Review Kiln Overhaul
Premix reclaimer , Rabu test local sudah, next test auto
2. 361_FN3, progress welding liner.
Alignment 18.00 - 24.00
Test uncouple 24.00 - 01.00,
couple motor 1.00 - 03.00"
3. 361_RM1, Test lubrikasi roller, lubrikasi gearbox, pompa hydraulic, test tension & lifting done.
Alignment 17.00-24.00
Test uncouple 00.00 - 02.00.
Test couple 02.00 - selesai
4. Separator 361_SR1, jalousi cek 20.00
setelah cek QC OK bongkar scaffolding, setelah itu test run
5. 391BE1, Wed sudah test run
6. 362RM2, welding center chute selesai 24.00 dicek QA
Kalibrasi roller 24.00 - 3.00
Separator jalousi cek 20.00,
setelah cek QA OK bongkar scaffolding
Test run setelah bongkar scaffolding
maindrive alignment 17.00-24.00
Test uncouple 00.00 - 02.00.
Test couple 02.00 - selesai
Test sealing air pressure 19.00
7. 362FN3, Test run 19.00
8. 431BE1, Progress pemasangan bucket 190 dari 528 buah.
target finish kamis (15/4) sore"
9. 431BE2, test uncouple finish.
Test couple 20.00
10. C5B cyclone innertube and castable jam 22.00,
bongkar scaffolding 22.00 - 10.00 (15/4)
11. C5A cyclone susun ulang s/d 02.00
castable jam 02.00 - 05.00,
bongkar scaffolding 05.00 - 17.00 (15/4)
12. Meal pipe C5A,
progress install expansion joint, setting s/d 10.00 (15/4)
castable 10.00 - 14.00 (15/4)
install tipping valve 08.00 - 15.00 (15/4)
install termocouple 08.00 (15/4)
Install air blaster
13. Meal pipe C5B, castable 19.00 - 21.00
welding casing 21.00 - 03.00
install tipping valve 08.00 - 15.00 (15/4)
install termocouple 08.00 (15/4)"
Install air blaster
13.A. Slide gate Fine Coal Pipe
14. Inlet Kiln, Wed fininshed
15. TAD, kamis siang ready 12.00 (15/4)
16. Coal Mill Baghouse,
install bag filter finish 22.00
Pembersihan 22.00 - 08.00
Install RF under baghouse 08-00 - 16.00 (15/4)
Install Multicell dan Multicore
cover target kamis sore (15/4)"
17. Coal Mill rewelding dibatasi s/d 17.00 (15/4)
cleaning tools tutup bigdoor s/d 08.00 (16/4)
18. Clinker cooler,
pemasangan grateplate 19.00 - 03.00
castable 21.00 - selesai
test run kedua (15/4)"
19. 491_PN1
spare rail sampai kamis pagi (15/4) lgsg dikerjakan
            Start 16/04/21
            Estimasi : jam 12.
            Setelah power on
            Setelah power on
mpa hydraulic, test tension & lifting done.
          Estimasi : jam 12.
          Setelah power on
          Setelah power on
            Sudah test
            Test Run Setelah power on
            Setelah power on
            Ok
            Ok
            Sudah
            Sudah
            Setelah power on
            Setelah power on
            Sudah
            Sudah test vibrasi 2.5, balancing setelah ada power
            Total terpasang 312+43
            M1 akan direpair setelah allignment M2
            Sudah ok
            Sudah ok
            Cleaning castable
            Bongkar pkl 12 sd pukl 24(on progress )
            Selesai pasang pukul 13.00, selesai jam 17.00
            Castable start 17.00-20.00
            Bongkar 20.00 - 02.00 (jum'at 16 Apr pagi)
            Selesai pkl 22 ( On Progress )
Pkl 22- 24 ( On Progress )
Pkl 24 (On Progress )
Pkl 13.00,jam 17.00 memperbesar lubang, siap 20.00
Pkl 15.00, Mulai jam 19.00-24.00
Final check (baut, gap flange)
Final check (baut, gap flange)
Final check (baut, gap flange)
Pkl 13.00,jam 17.00 memperbesar lubang, siap 20.00
Pkl 15.00, Finishing
Selenoid Sedang di pasang, Test jam 20.00
Final Check OK,Bongkar Scaffolding jam 19.00-24.00
Tinggal 11 titik. Selesai pkl 24,tinggal 7 titik, Selesai jam 24.00
ok
ok
ok
Setelah ada power (pukul 17.00)
ok
Ok
Tutup bigdoor 17.00 sd 08 (16 Apr)
ok
Paralel dgn Mekanik, selesai pk 24( On Progress)
Setelah catable & power on (pkl 18)
Pasang untuk No 1 kanan dan kiri