Construction Cost

The document outlines a construction summary detailing various works and their associated costs, with a total construction cost of Rs. 1,800,000 for one floor covering an area of 1000 sqft. It lists different categories of work including earthwork, flooring, steel work, and plumbing, along with the materials to be used from specified brands. Additional notes mention that government taxes may apply and any extra work will incur additional charges.

Uploaded by

simranjotkaur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

Construction Cost

The document outlines a construction summary detailing various works and their associated costs, with a total construction cost of Rs. 1,800,000 for one floor covering an area of 1000 sqft. It lists different categories of work including earthwork, flooring, steel work, and plumbing, along with the materials to be used from specified brands. Additional notes mention that government taxes may apply and any extra work will incur additional charges.

Uploaded by

simranjotkaur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

6/5/2021

CONSTRUCTION SUMMARY

S.No. Description of Works Amount


(in Rs.)

1 TOTAL EARTHWORK, FONDATION , MASONRY & PLASTER WORKS

2 TOTAL OF FLOORING AND DADDOING WORKS


3 TOTALOF STEEL WORK
4 TOTAL OF CEILING
5 TOTAL OF PARTITIONS AND WALL CLADDING
6 TOTAL OF DOORS/WINDOWs
7 TOTAL OF FINISHES
8 TOTAL OF KITCHEN
9 TOTAL OF ELECTRICAL WORK
10 TOTAL OF PLUMBING WORK
11 TOTAL OF WARDROBE

AMOUNT PER SQFT COST. 1800


TOTAL AREA 1000
TOTAL CONSTRUCTION COST ONE FLOOR 1800000

Note:
a) Extra Govt. Tax as per applicable.
b) If any extra work will be done at site that will be cost extra in bill.

S.No. Items Make

1 Cement bengur/ambuja
2 POP sakarni
3 Paint Asian/Dulux/
4 Tiles Kajariya/Gujrat make
5 Locks in cabinets, furniture, Door Handrof/Godrej
6 Wiring Polycab/skylark/kei
7 Switches Anchor/havels
8 Melamine polish Asian paints / ICI Dulux
9 MCCB/MCB Schneider/l&T
9 UPVC PIPE Suprem/astral