1 Tilal Mall and Hotel
TM-ARC-HT-DR-E0-ZZ-8125 TM-ARC-HT-DR-E0-ZZ-8125 Sharjah,UAE
FED FROM Plot Number/Area 7040 / JWAIZEI
FED FROM
MDB-HOTEL-04 MDB-HOTEL-04
Drawing Title
3RD FLOOR LEVEL
HOTEL
GROUND FLOOR LEVEL
ELECTRICAL
3 DETAIL 4 DETAIL SCHEMATIC DIAGRAM
- SMDB-HT-3F-W
NTS
- SMDB-HT-GF-1
NTS SHEET 18

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8138 T1
Date Plotted: 5/6/2019 2:31:48 PM
KEYPLAN

CABLE LEGEND KEY:


NO. OF SETS
DB-1AA-401 DB-DGR-407 DB-DGR-409 DB-1AA-415 DB-TGR-402 DB-DGR-404 DB-TGR-420 DB-1AA-410 DB-2AP-418 DB-HT-4F-WL DB-HT-4F-WP CONDUCTOR SIZE
TCL: 19.92 kW TCL: 7.52 kW TCL: 7.52 kW TCL: 19.92 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 19.92kW TCL: 24.43 kW TCL: 1.00 kW TCL: 2.48 kW
No. OF CPC
CPC SIZE

X X GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN


X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
No. OF CORE 2. DO NOT SCALE FROM THIS DRAWING.
(SINGLE-CORE/MULTI-CORE) 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,

1x16 1x16

1x35 1x16

1x35 1x16
1x35 1x16

1x16 1x16

1x16 1x16

1x35 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
CABLE TYPE
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF

Dx4

Dx2

Dx2

Dx4

Dx2

Dx2

Dx2

Dx4

Dx4

Dx4

Dx4
SPACE SPACE SPACE SPACE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF
ONLY.
F = Cu/FRT/SWA/LSF
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF
FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF
WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF
63AT 40AT 40AT 63AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE DRAWINGS.
TPN SPN SPN TPN SPN SPN SPN TPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB (E)MDB - MALL - XX - X

PANEL/EQUIPMENT NO.
RYB1 R2 Y2 B2 RYB3 R4 Y4 B4 RYB5 RYB6 RYB7 RYB8 R9 Y9 B9
ZONE NO.
400A TPN+E BUSBAR MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
35kA @ 1 SEC. A A A 400:5A MZ3 - MALL ZONE 3
415V/240V CH - CHILLER
CP1 - CAR PARK 1
FORM 2b TYPE 2 L1 L2 L3
CP2 - CAR PARK 2
CP3 - CAR PARK 3
300A
MALL OR HOTEL
SMDB-HT-4F-W TPN
SERVING GUEST ROOMS - WEST WING
PANEL/EQUIPMENT TYPE
LOCATION: EE ROOM, 4TH FLOOR TX - TRANSFORMER
TCL : 124.91 kW V SS MDB - MAIN DISTRIBUTION BOARD
MDL : 84.72 kW PFC - POWER FACTOR CORRECTOR
EMU UPS - UNINTERRUPTIBLE POWER SUPPLY
DF : 0.68 400:5A ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
1 HVSG - HIGH VOLTAGE SWITCHGEAR
TM-ARC-HT-DR-E0-ZZ-8125
(E)SMDB - MZ1 - 01 - X - BL - (L) X

FED FROM
MDB-HOTEL-04 PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
4TH FLOOR LEVEL
LEVEL
BL - BASEMENT
GF - GROUND
1 DETAIL FF - FIRST FLOOR
NTS RL - ROOF
- SMDB-HT-4F-W P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5

OWNERSHIP
L - LANDLORD
T - TENANT

CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
CP3 - CAR PARK 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
PANEL/EQUIPMENT TYPE
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SMDB - SUBMAIN DISTRIBUTION BOARD
MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
MCC - MOTOR CONTROL CENTER TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
DB-TGR-501 DB-TGR-503 DB-TGR-505 DB-TGR-507 DB-TGR-509 DB-TGR-511 DB-TGR-513 DB-DGR-515 DB-TGR-502 DB-TGR-504 DB-DGR-506 DB-TGR-508 DB-TGR-510 DB-TGR-512 DB-TGR-514 DB-TGR-516 DB-DGR-518 DB-TGR-520 DB-HT-5F-WL DB-HT-5F-WP ELCP - EMERGENCY LIGHTING PANEL
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 1.10 kW TCL: 2.48 kW 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TCL: 7.34 kW
TO 5213
DRAWING NOTES:

1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE


WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.

3. DO NOT SCALE ON THE DRAWING.


1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16

1x16 1x16
1x16 1x16

4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER


RELEVANT DOCUMENTS AND DRAWINGS.

5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT


Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx2

Dx4

Dx4
Dx2

SPACE SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
Purpose of Issue :
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
Initial/Current Issue Signatures
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
Size A0 Designed By: FD
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT LV SCHEMATIC NOTES: Datum - Checked By: EC
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
- Approved By: MJ

Client : Tilal Mall L.L.C


2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
R2 Y2 B2 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 MANUFACTURER. P.O. Box 5995
R1 Y1 B1 R3 Y3 B3
RYB7 RYB8 R9 Y9 B9 Sharjah, UAE
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Tel: +971 (6) 5560055
400A TPN+E BUSBAR Fax: +971 (6) 5560033
35kA @ 1 SEC. A A A 400:5A 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
415V/240V SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
Lead Consultant :
FORM 2b TYPE 2 L1 L2 L3 Design & Consultancy
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
built assets
300A 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
TPN Dubai, UAE Fax: +971 (4) 3242531
SMDB-HT-5F-W 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
SERVING GUEST ROOMS - WEST WING DONE ON ACTUAL INSTALLATION. Sub-Consultant :
LOCATION: EE ROOM, 5TH FLOOR 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TCL : 136.27 kW V SS BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
MDL : 83.44 kW Architect / Engineer of record :
OF CABLES AND UP.
EMU 400:5A
DF : 0.61 Design & Consultancy
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 for natural and
built assets
P.O. Box. 1779
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
1 RELAYS.

TM-ARC-HT-DR-E0-ZZ-8125 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Project Name:

FED FROM
IN MECHANICAL DESIGN.
Tilal Mall and Hotel
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
MDB-HOTEL-04
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
5TH FLOOR LEVEL Plot Number/Area 7040 / JWAIZEI
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
HOTEL
2 DETAIL
- SMDB-HT-5F-W
NTS ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 19

Scales Drawn By Suitability Code Project Stage


NTS EB S4 TENDER
Drawing No. Rev.

Filename:
TM-ARC-HT-DR-E0-ZZ-8139 T1
Date Plotted: 5/6/2019 2:31:55 PM