S Curve
S Curve
3,2 1 LS
Hydrant System yang memproteksi area Jetty, Filling Station, lengkap dengan rumah pompa, jockey 25 GPM, electrick & Diesel Engine Pump 500 GPM (Horizontal)
1 Pengadaan
Plan 0,76% 0,76% 0,76% 0,76%
a Hydrant System ( Jetty, Jalur pipa, Filling Station lengkap dengan rumah pompa, jockey, electrick & Diesel Engine Pump) 1 Ls 3,05% 29-Mar-21 19-Apr-21 3,05% Actual 0,49% 0,38% 0,21% 0,49% 0,49% 0,99%
- Horisontal Fire Pump 500 GPM Engine Driven
- Horisontal Fire Pump 500 GPM Electrical
- Jockey Pump 25 GPM
- Include Priming Tank
- Manual Call Button
Plan 0,29% 0,29% 0,29% 0,29%
2 Fabrikasi 1 LS 1,18% 29-Mar-21 19-Apr-21 1,18% Actual 0,29% 0,29% 0,59%
Plan 0,17% 0,17% 0,17% 0,17%
3 Instalasi 1 LS 0,69% 29-Mar-21 19-Apr-21 0,69% Actual 0,50% 0,19%
3,3 Mercaptan Injection System (Manual Operation, Storage Marcaptan by Drum & penuematic pump) 1 LS
1 Pengadaan
Plan 2,29% 2,29%
a Mercaptan Injection System (Manual Operation, Storage Marcaptan by Drum & penuematic pump) 1 LS 4,57% 05-Apr-21 12-Apr-21 4,00% Actual 1,50% 1,50% 1,00%
- Flowrate 5 Liter/hr
- Discharge Press 120,7 Kg/cm2
- Mercaptan storage tank, close head, standar duty ANSI MH2
- Material Carbon Steel
Plan 0,17% 0,17%
2 Instalasi 1 LS 0,35% 05-Apr-21 12-Apr-21 0,30% Actual 0,30%
3,4 Compressor Package (Non Oil Free, type Resiprocutting redundent, complete With Air Driyer, filter & air Receiving tank ) 1 LS
1 Pengadaan
Plan 0,61% 0,61% 0,61%
a Compressor Package (Non Oil Free, type Resiprocutting redundent, complete With Air Driyer, filter & air Receiving tank ) 1 LS 1,83% 22-Mar-21 05-Apr-21 1,00% Actual 1,00%
Plan 0,03% 0,03% 0,03%
2 Instalasi 1 LS 0,09% 22-Mar-21 05-Apr-21 0,00% Actual
3,5 Truck Loading Hose c/w Dry Gas Coupling (Without BreakWay) 3" Liquid dan 2 " (Length 3 mtr) Vapour Flange ANSI 300
1 Pengadaan
Plan ```` 9,15%
19-Apr-21 25-Apr-21 9,15% Actual 0,30% 4,00% 4,85%
a Truck Loading Hose Package 1 pax 9,15%
Plan 0,30%
2 Instalasi 2 LS 0,30% 19-Apr-21 25-Apr-21 0,00% Actual
4 PEKERJAAN PIPE FITTING & ACCESSORIES (FOLLOW PNID APPROVED) 1 LS 12,07% 12,07% 10,99% 1,08%
4,1 Pengadaan
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
1 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø1/2" 12 Meter 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
2 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø3/4" 12 Meter 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,01% 0,01% 0,04% 0,02% 0,02%
3 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø2" 48 Meter 0,10% 0,10% 01-Mar-21 29-Mar-21 0,10% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,02% 0,02% 0,08% 0,04% 0,04%
4 Pipe, API 5L Gr B, Sch 80, BE, SMLS, ASME B36.10, Ø3" 54 Meter 0,21% 0,21% 01-Mar-21 29-Mar-21 0,21% Actual 0,04% 0,04% 0,04% 0,04% 0,04%
Plan 0,03% 0,03% 0,13% 0,07% 0,07%
5 Pipe, API 5L Gr B, Sch 40, BE, SMLS, ASME B36.10, Ø8" 30 Meter 0,33% 0,33% 01-Mar-21 29-Mar-21 0,33% Actual 0,07% 0,07% 0,07% 0,07% 0,07%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
6 Flange, ASTM A105, SW, SCH. 80, 300# RF, ASME B16.5, Ø1/2" 26 Ea 0,02% 0,02% 01-Mar-21 29-Mar-21 0,02% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
7 Flange, ASTM A105, SW, SCH. 80, 300# RF, ASME B16.5, Ø3/4" 5 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,01% 0,01%
8 Flange, ASTM A105, WN, BE, SCH. 80, 300# RF, ASME B16.5, Ø2" 10 Ea 0,03% 0,03% 01-Mar-21 29-Mar-21 0,03% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
9 Flange, ASTM A105, WN, BE, SCH. 80, 300# RF, ASME B16.5, Ø3" 6 Ea 0,04% 0,04% 01-Mar-21 29-Mar-21 0,04% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,05% 0,05% 0,19% 0,09% 0,09%
10 Flange, ASTM A105, WN, BE, SCH. 40, 300# RF, ASME B16.5, Ø8" 19 Ea 0,46% 0,46% 01-Mar-21 29-Mar-21 0,46% Actual 0,09% 0,09% 0,09% 0,09% 0,09%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
11 Elbow 90, LR, ASTM A105, SCH.80, #3000, SW, ASME B16.9, Ø1/2" 14 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
12 Elbow 90, LR, ASTM A105, SCH.80, #3000, SW, ASME B16.9, Ø3/4" 6 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
13 Elbow 90, LR, ASTM A234 WPB, SCH.80, BW, ASME B16.9, Ø2" 18 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
14 Elbow 90, LR, ASTM A234 WPB, SCH.80, BW, ASME B16.9, Ø3" 21 Ea 0,04% 0,04% 01-Mar-21 29-Mar-21 0,04% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Page 1 of 3
S-CURVE
KLIEN / OWNER : PT PELINDO ENERGI LOGISTIK
KONTRAKTOR : PT PAMITRA JAYA KONSTRUKSI
KONSULTAN : PT PURI GANESHA ENGINEERING
PEKERJAAN DESIGN & BUILD FASILITAS
PROYEK :
PENERIMAAN TEMPORARY LPG DI TANJUNG EMAS SEMARANG
NO. DOKUMEN : PC-03-LPG-SMRG-CON
REVISI : 1 92,93% 12,12%
BULAN Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
NO URAIAN PEKERJAAN QTY UNIT PERSENTASE TANGGAL MULAI TANGGAL SELESAI AKTUAL PROGRESS MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
REMARK aktual persentase
29-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun
TANGGAL
31-Jan 07-Feb 14-Feb 21-Feb 28-Feb 07-Mar 14-Mar 21-Mar 28-Mar 04-Apr 11-Apr 18-Apr 25-Apr 02-May 09-May 16-May 23-May 30-May 06-Jun 13-Jun
PEKERJAAN PERSIAPAN Plan 0,01% 0,01% 0,04% 0,02% 0,02%
15 Elbow 90, LR, ASTM A234 WPB, SCH.40, BW, ASME B16.9, Ø8" 8 Ea 0,11% 0,11% 01-Mar-21 29-Mar-21 0,11% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
16 Tee Equal, ASTM A234 WPB, SCH.80, BE, ASME B16.9, Ø3" 3 Ea 0,02% 0,02% 01-Mar-21 29-Mar-21 0,02% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
17 Tee Equal, ASTM A234 WPB, SCH.40, BE, ASME B16.9, Ø8" 1 Ea 0,02% 0,02% 01-Mar-21 29-Mar-21 0,02% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,02% 0,02% 0,07% 0,03% 0,03%
18 800# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø1/2" 8 Ea 0,16% 0,16% 01-Mar-21 29-Mar-21 0,16% Actual 0,03% 0,03% 0,03% 0,03% 0,03%
Plan 0,01% 0,01% 0,03% 0,01% 0,01%
19 800# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø3/4" 2 Ea 0,06% 0,06% 01-Mar-21 29-Mar-21 0,06% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,04% 0,04% 0,16% 0,08% 0,08%
20 300# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø2" 5 Ea 0,40% 0,40% 01-Mar-21 29-Mar-21 0,40% Actual 0,08% 0,08% 0,08% 0,08% 0,08%
Plan 0,08% 0,08% 0,32% 0,16% 0,16%
21 300# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Floating ball, Flanged, Ø3" 6 Ea 0,79% 0,79% 01-Mar-21 29-Mar-21 0,79% Actual 0,16% 0,16% 0,16% 0,16% 0,16%
Plan 0,21% 0,21% 0,85% 0,42% 0,42%
22 300# RF, RB, ASTM A105 Body or A216 WCB, 13%Cr ball, PTFE, Split body & Side entry, Trunnion mounted ball, Gearbox Operation, Flanged, Ø8" 3 Ea 2,12% 2,12% 01-Mar-21 29-Mar-21 2,12% Actual 0,42% 0,42% 0,42% 0,42% 0,42%
Plan 0,04% 0,04% 0,16% 0,08% 0,08%
23 300# RF, ASTM A105 Body, F6 trim, Dual-Plate (Wafer-Lug type), Ø8" 1 Ea 0,40% 0,40% 01-Mar-21 29-Mar-21 0,40% Actual 0,08% 0,08% 0,08% 0,08% 0,08%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
24 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x1/2" 8 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
25 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x1 1/2" 1 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
26 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x3/4" 3 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
27 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø8"x2" 1 Ea 0,01% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,01% 0,01%
28 Weldolet, BW;MSS-SP-97, ASTM A105, SCH.80, Ø3"x1/2" 7 Ea 0,03% 0,03% 01-Mar-21 29-Mar-21 0,03% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
29 Blind Flange, ASTM A105, 300# RF, ASME B16.5, Ø8" 2 Ea 0,05% 0,05% 01-Mar-21 29-Mar-21 0,05% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
30 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø1/2" 26 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
31 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø3/4" 5 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,01% 0,00% 0,00%
32 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø2" 12 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,02% 0,01% 0,01%
33 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø3" 23 Ea 0,04% 0,04% 01-Mar-21 29-Mar-21 0,04% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,01% 0,01% 0,03% 0,02% 0,02%
34 Gasket, SPW, 300# RF, Graphite filler, 304 SS Winding, int and ext centering ring, ASME B16.20, Ø8" 19 Ea 0,09% 0,09% 01-Mar-21 29-Mar-21 0,09% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,01% 0,01% 0,03% 0,01% 0,01%
35 Studs A193 B7, Hex Head nuts A194 2H, C/W 2 rings, fluorocarbon coated min thk 35 micron, 1/2" x 60mm 124 Ea 0,07% 0,07% 01-Mar-21 29-Mar-21 0,07% Actual 0,01% 0,01% 0,01% 0,01% 0,01%
Plan 0,02% 0,02% 0,09% 0,04% 0,04%
36 Studs A193 B7, Hex Head nuts A194 2H, C/W 2 rings, fluorocarbon coated min thk 35 micron, 3/4" x 100mm 148 Ea 0,21% 0,21% 01-Mar-21 29-Mar-21 0,21% Actual 0,04% 0,04% 0,04% 0,04% 0,04%
Plan 0,01% 0,01% 0,03% 0,02% 0,02%
37 Studs A193 B7, Hex Head nuts A194 2H, C/W 2 rings, fluorocarbon coated min thk 35 micron, 3/4" x 110mm 56 Ea 0,08% 0,08% 01-Mar-21 29-Mar-21 0,08% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,01% 0,01% 0,05% 0,02% 0,02%
38 Flange, ASTM A105, WN, BE, SCH 80. 40, 300# RF, ASME B16.5, Ø3" 17 Ea 0,12% 0,12% 01-Mar-21 29-Mar-21 0,12% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,02% 0,02% 0,08% 0,04% 0,04%
39 800# SW, FB, A105, 316 Trim, PTFE, Floating ball, Ø1/2" 10 Ea 0,20% 0,20% 01-Mar-21 29-Mar-21 0,20% Actual 0,04% 0,04% 0,04% 0,04% 0,04%
Plan 0,04% 0,04% 0,16% 0,08% 0,08%
40 300# RF, ASTM A105 Body, F6 trim, Dual-Plate (Wafer-Lug type), Ø3" 1 Ea 0,40% 0,40% 01-Mar-21 29-Mar-21 0,40% Actual 0,08% 0,08% 0,08% 0,08% 0,08%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
41 Tee Red, ASTM A234 WPB, SCH.40, BE, ASME B16.9, Ø3" x 2" 3 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
42 Blind Flange, ASTM A105, 300# RF, ASME B16.5, Ø3" 2 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,01% 0,01% 0,05% 0,03% 0,03%
43 Flexible Hose 8 Inch, Flange #300,ANSI 16.5, RF 1 Ea 0,13% 0,13% 01-Mar-21 29-Mar-21 0,13% Actual 0,03% 0,03% 0,03% 0,03% 0,03%
Plan 0,01% 0,01% 0,03% 0,02% 0,02%
44 Flexible Hose 4 Inch, Flange #300, RF, ANSI 16.5 1 Ea 0,08% 0,08% 01-Mar-21 29-Mar-21 0,08% Actual 0,02% 0,02% 0,02% 0,02% 0,02%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
45 Conc Red, Sch 80, BE, ASTM A234 WPB, ASME B16.9, Ø4" x 3" 1 Ea 0,01% 0,01% 01-Mar-21 29-Mar-21 0,01% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,00% 0,00% 0,00% 0,00% 0,00%
46 Conc Red, Sch 80, BE, ASTM A234 WPB, ASME B16.9, Ø8" x 6" 1 Ea 0,00% 0,00% 01-Mar-21 29-Mar-21 0,00% Actual 0,00% 0,00% 0,00% 0,00% 0,00%
Plan 0,20% 0,20% 0,81% 0,41% 0,41%
4,2 Fabrikasi 1 Ls 2,04% 1,64% 01-Mar-21 29-Mar-21 2,04% Actual 0,41% 0,41% 0,41% 0,41% 0,40%
Plan 0,31% 0,31% 1,23% 0,61% 0,61%
4,3 Installasi 1 Ls 3,07% 2,39% 01-Mar-21 29-Mar-21 3,07% Actual 0,61% 1,00% 0,39% 0,39% 0,68%
5,2 Electrical
Plan 0,57% 0,57% 0,57% 0,57%
Page 2 of 3
S-CURVE
KLIEN / OWNER : PT PELINDO ENERGI LOGISTIK
KONTRAKTOR : PT PAMITRA JAYA KONSTRUKSI
KONSULTAN : PT PURI GANESHA ENGINEERING
PEKERJAAN DESIGN & BUILD FASILITAS
PROYEK :
PENERIMAAN TEMPORARY LPG DI TANJUNG EMAS SEMARANG
NO. DOKUMEN : PC-03-LPG-SMRG-CON
REVISI : 1 92,93% 12,12%
BULAN Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
NO URAIAN PEKERJAAN QTY UNIT PERSENTASE TANGGAL MULAI TANGGAL SELESAI AKTUAL PROGRESS MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
REMARK aktual persentase
29-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun
TANGGAL
31-Jan 07-Feb 14-Feb 21-Feb 28-Feb 07-Mar 14-Mar 21-Mar 28-Mar 04-Apr 11-Apr 18-Apr 25-Apr 02-May 09-May 16-May 23-May 30-May 06-Jun 13-Jun
A PEKERJAAN PERSIAPAN
Pengadaan dan pemasangan panel Distribusi 1 Set 2,29% 2,29% 29-Mar-21 19-Apr-21 2,29% Actual 0,57% 1,00% 0,72%
Plan 0,82% 0,82% 0,82% 0,82%
B Pengadaan dan pengerjaan kabel (exclude jaringan PLN) 1 LS 3,30% 3,30% 29-Mar-21 19-Apr-21 3,30% Actual 0,82% 1,00% 1,48%
Plan 0,09% 0,09% 0,09% 0,09%
C Panel Indoor Lighting Timer Switch 1 LS 0,36% 0,36% 29-Mar-21 19-Apr-21 0,36% Actual 0,09% 0,18% 0,09%
Plan 0,16% 0,16% 0,16% 0,16%
D Pengadaan dan pemasangan lampu Fillingshed exproof 6 EA 0,64% 0,64% 29-Mar-21 19-Apr-21 0,64% Actual 0,16% 0,32% 0,16%
Plan 0,14% 0,14% 0,14% 0,14%
E Pengadaan dan pemasangan lampu Jetty exproof 3 EA 0,57% 0,57% 29-Mar-21 19-Apr-21 0,57% Actual 0,14% 0,28% 0,15%
Plan 0,20% 0,20% 0,20% 0,20%
F Kabel Tray aksesories 1 LS 0,79% 0,79% 29-Mar-21 19-Apr-21 0,79% Actual 0,02% 0,38% 0,39%
Plan 0,11% 0,11% 0,11% 0,11%
G Local Control Switch (ESD Button) 1 EA 0,43% 0,43% 29-Mar-21 19-Apr-21 0,43% Actual 0,11% 0,22% 0,10%
Plan 0,13% 0,13% 0,13% 0,13%
H Smart UPS 1500 KVA Inrtface port USB software, 1 EA 0,54% 0,54% 29-Mar-21 19-Apr-21 0,54% Actual 0,13% 0,26% 0,15%
Plan 0,57% 0,57% 0,57% 0,57%
I Genset 125 kVA Sylent Type 1 EA 2,29% 2,57% 29-Mar-21 19-Apr-21 2,57% Actual 1,00% 0,57% 1,00%
Plan 0,36% 0,36% 0,36% 0,36%
J Penangkal Petir Radius 80 meter (Proteksi jetty dan Filling Shed) 1 LS 1,43% 1,27% 29-Mar-21 19-Apr-21 1,27% Actual 0,36% 0,72% 0,19%
Plan 0,30% 0,30% 0,30% 0,30%
K Grounding (Rumah Genset, Filling shed & Office ) 3 EA 1,18% 1,18% 29-Mar-21 19-Apr-21 1,18% Actual 0,30% 0,60% 0,28%
6 PEKERJAAN KELENGKAPAN HSSE 2,51% 2,20% 2,28%
Plan 1,60%
6,1 APAB (Alat pemadam Api Beroda) 68 KG 2 EA 1,60% 1,60% 29-Mar-21 04-Apr-21 1,60% Actual 1,60%
Plan 0,46%
6,2 APAR Powder 9 KG (filling shed masing2 bay) 2 EA 0,46% 0,40% 29-Mar-21 04-Apr-21 0,46% Actual 0,40% 0,06%
Plan 0,22%
6,3 APAR CO2 9 KG 6 EA 0,22% 0,20% 29-Mar-21 04-Apr-21 0,22% Actual 0,20% 0,02%
Plan 0,23%
6,4 Penambahan handrail area instrument 2 UNIT 0,23% 29-Mar-21 04-Apr-21 0,00% Actual
7 TESTING & COMISSIONING 2,71% 1,80% 1,80%
Plan 0,86%
7,1 Purging 1 LS 0,86% 0,50% 26-Apr-21 02-May-21 0,50% Actual 0,50%
Plan 0,54%
7,2 Flashing 1 LS 0,54% 0,50% 19-Apr-21 25-Apr-21 0,50% Actual 0,50%
Plan 0,82%
7,3 Hydrotest 1 LS 0,82% 0,50% 19-Apr-21 25-Apr-21 0,50% Actual 0,50%
Plan 0,49%
7,4 Gas In Commisioning 1 LS 0,49% 0,30% 10-May-21 16-May-21 0,30% Actual 0,30%
8 PLO & HAND OVER 1,00% 0,50% 0,50%
Plan 0,77% 0,77% 0,77% 0,77% 0,77%
8,1 COI 1 LS 1,00% 0,50% 10-May-21 07-Jun-21 0,50% Actual 0,50%
RENCANA PROGRESS 2,00% 2,00% 2,00% 3,35% 3,22% 2,83% 2,83% 7,13% 8,66% 11,91% 9,45% 18,47% 18,00% 2,22% 1,36% 1,26% 0,77% 0,77% 0,77% 0,77%
PT. Pelindo Energi Logistik PT. Puri Ganesha Engineering PT. Pamitra Jaya Konstruksi RENCANA KUMULATIF
#### 2,00% 3,99% 5,99% 9,34% 12,56% 15,40% 18,23% 25,36% 34,02% 45,93% 55,38% 73,84% 91,84% 94,06% 95,42% 96,68% 97,45% 98,21% 98,98% 100%
AKTUAL PROGRESS 5,12% 4,07% 3,92% 1,21% 1,49% 0,80% 7,69% 5,57% 4,21% 12,12% 13,71% 14,17% 12,80% 6,30%
AKTUAL KUMULATIF
#### 5,12% 9,19% 13,11% 14,32% 15,80% 16,60% 24,29% 29,87% 34,08% 46,20% 59,90% 74,07% 86,87% 93,17%
DEVIASI 3,12% 5,20% 7,12% 4,98% 3,24% 1,21% 6,06% 4,51% 0,06% 0,26% 4,52% 0,22% -4,97% -0,89%
Notes :
Page 3 of 3