This document outlines the schedule and progress of a construction project to build facilities for receiving temporary LPG in Tanjung Emas Semarang. It includes: 1. The work is divided into two main phases - preparatory work and civil works. Preparatory work such as mobilization, site preparation, and permitting is 13.94% complete. 2. Civil works including building an operations office and foundations is scheduled to begin in March 2021 and be 14.8% complete by the end of the period outlined in the schedule. 3. A Gantt chart shows the planned and actual progress of each task over time, with some tasks ahead of schedule and others slightly behind but still planned for

Uploaded by

Fahmy Flip
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views3 pages

S Curve

This document outlines the schedule and progress of a construction project to build facilities for receiving temporary LPG in Tanjung Emas Semarang. It includes: 1. The work is divided into two main phases - preparatory work and civil works. Preparatory work such as mobilization, site preparation, and permitting is 13.94% complete. 2. Civil works including building an operations office and foundations is scheduled to begin in March 2021 and be 14.8% complete by the end of the period outlined in the schedule. 3. A Gantt chart shows the planned and actual progress of each task over time, with some tasks ahead of schedule and others slightly behind but still planned for

Uploaded by

Fahmy Flip
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

S-CURVE

KLIEN / OWNER : PT PELINDO ENERGI LOGISTIK


KONTRAKTOR : PT PAMITRA JAYA KONSTRUKSI
KONSULTAN : PT PURI GANESHA ENGINEERING
PEKERJAAN DESIGN & BUILD FASILITAS
PROYEK :
PENERIMAAN TEMPORARY LPG DI TANJUNG EMAS SEMARANG
NO. DOKUMEN : PC-03-LPG-SMRG-CON
REVISI : 1 92,93% 12,12%
BULAN Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
NO URAIAN PEKERJAAN QTY UNIT PERSENTASE TANGGAL MULAI TANGGAL SELESAI AKTUAL PROGRESS MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
REMARK aktual persentase
29-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun
TANGGAL
31-Jan 07-Feb 14-Feb 21-Feb 28-Feb 07-Mar 14-Mar 21-Mar 28-Mar 04-Apr 11-Apr 18-Apr 25-Apr 02-May 09-May 16-May 23-May 30-May 06-Jun 13-Jun
1 PEKERJAAN PERSIAPAN 13,94% 13,96% 13,96%
Plan 0,69% 0,69%
1,1 Mobilisasi demobilisasi peralatan dan tenaga kerja 1 LS 1,39% 1,39% 15-Feb-21 22-Feb-21 1,39% Actual 0,15% 0,00% 0,54% 0,69%
Plan 0,66% 0,66%
1,2 Persiapan lokasi kerja 1 LS 1,32% 1,32% 15-Feb-21 22-Feb-21 1,32% Actual 0,40% 0,26% 0,00% 0,66%
Plan 0,50% 0,50% 0,50% 0,50%
1,3 Administrasi dan dokumentasi 1 LS 1,99% 1,99% 29-Jan-21 15-Feb-21 1,99% Actual 0,50% 0,50% 0,50% 0,26% 0,23%
Plan 0,25% 0,25% 0,25% 0,25% 0,25% 0,25% 0,25% 0,25% 0,25% 0,25% 0,25% 0,25%
1,4 Air listrik keamanan pass pelabuhan dan operasional proyek 1 LS 3,01% 3,01% 29-Jan-21 12-Apr-21 3,01% Actual 0,25% 0,25% 0,25% 0,25% 0,25% 0,26% 0,25% 0,25% 0,25% 0,25% 0,25% 0,23% 0,02%
Plan 1,25% 1,25% 1,25% 1,25% 1,25%
1,5 Engineering 1 LS 6,25% 6,25% 25-Jan-21 22-Feb-21 6,25% Actual 1,25% 1,25% 1,25% 0,44% 0,69% 1,37%

2 PEKERJAAN SIPIL 14,70% 14,80% 14,80%


2,1 Kantor operasional (portacamp 40 feet c/w AC Toilet) 1,00 LS
Plan 0,71% 0,71%
Pengadaan Kontainer 1,00 Unit 1,41% 1,41% 15-Mar-21 22-Mar-21 1,41% Actual 0,36% 0,36% 0,36% 0,34%
Plan 0,25% 0,25%
Pondasi 6,00 Unit 0,50% 0,50% 15-Mar-21 22-Mar-21 0,50% Actual 0,13% 0,13% 0,13% 0,12%
Plan 0,05% 0,05%
Erection and Installation 1,00 Unit 0,10% 0,10% 15-Mar-21 22-Mar-21 0,10% Actual 0,05% 0,05%

2,2 Ruang tunggu supir ( portacamp 20 feet c/w AC toilet) 1,00 LS


Plan 0,15% 0,15% 0,15% 0,15% 0,15%
Pengadaan Kontainer 1,00 Unit 0,76% 0,84% 22-Feb-21 22-Mar-21 0,84% Actual 0,16% 0,15% 0,15% 0,08% 0,15% 0,15%
Plan 0,05% 0,05% 0,05% 0,05% 0,05%
Pondasi 4,00 Unit 0,27% 0,27% 22-Feb-21 22-Mar-21 0,27% Actual 0,05% 0,05% 0,05% 0,03% 0,05% 0,05%
Plan 0,01% 0,01% 0,01% 0,01% 0,01%
Erection and Installation 1,00 Unit 0,05% 0,05% 22-Feb-21 22-Mar-21 0,05% Actual 0,01% 0,01% 0,01% 0,01% 0,01%

2,3 LPG Truck Filling Station 1,00 LS


Plan 1,68%
Pondasi 33,62 m3 1,68% 1,68% 22-Feb-21 28-Feb-21 1,68% Actual 0,33% 0,33% 0,33% 0,33% 0,36%
Plan 4,43%
Fabrikasi baja 7030,63 kg 4,43% 4,43% 22-Feb-21 28-Feb-21 4,43% Actual 3,32% 1,11%
Plan 0,55%
Erection Baja 7030,63 kg 0,55% 0,55% 22-Feb-21 28-Feb-21 0,55% Actual 0,50% 0,05%

2,4 Mercaptan shelter 1,00 LS


Plan 0,11% 0,11% 0,11% 0,11% 0,11%
Pengadaan Kontainer 933,64 kg 0,54% 0,54% 22-Feb-21 22-Mar-21 0,54% Actual 0,11% 0,06% 0,06% 0,06% 0,06% 0,06% 0,16%
Plan 0,03% 0,03% 0,03% 0,03% 0,03%
Pondasi 6,46 m3 0,16% 0,16% 22-Feb-21 22-Mar-21 0,16% Actual 0,03% 0,05% 0,05% 0,03%
Plan 0,02% 0,02% 0,02% 0,02% 0,02%
Erection and Installation 933,64 kg 0,08% 0,08% 22-Feb-21 22-Mar-21 0,08% Actual 0,02% 0,02% 0,02% 0,02%

2,5 Pipe structure dan aksesoris 1,00 LS


Plan 0,37% 0,37% 0,37%
Pondasi 1,00 ls 1,11% 1,13% 19-Apr-21 03-May-21 1,13% Actual 0,19% 0,19% 0,19% 0,37% 0,19%
Plan 0,60% 0,60% 0,60%
Fabrikasi 6714,95 kg 1,79% 1,80% 19-Apr-21 03-May-21 1,80% Actual 0,30% 0,30% 0,30% 0,60% 0,30%
Plan 0,29% 0,29% 0,29%
Erection and Installation 6714,95 kg 0,87% 0,88% 19-Apr-21 03-May-21 0,88% Actual 0,15% 0,14% 0,13% 0,29% 0,17%
Plan 0,10% 0,10% 0,10% 0,10%
2,6 Pemasangan instalasi air bersih (tee in existing) 1,00 LS 0,39% 0,39% 12-Apr-21 07-May-21 0,39% Actual 0,10% 0,29%

3 PEKERJAAN MECHANICAL 25,19% 22,60% 19,83% 2,77%


3,1 Loading /unloading hose 6" dan 3" Flange ANSI 300 (COO/COM Europa/USA/Japan). Composite hose (Length 9 mtr) 1 LS
1 Pengadaan Plan 0,97% 0,97%
a Size 6"X9 Meter 1 Unit 1,94% 12-Apr-21 19-Apr-21 1,77% Actual 0,59% 0,59% 0,59%
Plan 0,99% 0,99%
b Size 3"x 9 Meter 1 Unit 1,98% 12-Apr-21 19-Apr-21 1,46% Actual 0,50% 0,47% 0,50%
Plan 0,03% 0,03%
2 Instalasi 1 LS 0,06% 12-Apr-21 19-Apr-21 0,00% Actual

3,2 1 LS
Hydrant System yang memproteksi area Jetty, Filling Station, lengkap dengan rumah pompa, jockey 25 GPM, electrick & Diesel Engine Pump 500 GPM (Horizontal)
1 Pengadaan
Plan 0,76% 0,76% 0,76% 0,76%
a Hydrant System ( Jetty, Jalur pipa, Filling Station lengkap dengan rumah pompa, jockey, electrick & Diesel Engine Pump) 1 Ls 3,05% 29-Mar-21 19-Apr-21 3,05% Actual 0,49% 0,38% 0,21% 0,49% 0,49% 0,99%
- Horisontal Fire Pump 500 GPM Engine Driven
- Horisontal Fire Pump 500 GPM Electrical
- Jockey Pump 25 GPM
- Include Priming Tank
- Manual Call Button
Plan 0,29% 0,29% 0,29% 0,29%
2 Fabrikasi 1 LS 1,18% 29-Mar-21 19-Apr-21 1,18% Actual 0,29% 0,29% 0,59%
Plan 0,17% 0,17% 0,17% 0,17%
3 Instalasi 1 LS 0,69% 29-Mar-21 19-Apr-21 0,69% Actual 0,50% 0,19%
3,3 Mercaptan Injection System (Manual Operation, Storage Marcaptan by Drum & penuematic pump) 1 LS
1 Pengadaan
Plan 2,29% 2,29%
a Mercaptan Injection System (Manual Operation, Storage Marcaptan by Drum & penuematic pump) 1 LS 4,57% 05-Apr-21 12-Apr-21 4,00% Actual 1,50% 1,50% 1,00%
- Flowrate 5 Liter/hr
- Discharge Press 120,7 Kg/cm2
- Mercaptan storage tank, close head, standar duty ANSI MH2
- Material Carbon Steel
Plan 0,17% 0,17%
2 Instalasi 1 LS 0,35% 05-Apr-21 12-Apr-21 0,30% Actual 0,30%
3,4 Compressor Package (Non Oil Free, type Resiprocutting redundent, complete With Air Driyer, filter & air Receiving tank ) 1 LS
1 Pengadaan
Plan 0,61% 0,61% 0,61%
a Compressor Package (Non Oil Free, type Resiprocutting redundent, complete With Air Driyer, filter & air Receiving tank ) 1 LS 1,83% 22-Mar-21 05-Apr-21 1,00% Actual 1,00%
Plan 0,03% 0,03% 0,03%
2 Instalasi 1 LS 0,09% 22-Mar-21 05-Apr-21 0,00% Actual
3,5 Truck Loading Hose c/w Dry Gas Coupling (Without BreakWay) 3" Liquid dan 2 " (Length 3 mtr) Vapour Flange ANSI 300
1 Pengadaan
Plan ```` 9,15%
19-Apr-21 25-Apr-21 9,15% Actual 0,30% 4,00% 4,85%
a Truck Loading Hose Package 1 pax 9,15%

Plan 0,30%
2 Instalasi 2 LS 0,30% 19-Apr-21 25-Apr-21 0,00% Actual
4 PEKERJAAN PIPE FITTING & ACCESSORIES (FOLLOW PNID APPROVED) 1 LS 12,07% 12,07% 10,99% 1,08%
4,1 Pengadaan
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
1 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø1/2" 12 Meter 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
2 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø3/4" 12 Meter 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,01% 0,01% 0,04% 0,02% 0,02%
3 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø2" 48 Meter 0,10% 0,10% 01-Mar-21 29-Mar-21 0,10% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,02% 0,02% 0,08% 0,04% 0,04%
4 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø3" 54 Meter 0,21% 0,21% 01-Mar-21 29-Mar-21 0,21% Actual 0,04% 0,04% 0,04% 0,04% 0,04%
Plan 0,03% 0,03% 0,13% 0,07% 0,07%
5 Pipe, API 5L Gr B, Sch 40, BE, SMLS, ASME B36.10, Ø8" 30 Meter 0,33% 0,33% 01-Mar-21 29-Mar-21 0,33% Actual 0,07% 0,07% 0,07% 0,07% 0,07%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
6 Flange, ASTM A105, SW, SCH. 80, 300# RF, ASME B16.5, Ø1/2" 26 Ea 0,02% 0,02% 01-Mar-21 29-Mar-21 0,02% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
7 Flange, ASTM A105, SW, SCH. 80, 300# RF, ASME B16.5, Ø3/4" 5 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,01% 0,01%
8 Flange, ASTM A105, WN, BE, SCH. 80, 300# RF, ASME B16.5, Ø2" 10 Ea 0,03% 0,03% 01-Mar-21 29-Mar-21 0,03% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
9 Flange, ASTM A105, WN, BE, SCH. 80, 300# RF, ASME B16.5, Ø3" 6 Ea 0,04% 0,04% 01-Mar-21 29-Mar-21 0,04% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,05% 0,05% 0,19% 0,09% 0,09%
10 Flange, ASTM A105, WN, BE, SCH. 40, 300# RF, ASME B16.5, Ø8" 19 Ea 0,46% 0,46% 01-Mar-21 29-Mar-21 0,46% Actual 0,09% 0,09% 0,09% 0,09% 0,09%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
11 Elbow 90, LR, ASTM A105, SCH.80, #3000, SW, ASME B16.9, Ø1/2" 14 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
12 Elbow 90, LR, ASTM A105, SCH.80, #3000, SW, ASME B16.9, Ø3/4" 6 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
13 Elbow 90, LR, ASTM A234 WPB, SCH.80, BW, ASME B16.9, Ø2" 18 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
14 Elbow 90, LR, ASTM A234 WPB, SCH.80, BW, ASME B16.9, Ø3" 21 Ea 0,04% 0,04% 01-Mar-21 29-Mar-21 0,04% Actual 0,01% 0,01% 0,01% 0,01% 0,01%

Page 1 of 3
S-CURVE
KLIEN / OWNER : PT PELINDO ENERGI LOGISTIK
KONTRAKTOR : PT PAMITRA JAYA KONSTRUKSI
KONSULTAN : PT PURI GANESHA ENGINEERING
PEKERJAAN DESIGN & BUILD FASILITAS
PROYEK :
PENERIMAAN TEMPORARY LPG DI TANJUNG EMAS SEMARANG
NO. DOKUMEN : PC-03-LPG-SMRG-CON
REVISI : 1 92,93% 12,12%
BULAN Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
NO URAIAN PEKERJAAN QTY UNIT PERSENTASE TANGGAL MULAI TANGGAL SELESAI AKTUAL PROGRESS MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
REMARK aktual persentase
29-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun
TANGGAL
31-Jan 07-Feb 14-Feb 21-Feb 28-Feb 07-Mar 14-Mar 21-Mar 28-Mar 04-Apr 11-Apr 18-Apr 25-Apr 02-May 09-May 16-May 23-May 30-May 06-Jun 13-Jun
PEKERJAAN PERSIAPAN Plan 0,01% 0,01% 0,04% 0,02% 0,02%
15 Elbow 90, LR, ASTM A234 WPB, SCH.40, BW, ASME B16.9, Ø8" 8 Ea 0,11% 0,11% 01-Mar-21 29-Mar-21 0,11% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
16 Tee Equal, ASTM A234 WPB, SCH.80, BE, ASME B16.9, Ø3" 3 Ea 0,02% 0,02% 01-Mar-21 29-Mar-21 0,02% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
17 Tee Equal, ASTM A234 WPB, SCH.40, BE, ASME B16.9, Ø8" 1 Ea 0,02% 0,02% 01-Mar-21 29-Mar-21 0,02% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,02% 0,02% 0,07% 0,03% 0,03%
18 800# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø1/2" 8 Ea 0,16% 0,16% 01-Mar-21 29-Mar-21 0,16% Actual 0,03% 0,03% 0,03% 0,03% 0,03%
Plan 0,01% 0,01% 0,03% 0,01% 0,01%
19 800# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø3/4" 2 Ea 0,06% 0,06% 01-Mar-21 29-Mar-21 0,06% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,04% 0,04% 0,16% 0,08% 0,08%
20 300# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø2" 5 Ea 0,40% 0,40% 01-Mar-21 29-Mar-21 0,40% Actual 0,08% 0,08% 0,08% 0,08% 0,08%
Plan 0,08% 0,08% 0,32% 0,16% 0,16%
21 300# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø3" 6 Ea 0,79% 0,79% 01-Mar-21 29-Mar-21 0,79% Actual 0,16% 0,16% 0,16% 0,16% 0,16%
Plan 0,21% 0,21% 0,85% 0,42% 0,42%
22 300# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Trunnion mounted ball, Gearbox Operation, Flanged, Ø8" 3 Ea 2,12% 2,12% 01-Mar-21 29-Mar-21 2,12% Actual 0,42% 0,42% 0,42% 0,42% 0,42%
Plan 0,04% 0,04% 0,16% 0,08% 0,08%
23 300# RF, ASTM A105 Body, F6 trim, Dual-Plate (Wafer-Lug type), Ø8" 1 Ea 0,40% 0,40% 01-Mar-21 29-Mar-21 0,40% Actual 0,08% 0,08% 0,08% 0,08% 0,08%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
24 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x1/2" 8 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
25 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x1 1/2" 1 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
26 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x3/4" 3 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
27 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x2" 1 Ea 0,01% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,01% 0,01%
28 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø3"x1/2" 7 Ea 0,03% 0,03% 01-Mar-21 29-Mar-21 0,03% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
29 Blind Flange, ASTM A105, 300# RF, ASME B16.5, Ø8" 2 Ea 0,05% 0,05% 01-Mar-21 29-Mar-21 0,05% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
30 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø1/2" 26 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
31 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø3/4" 5 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
32 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø2" 12 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
33 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø3" 23 Ea 0,04% 0,04% 01-Mar-21 29-Mar-21 0,04% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,01% 0,01% 0,03% 0,02% 0,02%
34 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø8" 19 Ea 0,09% 0,09% 01-Mar-21 29-Mar-21 0,09% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,01% 0,01% 0,03% 0,01% 0,01%
35 Studs A193 B7, Hex Head nuts A194 2H, C/W 2 rings, fluorocarbon coated min thk 35 micron, 1/2" x 60mm 124 Ea 0,07% 0,07% 01-Mar-21 29-Mar-21 0,07% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,02% 0,02% 0,09% 0,04% 0,04%
36 Studs A193 B7, Hex Head nuts A194 2H, C/W 2 rings, fluorocarbon coated min thk 35 micron, 3/4" x 100mm 148 Ea 0,21% 0,21% 01-Mar-21 29-Mar-21 0,21% Actual 0,04% 0,04% 0,04% 0,04% 0,04%
Plan 0,01% 0,01% 0,03% 0,02% 0,02%
37 Studs A193 B7, Hex Head nuts A194 2H, C/W 2 rings, fluorocarbon coated min thk 35 micron, 3/4" x 110mm 56 Ea 0,08% 0,08% 01-Mar-21 29-Mar-21 0,08% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,01% 0,01% 0,05% 0,02% 0,02%
38 Flange, ASTM A105, WN, BE, SCH 80. 40, 300# RF, ASME B16.5, Ø3" 17 Ea 0,12% 0,12% 01-Mar-21 29-Mar-21 0,12% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,02% 0,02% 0,08% 0,04% 0,04%
39 800# SW, FB, A105, 316 Trim, PTFE, Floating ball, Ø1/2" 10 Ea 0,20% 0,20% 01-Mar-21 29-Mar-21 0,20% Actual 0,04% 0,04% 0,04% 0,04% 0,04%
Plan 0,04% 0,04% 0,16% 0,08% 0,08%
40 300# RF, ASTM A105 Body, F6 trim, Dual-Plate (Wafer-Lug type), Ø3" 1 Ea 0,40% 0,40% 01-Mar-21 29-Mar-21 0,40% Actual 0,08% 0,08% 0,08% 0,08% 0,08%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
41 Tee Red, ASTM A234 WPB, SCH.40, BE, ASME B16.9, Ø3" x 2" 3 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
42 Blind Flange, ASTM A105, 300# RF, ASME B16.5, Ø3" 2 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,01% 0,01% 0,05% 0,03% 0,03%
43 Flexible Hose 8 Inch, Flange #300,ANSI 16.5, RF 1 Ea 0,13% 0,13% 01-Mar-21 29-Mar-21 0,13% Actual 0,03% 0,03% 0,03% 0,03% 0,03%
Plan 0,01% 0,01% 0,03% 0,02% 0,02%
44 Flexible Hose 4 Inch, Flange #300, RF, ANSI 16.5 1 Ea 0,08% 0,08% 01-Mar-21 29-Mar-21 0,08% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
45 Conc Red, Sch 80, BE, ASTM A234 WPB, ASME B16.9, Ø4" x 3" 1 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
46 Conc Red, Sch 80, BE, ASTM A234 WPB, ASME B16.9, Ø8" x 6" 1 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,20% 0,20% 0,81% 0,41% 0,41%
4,2 Fabrikasi 1 Ls 2,04% 1,64% 01-Mar-21 29-Mar-21 2,04% Actual 0,41% 0,41% 0,41% 0,41% 0,40%
Plan 0,31% 0,31% 1,23% 0,61% 0,61%
4,3 Installasi 1 Ls 3,07% 2,39% 01-Mar-21 29-Mar-21 3,07% Actual 0,61% 1,00% 0,39% 0,39% 0,68%

5 PEKERJAAN ELEKTRIKAL & INSTRUMEN 27,88% 25,01% 22,56% 2,45%


5,1 Instrument
A Over pressure Protection Local Control (PSV) (COO/COM Europe/USA/Japan)
1 Pengadaan Plan 0,58%
a Over pressure Protection Local Control (PSV) (COO/COM Europe/USA/Japan) 1 Unit 0,58% 0,27% 12-Apr-21 18-Apr-21 0,54% Actual 0,27% 0,27%
Plan 0,02%
2 Instalasi 1 LS 0,02% 12-Apr-21 18-Apr-21 0,00% Actual

B Pneumatic ESDV 8" & 3" Rating#300 (COO/COM Europe/USA/Japan)


1 Pengadaan
a Pneumatic ESDV 8" & 3" Rating#300 (COO/COM Europe/USA/Japan)
Plan 2,43%
- Size 8" 1 Unit 2,43% 2,43% 12-Apr-21 18-Apr-21 2,43% Actual 2,43%
Plan 2,45%
- Size 3" 2 Unit 2,45% 2,45% 12-Apr-21 18-Apr-21 2,45% Actual 2,45%
Plan 2,09%
2 Instalasi 1 LS 2,09% 12-Apr-21 18-Apr-21 0,00% Actual 2,09%
C Pressure Switch Setting Pressure 16.2 bar & 14.4 bar
1 Pengadaan
Plan 0,22%
a Pressure Switch Setting Pressure 16.2 bar & 14.4 bar 2 LS 0,22% 0,10% 19-Apr-21 25-Apr-21 0,20% Actual 0,10% 0,10%
Plan 0,14%
2 Instalasi 1 LS 0,14% 0,00% 19-Apr-21 25-Apr-21 0,00% Actual
D Temperature Switch Setting Temperatur 40 Derajat Celcius
1 Pengadaan 1 LS
Plan 0,03%
a Temperature Switch Setting Temperatur 40 Derajat Celcius 0,03% 19-Apr-21 25-Apr-21 0,00% Actual
Plan 0,02%
2 Instalasi 0,02% 19-Apr-21 25-Apr-21 0,00% Actual
E Pressure Indicator 0-25 Bar
1 Pengadaan
Plan 0,25%
a Pressure Indicator 0-25 Bar 6 Unit 0,25% 19-Apr-21 25-Apr-21 0,00% Actual 0,25%
Plan 0,02%
2 Instalasi 1 LS 0,02% 19-Apr-21 25-Apr-21 0,00% Actual
F Temperature Indicator (0-100) 1 Unit
1 Pengadaan
Plan 0,11%
a Temperature Indicator (0-100) 1 Unit 0,11% 19-Apr-21 25-Apr-21 0,00% Actual 0,11%
Plan 0,05%
2 Instalasi 1 LS 0,05% 19-Apr-21 25-Apr-21 0,00% Actual
G Gas detector ( COO/COM USA/Europe/Japan)
1 Pengadaan
Plan 0,22% 0,22% 0,22% 0,22%
a Gas detector ( COO/COM USA/Europe/Japan) 3 Unit 0,87% 0,50% 29-Mar-21 19-Apr-21 0,50% Actual 0,50%
Plan 0,09% 0,09% 0,09% 0,09%
2 Instalasi 3 LS 0,37% 29-Mar-21 19-Apr-21 0,00% Actual
H Fire Alarm System (Panel Alarm Indoor, manual Call point, Sounder Beacon Water Proof) 1 LS
1 Pengadaan
Plan 0,30% 0,30% 0,30% 0,30%
a Fire Alarm System (Panel Alarm Indoor, manual Call point, Sounder Beacon Water Proof) 1 LS 1,19% 0,50% 29-Mar-21 19-Apr-21 1,00% Actual 0,50% 0,50%
Plan 0,13% 0,13% 0,13% 0,13%
2 Instalasi 1 LS 0,51% 29-Mar-21 19-Apr-21 0,00% Actual
I CCTV IP Camera System 3 Unit, Enviar 8 Chanel 1 unit, layar monitor 32 inch 1 unit
1 Pengadaan
Plan 0,27% 0,27% 0,27% 0,27%
a CCTV IP Camera System 3 Unit, Enviar 8 Chanel 1 unit, layar monitor 32 inch 1 unit 1 LS 1,06% 0,50% 29-Mar-21 19-Apr-21 1,00% Actual 0,50% 0,50%
Plan 0,37% 0,37% 0,37% 0,37%
2 Instalasi 1 LS 1,50% 29-Mar-21 19-Apr-21 0,50% Actual 0,50%
Plan 0,04% 0,04% 0,04% 0,04%
J Pemasangan jaringan internet (Exclude Jaringan) 1 LS 0,14% 29-Mar-21 19-Apr-21 0,00% Actual

5,2 Electrical
Plan 0,57% 0,57% 0,57% 0,57%

Page 2 of 3
S-CURVE
KLIEN / OWNER : PT PELINDO ENERGI LOGISTIK
KONTRAKTOR : PT PAMITRA JAYA KONSTRUKSI
KONSULTAN : PT PURI GANESHA ENGINEERING
PEKERJAAN DESIGN & BUILD FASILITAS
PROYEK :
PENERIMAAN TEMPORARY LPG DI TANJUNG EMAS SEMARANG
NO. DOKUMEN : PC-03-LPG-SMRG-CON
REVISI : 1 92,93% 12,12%
BULAN Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
NO URAIAN PEKERJAAN QTY UNIT PERSENTASE TANGGAL MULAI TANGGAL SELESAI AKTUAL PROGRESS MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
REMARK aktual persentase
29-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun
TANGGAL
31-Jan 07-Feb 14-Feb 21-Feb 28-Feb 07-Mar 14-Mar 21-Mar 28-Mar 04-Apr 11-Apr 18-Apr 25-Apr 02-May 09-May 16-May 23-May 30-May 06-Jun 13-Jun
A PEKERJAAN PERSIAPAN
Pengadaan dan pemasangan panel Distribusi 1 Set 2,29% 2,29% 29-Mar-21 19-Apr-21 2,29% Actual 0,57% 1,00% 0,72%
Plan 0,82% 0,82% 0,82% 0,82%
B Pengadaan dan pengerjaan kabel (exclude jaringan PLN) 1 LS 3,30% 3,30% 29-Mar-21 19-Apr-21 3,30% Actual 0,82% 1,00% 1,48%
Plan 0,09% 0,09% 0,09% 0,09%
C Panel Indoor Lighting Timer Switch 1 LS 0,36% 0,36% 29-Mar-21 19-Apr-21 0,36% Actual 0,09% 0,18% 0,09%
Plan 0,16% 0,16% 0,16% 0,16%
D Pengadaan dan pemasangan lampu Fillingshed exproof 6 EA 0,64% 0,64% 29-Mar-21 19-Apr-21 0,64% Actual 0,16% 0,32% 0,16%
Plan 0,14% 0,14% 0,14% 0,14%
E Pengadaan dan pemasangan lampu Jetty exproof 3 EA 0,57% 0,57% 29-Mar-21 19-Apr-21 0,57% Actual 0,14% 0,28% 0,15%
Plan 0,20% 0,20% 0,20% 0,20%
F Kabel Tray aksesories 1 LS 0,79% 0,79% 29-Mar-21 19-Apr-21 0,79% Actual 0,02% 0,38% 0,39%
Plan 0,11% 0,11% 0,11% 0,11%
G Local Control Switch (ESD Button) 1 EA 0,43% 0,43% 29-Mar-21 19-Apr-21 0,43% Actual 0,11% 0,22% 0,10%
Plan 0,13% 0,13% 0,13% 0,13%
H Smart UPS 1500 KVA Inrtface port USB software, 1 EA 0,54% 0,54% 29-Mar-21 19-Apr-21 0,54% Actual 0,13% 0,26% 0,15%
Plan 0,57% 0,57% 0,57% 0,57%
I Genset 125 kVA Sylent Type 1 EA 2,29% 2,57% 29-Mar-21 19-Apr-21 2,57% Actual 1,00% 0,57% 1,00%
Plan 0,36% 0,36% 0,36% 0,36%
J Penangkal Petir Radius 80 meter (Proteksi jetty dan Filling Shed) 1 LS 1,43% 1,27% 29-Mar-21 19-Apr-21 1,27% Actual 0,36% 0,72% 0,19%
Plan 0,30% 0,30% 0,30% 0,30%
K Grounding (Rumah Genset, Filling shed & Office ) 3 EA 1,18% 1,18% 29-Mar-21 19-Apr-21 1,18% Actual 0,30% 0,60% 0,28%
6 PEKERJAAN KELENGKAPAN HSSE 2,51% 2,20% 2,28%
Plan 1,60%
6,1 APAB (Alat pemadam Api Beroda) 68 KG 2 EA 1,60% 1,60% 29-Mar-21 04-Apr-21 1,60% Actual 1,60%
Plan 0,46%
6,2 APAR Powder 9 KG (filling shed masing2 bay) 2 EA 0,46% 0,40% 29-Mar-21 04-Apr-21 0,46% Actual 0,40% 0,06%
Plan 0,22%
6,3 APAR CO2 9 KG 6 EA 0,22% 0,20% 29-Mar-21 04-Apr-21 0,22% Actual 0,20% 0,02%
Plan 0,23%
6,4 Penambahan handrail area instrument 2 UNIT 0,23% 29-Mar-21 04-Apr-21 0,00% Actual
7 TESTING & COMISSIONING 2,71% 1,80% 1,80%
Plan 0,86%
7,1 Purging 1 LS 0,86% 0,50% 26-Apr-21 02-May-21 0,50% Actual 0,50%
Plan 0,54%
7,2 Flashing 1 LS 0,54% 0,50% 19-Apr-21 25-Apr-21 0,50% Actual 0,50%
Plan 0,82%
7,3 Hydrotest 1 LS 0,82% 0,50% 19-Apr-21 25-Apr-21 0,50% Actual 0,50%
Plan 0,49%
7,4 Gas In Commisioning 1 LS 0,49% 0,30% 10-May-21 16-May-21 0,30% Actual 0,30%
8 PLO & HAND OVER 1,00% 0,50% 0,50%
Plan 0,77% 0,77% 0,77% 0,77% 0,77%
8,1 COI 1 LS 1,00% 0,50% 10-May-21 07-Jun-21 0,50% Actual 0,50%
RENCANA PROGRESS 2,00% 2,00% 2,00% 3,35% 3,22% 2,83% 2,83% 7,13% 8,66% 11,91% 9,45% 18,47% 18,00% 2,22% 1,36% 1,26% 0,77% 0,77% 0,77% 0,77%
PT. Pelindo Energi Logistik PT. Puri Ganesha Engineering PT. Pamitra Jaya Konstruksi RENCANA KUMULATIF
#### 2,00% 3,99% 5,99% 9,34% 12,56% 15,40% 18,23% 25,36% 34,02% 45,93% 55,38% 73,84% 91,84% 94,06% 95,42% 96,68% 97,45% 98,21% 98,98% 100%
AKTUAL PROGRESS 5,12% 4,07% 3,92% 1,21% 1,49% 0,80% 7,69% 5,57% 4,21% 12,12% 13,71% 14,17% 12,80% 6,30%
AKTUAL KUMULATIF
#### 5,12% 9,19% 13,11% 14,32% 15,80% 16,60% 24,29% 29,87% 34,08% 46,20% 59,90% 74,07% 86,87% 93,17%
DEVIASI 3,12% 5,20% 7,12% 4,98% 3,24% 1,21% 6,06% 4,51% 0,06% 0,26% 4,52% 0,22% -4,97% -0,89%
Notes :

Rudy Arbai Farid Affandi Hari setiawan Rudianto


(Senior Manager Teknik & TI) (Engineering Manager) (Site Manager) (Project Manager)