6/5/2021
CONSTRUCTION SUMMARY
S.No. Description of Works Amount
(in Rs.)
1 TOTAL EARTHWORK, FONDATION , MASONRY & PLASTER WORKS
2 TOTAL OF FLOORING AND DADDOING WORKS
3 TOTALOF STEEL WORK
4 TOTAL OF CEILING
5 TOTAL OF PARTITIONS AND WALL CLADDING
6 TOTAL OF DOORS/WINDOWs
7 TOTAL OF FINISHES
8 TOTAL OF KITCHEN
9 TOTAL OF ELECTRICAL WORK
10 TOTAL OF PLUMBING WORK
11 TOTAL OF WARDROBE
AMOUNT PER SQFT COST. 1800
TOTAL AREA 1000
TOTAL CONSTRUCTION COST ONE FLOOR 1800000
Note:
a) Extra Govt. Tax as per applicable.
b) If any extra work will be done at site that will be cost extra in bill.
S.No. Items Make
1 Cement bengur/ambuja
2 POP sakarni
3 Paint Asian/Dulux/
4 Tiles Kajariya/Gujrat make
5 Locks in cabinets, furniture, Door Handrof/Godrej
6 Wiring Polycab/skylark/kei
7 Switches Anchor/havels
8 Melamine polish Asian paints / ICI Dulux
9 MCCB/MCB Schneider/l&T
9 UPVC PIPE Suprem/astral