0% found this document useful (0 votes)
129 views15 pages

Water Supply Scheme Report

This document provides a final investigation report for a proposed water supply scheme in West Bengal. It includes details of the location, existing water and sanitation systems, justification for the scheme, and proposed water sources. The key points are: 1) The location includes village/mouza names and populations as well as water quality issues like excess iron, fluoride, arsenic, etc. 2) The existing water supply relies on hand pumps and dug wells, and prevalent waterborne diseases include diarrhea, typhoid, and Japanese encephalitis. 3) The justification for the scheme is the difficult terrain making other sources infeasible and high prevalence of waterborne illness. 4) The proposed sources being

Uploaded by

anirbanpwd76
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views15 pages

Water Supply Scheme Report

This document provides a final investigation report for a proposed water supply scheme in West Bengal. It includes details of the location, existing water and sanitation systems, justification for the scheme, and proposed water sources. The key points are: 1) The location includes village/mouza names and populations as well as water quality issues like excess iron, fluoride, arsenic, etc. 2) The existing water supply relies on hand pumps and dug wells, and prevalent waterborne diseases include diarrhea, typhoid, and Japanese encephalitis. 3) The justification for the scheme is the difficult terrain making other sources infeasible and high prevalence of waterborne illness. 4) The proposed sources being

Uploaded by

anirbanpwd76
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 15

FINAL INVESTIGATION REPORT OF

PROPOSED WATER SUPPLY SCHEME FOR

Name of scheme
AND IT’S ADJOINING MOUZAS

BLOCK: - -------

DISTRICT: - -------

NAME OF DIVISION,
P.H.E. DTE. GOVT. OF WEST BENGAL.

~1~
FINAL INVESTIGATION REPORT OF THE PROPOSED WATER SUPPLY SCHEME
FOR -------------AND ITS ADJOINING MOUZAS,
BLOCK: - ------- DISTRICT: - -------
________________________________________________________________________________
Reference Memo. No. 1) Memo No- , Dated-
_______________________________________________________________________________

Period of Investigation: From _______________________ to ___________________________

1. LOCATION OF SCHEME WITH THE FOLLOWING DETAILS:

a) Name of District : -------


b) Name of Sub-Division : ------
c) Name of Block : -------
d) Name of Police Station : ------
e) Details of Command Area :

Table 1.1: Villege/Mouza Details (Part-A)


Sl. Name of the J.L. Census Area Habitation nos.
No. Village(s)/Mouza(s) No. Code (Hectare) Total Considered under
the scheme

Table 1.2: Villege/Mouza Populations (Part-B)


Sl. Name of the Village/Mouza J.L. 2011 Census Population Considered under the
No. No. Scheme
Total SC ST Population Area (Ha)

Total SC/ST Population


Percentage of SC/ST Population
Population Density (Pensons/Ha)

Co-ordinate Details of Village / Mouza / Habitations


Table 1.3:
~2~
SL Name of the J.L. Co-Ordinate Details Name of Habitation Nos. of Co-Ordinate Details
No Villege(s) / No. Latitude Longitude House Latitude Longitude
Mouza(s) Hold

NOTE: - NOS OF HOUSE HOLD CALCULATED AS TOTAL POPULATION DIVIDED BY 4.5

e) Nos. of G.P. covered :

f) Name(s), address & telephone no of the GP(s) :

g) Distance of Command Area :


i) From District Head Quarter : KM

~3~
ii) From Sub-Divisional Head Quarters : KM
`
iii) From Block Head Quarters : KM

iv) Type of Communication :

h) i) Nearest Railway Station :

ii) Distance from Proposed Head Works :

i) i) Nearest Airport :

ii) Distance from proposed Head Works Site :

j) i) Name of the nearest river :


Impounding reservoir / Jhora (if any)

ii) Distance from the proposed command area :

iii) Tidal or Non-Tidal :

iv) Navigation or non-navigation :

v) Perennial or non-perennial :

vi) If Non-Perennial, flow period :

vii) Discharge during summer :

viii) Discharge during monsoon (with :


details of inundation / overflow etc.)

ix) Erosion occurs or not :

x) Distance from the H/W site of the proposed :


command area.

2. EXISTING S YSTEM OF WATER SUPPLY AND S ANITATION IN THE AREA UNDER PURVIEW
:
(Please give brief description on existing water supply and sanitation in the schools)
A) Water Supply :
a) Present Water Supply System:
i) Tube well with hand pump : Nos.
ii) Dug well : Nos.
iii) Perennial Pond /Jhora/River : Nos.
(Specify the name)

~4~
b) Whether Rig Bored Tube well is feasible when answer (1) is negative: Yes/No.

c) No. of Tube well in working condition within command area : Nos.

d) Whether there is excess Iron/Fluoride / Arsenic / Chloride / Nitrate :


in water in the tube well or well (State specific problems).
e) Whether ground water is saline : Y/N.

f) Any other water quality problems :


(Enclosed water quality analysis report of few hand pump
within the command area).

g) Prevalence of water borne disease in the area : Frequent/seasonal /occasional.

h) Major diseases (Briefly state name and nature of distribution) :


(Diarrhoea / Amibiosis / Typhoid / J.E. etc.)

B) Sanitation :
(i)General :

3. JUSTIFICATION OF THE SCHEME :


a) Difficult Area :
(Where H.P/Rig bored tube wells are not feasible in general)
b) Water borne disease prevalence area :

c) Water quality problem area, give brief detail :


(Excess presence of As, F, Cl, Fe etc as per CPHEEO Norms)

d) Any other importance attached to the area :

4. PROPOSAL ON SOURCES WITH REFERENCE TO FOLLOWING


PARTICULARS :
A) Tube well Source / Sub-Surface Source :
(Layer Chart, Details of Tube well Assembly, Yield Test Report, Phy. & Chem. Analysis
Report within 6 months of the existing Deep Tube well /trials bores within or around the
command area to be attached)
i) Location / Name of the scheme :
a) Name of the reference scheme
b) Mouza (J.L.) :

c) Latitude :

d) Longitude :

ii) Distance from the proposed :


Head Works

~5~
iii) Depth of Sub-soil water level :
(Static Water Level BGL in m)

iv)Seasonal variation of Sub-soil water :


level of the above well

v)Probable Depth of Aquifer :

vi)Yield of the Existing Well :

vii)Draw down :

viii)Physical / Chemical Analysis Report of the :


water from the existing (ref.) tube well

B) Surface Source :
(River / Impounding Reservoir / Dam/Pond/Lake/OCP etc.)
i) Name of the source & location of intake :
(Mouza, JL no. Long./Lat.)

ii) Distance of the intake from the proposed :


treatment units and the reservoir site.

iii) Type of intake including :


arrangements proposed

iv) Test Report of Sample of Water for :

a) Physical Analysis :

b) Chemical Analysis :
(Include Phenol, Pesticides etc in case of OCP and surface water based schemes)
c) Bacteriological, BOD, COD, :
DO Analysis

d) Heavy Metal Analysis :


(Pb, Cd, Cr etc. for OCP and surface water based schemes)

v) Depth of water at intake point during lean period:

vi)Discharge of the river during lean period :


C) Spring / Jhora Source etc. :
i) Location of Spring (Long./Lat.) :
ii) Its elevation from lowest supply point :
iii) Type of intake :

iv)Available flow in the driest part of :


the year
~6~
v) Maximum turbidity expected during :
the monsoon

vi)Nature of habitation on the upper :


region of intake point

viii) Physical, Chemical, Bacteriological, :


Metal, BOD, COD, DO analysis
report of the water sample

D) Rainwater Harvesting Structures :

Type of Scheme : Storage Pond / Roof Top.


a) Storage Pond
i) Type of Storage Pond : New Const. / Existing pond with renovation.
ii) Location (Mouza, JL no., Long./Lat.) :
iii) Area (ha) :
iv) Nature of renovation required(Give brief detail) :

v) Present use of the pond (Give brief detail) :

vi) Whether pond can be used exclusively for drinking : Y/N


(Record GP/VWSC’s opinion) .

b) Roof Top :
i) No. of houses with total roof area >100 m2 :
ii) Location of Houses :
(Mouza, JL no., Long./Lat .for individual building or clusters. and also mark in LOP)
iii) Location of Storage Tank :
(Location of storage tank with sketch need to be marked in LOP)
iv) Whether tank will be maintained by the user : Y/N
(if ‘N’ reason there of)

v) Per capita rate of drinking water supply proposed :

5. PARTICULARS OF AN EXISTING WATER SUPPLY (MUNICIPAL /RURAL) NEARBY :


i) Name of scheme :

ii) Distance from proposed command area :

iii) Type of Source :

iv) Intake :

~7~
v) Treatment Units :

vi) Reservoir :

vii) Distribution :

viii) Other Particulars :

6. EXACT POSITION OF PROPOSED TREATMENT UNITS /HEAD WORKS INCLUDING 2ND /3RD
/4TH TUBE WELL SITE AND OTHERS TO BE SHOWN IN THE MAP WITH FOLLOWING
PARTICULARS :

A) Table- 6.1: Details of proposed Treatment Unit Site / Head Work Site (1st Tube well site) :-
Sl. No Details of Land
i) Name of Mouza
ii) J. L. No.
iii) Plot No. / Dag No.
iv) Latitude
v) Longitude
vi) Area of Land
vii) Particulars of the land (Khas/Private)
viii) Height/Depth of Land from road level
ix) Availability of approach road

B) Table- 6.2: Details of proposed 2nd Tube well site :


Sl. No Details of Land
i) Name of Mouza
ii) J. L. No.
iii) Plot No. / Dag No.
iv) Latitude
v) Longitude
vi) Area of Land
vii) Particulars of the land (Khas/Private)
viii) Height/Depth of Land from road level
ix) Availability of approach road

C ) Table- 6.3: Details of proposed 3rd Tube well site :


Sl. No Details of Land
i) Name of Mouza
ii) J. L. No.
iii) Plot No. / Dag No.
iv) Latitude
v) Longitude
vi) Area of Land
vii) Particulars of the land (Khas/Private)
viii) Height/Depth of Land from road level
ix) Availability of approach road

~8~
D) Whether the reservoir site is at highest and tentative in central position : Y/N
(If “N” briefly describes the reason)

E) Radial distance among the Tube wells :


(i) Between T/W no. 1 & T/W no. 2 :
(ii) Between T/W no. 2 & T/W no. 3 :
(iii) Between T/W no. 3 & T/W no. 1 :

7. ROADS (ROADS THROUGH UN-INHABITED AREAS MAY BE SHOWN SPECIFICALLY )

A. All New, roads to be shown on the map (as obtained:


From P.W.D./ Panchayet / Zilla Parishad / GIS referenc etc)

B. All Road crossing particularly for National and :


State Highway with details of road to be shown
with following particulars.

i) Type of Road :

ii) Width of Carriage way :

iii) Width of foot-path :

8. RAILWAY TRACK :
All rail crossing to be shown in the map :

i) Details of crossings :
( Culvert / Underpass / Cover Pass )

ii) Width of Pass :

iii) Whether extra arrangement to be made :


for the crossing.

9. IMPORTANT PLACES , LOCAL FUNCTIONARIES , INFRASTRUCTURES / FACTORIES


/ INSTITUTION ETC:

a) Table: 9(a): Details of Religious Area :


Sl. Name of Latitude Longitude Existing Present
No. Temple / Mosque water supply Status of
/Church system Sanitation
1.
2.
3.
4.
5
6
7

~9~
b) Table: 9(b): Details of Business Area :
Sl. Name of Business No. of Latitude Longitude Existing Present
No. Area gatherings water supply Status of
system Sanitation
1.
2.
3.

c) Table: 9(c): Details of Hospital / Health Center:


(SHC/PHC/Block/Sub-Division/District/Super Specialty Hospital)
Sl. Type of Health No. of Latitude Longitude Existing Present
No. Centre /Hospital beds water supply Status of
system Sanitation
1.
2.
3.
4.

d) Table: 9(d): Details of School / College / Institution :


Sl. Name of School / No. of Latitude Longitude Existing Present
No. College / Institution Students water supply Status of
system Sanitation
1.
2.
3.
4.
5
6
7
8
9
10
11
12
13
14
e) Table: 9(e): Details of SSK / MSK / Anganwady Centre / ICDS etc. in Govt. premises:
Sl. Name of No. of Latitude Longitude Existing Present
No. Institution Users water supply Status of
system Sanitation
1.
2.
3.
4.
5
6
7
8
9
10
11
12
13
14
15
16
17
~ 10 ~
18

f) Table: 9(f): Details of Government Office :


(B.D.O. Office / Post Office Panchayat Samity/Gram Panchayat etc)
Sl. Name of No. of Latitude Longitude Existing Present
No. Office Officials water supply Status of
system Sanitation
1.
2.
3.
4.

g) Table: 9(g): Details of Public Offices (Bank etc.) :


Sl. Name of No. of Latitude Longitude Existing Present
No. Office Officials water supply Status of
system Sanitation
1.
2.
3.
4.

h) Table: 9(h): Details of Other important Public Buildings :


(Cinema / Club / Bus terminus, give brief detail)
Sl. Name No. of Latitude Longitude Existing Present
No. gathering water supply Status of
/ seats system Sanitation
1.
2.
3.
4.

Note: Any other institution situated in private premises to be noted in separate sheet.
10. REGARDING V.W.S.C. :

a) Whether VWSC has been formed : YES / NO


(if Yes, details structure of V.W.S.C.
Telephone No., Address etc.)

11. REGARDING M INORITY / SC / ST DOMAINATED CLUSTERS :

No of minority/SC/ST dominated clusters (Pl mark in LOP) : nos.


(Use different color for General & Other Community)

12. MELA, RELIGIOUS FESTIVAL , CONGREGATION ETC

Whether any important religious festival / Mela occurs within the proposed area, if so give
brief description with the following particulars:

a) Location of Mela to be shown in the Map (Long. / Lat.) :


~ 11 ~
b) Duration of Mela : ………………Day(s)

c) Approximate congregation in Mela :……………….No.(s)

d) Approximate water demand per day :

13. DETAILS OF RAINFALL DATA

Table: 11.1 : Rainfall Data of the Block:

Year Name of Block Total Rainfall Remarks


(mm.)

14. DETAILS OF CANALS :

a) Position of Canals to be shown in map :


(Blue Colour)

b) Width of Canals (m) :

c) Whether extra arrangement have to be :


made for carrying water supply line to cross
the canal (Position of crossing to be shown in map)
d) Type of Crossing proposed :

e) Position of new cut canals to be shown :


in the map

15. DETAILS OF ELECTRICITY (THREE PHASE)

a) Type of Electricity available (hrs/day) , (440 V./11000 V, H.T. Line etc.) :


i) Head Work Site :
nd
ii) 2 T/W Site :
rd
iii) 3 T/W Site :
~ 12 ~
iv) Other T/W Site :

b) Distance from the


i) Head Work Site :
ii) 2nd T/W Site :
iii) 3rd T/W Site :
iv) Other T/W Site :

c) Voltage fluctuation occurs or not : Y/N

d) Details of Load Shedding :


i) Duration Time (In general) :
ii) Hours in Day :
iii) Hours at Night :
iv) Total hours in a day :

e) If electricity is not available whether there : Y/N


is any scope of power installation in near future

f) If not available, possibility to install generator set/


Solar powered pumps to be explored :
(Briefly describe GP/VWSC opinion)

16. REGARDING SWAJALDHARA / ANY OTHER MODE OF PWSS SCHEMES :

a) Whether there is any Swajal Dhara or


Any other water supply scheme within
the proposed command area. : Y/N

b) If Yes , then fill up the table.

Table: 12.1 : Details of Swajaldhara W/S Schemes within the proposed command area:

Sl. Name of Mouza Name of Habitation No. of House Hold No. of Population
No. (J.L. No.)

~ 13 ~
1.

2.

3.

c) Whether the scheme is running : YES / NO.


( If No, give brief detail)

d) Whether Tariff collected regularly : YES / NO.


( If Yes, give rate, mode of collection etc.)

17. GP/VWSC OPINION ( IF ANY ):

Signature of the Chairman


VWSC/GP.

18. SPECIAL FEATURES , IF ANY :

19. ADDITIONAL REMARKS, IF ANY :

SIGNATURE OF INVESTIGATING OFFICER

( ) ( )
Junior Engineer Junior Engineer

( )
Assistant Engineer

~ 14 ~
Remarks/Recommendations/comments etc, if any likely to be added by the Executive Engineer

( ) ( )
Assistant Engineer Executive Engineer
Division Division
P.H. Engineering Dte. P.H. Engineering Dte.

~ 15 ~

You might also like