INSPECTION CHECKLIST FOR WATERPROOFING WORKS
Element : Inspection Date :
Block / Phase : Sub-Contractor :
Units :
Inspection Re-inspection
Acceptibility Acceptibility
Item Description
( X or √ ) Date ( X or √ )
CONT CONS CONT CONS
Surface Free From Oil / Grease /
1.0 Dirt. Motar Stain
2.0 Angle Fillet
WORKS ABOVE TO COMPLETE AND INSPECTION SIGN - OFF PRIOR TO SUBSEQ
3.0 Waterproofing Material
Upturn to wall (300mm high at
4.0 Bath / Balcony / Yard)
WORKS ABOVE TO COMPLETE AND INSPECTION SIGN - OFF PRIOR TO SUBSEQ
Sequence of work
5.0 (Hacking after waterproofing)
Water ponding Test
( Water level / Touch-up after
6.0 Plumbing works)
7.0
Ponding Test :
11.1
Bathroom
(11.2
____________hr)
Dry Yard
(11.3
____________hr)
Balcony ( ____________hr)
11.4
Swimming Pool / Pond /
Plantex Box
( ____________hr)
11.5
Flat Roof
( ____________hr)
Status :
Accepted with condition to
Accepted rectify as comments
Request by Varifi
Participants
Contractor's Representative Consultant's
Name
Designation
Signature
Date
** N/A where Not Applicable and Add item (s) where as necessary
Attachment AR06
PROJECT :
ERPROOFING WORKS
actor :
( Company's Name )
e-inspection
Checking Method Remarks
Date
Cross line
Laser
Visual
N - OFF PRIOR TO SUBSEQUENT WORKS
Visual
Visual
N - OFF PRIOR TO SUBSEQUENT WORKS
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
ed with condition to Not acceptable. Re-
fy as comments inspection required
Varified / Approved by
Consultant's / Client's Representative