The document outlines a comprehensive construction project including various works such as brick work, concrete work, reinforcement steel, and finishing works. It details the materials required, their specifications, and associated costs for each section of the project. Additionally, it includes electrical specifications and a cost estimation summary for the overall construction, highlighting quantities, rates, and total amounts for different tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views9 pages

Tribhuwan Shrestha (Quatation)

The document outlines a comprehensive construction project including various works such as brick work, concrete work, reinforcement steel, and finishing works. It details the materials required, their specifications, and associated costs for each section of the project. Additionally, it includes electrical specifications and a cost estimation summary for the overall construction, highlighting quantities, rates, and total amounts for different tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

S.N.

Description of works
1 BRICK WORKS
4.2.2 In c/s (1:4) in superstructure in local chimney made bricks(9")
4.2.3 In c/s (1:4) in superstructure in local chimney made bricks(4")
2 Concrete works

Providing, mixing, placing, compacting and curing for seven days PCC for RCC works including
formwork,shuttering and centering with reinforcements all completes as per drawing, specification and instruction.

In superstructure M20 ( 1:1.5:3 ) opc cement


3 Reinforcement Steel
Providing and fixing reinforcement (Fe500) confirming to IS code in all beams, column, slabs, lintels, chajja,
staircase, DPC, Corners, T-junction, counter table etc. as per detail drawings and specifications including
3
straightening, ending, placing and binding in proper directed by engineer and including transporting of material upto
30m lead all complete work using rebar equivalent.
4 Centering and Shuttering of Formwork
4 Centering and Shuttering of Formwork(12mm thick water proof coloured ply board)
5 Finishing Works
Plastering with specified mortar mix ratio in any level, size and shape of wall, ceiling, band, blocks etc. as required
5 including racking, watering cleaning of base , plastering to plumb, line, level, smoothness etc. and including curing
and cost of necessary scaffoldings works all complete as per drawings and specifications.
5.1.1 A) 20 mm thick C/S (1:6) plaster on external walls
5.1.2 B) 12.5 mm thick C/S (1:4) plaster on internal walls
5.1.3 c) 20 mm thick C/S (1:6) plaster on boundary walls
6 Tiles Work
Supplying and Laying 10mm thick porecelyne glazed Tile with 1:4 cement sand mortar with Border all complete.()
7 Flooring Works
Supplying and Laying Porecelyne Non Glaze Tile with 1:4 Cement Sand Mortar with Border for toilet and kitchen
a.
all complete.()
Supplying and laying screeding works for TILE FLOORING all complete as per drawing, specification and
b
instruction.
c Supplying and laying IPS works all complete as per drawing, specification and instruction.
Supplying and laying of Granite below window base and parapet molding as per drawing, specification and
d
instruction. Granite Price Up 240 Sq.Ft Also Tile Price Up to 100 Per Sq.Ft

IPS works on floors of the staircase, steps and landing and rooms for parquet flooring as per drawing, specification
e
and instruction.
Applying and laying two coats of water proofing chemicals like Dr. Fixit as per instructions by engineer.
8 Skirting
Supplying and laying IPS works all complete as per drawing, specification and instruction.

Supplying and laying tiles skirting works all complete as per drawing, specification and instruction.

Supplying and laying parquet skirting works all complete as per drawing, specification and instruction.

9 UPVC windows/doors

9.2.2 Supplying and providing (89 mm Profile ) Window And Sliding door with net including fittings and transportation

Page 1 of 2
S.N. Description of works
10 Painting Works

Supplying and painting the interior wall surface with Luxury emulsion paint of approved brand and uniform shade
including primer all complete as per instructed by engineer.

Supplying the interior wall and ceiling surface with white putty plaster all complete as per instructed by engineer .
Supplying and painting the exterior wall surface with two coat of weather coat (APEX ULTIMA or Equivalent) paint
of approved brand and uniform shade including primer.
11 STAIR RAILING WORKS
Supplying and Providing 3-4 Line Steelness Steel Railing work (3FT. HIGH) in Stair ) Is Certified Pipe (Jindal )

12 IRON STAIRS
Supplying and Providing Lshaped or circular Metal staircase with all necessary fittings and transportation for access
to roof terrace from lower terrace (IS Standard Ms Metal Pipe with Necessary Colouring )
13 Wood Colour : Chopra Finishing in Main Door and Enamel Coat with Primer in Internal Door finishing .
15 Main Door
Main Door 1: Providing ( Nepali Agrakh ) Wood Frame and Shutter with All Necessary Fiting and Joints. Providing
a.
Main Door Price Up to Nrs 200000
Internal Door : Supplying and providing DOOR shutters with Ready Made ( Ply Khapa ) including fittings and
c.
transportation
16 Exterior Design / Cornishing Work
According To 3D Design Finishing A-Grade Asian or Burger Paint ( Necessary Weather Coat in Outer Topped
portion )
17 Special Treatment and waterproofing works
Waterproofing with the 4gsm membrane sheet followed by PMM work using Polymer and minimum 4" lapping in
between the membrane. This should pass ponding test for 24 hrs.Also provided 2k Coating in Terrace for Proof
followed .
18 Over Head Watertank and stand : Water Tank Nepatop 20000 Ltr , Water Tank Stand : Metal
19 Underground water tank (8000-10000 ltr) : According to Drawing ,
Main Gate : Providing and Installation of Main Gate of standard size of L=10 feet , H=6 feet and Is Standard Iron
20
Sheet of 7 mm with 2*2 Hollw iron Pipe with Necessary joints ans Fixture.
21 Electrical fittings : According to electrical Drawing and Specifications
22 Sanitary pipes and fittings : According to electrical Drawing and Specifications
23 Septic Tank and Soak Pit : According to Design And Drawing
24 Boundary Wall : Plaster Work Necessary only .

Page 2 of 2
Quatation Of Material
S.N Material Name Material Quality / Works Discription
1 Cement Shivam / Hongshi If Shortage Same Quality Cement Used
2 TMT Bar ( Dandi ) Shree,Laxmi If Shortage Same Quality Cement used
3 Brick No.1 in Super Structure and 2nd Class in Toe Wall ( B.M / S.K )
3 Brick (Chinease ) Chinease Brick Wall 4 Inch According Design
4 Baluwa ( Sand ) Double Wash (Melamchi )
5 Gitti (Aggregate ) Crusheer Aggregate (Melamchi )
6 Windows UPVC 90mm Profile ( ( 92 Mm Base Profile )
7 Chaukas Nepali Aggrakh Wood ( 3 x 4 " ) Thicknesss
8 Room Doors Ready Made (Ply Khapa ) Wooden Door
9 Wall 9" Below Bisment and Outer wall
10 Wall 4" Inner Partation / ( According to Design )
For Space Stair,Passage ,Kitchen v, Parafet Top etc. Marble : P White or Jet Black
11
Marbal /Granite and Cream White Tile Combination ( Price Up to 230 Per Sq.Ft )
12 Tiles Kitchen Floor / Toilet / Terrace ( Vitrified Tile Price Up to 100 Per Sq.ft )
13 Toilet and Bathroom According Sanitary and Bathroom Quatation and Specification
14 Pipes / Sanitary According Sanitary Specification ( Using Cpvc Plumber Pipe and Acc)
Electrical Points and Switches
15 As Per Eletrical Quatation and Specification )
and Light
17 Paint and Putting Inner putting with paint,Exterior Paint Only ) ( Asian / Berger )
18 Railing ( Stair and D-Height ) Wooden Railing in Stair and Hukka Design Balcony
Note:
1. स ूण काय ह द कामदारह बाट स न ग रने छ ।
3.( ा )क िनको सामान प रवतन ँ दा सामान को मु मा पिन प रवतन ने छ ।
4. आपसी सहमितमा मा काय प रवतन गन पािहने छ ।
Electrical Specification
Owner Name :
S.No Description
1 Wires : Prakash / Trisakti Cable or Equivalent
2 Accessories: K.S.D ,Havels / Equivalent
Per bedroom specification 1 wall light /1 ceiling light (Dome light)/ 1 tube light / 2
3 power socket /3 way gang switch
Per Living room specification dual wall light /dual ceiling light (Dome light)/ dual tube
4 light / 2 power socket /3 way gang switch
Per Bathroom room specification Mirror light /dual ceiling light (Dome light)/ / 2
5 power socket /3 way gang switch
6 3 DB box per floor / 1 MCB Box
Per Kitchen specification /dual ceiling light (Dome light)/ 1 tube light / 3 power socket
7 /3 way gang switch
8 Exterior Single dome light in each balcony top
9 Power socket 7/22 in Underground tank and inar each
11 Pair of light on Entrance Gate
12 Single dome light with switch in each staircase
13 Each dome light in each passage
14 3 dome light in lower terrace

Note:
1. स ूण काय ह द कामदारह बाट स न ग रने छ ।
2. घर धनी ले इ ायको ख मा ,आपसी सम दा रमा ( सामान र मु प रवतन गन सािकने छ ।
3.( ा )क िनको सामान प रवतन ँ दा सामान को मु मा पिन प रवतन ने छ ।
4. आपसी सहमितमा मा काय प रवतन गन पािहने छ ।
Construction Cost Estimation Summary
Client's Name :Tribhuwan Shrestha
Address: KMC-Tinkune
S.N Description Unit Quantity Rate Amount Cum Sum
A Section 1: Design And Drawing
Naksa Design,Analysis, Structure and Municipal
1 1 3,174.00 32.75 No Cost
Naksa Pass Up to DPC Work
B Section 2: Levelling and Excavation Works
1 Site Clearance / Excavation Works cft 2,480.00 30.00 74,400.00
2 Back Fill In Excavated Area cft 496.00 23.34 11,574.74 165,674.94
3 Soft Soil Work / Soil filling up to DPC cft 4631.040 17.21 79,700.20

C Section 3: Foundation Protection and Preparation Works


Brick Soiling in Footing and GF Level and Outer
1 cft 1580.493 78.63 124,277.35
Pcc Work Portion 258,619.28
2 PCC Works in Footing and GF Level cft 395.123 340.00 134,341.93

D Section 4: RCC, Reinforcement and Shuttering Works


1 M20 concrete cft 3,201.70 490.00 1,568,833.79
Reinforcement ( Laxmi / Ambe / Shree )
2 kg 12,098.92 145.00 1,754,343.68 3,646,687.10
(including Binding Wire ,GI,Nail,Cutting )
3 Shuttering Works sqft 7702.61 42.00 323,509.63

E Section 5: Opening Schedule


1 Main Door 1 Nos 1.00 150,000.00 150,000.00
a. Main Door 3"x4" Frame (wooden) cuft 1.00 10,940.00 10,940.00
b. Main Door Lock+Handel (PL ) Nos 1.00 9,000.00 9,000.00

Client Name : Company Stamp


Signature : 1 Company Name:
2 Internal Doors
a. 3"x4" Frame(wooden) Frame Nos 12.00 9,800.00 117,600.00 1,058,367.50

b. Shutter ReadyMade Nos 12.00 7,500.00 90,000.00


c. Lock,With Necessary Installation Nos 12.00 4,000.00 48,000.00
3 Windows (UPVC) sqft 652.25 750.00 489,187.50
4 Metal Work In Windows Ground Floor Only sqft 378.00 380.00 143,640.00

F Section 6: Walls / Plasters/Painting


1 Brick Masonary cft 3,084.18 446.00 1,375,544.92
2 Plaster Works sqft 8,445.46 80.00 675,636.80
3 Double Plaster Design ( Carness Butta ) Rft 1,050.00 468.77 492,208.50
4 Painting Works sqft 11,062.23 30.00 331,866.90 3,013,285.81
a. Internal Wall Putting sqft 8843.12 12.00 106,117.44

sqft
b. Enamel Paint in Door Shutter and Metal Work 911.75 35.00 31,911.25

G Section 7: Tiles ,Marble,Screeding ,Punning and Granite


1 Screeding sqft 2,924.65 70.00 204,725.73
2 Granite Work sqft 1,175.48 500.00 587,739.58 1,362,025.32
3 Tile in Kitchen,Terrace And Varahanda Sqft 2,847.80 200.00 569,560.00
H Section 8 : Exterior Design Section
1 Exterior Brick Work Finishing Sq.Ft 544.44 480.00 261,331.20
330,751.20
2 Classical Design Hukka In Terrace Rft 39.00 1,780.00 69,420.00

Client Name : Company Stamp


Signature : 2 Company Name:
I Section 9: Special treatment and waterproofing works
Water Proof Treatmet with Floor in
1 Terrace,Bathrrom And Balconey (2K Coat) sqft 790.45 180.00 142,281.00 180,765.00
2 DPC Treatment With Coating sqft 427.60 90.00 38,484.00

J Section 10: Others Items


1 Overhead Watertank and Metal Stand
a. Tank 1000 Ltr-2 Nos Nos 2 15,000.00 30,000.00
b. Metal Stand Nos 1 28,000.00 28,000.00
2 Underground Water tank ( 10-12000 Ltr ) TS 215,446.23
3 Railling (Stairs) Wooden Rft 42.45 3,820.00 162,159.00
4 Metal Staircase LS 1 39,000.00
5 Boundary Wall ( Already in Site ) Required Cost will be Added
6 Main Gate LS 1 60,000.00 958,061.12
Septic Tank and Soak Pit ( Laying Pipe to Sewer
TS 1 39,177.89
7 Line )
8 Stone Laying In Outer Portion Parking Area sqft 352 280.00 98,560.00
9 Parquating in Both Living Room sqft 555.00 165.00 91,575.00
10 False Ciling in Living and Kitchen Dining Rft 672.45 140.00 94,143.00
11 Water Filter Set LS 1 35,000.00
12 Water Solar and Supply System Set TS 1 65,000.00
Sub - Total 10,974,237.26
Electrical fittings 438,969.49
Sanitary pipes and fittings 555,750.00
Total including Management Charge 12,208,335.89
Contract Agreement Amount
Client Name : Company Stamp
Signature : 3 Company Name:
Sanitary / Bathroom Fitting

S.N. Description Unit Rate Amount Remark


1 Wash basin
Wash Basin : 1 Set Per Bathroom 1 5,800.00 5,800.00

2 Commode
Commode : 1 Set Per Bathroom 1 18,500.00 18,500.00

3 Wall Mixture
All Floor Wall Mixture : 1 Set Per Bathroom 1 6,800.00 6,800.00

4 C- Tap Mixture Mixture


All Floor As necessary 1 5,500.00 5,500.00

5 CP Set : As Feeting Nacessary 1 2,500.00 2,500.00

6 Angle Valve : As Feeting Nacessary


Per Bathroom Nacessary 4 850.00 3,400.00

7 Commod Spray : Per Bathroom 1 set 1 1,550.00 1,550.00

8 Mirror : Per Bathroom 1 Set 1 1,100.00 1,100.00


9 Other Necessary fitting iteam Ls 8,000.00 8,000.00
Sub-Total 53,150.00
Per Bathroom Set - 53150
Total No of Bathroom 5
Sub-Total 265,750.00
10 Buying And Installation of Pipe and Fitting 197,500.00
11 Kitchen Necessary Cost For Installation 40,000.00
11 Necessary Cost For Installation 52,500.00
Total Cost 555,750.00
Note:
1. स ू ण काय ह द कामदारह बाट स न ग रने छ ।
2. घर धनी ले इ ायको ख मा ,आपसी सम दा रमा ( सामान प रवतन गन सािकने छ ।
3.( )क िनको सामन प रवतन ँदा सामान को मु मा पिन प रवतन ने छ ।
4. आपसी सहमितमा मा काय प रवतन गन पािहने छ ।
Installment
S.N Payment Schedule Schedule Percentage Remarks
Amount

1
Advance Payment / sfd ;'? ug{sf] nflu 1,586,000.00 ! k6s 13%

2 Footing / xfQLkflxn] ;s]sf] ef]lnkN6 1,342,000.00 ! k6s 11%

DPC / l8lkl; ;s]sf] ef]lnkN6 1,342,000.00 ! k6s 11%


3
Ground Floor Wall and Slab / e'O tNnfsf] jfn
976,000.00 ! k6s 8%
4 / 9nfg ;s]sf] ef]lnkN6
First Floor Wall and Slab / klxnf] tNnfsf] jfn /
976,000.00 ! k6s 8%
5 9nfg ;s]sf] ef]lnkN6
Second Floor Wall and Slab / bf];|f] tNnfsf] jfn
976,000.00 ! k6s 8%
6 / 9nfg ;s]sf] ef]lnkN6
Third Floor Wall and Slab / t];|f] tNnfsf] jfn
;s]sf] ef]lnkN6 976,000.00 ! k6s 8%
7
Boundary Wall , Water Tank , Septic Tank
1,220,000.00 ! k6s 10%
8 and Other Structural Construction
;Dk"0f{ jfn, Knf:6/ / sf]/fdl;gf] sf] sfd ;s]sf]
1,220,000.00 ! k6s 10%
9 ef]lnkN6
10 cGo afsL sfo{ ;lxt lkmlglzª ;fdg vl/b 1,220,000.00 ! k6s 10%

11 cGo ;Gk"0f{ sfo{ ;s]sf], tfnf x:tfGt/0f u/]sf] lbg 366,000.00 ! k6s 3%

Total 12,200,000.00 !! k6s 100%