Tilal Mall and Hotel Sharjah, UAE: Detail 1
Tilal Mall and Hotel Sharjah, UAE: Detail 1
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
F = Cu/FRT/SWA/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
G = Cu/FRT/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
H = Cu/MICS/LSF DRAWINGS.
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
Dx2
J = Cu/MICS
SPACE SPACE K = Cu/PVC/LSF
L = Cu/PVC/PVC
M = Cu/LSF
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE
(E)MDB - MALL - XX - X
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT PANEL/EQUIPMENT NO.
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN ZONE NO.
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 RYB7 RYB8 R9 Y9 B9
CP1 - CAR PARK 1
CP2 - CAR PARK 2
400A TPN+E BUSBAR CP3 - CAR PARK 3
35kA @ 1 SEC. A A A 400:5A
MALL OR HOTEL
415V/240V
FORM 2b TYPE 2 L1 L2 L3
PANEL/EQUIPMENT TYPE
300A TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
TPN PFC - POWER FACTOR CORRECTOR
SMDB-HT-6F-W UPS - UNINTERRUPTIBLE POWER SUPPLY
SERVING GUEST ROOMS - WEST WING ELMDB - EMERGENCY LIGHTING MAIN DB
LOCATION: EE ROOM, 6TH FLOOR CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
TCL : 136.27 kW V SS SYNC - SYNCHRONIZING POWER SUPPLY
MDL : 83.44 kW HVSG - HIGH VOLTAGE SWITCHGEAR
EMU 400:5A
DF : 0.61 - - - - -
(E)SMDB MZ1 01 X BL (L) X
PANEL/EQUIPMENT NO.
1
L - LIGHTING
TM-ARC-HT-DR-E0-ZZ-8125 P - POWER
LEVEL
FED FROM BL - BASEMENT
MDB-HOTEL-04 GF - GROUND
FF - FIRST FLOOR
5TH FLOOR LEVEL RL - ROOF
P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
1 DETAIL P5 - PARKING LEVEL 5
NTS
- SMDB-HT-6F-W
OWNERSHIP
L - LANDLORD
T - TENANT
REFERENCE DRAWINGS:
CORE
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
ZONE NO. SYMBOLS AND ABBREVIATIONS
MZ1 - MALL ZONE 1
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 NOTES
CH - CHILLER 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
CP1 - CAR PARK 1 MISCELLANEOUS DETAILS 0021
CP2 - CAR PARK 2 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
CP3 - CAR PARK 3 TO 1213
PANEL/EQUIPMENT TYPE 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
SMDB - SUBMAIN DISTRIBUTION BOARD TO 2213
ESMDB - ESSENTIAL SUBMAIN 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DB-HT-L 7F-SP DB-HT-L 7F-SL DB-HT-L 7F-KP1 DB-HT-L 7F-KP2 DISTRIBUTION BOARD
TO 5213
TCL: 39.42 kW TCL: 5.23 kW TCL: 23.47 kW TCL: 36.39 kW MCC - MOTOR CONTROL CENTER
1x10 1x10
1x16 1x16
1x25 1x16
3. DO NOT SCALE ON THE DRAWING.
P01 20/12/18 FIRST ISSUE
Dx4
Dx4
Dx4
Dx4
SPACE SPACE 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER Rev. Date Description
RELEVANT DOCUMENTS AND DRAWINGS. Purpose of Issue :
Filename:
TM-ARC-HT-DR-E0-ZZ-8140 T1
Date Plotted: 5/6/2019 2:32:01 PM
KEYPLAN
1x25 1x16
1x25 1x16
1x25 1x16
1x70 1x35
1x70 1x35
H = Cu/MICS/LSF
ONLY.
J = Cu/MICS
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
K = Cu/PVC/LSF
FOR ALL MEP SERVICES BASED ON FINAL SELECTED
Dx4
Dx4
Dx4
Dx4
Dx4
L = Cu/PVC/PVC
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
SPACE M = Cu/LSF
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
(E)MDB - MALL - XX - X CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.
PANEL/EQUIPMENT NO.
TO BMS
ZONE NO.
300mA 300mA 300mA 300mA 300mA MZ1 - MALL ZONE 1
ELR+ ELR+ ELR+ ELR+ ELR+ MZ2 - MALL ZONE 2
SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP SHUNT TRIP
MZ3 - MALL ZONE 3
80AT 80AT 80AT 160AT 160AT CH - CHILLER
TPN TPN TPN TPN TPN CP1 - CAR PARK 1
MCCB MCCB MCCB MCCB MCCB CP2 - CAR PARK 2
CP3 - CAR PARK 3
MALL OR HOTEL
1 2 3 4 5 6
CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2 REFERENCE DRAWINGS:
CP3 - CAR PARK 3 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
PANEL/EQUIPMENT TYPE SYMBOLS AND ABBREVIATIONS
SMDB - SUBMAIN DISTRIBUTION BOARD 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
ESMDB - ESSENTIAL SUBMAIN NOTES
DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
KIDS POOL MAIN POOL JACUZZI MCC - MOTOR CONTROL CENTER MISCELLANEOUS DETAILS 0021
CONTROL PANEL CONTROL PANEL CONTROL PANEL BY NOMINATED 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
UPS - UNINTERUPTIBLE POWER SUPPLY
PROVISION PROVISION PROVISION SPECIALIST ELCP - EMERGENCY LIGHTING PANEL TO 1213
10kW 20kW CONTRACTOR
40kW 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
DRAWING NOTES: TO 2213
6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
TO 5213
BY ELECTRICAL WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
40A 100A 63A CONTRACTOR WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
TPN TPN TPN STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
1x50 1x25
1x25 1x16
Dx4
Dx4
FED FROM
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL. Tilal Mall and Hotel
MDB-HOTEL-04
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.
Sharjah,UAE
Plot Number/Area 7040 / JWAIZEI
7TH FLOOR LEVEL
Drawing Title
HOTEL
2 DETAIL ELECTRICAL
NTS
- SMDB-HT-7F-POOL SCHEMATIC DIAGRAM
SHEET 21
Filename:
TM-ARC-HT-DR-E0-ZZ-8141 T1
Date Plotted: 5/6/2019 2:32:08 PM
KEYPLAN
BOILER CIRCULATING
CABLE LEGEND KEY:
TCL: 14.92 kW
PUMP (DUTY)
TCL: 8.00 kW
NO. OF SETS
CONDUCTOR SIZE
(DUTY)
BP-02
No. OF CPC
CPC SIZE
M M X X
GENERAL NOTES:
BOILER CIRCULATING
BOILER CIRCULATING
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
PUMP (STANDBY)
No. OF CORE ARCHITECT/ENGINEER.
(SINGLE-CORE/MULTI-CORE) 2. DO NOT SCALE FROM THIS DRAWING.
TCL: 14.92 kW
TCL: 14.92 kW
SHUNT PUMP
SHUNT PUMP
PUMP (DUTY)
TCL: 5.60 kW
TCL: 5.60 kW
TCL: 3.73 kW
TCL: 3.73 kW
TCL: 0.75 kW
TCL: 0.75 kW
TCL: 5.00 kW
TCL: 5.00 kW
TCL: 2.50 kW
TCL: 2.50 kW
TCL: 0.55 kW
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
TCL: 8.00 kW
TCL: 8.00 kW
TCL: 0.55 kW
CABLE TYPE
TCL: 0.10 kW
(STANDBY)
(STANDBY)
(STANDBY)
(STANDBY)
(STANDBY)
(STANDBY)
(STANDBY)
A = Cu/PVC/AWA/PVC OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
HW-CP-03
HW-CP-04
HW-CP-01
HW-CP-02
B = Cu/PVC/SWA/PVC LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
BOILER
BOILER
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
(DUTY)
C = Cu/XLPE/AWA/LSF
TP-11
TP-12
BP-01
BP-03
BP-4
BP-5
D = Cu/XLPE/SWA/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
E = Cu/XLPE/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
F = Cu/FRT/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
G = Cu/FRT/LSF ONLY.
M M M M M M M M M M M M M M M M M H = Cu/MICS/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
BY NOMINATED J = Cu/MICS FOR ALL MEP SERVICES BASED ON FINAL SELECTED
SPECIALIST K = Cu/PVC/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
EPO EPO EPO EPO EPO EPO EPO EPO EPO L = Cu/PVC/PVC APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
CONTRACTOR
M = Cu/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS N = Cu/MICA/XLPE/SWA/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
EQUIPMENT NOMENCLATURE CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.
BY ELECTRICAL (E)MDB - MALL - XX - X
32A 32A 32A 32A 125A 32A 32A 80A 32A CONTRACTOR
TPN TPN TPN TPN TPN TPN TPN TPN TPN
PANEL/EQUIPMENT NO.
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
1x10 1x10
1x50 1x25
1x25 1x16
1x6
1x6
1x6
1x6
1x6
1x6
MZ3 - MALL ZONE 3
CH - CHILLER
SPACE SPACE SPACE
CP1 - CAR PARK 1
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
1x6
1x6
1x6
1x6
1x6
1x6
CP2 - CAR PARK 2
CP3 - CAR PARK 3
MALL OR HOTEL
TO BMS
PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
30mA 30mA 30mA 30mA 30mA 30mA 30mA 30mA 30mA PFC - POWER FACTOR CORRECTOR
ELCB ELCB ELCB ELCB ELR+ ELCB ELCB ELCB ELCB UPS - UNINTERRUPTIBLE POWER SUPPLY
SHUNT TRIP ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
32AT 32AT 32AT 32AT 125AT 32AT 32AT 80AT 32AT ACB - AIR CIRCUIT BREAKER PANEL
TPN TPN TPN TPN TPN TPN TPN TPN TPN SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
1 MCCB 2 MCCB 3 MCCB 4 MCCB 5 MCCB 6 MCCB 7 MCCB 8 MCCB 9 MCCB 10 11 12
(E)SMDB - MZ1 - 01 - X - BL - (L) X
200A TPN+E BUSBAR
35kA @ 1 SEC. A A A 200:5A PANEL/EQUIPMENT NO.
415V/240V L - LIGHTING
P - POWER
FORM 2b TYPE 2 L1 L2 L3
LEVEL
125A BL - BASEMENT
ESMDB-HT-10F-PH GF - GROUND
TPN
LOCATION: MEP PLANT ROOM FF - FIRST FLOOR
10TH LEVEL RL - ROOF
TCL : 64.07 kW P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
MDL : 51.26 kW V SS P3 - PARKING LEVEL 3
DF : 0.80 P4 - PARKING LEVEL 4
EMU 200:5A P5 - PARKING LEVEL 5
OWNERSHIP
L - LANDLORD
2 T - TENANT
TM-ARC-HT-DR-E0-ZZ-8137 CORE
ZONE NO.
FED FROM MZ1 - MALL ZONE 1
ESMDB-HT-6F-W MZ2 - MALL ZONE 2
10TH FLOOR LEVEL MZ3 - MALL ZONE 3
CH - CHILLER REFERENCE DRAWINGS:
CP1 - CAR PARK 1
CP2 - CAR PARK 2 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
1 DETAIL CP3 - CAR PARK 3 SYMBOLS AND ABBREVIATIONS
NTS 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
- ESMDB-HT-10F-PH PANEL/EQUIPMENT TYPE NOTES
SMDB - SUBMAIN DISTRIBUTION BOARD
ESMDB - ESSENTIAL SUBMAIN 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
MCC - MOTOR CONTROL CENTER 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213
UPS - UNINTERUPTIBLE POWER SUPPLY
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
ELCP - EMERGENCY LIGHTING PANEL
TO 2213
ISOL-JP-01 ISOL-RP-01 ISOL-RP-02
DRAWING NOTES: 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
JOCKEY PUMP RECIRCULATING RECIRCULATING TO 5213
5.00 kW 0.60 kW 0.60 kW 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
DUTY DUTY DUTY BY NOMINATED
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
SPECIALIST
M M M CONTRACTOR STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION.
EPO EPO EPO
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS A 20/01/2019 SEWA SUBMISSION
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS. Rev. Date Authority Description
1x4
1x4
Fx4
Fx4
1x6
1x4
1x4
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Datum - Checked By: EC
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Grid - Approved By: MJ
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
MANUFACTURER. Client : Tilal Mall L.L.C
ELS + ELS + ELS +
P.O. Box 5995
ALARM ALARM ALARM 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Sharjah, UAE
TO BMS Tel: +971 (6) 5560055
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Fax: +971 (6) 5560033
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
32AT 20AT 20AT
TPN TPN TPN 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. Lead Consultant :
MCCB MCCB Design & Consultancy
MCCB for natural and
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. built assets
Filename:
TM-ARC-HT-DR-E0-ZZ-8142 T1
Date Plotted: 5/3/2019 1:38:02 PM
KEYPLAN
X X GENERAL NOTES:
(E)MDB - MALL - XX - X
PANEL/EQUIPMENT NO.
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
MALL OR HOTEL
LV ROOM
PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
SEE LV SCHEMATIC SEE LV SCHEMATIC SEE LV SCHEMATIC SEE LV SCHEMATIC ACB - AIR CIRCUIT BREAKER PANEL
DWG NO. TM-ARC-HT-DR-E0-ZZ-8122 DWG NO. TM-ARC-HT-DR-E0-ZZ-8123 DWG NO. TM-ARC-HT-DR-E0-ZZ-8124 DWG NO. TM-ARC-HT-DR-E0-ZZ-8125 SYNC - SYNCHRONIZING POWER SUPPLY
FOR DETAILS FOR DETAILS FOR DETAILS FOR DETAILS
HVSG - HIGH VOLTAGE SWITCHGEAR
PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
LEVEL
BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
TX-HOTEL-SPARE RL - ROOF
P1 - PARKING LEVEL 1
TX-HOTEL-01 TX-HOTEL-02 TX-HOTEL-03 TX-HOTEL-04 P2 - PARKING LEVEL 2
TX ROOM
TCL = 2292.40 kW TCL = 1755.96 kW TCL = 1743.05 kW TCL = 1699.04 kW P3 - PARKING LEVEL 3
MDL = 1146.20 kW MDL = 1247.02 kW MDL = 1165.56 kW MDL = 1171.13 kW P4 - PARKING LEVEL 4
11KV/0.415KV, 50Hz 11KV/0.415KV, 50Hz 11KV/0.415KV, 50Hz 11KV/0.415KV, 50Hz P5 - PARKING LEVEL 5
2000KVA 2000KVA 2000KVA 2000KVA
DRY TYPE DRY TYPE DRY TYPE DRY TYPE OWNERSHIP
L - LANDLORD
T - TENANT
3C 95SQMM
Cu/XLPE/SWA/LSF CORE
(TYP)
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
REFERENCE DRAWINGS:
MZ3 - MALL ZONE 3
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
1 2 3 4 5 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
NOTES
PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
FEEDER FEEDER FEEDER FEEDER FEEDER SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT MANAGEMENT ESMDB - ESSENTIAL SUBMAIN
RELAY RELAY RELAY RELAY RELAY DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
MCC - MOTOR CONTROL CENTER TO 1213
FMR FMR FMR FMR FMR 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
FIXED TYPE FIXED TYPE FIXED TYPE FIXED TYPE FIXED TYPE ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
630A 630A 630A 630A 630A TO 5213
SF6C.B SF6C.B SF6C.B SF6C.B SF6C.B DRAWING NOTES:
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
TCL : 4048.36 kW TCL : 3442.09 kW Client : Tilal Mall L.L.C
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
MDL = 2393.22 kW MDL = 2336.69 kW P.O. Box 5995
DF = 0.59 MANUFACTURER.
DF = 0.68 Sharjah, UAE
HVSG-HOTEL HV SWITCHGEAR DESIGN TO BE CONFIRMED BY Tel: +971 (6) 5560055
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
SEWA. Fax: +971 (6) 5560033
LOCATION : MAIN LV ROOM AT BASEMENT LEVEL
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
Design & Consultancy
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
CABLE TO BE PROCURED AND CONNECTED BY built assets
SEWA.
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
FROM SEWA HV NETWORK Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. Sub-Consultant :
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BASEMENT LEVEL BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
Architect / Engineer of record :
OF CABLES AND UP.
Design & Consultancy
for natural and
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
P.O. Box. 1779
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
RELAYS.
Project Name:
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
IN MECHANICAL DESIGN.
Tilal Mall and Hotel
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
Plot Number/Area 7040 / JWAIZEI
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
HOTEL
ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 01
Filename:
TM-ARC-HT-DR-E0-ZZ-8121 T1
Date Plotted: 5/6/2019 2:29:57 PM
KEYPLAN
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA.
MDB-HOTEL-03
TCL : 117.74 kW
MDL : 56.29 kW
DF : 0.48
1
B
2
TM-ARC-HT-DR-E0-ZZ-8124
TM-ARC-HT-DR-E0-ZZ-8126
3
MDB-HOTEL-02 MDB-HOTEL-04
TCL : 755.39 kW TCL : 348.55 kW TM-ARC-HT-DR-E0-ZZ-8126
MDL : 504.93kW MDL : 188.61 kW 1
DF : 0.67 DF : 0.49
1 TM-ARC-HT-DR-E0-ZZ-8126 MCC-HT-BL-Z3-1 MCC-HT-BL-Z3-2 (DUTY) MCC-HT-BL-Z3-3 (STANDBY)
A C 1
TCL: 1772.40 kW TCL: 260.00 kW TCL: 260.00 kW
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8125 MDL: 886.20 kW MDL: 260.00 kW MDL: 0.00 kW
DF: 0.50 DF: 1.00 DF: 0.00
REFERENCE DRAWINGS:
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
SPACE SPACE
2x240 1x240
1x630 1x630
4x300 1x630
1x240 1x120
2x300 1x300
2x240 1x240
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
Dx4
Dx4
Kx1
Fx4
Fx4
Fx4
Drawing Title
HOTEL
ELECTRICAL
DETAIL SCHEMATIC DIAGRAM
1 NTS
2 DETAIL SHEET 02
- GMDB-HOTEL
NTS
- TX-HOTEL-01
Filename:
TM-ARC-HT-DR-E0-ZZ-8122 T1
Date Plotted: 5/6/2019 2:30:03 PM
KEYPLAN
PANEL/EQUIPMENT NO.
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
6TH FLOOR LEVEL MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
MALL OR HOTEL
PANEL/EQUIPMENT NO.
L - LIGHTING
3RD FLOOR LEVEL P - POWER
LEVEL
BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
2ND FLOOR LEVEL P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
OWNERSHIP
L - LANDLORD
T - TENANT
1ST FLOOR LEVEL
CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2 REFERENCE DRAWINGS:
MZ3 - MALL ZONE 3
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
GROUND FLOOR LEVEL
CP2 - CAR PARK 2 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
SMDB-HT-BL-Z2 SMDB-HT-BL-Z3 ESMDB-HT-BL-Z1Z2 ESMDB-HT-BL-MECH CP3 - CAR PARK 3 NOTES
ESMDB-HT-BL-Z3 ESMDB-HT-BL-ICT
(BASEMENT ZONE 2) (BASEMENT ZONE 3) (BASEMENT ZONE 1 & 2) (BASEMENT ZONE 3) (BASEMENT) TCL(DUTY): 152.26 kW 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
PANEL/EQUIPMENT TYPE
TCL: 126.68 kW TCL: 149.15 kW TCL: 131.14 kW TCL: 123.58 kW TCL: 104.91 kW MDL: 139.96 kW EMCC-HT-BL-Z3-1 4 SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
MDL: 101.34 kW MDL: 123.31 kW MDL: 99.61 kW MDL: 98.87 kW MDL: 73.44 kW DF: 0.92 (BASEMENT ZONE 3)
ESMDB - ESSENTIAL SUBMAIN 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
DF: 0.80 DF: 0.83 DF: 0.76 DF: 0.80 DF: 0.70 TCL(DUTY): 15.50 kW TM-ARC-HT-DR-E0-ZZ-8129
2 3 1
DISTRIBUTION BOARD TO 1213
MDL: 10.00 kW
MCC - MOTOR CONTROL CENTER
DF: 0.65 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TM-ARC-HT-DR-E0-ZZ-8127 TM-ARC-HT-DR-E0-ZZ-8127 TM-ARC-HT-DR-E0-ZZ-8128 UPS-HOTEL UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
150 kVA, 415V, 3:3 ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
4 MODULAR TYPE UPS
3 TO 5213
TM-ARC-HT-DR-E0-ZZ-8127 USMDB-HT-BL-UPS
TM-ARC-HT-DR-E0-ZZ-8128 (LOCATED AT UPS ROOM BASEMENT)
TCL: 89.00 kW
1 MDL: 62.30 kW
MCC-HT-BL-Z3-4 1
I/O DF: 0.70 A 20/01/2019 SEWA SUBMISSION
TM-ARC-HT-DR-E0-ZZ-8127 (BASEMENT ZONE 3) 2
TM-ARC-HT-DR-E0-ZZ-8131 Rev. Date Authority Description
SMDB-HT-BL-Z1 TCL: 305.50 kW M.BYPASS
SMDB-HT-BL-MECH TM-ARC-HT-DR-E0-ZZ-8128
(BASEMENT ZONE 1) MDL: 155.50 kW
TCL(DUTY): 59.00 kW DF: 0.51
TCL: 286.49 kW MDL: 59.00 kW 3 4
MDL: 229.19 kW DF: 1.00
DF: 0.80 TM-ARC-HT-DR-E0-ZZ-8130 TM-ARC-HT-DR-E0-ZZ-8130
DRAWING NOTES:
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE P02 20/12/18 DESIGN FURTHER DEVELOPED
1x150
1x300
1x300
1x240
1x120
1x150
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
1x16
1x300
1x70
1x35
1x630
1x300
1x240
1x120
1x50
1x70
1x16
1x300
3x185
3x185
2x240
1x240
1x120
1x300
1x35
3x185
1x70
2x630
2x300
2x240
1x240
1x120
Fx4
Fx4
Fx4
Fx4
Dx4
FOR TENDER
Fx4
Fx4
Fx4
Fx4
1x95
1x16
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Kx1
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Scales Drawn By Suitability Code Project Stage
PER SEWA.
NTS EB S4 TENDER
Drawing No. Rev.
Filename:
TM-ARC-HT-DR-E0-ZZ-8123 T1
Date Plotted: 5/6/2019 2:30:10 PM
KEYPLAN
ROOF LEVEL
MALL OR HOTEL
2 400A
TM-ARC-HT-DR-E0-ZZ-8134 SMDB-HT-5F-E TAP-OFF PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
TCL: 180.89 kW 1x300 1x150
MDB - MAIN DISTRIBUTION BOARD
MDL: 112.25 kW Dx4 PFC - POWER FACTOR CORRECTOR
DF: 0.62 UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
5TH FLOOR LEVEL ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
1 400A
TM-ARC-HT-DR-E0-ZZ-8134 TAP-OFF (E)SMDB - MZ1 - 01 - X - BL - (L) X
SMDB-HT-4F-E
TCL: 180.71 kW 1x300 1x150
Dx4 PANEL/EQUIPMENT NO.
MDL: 122.73 kW
L - LIGHTING
DF: 0.68 P - POWER
1x25
1x95
1x95
1x16
1x16
1x50
Initial/Current Issue Signatures
Original
Size A0 Designed By: FD
LV SCHEMATIC NOTES:
1x185
1x150
2x630
1x50
Dx4
1x35
1x35
1x95
Dx4
Dx4
Dx4
Kx1
Dx4
Fx4
Datum - Checked By: EC
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Grid - Approved By: MJ
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY Client :
MANUFACTURER. Tilal Mall L.L.C
P.O. Box 5995
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Sharjah, UAE
Tel: +971 (6) 5560055
1200AT 4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE Fax: +971 (6) 5560033
TP 2000 AT 100AT 300AT 250AT 100AT 200AT 80AT SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
1200AT ACB 4P 4P 4P 4P 4P 4P 4P
MCCB MCCB MCCB MCCB MCCB MCCB Lead Consultant :
TP MCCB 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
Design & Consultancy
for natural and
PFI ISOL. built assets
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
P.O. Box. 52750 Tel: +971 (4) 3193333
1 2 3 4 6 7 8 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
DONE ON ACTUAL INSTALLATION.
3200A TPN+E BUSBAR Sub-Consultant :
3200AT 400:5 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
65kA @ 3 SEC. A A A 3200:5 A A A
4P BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
415V/240V BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
ACB L1 L2 L3 OF CABLES AND UP.
FORM 4 TYPE 2 L1 L2 L3
N/C Architect / Engineer of record :
OC SC EF U-V 400:5 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
OC SC EF U-V 3200:5 Design & Consultancy
for natural and
built assets
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
TO BMS EMU
RELAYS.
P.O. Box. 1779
3200AT 300AT Copyright © Arcadis 2018 Sharjah, UAE
4P 4P 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
TO BMS M TO BMS M
Project Name:
ACB MCCB IN MECHANICAL DESIGN.
EM
MDB-HOTEL-03
V SS
N/O
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL Tilal Mall and Hotel
(SERVING EAST SIDE) V SS CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
LOCATION: SUBSTATION AT BASEMENT LEVEL ESSENTIAL LOAD
SPECIALISTS INFORMATION OR DETAIL. Sharjah,UAE
TCL = 1743.05 kW TCL : 117.74 kW 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Plot Number/Area 7040 / JWAIZEI
PFC-HOTEL-03 MDL = 1165.56 kW MDL : 56.29 kW PER SEWA.
600kVAR MULTISTEP SEWA TARIFF
Drawing Title
AUTO PFC
DF = 0.67 DF : 0.48
METERING
KWH HOTEL
ELECTRICAL
15 X 1C 630 mm² Cu/XLPE/PVC
(COORDINATE WITH SEWA)
SCHEMATIC DIAGRAM
SHEET 04
TX-HOTEL-03
C
2000kVA
11000-415/240V TO GMDB-HOTEL LOCATED
Scales Drawn By Suitability Code Project Stage
(BY SEWA) AT BASEMENT LEVEL
BASEMENT LEVEL NTS EB S4 TENDER
Drawing No. Rev.
Filename:
TM-ARC-HT-DR-E0-ZZ-8124 T1
Date Plotted: 5/6/2019 2:30:16 PM
ELECTRICAL ROOM RISER KEYPLAN
SERVING HOTEL WEST SIDE
EQUIPMENT NOMENCLATURE DRAWING NOTES:
PANEL/EQUIPMENT TYPE 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
SMDB - SUBMAIN DISTRIBUTION BOARD PER SEWA.
1 ESMDB - ESSENTIAL SUBMAIN
300A
DISTRIBUTION BOARD
TAP-OFF SMDB-HT-4F-W TM-ARC-HT-DR-E0-ZZ-8139
MCC - MOTOR CONTROL CENTER
1x185 1x95 TCL: 124.91 kW
Dx4 UPS - UNINTERUPTIBLE POWER SUPPLY
MDL: 84.72 kW
ELCP - EMERGENCY LIGHTING PANEL
DF: 0.68
4TH FLOOR LEVEL
3
300A
TAP-OFF SMDB-HT-3F-W TM-ARC-HT-DR-E0-ZZ-8138
1x185 1x95 TCL: 121.93 kW
Dx4 MDL: 83.43 kW
DF: 0.68
3RD FLOOR LEVEL
630A
TAP-OFF 2x240 1x240 1
Dx4 SMDB-HT-2F-K1 TM-ARC-HT-DR-E0-ZZ-8138
TCL: 202.98 kW
MDL: 162.38 kW
DF: 0.80 ESMDB-HT-2F-W
400A
TCL: 56.85 kW
TAP-OFF 1x300 1x150 2
MDL: 45.45 kW
Dx4 SMDB-HT-2F-K2 REFERENCE DRAWINGS:
TM-ARC-HT-DR-E0-ZZ-8138 DF: 0.80
TCL: 162.68 kW 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
MDL: 130.15 kW SYMBOLS AND ABBREVIATIONS
2ND FLOOR LEVEL DF: 0.80
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
1 MISCELLANEOUS DETAILS 0021
TM-ARC-HT-DR-E0-ZZ-8137 FP-01 (HOTEL) 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
LOCATED AT CARPARK TO 1213
1st FLOOR LEVEL TCL : 168.0 kW 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
2 TO 2213
BY NOMINATED M
4 SPECIALIST ESMDB-HT-CP1-FP TM-ARC-HT-DR-E0-ZZ-8142 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
140A FP LOCATED AT CARPARK TO 5213
CONTRACTOR
TAP-OFF SMDB-HT-GF-1 TM-ARC-HT-DR-E0-ZZ-8138 CONTROLLER TCL: 6.20 kW
1x300 1x150
TCL: 140.93 kW MDL: 6.20 kW
Dx4 MDL: 112.75 kW 1600AT DF: 1.00
BY ELECTRICAL
GROUND FLOOR LEVEL DF: 0.80 CONTRACTOR 3P
1x630
1x95
1x95
1x50
1x16
1x35
1x16
Purpose of Issue :
FOR TENDER
2x630
1x150
1x150
4x300
1x95
1x35
1x70
1x35
Dx4
Dx4
Kx1
Fx4
Fx4
Fx4
Fx4
Fx4
Initial/Current Issue Signatures
SPACE SPACE Original
Size A0 Designed By: FD
Drawing Title
HOTEL
ELECTRICAL
15 X 1C 630 mm² Cu/XLPE/PVC
(COORDINATE WITH SEWA)
SCHEMATIC DIAGRAM
SHEET 05
TX-HOTEL-04
B
2000kVA
11000-415/240V TO GMDB-HOTEL LOCATED
BASEMENT LEVEL (BY SEWA) AT BASEMENT LEVEL Scales Drawn By Suitability Code Project Stage
NTS EB S4 TENDER
Drawing No. Rev.
Filename:
TM-ARC-HT-DR-E0-ZZ-8125 T1
Date Plotted: 5/6/2019 2:30:23 PM
KEYPLAN
M M X X GENERAL NOTES:
EPO EPO
BY
2000A 2000A 400A 400A ELECTRICAL X 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
BY ELECTRICAL BY ELECTRICAL
TPN TPN TPN TPN CONTRACTOR METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
CONTRACTOR CONTRACTOR
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
No. OF CORE 2. DO NOT SCALE FROM THIS DRAWING.
(SINGLE-CORE/MULTI-CORE) 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
CABLE TYPE OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
A = Cu/PVC/AWA/PVC LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
B = Cu/PVC/SWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
C = Cu/XLPE/AWA/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
D = Cu/XLPE/SWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
E = Cu/XLPE/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
F = Cu/FRT/SWA/LSF ONLY.
6x240 1x630
6x240 1x630
G = Cu/FRT/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
1x300 1x150
1x300 1x150
H = Cu/MICS/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
J = Cu/MICS MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
K = Cu/PVC/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
Dx4
Dx4
L = Cu/PVC/PVC WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
Dx4
Dx4
M = Cu/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
TO FACP TO FACP N = Cu/MICA/XLPE/SWA/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
EQUIPMENT NOMENCLATURE DRAWINGS.
(E)MDB - MALL - XX - X
PANEL/EQUIPMENT NO.
CONTROLS CONTROLS
SECTION SEE SEE SECTION
MECH MECH ZONE NO.
ELR + UVR + ELR + UVR + PLANS PLANS MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
CONTACTOR + CONTACTOR + MZ3 - MALL ZONE 3
TO BMS
SHUNT TRIP SHUNT TRIP 30mA ELR+ 30mA ELR+ CH - CHILLER
SHUNT TRIP SHUNT TRIP CP1 - CAR PARK 1
CP2 - CAR PARK 2
EMU
CP3 - CAR PARK 3
EMU
2000AT 2000AT 400AT, TPN 400AT, TPN
MALL OR HOTEL
TPN TPN MCCB MCCB
TO BMS
ACB ACB
EM PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
1 2 MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
2000A TPN+E BUSBAR 800A TPN+E BUSBAR ELMDB - EMERGENCY LIGHTING MAIN DB
50kA @ 1 SEC. A A A 2000:5A 35kA @ 1 SEC. A A A 800:5A CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
415V/240V 415V/240V
SYNC - SYNCHRONIZING POWER SUPPLY
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 HVSG - HIGH VOLTAGE SWITCHGEAR
TYPE 2 TYPE 2
2000AT 630A (E)SMDB - MZ1 - 01 - X - BL - (L) X
MCC-HT-BL-Z3-1 TPN MCC-HT-BL-Z3-2
TPN
LOCATION: BASEMENT CHILLER ROOM ACB LOCATION: BASEMENT CHILLER ROOM
TCL : 1772.40 kW TCL : 260.00 kW PANEL/EQUIPMENT NO.
MDL : 886.20 kW MDL : 260.00 kW L - LIGHTING
DF : 0.50 DF : 1.00 P - POWER
V SS V SS
LEVEL
EMU 2000:5A EMU 800:5A BL - BASEMENT
TO BMS GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
1 1 P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
TM-ARC-HT-DR-E0-ZZ-8122 TM-ARC-HT-DR-E0-ZZ-8122
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
FED FROM FED FROM
MDB-HOTEL-01 MDB-HOTEL-01 OWNERSHIP
L - LANDLORD
BASEMENT BASEMENT T - TENANT
CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
CH - CHILLER
1 DETAIL 2 DETAIL CP1 - CAR PARK 1 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
NTS ISOL-CHWP-HT-BL-02 ISOL-CTWP-HT-BL-02 NTS CP2 - CAR PARK 2 SYMBOLS AND ABBREVIATIONS
- MCC-HT-BL-Z3-1 - MCC-HT-BL-Z3-2 CP3 - CAR PARK 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CHILLED CONDENSER
NOTES
PUMP PUMP PANEL/EQUIPMENT TYPE
BY NOMINATED SMDB - SUBMAIN DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
(STANDBY) (STANDBY) SPECIALIST MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
150.00 kW 110.00 kW CONTRACTOR DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
MCC - MOTOR CONTROL CENTER TO 1213
EPO
M EPO
M
UPS - UNINTERUPTIBLE POWER SUPPLY 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
400A 400A ELCP - EMERGENCY LIGHTING PANEL TO 2213
BY ELECTRICAL
TPN TPN CONTRACTOR 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DRAWING NOTES: TO 5213
1x300 1x150
Dx4
EMU 800:5A 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Project Name:
IN MECHANICAL DESIGN.
Filename:
TM-ARC-HT-DR-E0-ZZ-8126 T1
Date Plotted: 5/6/2019 2:30:29 PM
KEYPLAN
FP-HT-GF-01
(LOCATED AT
LANDSCAPE AREA)
TCL: 2.50 kW
X X GENERAL NOTES:
1x50 1x25
1x50 1x25
1x16 1x16
1x25 1x16
1x95 1x50
1x25 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
B = Cu/PVC/SWA/PVC
1x35 1x16
1x25 1x16
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
ONLY.
Dx4
Dx4
SPACE SPACE SPACE SPACE SPACE F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE
ZONE NO.
5 6 7 8 9 10 11 12 6 7 8 9 10 MZ1 - MALL ZONE 1
1 2 3 4 1 2 3 4 5
MZ2 - MALL ZONE 2
800A TPN+E BUSBAR 400A TPN+E BUSBAR MZ3 - MALL ZONE 3
35kA @ 1 SEC. 35kA @ 1 SEC. CH - CHILLER
A A A 800:5A A A A 400:5A CP1 - CAR PARK 1
415V/240V FORM 2b 415V/240V FORM 2b
TYPE 2 TYPE 2 CP2 - CAR PARK 2
CP3 - CAR PARK 3
L1 L2 L3 L1 L2 L3
MALL OR HOTEL
630A 300A
SMDB-HT-BL-Z1 TPN SMDB-HT-BL-Z2 TPN PANEL/EQUIPMENT TYPE
SERVING BASEMENT - ZONE 1 SERVING BASEMENT - ZONE 2 TX - TRANSFORMER
LOCATION: EE ROOM, BASEMENT LEVEL LOCATION: EE ROOM, BASEMENT LEVEL MDB - MAIN DISTRIBUTION BOARD
TCL : 286.49 kW TCL : 126.68 kW PFC - POWER FACTOR CORRECTOR
MDL : 229.19 kW V SS MDL : 101.34 kW V SS UPS - UNINTERRUPTIBLE POWER SUPPLY
DF : 0.80 DF : 0.80 ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
EMU 800:5A EMU 400:5A ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123
PANEL/EQUIPMENT NO.
L - LIGHTING
FED FROM FED FROM
P - POWER
MDB-HOTEL-02 MDB-HOTEL-02
LEVEL
BASEMENT LEVEL BASEMENT LEVEL BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
1 DETAIL 2 DETAIL P2 - PARKING LEVEL 2
NTS NTS P3 - PARKING LEVEL 3
- SMDB-HT-BL-Z1 - SMDB-HT-BL-Z2 P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
OWNERSHIP
L - LANDLORD
T - TENANT
CORE
ZONE NO.
MZ1 - MALL ZONE 1
FAHU-HT-BS-01 FAHU-HT-BS-01 FAHU-HT-BS-01 FAHU-HT-BS-01 FAHU-HT-BS-02 FAHU-HT-BS-02 FAHU-HT-BS-02 FAHU-HT-BS-02 FAHU-HT-BS-03 FAHU-HT-BS-03 FAHU-HT-BS-03 FAHU-HT-BS-03 MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
5.50 kW 5.50 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 5.50 kW 5.50 kW 7.50 kW 7.50 kW 3.00 kW 3.00 kW
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
M M M M M M M M M M M M BY NOMINATED CP2 - CAR PARK 2
SPECIALIST 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO CONTRACTOR NOTES
PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
32A 32A 20A 20A 20A 20A 32A 32A 40A 40A 20A 20A DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN BY ELECTRICAL TO 1213
TPN MCC - MOTOR CONTROL CENTER
CONTRACTOR
S4-LIFT 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
JBA-17
18.00 kW UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
21.90 kW
ELCP - EMERGENCY LIGHTING PANEL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
(KITCHEN
EQUIPMENT) M BY NOMINATED TO 5213
DRAWING NOTES:
SPECIALIST
JBA-17
DB-HT-BL-Z3P2 DB-HT-BL-Z3KP1 DB-HT-BL-Z3KP2 DB-HT-BL-Z3KP3 DB-HT-BL-Z3KP4 EPO CONTRACTOR
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
TCL: 21.70 kW TCL: 20.37 kW TCL: 6.41 kW TCL: 23.42 kW TCL: 2.50 kW WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
1x10 1x10
1x10 1x10
1x6
1x6
1x4
1x4
1x4
1x4
1x6
1x6
1x4
1x4
80A 80A STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
TPN TPN BY ELECTRICAL Rev. Date Authority Description
CONTRACTOR 2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
1x6
1x6
1x4
1x4
1x4
1x4
1x6
1x6
1x4
1x4
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
TO FACP
3. DO NOT SCALE ON THE DRAWING.
1x10 1x10
1x25 1x16
1x16 1x16
1x25 1x16
1x25 1x16
Dx4
Dx4
Dx4
Dx4
Dx4
1
1 IN MECHANICAL DESIGN.
Tilal Mall and Hotel
TM-ARC-HT-DR-E0-ZZ-8123
TM-ARC-HT-DR-E0-ZZ-8123 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
FED FROM Plot Number/Area 7040 / JWAIZEI
FED FROM
MDB-HOTEL-02 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
MDB-HOTEL-02
PER SEWA. Drawing Title
HOTEL
BASEMENT LEVEL
ELECTRICAL
3 DETAIL 4 DETAIL SCHEMATIC DIAGRAM
NTS
- SMDB-HT-BL-Z3
NTS
- SMDB-HT-BL-MECH SHEET 07
Filename:
TM-ARC-HT-DR-E0-ZZ-8127 T1
Date Plotted: 5/6/2019 2:30:36 PM
KEYPLAN
2 EDB-HT-1F-1
TCL: 3.56 kW
TM-ARC-HT-DR-E0-ZZ-8129 CABLE LEGEND KEY:
NO. OF SETS
GROUND FLOOR LEVEL 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
FIRE COMMAND EQPT ISOL-WWT-1 EDB-HT-BL-Z3L EDB-HT-BL-Z3P EDB-HT-BL-SEC EDB-HT-BL-Z3KP EDB-HT-BL-Z3PH EDB-HT-BL-TX EDB-HT-BL-LV X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
EDB-HT-BL-Z1L EDB-HT-BL-Z1P EDB-HT-BL-Z2L EDB-HT-BL-Z2P EDB-HT-BL-Z1KP EDB-HT-BL-Z2PH EDB-HT-BL-FC 50.00 kW TCL: 4.03 kW TCL: 6.60 kW TCL: 3.20 kW TCL: 41.22 kW TCL: 62.63 kW TCL: 2.00 kW TCL: 3.90 kW VERIFIED ON SITE AND APPROVED BY THE
TCL: 6.40 kW TCL: 9.08 kW TCL: 33.16 kW TCL: 3.00 kW UDB-HT-BL-SER UDB-HT-BL-AV UDB-HT-BL-SEC
TCL: 6.43 kW TCL: 11.69 kW TCL: 3.43 kW (ICT RACKS) (ICT RACKS) ARCHITECT/ENGINEER.
(ICT RACKS)
TCL: 11.00 kW 2. DO NOT SCALE FROM THIS DRAWING.
M BY NOMINATED TCL: 74.00 kW TCL: 4.00 kW No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
SPECIALIST (SINGLE-CORE/MULTI-CORE)
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
EPO CONTRACTOR CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
200A D = Cu/XLPE/SWA/LSF
BY ELECTRICAL 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
TPN E = Cu/XLPE/LSF
CONTRACTOR ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF
1x16 1x16
1x16 1x16
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
1x70 1x35
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x70 1x35
1x16 1x16
1x50 1x25
J = Cu/MICS
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
1x95 1x50
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
Fx4
Dx4
Fx4
Dx4
Dx4
Dx4
Dx4
Dx4
Fx4
Dx4
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
Fx4
SPACE
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Fx4
Dx4
SPACE N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE
(E)MDB - MALL - XX - X
1x25 1x16
1x25 1x16
1x25 1x16
1x25 1x16
1x25 1x16
1x25 1x16
1x25 1x16
3. DO NOT SCALE ON THE DRAWING.
1x4
1x4
1x4
1x4
1x4
1x4
1x4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
1x4
1x4
1x4
1x4
1x4
Fx4
Fx4
Fx4
1x4
1x4
TO FACP SPACE SPACE TO FACP 5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
CONTROLS CONTROLS Initial/Current Issue Signatures
SECTION SECTION 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
SEE MECH
PLANS
Size A0 Designed By: FD
1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
6 11 12 Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
200A TPN+E BUSBAR 300A TPN+E BUSBAR DONE ON ACTUAL INSTALLATION. Sub-Consultant :
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 300:5A
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
415V/240V 415V/240V
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
Architect / Engineer of record :
TYPE 2 TYPE 2 OF CABLES AND UP.
100A 250A Design & Consultancy
for natural and
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
TPN TPN P.O. Box. 1779
EMCC-HT-9F-1 EMCC-HT-10F-1
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
LOCATION: EE ROOM, 9TH LEVEL LOCATION: EE ROOM, 10TH LEVEL
RELAYS.
TCL(DUTY)= 35.50 kW TCL(DUTY) = 103.50 kW Project Name:
V SS V SS 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
MDL : 0.75 kW
DF : 0.02 200:5A
MDL = 20.00 kW
DF = 0.19 300:5A
IN MECHANICAL DESIGN. Tilal Mall and Hotel
EMU EMU
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
Plot Number/Area 7040 / JWAIZEI
4 5 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8123 HOTEL
Filename:
TM-ARC-HT-DR-E0-ZZ-8128 T1
Date Plotted: 5/6/2019 2:30:42 PM
KEYPLAN
TCL: 8.00 kW
(DUTY)
TP-9
CABLE LEGEND KEY:
NO. OF SETS
M
TCL: 1.87 kW
TCL: 3.73 kW
TCL: 3.73 kW
TCL: 0.03 kW
TCL: 0.03 kW
TCL: 0.03 kW
TCL: 5.60 kW
TCL: 5.60 kW
TCL: 8.00 kW
TCL: 3.00 kW
TCL: 3.00 kW
TCL: 8.00 kW
TCL: 8.00 kW
TCL: 3.73 kW
TCL: 3.73 kW
TCL: 1.49 kW
TCL: 0.03 kW
TCL: 0.03 kW
TCL: 3.28 kW
CONDUCTOR SIZE
(STANDBY)
(STANDBY)
(STANDBY)
(STANDBY)
HW-CP-10
HW-CP-10
HW-CP-10
HW-CP-10
HW-CP-10
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
No. OF CPC
GWP-1
GWP-2
SEP-1
SEP-2
TP-10
SP-5
SP-1
SP-7
SP-4
TP-6
TP-7
TP-8
GI-1
CPC SIZE
M M M M M M M M M M M M M M M M M M M GENERAL NOTES:
X X
BY NOMINATED BY NOMINATED
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
SPECIALIST SPECIALIST
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
CONTRACTOR CONTRACTOR
VERIFIED ON SITE AND APPROVED BY THE
SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
(SINGLE-CORE/MULTI-CORE) OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
BY ELECTRICAL BY ELECTRICAL
20A 20A 20A 20A 20A CONTRACTOR 32A 32A 20A 63A 20A 20A 20A 20A 20A CONTRACTOR CABLE TYPE LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
1x16 1x16
1x4
1x4
1x4
1x4
1x4
1x6
1x6
1x4
1x4
1x4
1x4
1x4
1x4
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
1x4
1x4
1x4
1x4
1x4
1x6
1x6
1x4
1x4
1x4
1x4
1x4
1x4
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
EQUIPMENT NOMENCLATURE
TO BMS TO BMS
(E)MDB - MALL - XX - X
30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD PANEL/EQUIPMENT NO.
ZONE NO.
20AT 20AT 20AT 20AT 20AT 32AT 32AT 20AT 63AT 20AT 20AT 20AT 20AT 20AT MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
MZ3 - MALL ZONE 3
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB CH - CHILLER
RYB1 RYB2 RYB3 RYB4 RYB9 RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
200A TPN+E BUSBAR 200A TPN+E BUSBAR
35kA @ 1 SEC. 35kA @ 1 SEC. MALL OR HOTEL
415V/240V 415V/240V
FORM 2b TYPE 2 FORM 2b TYPE 2 PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
63A 100A PFC - POWER FACTOR CORRECTOR
TPN EDB-HT-BL-Z2PH TPN UPS - UNINTERRUPTIBLE POWER SUPPLY
SERVING BASEMENT - ZONE 2 ELMDB - EMERGENCY LIGHTING MAIN DB
EDB-HT-BL-Z1P
LOCATION: EE ROOM, BASEMENT LEVEL CBU - CENTRAL BATTERY UNIT
SERVING BASEMENT - ZONE 1
TCL= 33.16 kW ACB - AIR CIRCUIT BREAKER PANEL
LOCATION: EE ROOM, BASEMENT LEVEL
MDL= 26.53 kW SYNC - SYNCHRONIZING POWER SUPPLY
TCL= 11.69 kW
DF= 0.80 HVSG - HIGH VOLTAGE SWITCHGEAR
MDL= 9.35 kW
DF= 0.80
(E)SMDB - MZ1 - 01 - X - BL - (L) X
PANEL/EQUIPMENT NO.
1 1 L - LIGHTING
P - POWER
TM-ARC-HT-DR-E0-ZZ-8128 TM-ARC-HT-DR-E0-ZZ-8128
LEVEL
BL - BASEMENT
FED FROM FED FROM GF - GROUND
ESMDB-HT-BL-Z1Z2 ESMDB-HT-BL-Z1Z2 FF - FIRST FLOOR
BASEMENT LEVEL BASEMENT LEVEL RL - ROOF
P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
1 DETAIL 2 DETAIL P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
NTS NTS
- EDB-HT-BL-Z1P - EDB-HT-BL-Z2PH P5 - PARKING LEVEL 5
OWNERSHIP
L - LANDLORD
T - TENANT
CORE
ZONE NO.
MZ1 - MALL ZONE 1
ISOL-SEF-HT-GF-01 ISOL-MAF-HT-GF-01 ISOL-EAF-HT-BS-01A ISOL-EAF-HT-BS-01B ISOL-EAF-HT-BS-01C ISOL-EAF-HT-BS-01D ISOL-EF-HT-BS-01 ISOL-EF-HT-BS-02 ISOL-EF-HT-BS-03 ISOL-EF-HT-BS-04 BY NOMINATED MZ2 - MALL ZONE 2
SPECIALIST MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
5.50 kW 4.00 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW 0.75 kW
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CONTRACTOR CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
TCL: 13.0 kW
BY ELECTRICAL
PANEL/EQUIPMENT TYPE
TP-4
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN CONTRACTOR 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SMDB - SUBMAIN DISTRIBUTION BOARD MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
M DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TCL: 13.0 kW
TCL: 13.0 kW
TCL: 0.03 kW
TCL: 0.03 kW
TCL: 0.03 kW
TCL: 0.03 kW
TCL: 5.60kW
TCL: 5.60kW
TCL: 7.46kW
TCL: 7.46kW
TCL: 7.46kW
TCL: 7.46kW
TCL: 7.46kW
TCL: 21.5kW
TCL: 21.5kW
(STANDBY)
(STANDBY)
(STANDBY)
(STANDBY)
HW-CP-10
HW-CP-10
HW-CP-10
HW-CP-10
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
(DUTY)
GWP-3
GWP-4
SEP-3
SEP-4
SP-4
TP-1
TP-2
TP-3
TP-5
GI-2
1x6
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS SEE PH DRAWINGS STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
1x6
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
BY ELECTRICAL SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
20A 32A 32A 32A 100A 63A 20A 20A 20A 20A CONTRACTOR TO FACP
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN 3. DO NOT SCALE ON THE DRAWING.
1x16 1x16
CONTROLS
1x4
1x6
1x6
1x6
1x4
1x4
1x4
1x4
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SEE MECH SECTION
PLANS PLANS PLANS PLANS PLANS PLANS PLANS PLANS PLANS WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
1x4
1x6
1x6
1x6
1x4
1x4
1x4
1x4
TO BMS
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
Initial/Current Issue Signatures
100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 100mA ELCB 6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + Size A0 Designed By: FD
TO BMS ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM
TO BMS LV SCHEMATIC NOTES: Datum - Checked By: EC
30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 30mA RCD 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
32AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN 20AT, TPN THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Client : Tilal Mall L.L.C
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
20AT 32AT 32AT 32AT 100AT 63AT 20AT 20AT 20AT 20AT 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY P.O. Box 5995
MANUFACTURER. Sharjah, UAE
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN
Tel: +971 (6) 5560055
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. Fax: +971 (6) 5560033
RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 RYB9 RYB10 1 2 3 4 5 6 7 8 9 10
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
200A TPN+E BUSBAR 200A TPN+E BUSBAR Design & Consultancy
A A A 200:5A 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
35kA @ 1 SEC. 35kA @ 1 SEC. built assets
415V/240V 415V/240V 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
FORM 2b TYPE 2 FORM 4a TYPE 2 L1 L2 L3 Dubai, UAE Fax: +971 (4) 3242531
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. Sub-Consultant :
160A 100A
EDB-HT-BL-Z3PH TPN TPN 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
EMCC-HT-BL-Z3-1
SERVING BASEMENT - ZONE 3 BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
LOCATION: EE ROOM, BASEMENT LEVEL LOCATION: ZONE 3, BASEMENT LEVEL BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS Architect / Engineer of record :
TCL= 62.63 kW OF CABLES AND UP.
TCL(DUTY)= 15.50 kW Design & Consultancy
MDL= 50.10 kW V SS for natural and
DF= 0.80 MDL= 10.00 kW 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
P.O. Box. 1779
DF= 0.65 EMU 200:5A
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
RELAYS.
Project Name:
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
3 1 IN MECHANICAL DESIGN. Tilal Mall and Hotel
TM-ARC-HT-DR-E0-ZZ-8123
TM-ARC-HT-DR-E0-ZZ-8128 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
FED FROM FED FROM Plot Number/Area 7040 / JWAIZEI
ESMDB-HT-BL-Z3 MDB-HOTEL-02
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
BASEMENT LEVEL BASEMENT LEVEL PER SEWA. Drawing Title
HOTEL
Filename:
TM-ARC-HT-DR-E0-ZZ-8129 T1
Date Plotted: 5/6/2019 2:30:49 PM
KEYPLAN
FAHU-HT-10F-01 FAHU-HT-10F-01 FAHU-HT-10F-01 FAHU-HT-10F-01 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-02 FAHU-HT-10F-03 FAHU-HT-10F-03 FAHU-HT-10F-03 FAHU-HT-10F-03 BY NOMINATED
4.00 kW 4.00 kW 3.00 kW 3.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 4.00 kW 5.50 kW 5.50 kW 4.00 kW 4.00 kW ISOL-EU-HT-9F-01 ISOL-MAU-HT-9F-01 ISOL-EF-HT-9F-01
4.00 kW 4.0 kW 0.75 kW SPECIALIST
DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY DUTY CONTRACTOR
DUTY DUTY DUTY
CABLE LEGEND KEY:
M M M M M M M M M M M M M M M M BY NOMINATED
SPECIALIST NO. OF SETS
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO CONTRACTOR EPO EPO 20A EPO 20A CONDUCTOR SIZE
20A BY ELECTRICAL
TPN TPN TPN No. OF CPC
CONTRACTOR
20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 20A 32A 32A 20A 20A CPC SIZE
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN BY ELECTRICAL
CONTRACTOR GENERAL NOTES:
X X
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
X METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING.
No. OF CORE 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
(SINGLE-CORE/MULTI-CORE)
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
CABLE TYPE
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x6
1x6
1x4
1x4
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
1x4
1x4
1x4
A = Cu/PVC/AWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x4
1x6
1x6
1x4
1x4
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
Dx4
Dx4
Dx4
1x4
1x4
1x4
SPACE D = Cu/XLPE/SWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
TO FACP TO FACP E = Cu/XLPE/LSF ONLY.
F = Cu/FRT/SWA/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
CONTROLS L = Cu/PVC/PVC LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
CONTROLS
SECTION M = Cu/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
SEE MECH SEE MECH SEE MECH SECTION
N = Cu/MICA/XLPE/SWA/LSF DRAWINGS.
PLANS PLANS PLANS EQUIPMENT NOMENCLATURE
MALL OR HOTEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4
PANEL/EQUIPMENT TYPE
200A TPN+E BUSBAR 200A TPN+E BUSBAR TX - TRANSFORMER
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 200:5A MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
415V/240V 415V/240V UPS - UNINTERRUPTIBLE POWER SUPPLY
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 ELMDB - EMERGENCY LIGHTING MAIN DB
TYPE 2 TYPE 2 CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
200A 63A
SYNC - SYNCHRONIZING POWER SUPPLY
TPN TPN HVSG - HIGH VOLTAGE SWITCHGEAR
MCC-HT-9F-1
SMDB-HT-10F-MECH (E)SMDB - MZ1 - 01 - X - BL - (L) X
LOCATION: AHU ROOM LOCATION: EE ROOM, 9TH LEVEL
BASEMENT LEVEL V SS TCL(DUTY)= 8.75 kW SS
V
TCL(DUTY)= 65.00 kW PANEL/EQUIPMENT NO.
MDL : 8.75 kW
MDL : 65.00 kW L - LIGHTING
EMU 200:5A EMU 200:5A
DF : 1.00 DF : 1.00 P - POWER
LEVEL
BL - BASEMENT
1 1 GF - GROUND
FF - FIRST FLOOR
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123 RL - ROOF
P1 - PARKING LEVEL 1
FED FROM P2 - PARKING LEVEL 2
FED FROM
MDB-HOTEL-02 P3 - PARKING LEVEL 3
MDB-HOTEL-02
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
10TH FLOOR LEVEL 9TH FLOOR LEVEL
OWNERSHIP
L - LANDLORD
1 DETAIL 2 DETAIL T - TENANT
NTS NTS
- SMDB-HT-10F-MECH CORE
- MCC-HT-9F-1
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP3 - CAR PARK 3
NOTES
ISOL-CRAC-01 ISOL-CRAC-01 ISOL-CRAC-02 ISOL-CRAC-02 PANEL/EQUIPMENT TYPE 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
BY NOMINATED ISOL-CRAC-01 (HUMIDIFIER) (ELECTRIC HETING) ISOL-ACCU-HT-B-01A ISOL-ACCU-HT-B-01B ISOL-CRAC-02 (HUMIDIFIER) (ELECTRIC HETING) ISOL-ACCU-HT-B-02 ISOL-ACCU-HT-03A ISOL-ACCU-HT-03B ISOL-ACCU-HT-03C ISOL-ACCU-HT-03D ISOL-ACCU-HT-03E ISOL-ACCU-HT-03F SMDB - SUBMAIN DISTRIBUTION BOARD
ISOL-CT-HT-GF-01 ISOL-CT-HT-GF-02 ISOL-PU-HT-01 MISCELLANEOUS DETAILS 0021
SPECIALIST 46.00 kW 11.30 kW 15.00 kW 4.80 kW 4.80 kW 17.50 kW 6.00 kW 12.00 kW 2.70 kW 5.36 kW 5.36 kW 5.36 kW 5.36 kW 5.36 kW 5.36 kW ESMDB - ESSENTIAL SUBMAIN
150.00 kW 150.00 kW 5.50 kW DUTY DUTY DUTY (STANDBY) (STANDBY) DUTY DUTY DUTY STANDBY DUTY DUTY DUTY DUTY DUTY DUTY 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
DUTY STANDBY DUTY CONTRACTOR DISTRIBUTION BOARD
MCC - MOTOR CONTROL CENTER TO 1213
M M M M M M M M M M M M M M M 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
BY NOMINATED
EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO EPO SPECIALIST UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
EPO EPO EPO ELCP - EMERGENCY LIGHTING PANEL
630A 630A 32A BY ELECTRICAL CONTRACTOR 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TPN TPN TPN CONTRACTOR TO 5213
DRAWING NOTES:
200A 63A 80A 32A 32A 80A 32A 63A 20A 32A 32A 32A 32A 32A 32A
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN 1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE
BY ELECTRICAL
WITH THE LATEST EDITION OF SEWA (SHARJAH ELECTRICITY AND
CONTRACTOR
WATER AUTHORITY), OTHER APPLICABLE LOCAL AND INTERNATIONAL
STANDARDS, THE PROJECT SPECIFICATIONS AND DOCUMENTATION. A 20/01/2019 SEWA SUBMISSION
Rev. Date Authority Description
2. THIS DRAWING INDICATES DESIGN INTENT ONLY, SHOP DRAWINGS
SHALL BE PROVIDED FOR FINAL INSTALLATION DETAILS.
1x16 1x16
1x25 1x16
1x25 1x16
1x16 1x16
2x150 1x150
2x150 1x150
1x6
1x6
1x6
1x4
1x6
1x6
1x6
1x6
1x6
1x6
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
1x6
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Fx4
Fx4
Fx4
Fx4
Fx4
Fx4
1x6
1x6
1x6
1x4
1x6
1x6
1x6
1x6
1x6
1x6
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
Dx4
Dx4
Dx4
1x6
SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
TO FACP TO FACP WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE Purpose of Issue :
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
Initial/Current Issue Signatures
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
CONTROLS CONTROLS Size A0 Designed By: FD
SEE SEE SEE SECTION SECTION
MECH MECH MECH LV SCHEMATIC NOTES: EC
PLANS PLANS PLANS
Datum - Checked By:
TO BMS 1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid - Approved By: MJ
TO BMS THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
Client : Tilal Mall L.L.C
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY
P.O. Box 5995
ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + ELS + MANUFACTURER.
Sharjah, UAE
ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM ALARM
Tel: +971 (6) 5560055
TO BMS TO BMS 3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
Fax: +971 (6) 5560033
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
630AT, TPN 630AT, TPN 32AT, TPN 200AT, TPN 63AT, TPN 80AT, TPN 32AT, TPN 32AT, TPN 80AT, TPN 32AT, TPN 63AT, TPN 20AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN 32AT, TPN SAME BRAND ALLTHROUGH OUT THE INSTALLATION. Lead Consultant :
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB Design & Consultancy
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC. for natural and
built assets
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
Dubai, UAE Fax: +971 (4) 3242531
1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 16 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. Sub-Consultant :
800A TPN+E BUSBAR 400A TPN+E BUSBAR 8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
35kA @ 1 SEC. A A A 800:5A 35kA @ 1 SEC. A A A 400:5A BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
415V/240V 415V/240V Architect / Engineer of record :
OF CABLES AND UP.
FORM 4a L1 L2 L3 FORM 4a L1 L2 L3 Design & Consultancy
for natural and
TYPE 2 TYPE 2 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85 built assets
630A 400A P.O. Box. 1779
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Copyright © Arcadis 2018 Sharjah, UAE
TPN TPN RELAYS.
ESMDB-HT-BL-MECH
Project Name:
MCC-HT-BL-Z3-4 LOCATION: BASEMENT LEVEL 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
LOCATION: ZONE 3
BASEMENT LEVEL V SS TCL(DUTY)= 152.26 kW V SS
IN MECHANICAL DESIGN. Tilal Mall and Hotel
TCL= 305.50 kW
MDL= 155.50 kW
EMU 800:5A
MDL : 139.96 kW
EMU 400:5A
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
DF= 0.51 DF : 0.92 SPECIALISTS INFORMATION OR DETAIL.
Plot Number/Area 7040 / JWAIZEI
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
1 1 HOTEL
TM-ARC-HT-DR-E0-ZZ-8123 TM-ARC-HT-DR-E0-ZZ-8123
ELECTRICAL
FED FROM FED FROM
SCHEMATIC DIAGRAM
MDB-HOTEL-02 MDB-HOTEL-02 SHEET 10
BASEMENT LEVEL BASEMENT LEVEL
Filename:
TM-ARC-HT-DR-E0-ZZ-8130 T1
Date Plotted: 5/6/2019 2:30:56 PM
KEYPLAN
GENERAL NOTES:
EDB-HT-RL-GSM
(GSM ROOM) EQUIPMENT NOMENCLATURE
ROOF LEVEL TCL: 25.00 kW
(E)MDB - MALL - XX - X
PANEL/EQUIPMENT NO.
10TH FLOOR LEVEL
EDB-HT-9F-P ZONE NO.
(ICT RACKS) MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
TCL: 3.23 kW
9TH FLOOR LEVEL MZ3 - MALL ZONE 3
CH - CHILLER
EDB-HT-8F-P
CP1 - CAR PARK 1
(ICT RACKS)
CP2 - CAR PARK 2
TCL: 3.43 kW CP3 - CAR PARK 3
8 FLOOR LEVEL
EDB-HT-7F-P MALL OR HOTEL
(ICT RACKS)
7TH FLOOR LEVEL TCL: 3.55 kW
PANEL/EQUIPMENT TYPE
EDB-HT-6F-P TX - TRANSFORMER
(ICT RACKS) MDB - MAIN DISTRIBUTION BOARD
6TH FLOOR LEVEL TCL: 3.23 kW PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
EDB-HT-5F-P ELMDB - EMERGENCY LIGHTING MAIN DB
(ICT RACKS) CBU - CENTRAL BATTERY UNIT
TCL: 3.43 kW ACB - AIR CIRCUIT BREAKER PANEL
5TH FLOOR LEVEL
SYNC - SYNCHRONIZING POWER SUPPLY
EDB-HT-4F-P HVSG - HIGH VOLTAGE SWITCHGEAR
(ICT RACKS)
4TH FLOOR LEVEL TCL: 3.43 kW (E)SMDB - MZ1 - 01 - X - BL - (L) X
EDB-HT-3F-P
(ICT RACKS) PANEL/EQUIPMENT NO.
TCL: 3.23 kW L - LIGHTING
3RD FLOOR LEVEL
P - POWER
EDB-HT-2F-P
(ICT RACKS) LEVEL
2ND FLOOR LEVEL TCL: 4.49 kW BL - BASEMENT
GF - GROUND
FF - FIRST FLOOR
EDB-HT-1F-P
RL - ROOF
(ICT RACKS)
1ST FLOOR LEVEL P1 - PARKING LEVEL 1
TCL: 4.43 kW
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
EDB-HT-GF-P P4 - PARKING LEVEL 4
(ICT RACKS)
P5 - PARKING LEVEL 5
GROUND FLOOR LEVEL TCL: 5.46 kW
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
1 DETAIL 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE Architect / Engineer of record :
NTS DONE ON ACTUAL INSTALLATION. Design & Consultancy
- ESMDB-HT-BL-ICT for natural and
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT built assets
P.O. Box. 1779
BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS Copyright © Arcadis 2018 Sharjah, UAE
OF CABLES AND UP.
Project Name:
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
Tilal Mall and Hotel
10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
RELAYS. Sharjah,UAE
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Plot Number/Area 7040 / JWAIZEI
IN MECHANICAL DESIGN.
Drawing Title
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL HOTEL
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 11
Filename:
TM-ARC-HT-DR-E0-ZZ-8131 T1
Date Plotted: 5/6/2019 2:31:02 PM
KEYPLAN
X X GENERAL NOTES:
5TH FLOOR LEVEL 9TH FLOOR LEVEL 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
X
METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
EDB-HT-4F-E EDB-HT-8F-E VERIFIED ON SITE AND APPROVED BY THE
ARCHITECT/ENGINEER.
TCL: 4.55 kW TCL: 4.93 kW No. OF CORE 2. DO NOT SCALE FROM THIS DRAWING.
MDL: 3.64 kW MDL: 3.94 kW (SINGLE-CORE/MULTI-CORE) 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
CABLE TYPE OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
A = Cu/PVC/AWA/PVC LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
B = Cu/PVC/SWA/PVC SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
4TH FLOOR LEVEL 8TH FLOOR LEVEL C = Cu/XLPE/AWA/LSF THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
D = Cu/XLPE/SWA/LSF BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
E = Cu/XLPE/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
EDB-HT-3F-E EDB-HT-7F-E EDB-HT-7F-BMU F = Cu/FRT/SWA/LSF ONLY.
TCL: 10.19 kW TCL: 4.55 kW TCL: 15.00 kW G = Cu/FRT/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
H = Cu/MICS/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
MDL: 8.15 kW MDL: 3.64 kW MDL: 3.00 kW J = Cu/MICS MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
K = Cu/PVC/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
L = Cu/PVC/PVC WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
M = Cu/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
3RD FLOOR LEVEL 7TH FLOOR LEVEL N = Cu/MICA/XLPE/SWA/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
EQUIPMENT NOMENCLATURE DRAWINGS.
EDB-HT-2F-E EDB-HT-6F-E (E)MDB - MALL - XX - X
TCL: 4.92 kW TCL: 4.60 kW
MDL: 3.93 kW MDL: 3.68 kW PANEL/EQUIPMENT NO.
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x50 1x25
CP3 - CAR PARK 3
MALL OR HOTEL
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
SPACE SPACE SPACE PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
HVSG - HIGH VOLTAGE SWITCHGEAR
63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 63AT 125AT
TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN TPN (E)SMDB - MZ1 - 01 - X - BL - (L) X
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
1 2 3 4 5 6 1 2 3 4 5 6 7 8
LEVEL
BL - BASEMENT
200A TPN+E BUSBAR 200A TPN+E BUSBAR GF - GROUND
35kA @ 1 SEC. A A A 200:5A 35kA @ 1 SEC. A A A 200:5A FF - FIRST FLOOR
RL - ROOF
415V/240V 415V/240V P1 - PARKING LEVEL 1
L1 L2 L3
FORM 2b TYPE 2 L1 L2 L3 FORM 2b TYPE 2 P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
100A 200A P4 - PARKING LEVEL 4
ESMDB-HT-2F-E ESMDB-HT-6F-E P5 - PARKING LEVEL 5
TPN TPN
LOCATION: 2ND FLOOR EE ROOM LOCATION: 6TH FLOOR EE ROOM
OWNERSHIP
TCL : 24.25 kW TCL : 87.99 kW L - LANDLORD
MDL : 19.40 kW MDL : 31.39 kW V SS T - TENANT
V SS
DF : 0.80 DF : 0.36
CORE
EMU 200:5A EMU 200:5A
ZONE NO.
MZ1 - MALL ZONE 1
1 1 MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
TM-ARC-HT-DR-E0-ZZ-8124 TM-ARC-HT-DR-E0-ZZ-8124 CH - CHILLER
CP1 - CAR PARK 1 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP2 - CAR PARK 2 SYMBOLS AND ABBREVIATIONS
FED FROM FED FROM
CP3 - CAR PARK 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MDB-HOTEL-03 MDB-HOTEL-03
2ND FLOOR LEVEL 6TH FLOOR LEVEL PANEL/EQUIPMENT TYPE
NOTES
SMDB - SUBMAIN DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
ESMDB - ESSENTIAL SUBMAIN MISCELLANEOUS DETAILS 0021
1x70 1x35
1x70 1x35
1x95 1x50
1x25 1x16
1x16 1x16
1x16 1x16
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
1x6
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
SPACE SPACE SPACE Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
SPACE SPACE SPACE TO FACP TO FACP TO FACP SPACE TO FACP ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR Purpose of Issue :
Fx4
1x6
Filename:
TM-ARC-HT-DR-E0-ZZ-8132 T1
Date Plotted: 5/6/2019 2:31:09 PM
KEYPLAN
1x16 1x16
1x35 1x16
1x35 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
CABLE TYPE
A = Cu/PVC/AWA/PVC 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
B = Cu/PVC/SWA/PVC FOR ALL MEP SERVICES BASED ON FINAL SELECTED
C = Cu/XLPE/AWA/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
Dx2
Dx4
Dx4
Dx4
Dx2
Dx2
Dx4
Dx2
Dx2
Dx4
Dx4
SPACE SPACE SPACE SPACE D = Cu/XLPE/SWA/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
E = Cu/XLPE/LSF WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
F = Cu/FRT/SWA/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
G = Cu/FRT/LSF CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
H = Cu/MICS/LSF DRAWINGS.
J = Cu/MICS
K = Cu/PVC/LSF
L = Cu/PVC/PVC
M = Cu/LSF
63AT 40AT 40AT 63AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT N = Cu/MICA/XLPE/SWA/LSF
TPN SPN TPN EQUIPMENT NOMENCLATURE
TPN SPN SPN SPN SPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB (E)MDB - MALL - XX - X
PANEL/EQUIPMENT NO.
RYB1 R2 Y2 B2 RYB3 R4 Y4 B4 RYB5 RYB6 RYB7 RYB8 R9 Y9 B9
ZONE NO.
400A TPN+E BUSBAR MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
35kA @ 1 SEC. A A A 400:5A MZ3 - MALL ZONE 3
415V/240V CH - CHILLER
CP1 - CAR PARK 1
FORM 2b TYPE 2 L1 L2 L3
CP2 - CAR PARK 2
CP3 - CAR PARK 3
300A
MALL OR HOTEL
SMDB-HT-4F-W TPN
SERVING GUEST ROOMS - WEST WING
PANEL/EQUIPMENT TYPE
LOCATION: EE ROOM, 4TH FLOOR TX - TRANSFORMER
TCL : 124.91 kW V SS MDB - MAIN DISTRIBUTION BOARD
MDL : 84.72 kW PFC - POWER FACTOR CORRECTOR
EMU UPS - UNINTERRUPTIBLE POWER SUPPLY
DF : 0.68 400:5A ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
1 HVSG - HIGH VOLTAGE SWITCHGEAR
TM-ARC-HT-DR-E0-ZZ-8125
(E)SMDB - MZ1 - 01 - X - BL - (L) X
FED FROM
MDB-HOTEL-04 PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
4TH FLOOR LEVEL
LEVEL
BL - BASEMENT
GF - GROUND
1 DETAIL FF - FIRST FLOOR
NTS RL - ROOF
- SMDB-HT-4F-W P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
OWNERSHIP
L - LANDLORD
T - TENANT
REFERENCE DRAWINGS:
CORE 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
ZONE NO.
MZ1 - MALL ZONE 1 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
MZ2 - MALL ZONE 2 NOTES
MZ3 - MALL ZONE 3 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
CH - CHILLER MISCELLANEOUS DETAILS 0021
CP1 - CAR PARK 1
CP2 - CAR PARK 2 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
CP3 - CAR PARK 3 TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
PANEL/EQUIPMENT TYPE TO 2213
SMDB - SUBMAIN DISTRIBUTION BOARD
ESMDB - ESSENTIAL SUBMAIN 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DISTRIBUTION BOARD TO 5213
MCC - MOTOR CONTROL CENTER
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
Dx2
Filename:
TM-ARC-HT-DR-E0-ZZ-8133 T1
Date Plotted: 5/6/2019 2:31:15 PM
KEYPLAN
X X
X GENERAL NOTES:
1x16 1x16
1x16 1x16
1x35 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x35 1x16
1x35 1x16
1x35 1x16
1x16 1x16
1x16 1x16
- - - CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
(E)MDB MALL XX X
DRAWINGS.
Dx2
Dx2
Dx4
Dx4
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
Dx4
Dx4
Dx4
SPACE SPACE SPACE PANEL/EQUIPMENT NO.
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2
CP3 - CAR PARK 3
40AT 40AT 63AT 63AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT 63AT
SPN SPN TPN TPN SPN SPN SPN SPN SPN SPN TPN TPN TPN TPN TPN MALL OR HOTEL
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
PANEL/EQUIPMENT TYPE
TX - TRANSFORMER
MDB - MAIN DISTRIBUTION BOARD
R1 Y1 B1 RYB2 RYB3 R4 Y4 B4 R5 Y5 B5 RYB6 RYB7 RYB8 RYB9 RYB10 RYB11 RYB12
PFC - POWER FACTOR CORRECTOR
UPS - UNINTERRUPTIBLE POWER SUPPLY
400A TPN+E BUSBAR
ELMDB - EMERGENCY LIGHTING MAIN DB
35kA @ 1 SEC. A A A 400:5A CBU - CENTRAL BATTERY UNIT
415V/240V ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
FORM 2b TYPE 2 L1 L2 L3 HVSG - HIGH VOLTAGE SWITCHGEAR
400A
(E)SMDB - MZ1 - 01 - X - BL - (L) X
TPN
SMDB-HT-4F-E
SERVING GUEST ROOMS - EAST WING PANEL/EQUIPMENT NO.
L - LIGHTING
LOCATION: EE ROOM, 4TH FLOOR
P - POWER
TCL : 180.71 kW V SS
MDL : 122.73 kW LEVEL
EMU 400:5A BL - BASEMENT
DF : 0.68 GF - GROUND
FF - FIRST FLOOR
RL - ROOF
P1 - PARKING LEVEL 1
1 P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
TM-ARC-HT-DR-E0-ZZ-8124 P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
FED FROM
MDB-HOTEL-03 OWNERSHIP
L - LANDLORD
4TH FLOOR LEVEL T - TENANT
CORE
ZONE NO.
1 DETAIL MZ1 - MALL ZONE 1
NTS MZ2 - MALL ZONE 2
- SMDB-HT-4F-E MZ3 - MALL ZONE 3
CH - CHILLER
CP1 - CAR PARK 1
CP2 - CAR PARK 2 REFERENCE DRAWINGS:
CP3 - CAR PARK 3 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
PANEL/EQUIPMENT TYPE
SMDB - SUBMAIN DISTRIBUTION BOARD 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
ESMDB - ESSENTIAL SUBMAIN NOTES
DISTRIBUTION BOARD 3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MCC - MOTOR CONTROL CENTER MISCELLANEOUS DETAILS 0021
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR P01 20/12/18 FIRST ISSUE
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
SPACE SPACE SPACE TO COMMENCING WORK. Rev. Date Description
Purpose of Issue :
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. FOR TENDER
Initial/Current Issue Signatures
LV SCHEMATIC NOTES: Original
Size A0 Designed By: FD
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. Datum - Checked By: EC
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT
40AT Grid
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN
2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY - Approved By: MJ
SPN MANUFACTURER.
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB Client :
MCCB Tilal Mall L.L.C
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION.
P.O. Box 5995
Sharjah, UAE
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 Tel: +971 (6) 5560055
RYB9 RYB10 RYB11 SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
Fax: +971 (6) 5560033
400A TPN+E BUSBAR 5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
35kA @ 1 SEC. A A A 400:5A Lead Consultant :
6. FINAL LOAD BALANCING TO BE DONE BY OTHERS. Design & Consultancy
415V/240V for natural and
built assets
FORM 2b TYPE 2 L1 L2 L3 7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
DONE ON ACTUAL INSTALLATION. P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
400A Dubai, UAE Fax: +971 (4) 3242531
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
TPN BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT Sub-Consultant :
SMDB-HT-5F-E
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
SERVING GUEST ROOMS - EAST WING OF CABLES AND UP.
LOCATION: EE ROOM, 5TH FLOOR
9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
TCL : 180.89 kW V SS Architect / Engineer of record :
MDL : 112.25 kW 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE Design & Consultancy
for natural and
EMU 400:5A RELAYS. built assets
DF : 0.62 P.O. Box. 1779
11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Copyright © Arcadis 2018 Sharjah, UAE
IN MECHANICAL DESIGN.
1 Project Name:
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
TM-ARC-HT-DR-E0-ZZ-8124 CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
SPECIALISTS INFORMATION OR DETAIL.
Tilal Mall and Hotel
FED FROM 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE Sharjah,UAE
MDB-HOTEL-03 PER SEWA.
Plot Number/Area 7040 / JWAIZEI
5TH FLOOR LEVEL
Drawing Title
HOTEL
2 DETAIL ELECTRICAL
- SMDB-HT-5F-E
NTS SCHEMATIC DIAGRAM
SHEET 14
Filename:
TM-ARC-HT-DR-E0-ZZ-8134 T1
Date Plotted: 5/6/2019 2:31:22 PM
KEYPLAN
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
1x16 1x16
1x16 1x16
B = Cu/PVC/SWA/PVC BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
C = Cu/XLPE/AWA/LSF 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
D = Cu/XLPE/SWA/LSF ONLY.
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
SPACE SPACE SPACE E = Cu/XLPE/LSF 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
F = Cu/FRT/SWA/LSF FOR ALL MEP SERVICES BASED ON FINAL SELECTED
G = Cu/FRT/LSF MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
H = Cu/MICS/LSF APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
J = Cu/MICS WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
K = Cu/PVC/LSF LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
L = Cu/PVC/PVC CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
M = Cu/LSF DRAWINGS.
N = Cu/MICA/XLPE/SWA/LSF
40AT 40AT 40AT 40AT 40AT EQUIPMENT NOMENCLATURE
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN (E)MDB - MALL - XX - X
SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB
PANEL/EQUIPMENT NO.
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8 ZONE NO.
RYB9 RYB10 RYB11 MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
400A TPN+E BUSBAR MZ3 - MALL ZONE 3
35kA @ 1 SEC. A A A 400:5A CH - CHILLER
CP1 - CAR PARK 1
415V/240V
CP2 - CAR PARK 2
FORM 2b TYPE 2 L1 L2 L3 CP3 - CAR PARK 3
OWNERSHIP
L - LANDLORD
T - TENANT
CORE
ZONE NO.
MZ1 - MALL ZONE 1
REFERENCE DRAWINGS:
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CH - CHILLER SYMBOLS AND ABBREVIATIONS
CP1 - CAR PARK 1
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
CP2 - CAR PARK 2
NOTES
CP3 - CAR PARK 3
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
PANEL/EQUIPMENT TYPE MISCELLANEOUS DETAILS 0021
SMDB - SUBMAIN DISTRIBUTION BOARD
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
ESMDB - ESSENTIAL SUBMAIN
TO 1213
DISTRIBUTION BOARD
MCC - MOTOR CONTROL CENTER 5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
DB-TGR-723 DB-TGR-727 DB-TGR-726 DB-DGR-728 DB-DGR-738 DB-1SA-742 DB-TGR-744 UPS - UNINTERUPTIBLE POWER SUPPLY 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
DB-TGR-717 DB-TGR-719 DB-DGR-721 DB-TGR-725 DB-TGR-729 DB-TGR-731 DB-TGR-733 DB-TGR-735 DB-TGR-722 DB-TGR-724 DB-TGR-730 DB-TGR-732 DB-DGR-734 DB-TGR-736 DB-1SB-746 DB-HT-7F-EL DB-HT-7F-EP
ELCP - EMERGENCY LIGHTING PANEL TO 5213
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.34 kW TCL: 9.60 kW TCL: 2.07 kW TCL: 6.62 kW
DRAWING NOTES:
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER
RELEVANT DOCUMENTS AND DRAWINGS.
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT
SPACE SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT Rev. Date Description
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Purpose of Issue :
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
FOR TENDER
TO COMMENCING WORK. Initial/Current Issue Signatures
Original
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Size A0 Designed By: FD
Filename:
TM-ARC-HT-DR-E0-ZZ-8135 T1
Date Plotted: 5/6/2019 2:31:29 PM
KEYPLAN
DB-TGR-817 DB-TGR-819 DB-DGR-821 DB-TGR-823 DB-TGR-825 DB-TGR-827 DB-TGR-829 DB-TGR-831 DB-TGR-833 DB-TGR-835 DB-TGR-822 DB-TGR-824 DB-TGR-826 DB-DGR-828 DB-TGR-830 DB-TGR-832 DB-DGR-834 DB-TGR-836 DB-DGR-838 DB-1SA-842 DB-TGR-844 DB-1SB-846 DB-HT-8F-EL DB-HT-8F-EP DB-HT-8F-SN
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.34 kW TCL: 9.60 kW TCL: 4.46 kW TCL: 38.57 kW TCL: 30.00 kW
GENERAL NOTES:
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
1x16 1x16
1x25 1x16
1x25 1x16
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
Dx4
SPACE SPACE SPACE ONLY.
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
FOR ALL MEP SERVICES BASED ON FINAL SELECTED
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
DRAWINGS.
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 80AT 80AT
40AT
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN TPN
SPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8
RYB9 RYB10 RYB11 RYB12
630A
TPN
SMDB-HT-8F-E
SERVING GUEST ROOMS - EAST WING
LOCATION: EE ROOM, 8TH FLOOR
TCL : 240.60 kW V SS
MDL : 159.95 kW
EMU 800:5A
DF : 0.66
1
TM-ARC-HT-DR-E0-ZZ-8124
FED FROM
MDB-HOTEL-03
2 DETAIL
NTS
- SMDB-HT-8F-E
REFERENCE DRAWINGS:
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MISCELLANEOUS DETAILS 0021
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
DB-TGR-917 DB-DGR-919 DB-TGR-921 DB-TGR-923 DB-TGR-925 DB-TGR-927 DB-TGR-929 DB-TGR-931 DB-TGR-933 DB-TGR-935 DB-TGR-922 DB-TGR-924 DB-TGR-926 DB-DGR-928 DB-TGR-930 DB-1SA-934 DB-DGR-936 DB-DGR-938 DB-1SA-942 DB-TGR-944 DB-1SB-946 DB-HT-9F-EL DB-HT-9F-EP DB-HT-10F-EP DB-HT-10F-EL 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 10.42 kW TCL: 7.52 kW TCL: 7.52 kW TCL: 10.42 kW TCL: 7.34 kW TCL: 9.60 kW TCL: 2.24 kW TCL: 12.46 kW TCL: 28.60 kW TCL: 4.54 kW TO 5213
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x25 1x16
1x16 1x16
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
Dx4
Dx4
SPACE SPACE SPACE SPACE SPACE P01 20/12/18 FIRST ISSUE
Rev. Date Description
Purpose of Issue :
FOR TENDER
Initial/Current Issue Signatures
Original
Size A0 Designed By: FD
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT 80AT 63AT
40AT Datum - Checked By: EC
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN TPN TPN
SPN
Grid - Approved By: MJ
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MCCB
Client : Tilal Mall L.L.C
P.O. Box 5995
R1 Y1 B1 R2 Y2 B2 R3 Y3 B3 R4 Y4 B4 R5 Y5 B5 R6 Y6 B6 R7 Y7 B7 R8 Y8 B8
RYB9 RYB10 RYB11 RYB12 RYB13 RYB14 Sharjah, UAE
Tel: +971 (6) 5560055
800A TPN+E BUSBAR Fax: +971 (6) 5560033
35kA @ 1 SEC. A A A 800:5A
415V/240V Lead Consultant :
Design & Consultancy
FORM 2b TYPE 2 L1 L2 L3 for natural and
built assets
630A P.O. Box. 52750 Tel: +971 (4) 3193333
Copyright © Arcadis 2018
TPN Dubai, UAE Fax: +971 (4) 3242531
SMDB-HT-9F-E
SERVING GUEST ROOMS - EAST WING Sub-Consultant :
FED FROM
Tilal Mall and Hotel
MDB-HOTEL-03 Sharjah,UAE
9TH FLOOR LEVEL Plot Number/Area 7040 / JWAIZEI
Drawing Title
HOTEL
2 DETAIL
NTS ELECTRICAL
SMDB-HT-9F-E
SCHEMATIC DIAGRAM
-
SHEET 16
Filename:
TM-ARC-HT-DR-E0-ZZ-8136 T1
Date Plotted: 5/6/2019 2:31:35 PM
KEYPLAN
PANEL/EQUIPMENT NO.
PANEL/EQUIPMENT NO.
L - LIGHTING
TCL: 0.37 kW
P - POWER
TCL: 0.37 kW
(STANDBY)
HW-CP-05
HW-CP-06
LEVEL
EDB-HT-7F-S BL - BASEMENT
TCL: 3.12 kW GF - GROUND
M M MDL: 2.50kW FF - FIRST FLOOR
DF: 0.80 RL - ROOF
BY NOMINATED 7TH FLOOR LEVEL P1 - PARKING LEVEL 1
SPECIALIST P2 - PARKING LEVEL 2
EDB-HT-2F-KP1 EDB-HT-2F-KP2 EPO
CONTRACTOR EDB-HT-2F-K EDB-HT-6F-W
TCL: 6.35 kW TCL: 0.52 kW P3 - PARKING LEVEL 3
TCL: 43.91 kW TCL: 1.07 kW
MDL: 5.08 kW MDL: 0.42 kW P4 - PARKING LEVEL 4
MDL: 35.13 kW MDL: 0.85 kW
DF: 0.80 DF: 0.80 P5 - PARKING LEVEL 5
DF: 0.80 DF: 0.80
BY ELECTRICAL OWNERSHIP
32A CONTRACTOR L - LANDLORD
TPN T - TENANT
CORE
REFERENCE DRAWINGS:
ZONE NO.
MZ1 - MALL ZONE 1 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x50 1x25
1x16 1x16
1x70 1x35
1x16 1x16
SYMBOLS AND ABBREVIATIONS
1x6
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Fx4
1x6
Filename:
TM-ARC-HT-DR-E0-ZZ-8137 T1
Date Plotted: 5/6/2019 2:31:42 PM
KEYPLAN
5. ANY DISCREPANCIES BETWEEN ANY DRAWING OR RELEVANT 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN
MALL OR HOTEL
PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT VERIFIED ON SITE AND APPROVED BY THE
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE ARCHITECT/ENGINEER.
PANEL/EQUIPMENT TYPE
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR 2. DO NOT SCALE FROM THIS DRAWING.
TX - TRANSFORMER
TO COMMENCING WORK. 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
MDB - MAIN DISTRIBUTION BOARD
PFC - POWER FACTOR CORRECTOR OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MEP,
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
UPS - UNINTERRUPTIBLE POWER SUPPLY
ELMDB - EMERGENCY LIGHTING MAIN DB SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
CBU - CENTRAL BATTERY UNIT THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
1x95 1x50
1x70 1x35
1x70 1x35
1x35 1x16
1x10 1x10
1x150 1x95
1x35 1x16
LV SCHEMATIC NOTES: BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY 4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL ONLY.
HVSG - HIGH VOLTAGE SWITCHGEAR
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED.. 5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
SPACE SPACE SPACE FOR ALL MEP SERVICES BASED ON FINAL SELECTED
(E)SMDB - MZ1 - 01 - X - BL - (L) X 2. ALL PANEL APPURTENACES SHALL BE DETERMINED AND PRODUCED BY MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
MANUFACTURER. APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
PANEL/EQUIPMENT NO. WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
3. ALL TAP-OFF UNITS SHALL BE EQUIPPED WITH LSIG PROTECTION. LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
L - LIGHTING
P - POWER CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
4. ALL CIRCUIT BREAKERS TO BE USED SHALL BE BRAND NEW AND WITH THE DRAWINGS.
SAME BRAND ALLTHROUGH OUT THE INSTALLATION.
LEVEL
200AT 250AT 100AT 160AT 160AT 100AT 40AT BL - BASEMENT
5. ALL INSULATION OF FIRE RATED CABLES SHALL BE THERMOSET PLASTIC.
GF - GROUND
TPN TPN TPN TPN TPN TPN TPN FF - FIRST FLOOR
MCCB MCCB MCCB MCCB MCCB 6. FINAL LOAD BALANCING TO BE DONE BY OTHERS.
MCCB MCCB RL - ROOF
P1 - PARKING LEVEL 1
7. ARRANGEMENT OF BRANCHES DOES NOT MEAN SAME ARRANGEMENT TO BE
P2 - PARKING LEVEL 2
DONE ON ACTUAL INSTALLATION.
P3 - PARKING LEVEL 3
1 2 3 4 1 2 3 4 5 6 P4 - PARKING LEVEL 4
8. ALL SMDB, MCC AND DB MAIN INCOMER SHALL BE NON AUTO CIRCUIT
P5 - PARKING LEVEL 5
800A TPN+E BUSBAR 400A TPN+E BUSBAR BREAKER FOR SINGLE SET INCOMING CABLE WHILE A CIRCUIT
BREAKER WITH PROTECTION TO USED FOR PANELS WITH TWO SETS
35kA @ 1 SEC. A A A 800:5A 35kA @ 1 SEC. A A A 400:5A OWNERSHIP OF CABLES AND UP.
415V/240V 415V/240V L - LANDLORD
T - TENANT 9. UNCORRECTED POWER FACTOR WAS ASSUMED TO BE AT 0.85
FORM 2b TYPE 2 L1 L2 L3 FORM 2b TYPE 2 L1 L2 L3
CORE 10. MDB's, EMDB's, GMDB's, SYNC PANEL SHALL BE PROVIDED WITH PHASE FAILURE
630A 400A ZONE NO. RELAYS.
SMDB-HT-2F-K1 TPN SMDB-HT-2F-K2 TPN MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED
SERVING KITCHEN SERVING KITCHEN & WEST COMMON AREAS IN MECHANICAL DESIGN.
MZ3 - MALL ZONE 3
LOCATION: EE ROOM, 2ND FLOOR LOCATION: EE ROOM, 2ND FLOOR CH - CHILLER
CP1 - CAR PARK 1 12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
TCL : 202.98 kW V SS TCL : 162.68 kW V SS CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER
CP2 - CAR PARK 2
MDL : 162.38 kW MDL : 130.15 kW CP3 - CAR PARK 3 SPECIALISTS INFORMATION OR DETAIL.
DF : 0.80 EMU 800:5A EMU 400:5A
DF : 0.80 PANEL/EQUIPMENT TYPE 13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
SMDB - SUBMAIN DISTRIBUTION BOARD PER SEWA.
ESMDB - ESSENTIAL SUBMAIN
DISTRIBUTION BOARD
1 1
MCC - MOTOR CONTROL CENTER
TM-ARC-HT-DR-E0-ZZ-8125 TM-ARC-HT-DR-E0-ZZ-8125
UPS - UNINTERUPTIBLE POWER SUPPLY
ELCP - EMERGENCY LIGHTING PANEL
FED FROM FED FROM
MDB-HOTEL-04 MDB-HOTEL-04
1 DETAIL 2 DETAIL
NTS NTS
- SMDB-HT-2F-K1 - SMDB-HT-2F-K2
REFERENCE DRAWINGS:
1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
SYMBOLS AND ABBREVIATIONS
2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
MISCELLANEOUS DETAILS 0021
4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
TO 2213
DB-HT-1F-L DB-HT-1F-P1 DB-HT-1F-P2 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TCL: 8.85 kW TCL: 24.67 kW TCL: 21.60 kW TO 5213
DB-2AP-301 DB-DGR-309 DB-1AA-315 DB-TGR-302 DB-DGR-304 DB-TGR-320 DB-1AA-310 DB-2AP-318 DB-HT-3F-WL DB-HT-3F-WP
TCL: 24.43 kW TCL: 7.52 kW TCL: 19.92 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 19.92 kW TCL: 24.43 kW TCL: 1.03 kW TCL: 2.48 kW
1ST FLOOR LEVEL
A 20/01/2019 SEWA SUBMISSION
DB-HT-GF-L DB-HT-GF-P1 DB-HT-GF-P2 DB-HT-GF-KP Rev. Date Authority Description
TCL: 12.34 kW TCL: 24.20 kW TCL: 11.40 kW TCL: 37.88 kW
1x16 1x16
1x35 1x16
1x16 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x35 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
P01 20/12/18 FIRST ISSUE
Rev. Date Description
Purpose of Issue :
Dx2
Dx4
Dx2
Dx4
Dx2
Dx2
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
Dx4
SPACE SPACE SPACE SPACE SPACE SPACE SPACE FOR TENDER
Initial/Current Issue Signatures
Original
Size A0 Designed By: FD
Project Name:
1 1 Tilal Mall and Hotel
TM-ARC-HT-DR-E0-ZZ-8125 TM-ARC-HT-DR-E0-ZZ-8125 Sharjah,UAE
FED FROM Plot Number/Area 7040 / JWAIZEI
FED FROM
MDB-HOTEL-04 MDB-HOTEL-04
Drawing Title
3RD FLOOR LEVEL
HOTEL
GROUND FLOOR LEVEL
ELECTRICAL
3 DETAIL 4 DETAIL SCHEMATIC DIAGRAM
- SMDB-HT-3F-W
NTS
- SMDB-HT-GF-1
NTS SHEET 18
Filename:
TM-ARC-HT-DR-E0-ZZ-8138 T1
Date Plotted: 5/6/2019 2:31:48 PM
KEYPLAN
X X GENERAL NOTES:
1x16 1x16
1x35 1x16
1x35 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x35 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
CABLE TYPE
LANDSCAPE AND CIVIL DRAWINGS AND ALL RELEVANT
A = Cu/PVC/AWA/PVC
SECTIONS OF THE SPECIFICATIONS. ANY DISCREPANCY IN
B = Cu/PVC/SWA/PVC
THE DRAWINGS AND DESIGN DOCUMENTS SHALL BE
C = Cu/XLPE/AWA/LSF
Dx4
Dx2
Dx2
Dx4
Dx2
Dx2
Dx2
Dx4
Dx4
Dx4
Dx4
SPACE SPACE SPACE SPACE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER.
D = Cu/XLPE/SWA/LSF
4. THIS DRAWING IS FOR THE PURPOSE OF DESIGN INTENT
E = Cu/XLPE/LSF
ONLY.
F = Cu/FRT/SWA/LSF
5. THE MEP CONTRACTOR SHALL PROVIDE SHOP DRAWINGS
G = Cu/FRT/LSF
FOR ALL MEP SERVICES BASED ON FINAL SELECTED
H = Cu/MICS/LSF
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL BE
J = Cu/MICS
APPROVED BY SITE ENGINEER. ALL SERVICES SHALL COMPLY
K = Cu/PVC/LSF
WITH RELEVANT REGULATIONS, CODES OF PRACTICE AND
L = Cu/PVC/PVC
LOCAL AUTHORITY REQUIREMENTS. ALL MEP RELATED
M = Cu/LSF
63AT 40AT 40AT 63AT 40AT 40AT 40AT 63AT 63AT 63AT 63AT CONSTRUCTION SHALL FOLLOW THE APPROVED SHOP
N = Cu/MICA/XLPE/SWA/LSF
EQUIPMENT NOMENCLATURE DRAWINGS.
TPN SPN SPN TPN SPN SPN SPN TPN TPN TPN TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB (E)MDB - MALL - XX - X
PANEL/EQUIPMENT NO.
RYB1 R2 Y2 B2 RYB3 R4 Y4 B4 RYB5 RYB6 RYB7 RYB8 R9 Y9 B9
ZONE NO.
400A TPN+E BUSBAR MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
35kA @ 1 SEC. A A A 400:5A MZ3 - MALL ZONE 3
415V/240V CH - CHILLER
CP1 - CAR PARK 1
FORM 2b TYPE 2 L1 L2 L3
CP2 - CAR PARK 2
CP3 - CAR PARK 3
300A
MALL OR HOTEL
SMDB-HT-4F-W TPN
SERVING GUEST ROOMS - WEST WING
PANEL/EQUIPMENT TYPE
LOCATION: EE ROOM, 4TH FLOOR TX - TRANSFORMER
TCL : 124.91 kW V SS MDB - MAIN DISTRIBUTION BOARD
MDL : 84.72 kW PFC - POWER FACTOR CORRECTOR
EMU UPS - UNINTERRUPTIBLE POWER SUPPLY
DF : 0.68 400:5A ELMDB - EMERGENCY LIGHTING MAIN DB
CBU - CENTRAL BATTERY UNIT
ACB - AIR CIRCUIT BREAKER PANEL
SYNC - SYNCHRONIZING POWER SUPPLY
1 HVSG - HIGH VOLTAGE SWITCHGEAR
TM-ARC-HT-DR-E0-ZZ-8125
(E)SMDB - MZ1 - 01 - X - BL - (L) X
FED FROM
MDB-HOTEL-04 PANEL/EQUIPMENT NO.
L - LIGHTING
P - POWER
4TH FLOOR LEVEL
LEVEL
BL - BASEMENT
GF - GROUND
1 DETAIL FF - FIRST FLOOR
NTS RL - ROOF
- SMDB-HT-4F-W P1 - PARKING LEVEL 1
P2 - PARKING LEVEL 2
P3 - PARKING LEVEL 3
P4 - PARKING LEVEL 4
P5 - PARKING LEVEL 5
OWNERSHIP
L - LANDLORD
T - TENANT
CORE
ZONE NO.
MZ1 - MALL ZONE 1
MZ2 - MALL ZONE 2
MZ3 - MALL ZONE 3 REFERENCE DRAWINGS:
CH - CHILLER 1. ELECTRICAL SERVICES LEGEND, TM-ARC-ZZ-DR-E0-ZZ-0001
CP1 - CAR PARK 1 SYMBOLS AND ABBREVIATIONS
CP2 - CAR PARK 2
CP3 - CAR PARK 3 2. ELECTRICAL SERVICES GENERAL TM-ARC-ZZ-DR-E0-ZZ-0012
NOTES
PANEL/EQUIPMENT TYPE
3. ELECTRICAL SERVICES TM-ARC-ZZ-DR-E0-ZZ-0013 -
SMDB - SUBMAIN DISTRIBUTION BOARD
MISCELLANEOUS DETAILS 0021
ESMDB - ESSENTIAL SUBMAIN
DISTRIBUTION BOARD 4. LIGHTING LAYOUTS TM-ARC-HT-DR-E1-'XX'-1201
MCC - MOTOR CONTROL CENTER TO 1213
5. SMALL POWER LAYOUTS TM-ARC-HT-DR-E2-'XX'-2201
UPS - UNINTERUPTIBLE POWER SUPPLY TO 2213
DB-TGR-501 DB-TGR-503 DB-TGR-505 DB-TGR-507 DB-TGR-509 DB-TGR-511 DB-TGR-513 DB-DGR-515 DB-TGR-502 DB-TGR-504 DB-DGR-506 DB-TGR-508 DB-TGR-510 DB-TGR-512 DB-TGR-514 DB-TGR-516 DB-DGR-518 DB-TGR-520 DB-HT-5F-WL DB-HT-5F-WP ELCP - EMERGENCY LIGHTING PANEL
TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.34 kW TCL: 7.52 kW TCL: 1.10 kW TCL: 2.48 kW 6. CONTAINMENT LAYOUTS TM-ARC-HT-DR-E5-'XX'-5201
TCL: 7.34 kW
TO 5213
DRAWING NOTES:
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
1x16 1x16
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx2
Dx4
Dx4
Dx2
SPACE SPACE SPACE PROJECT DOCUMENT, THE MORE STRINGENT REQUIREMENT P01 20/12/18 FIRST ISSUE
WILL GOVERN. IN CASE THAT THE MORE STRINGENT REQUIREMENT Rev. Date Description
CANNOT BE DETERMINED, THE ITEM SHALL BE BOUGHT TO THE
Purpose of Issue :
ATTENTION OF THE DESIGNER FOR CLARIFICATION PRIOR
TO COMMENCING WORK.
FOR TENDER
Initial/Current Issue Signatures
6. CABLE LENGTHS SHALL NOT BE USED FOR BOQ PURPOSES. Original
Size A0 Designed By: FD
40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 63AT 63AT LV SCHEMATIC NOTES: Datum - Checked By: EC
SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN SPN TPN TPN
1. FULL DISCRIMINATION OF PROTECTIVE DEVICES SHALL BE IMPLEMENTED ALL Grid
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
THROUGH OUT THE ELECTRICAL SYSTEM, CASCADING ARE NOT ALLOWED..
- Approved By: MJ
TM-ARC-HT-DR-E0-ZZ-8125 11. CABLE TYPE AND NUMBER OF RUNS WILL DEPEND ON STARTER TYPE SPECIFIED Project Name:
FED FROM
IN MECHANICAL DESIGN.
Tilal Mall and Hotel
12. MOTOR CONTROLLER'S BMS CONNECTION ARE INDICATIVE ONLY, FINAL
MDB-HOTEL-04
CONNECTIONS ARE TO BE WITH MECHANICAL, PUBLIC HEALTH AND OTHER Sharjah,UAE
SPECIALISTS INFORMATION OR DETAIL.
5TH FLOOR LEVEL Plot Number/Area 7040 / JWAIZEI
13. ALL CIRCUIT BREAKER BEFORE THE KWH METER SHALL BE LOCKABLE TYPE
PER SEWA. Drawing Title
HOTEL
2 DETAIL
- SMDB-HT-5F-W
NTS ELECTRICAL
SCHEMATIC DIAGRAM
SHEET 19
Filename:
TM-ARC-HT-DR-E0-ZZ-8139 T1
Date Plotted: 5/6/2019 2:31:55 PM