Fully Automatic Blow Molding Machine DMK-L8
Fully Automatic Blow Molding Machine DMK-L8
DMK-L8
Machine Manual
Tel:
post code:318020
Fax:
1
General catalogue
Part I catalogue……………………………………………….4
1. Security system………………………………………………………..4
2. Alarm: buzzer…………………………………………………………5
3. The operator of the note…………………………………………………………..5
4. The machine operators’ attention………………………………………………….6
5. Maintain the attention inspectors………………………………………………….6
6. Compressed air circuit of the note………………………………………………...7
7. Laws and regulations……………………………………………………………...7
8. Managers, supervisors and managers……………………………………………..7
9. Notice to fume and miasma…………………………………...………..7
10. For fire precautions………………………………………………………………..8
11. Fire-fighting equipment…………………………………………………………….8
3. Subsidiary machinery……………………………………………………………...11
4. Mechanical installation……………………………………………………………11
5. Electrical…………………………………………………………………………..12
2
7. Cooling water………………………………………………………….……..……13
3. tooling……………………………………………………………………………..15
device……………………………………………………………...22
1. Preface……………………………………………………………………………..22
3.1 Emergency stop button.( When the emergency stop button can be pressed.)…25
4.1 Features………………………………………………………………………...27
3
4.3 Operation is introduced and the related function picture………………………28
5. Commissioning…………………………………………………………………….37
6. Basic operation…………………………………………………………………….38
1.3. Operation………………………………………………………………….……………..44
4
Part 1 Catalogue
requirements of this instruction manual operation, may cause casualty accidents, such as
mechanical damage. Forgive my company on the economic loss caused by irresponsible. If there
1. Security system
5
1.2 Security gate
All mechanical moving parts (bottle preform GongGeiBu move send out of
position of molding, etc.), cover and security protection device such protection device. Open
any security limit switches will be cut off after all mechanical operation will stop immediately.
And if all the security shutoff no word, also cannot start the machine operation. Operating
machinery, must confirm that all the security of the limit switch is correct. And if the security has
been taken down or invalid, absolutely cannot run machinery. As for the maintenance and
operation to enter exit to prevent accidents, please switch off the main machine.
1.3 Air
6
1.4 Emergency stop
It consists of three stop switches. Press any of these three emergency stop buttons,
machine will stop immediately. And machine will not restart unless not relieve the emergency
stop. Relieving emergency stop, please turn right the button head. Before machine start, please
check the emergency stop buttons and make sure it can work well.
In the circumstance wire short cuts or abnormal current runs, switch QF starts and cut off all
The host computer is installed with earth wire, which should be strand wire and stronger than
the provision thickness. Please comply with the company’s regulation, because different areas
different regulations.
2 .Caution board
Caution boards, reading dangerous in big letters of high colors, are stick on all
parts of the main machine, including dangerous, caution and attention.
Dangerous
Pay attention to the caution board, to avoid worker injury such dangerous
accidents.
Warning
Regardless of caution board will cause injury and death. So danger and caution
predict not only product damage, but also death and injury.
Attention
Regardless of caution board will cause injury and death. And danger and caution
predict product damage such dangerous accident. That is to say, the order according to
the danger degree is danger, caution and attention
Please read carefully and obey the content on the caution board, any questions please contact
7
our company.
3 Operation notice
3.1 Don’t climb onto the running machine, which will cause injury. And
touching moveable parts of the machine will result in malfunction and accident.
3.2. Cut off electricity and stop machine before working on the machine.
Cut off the air supply before operation; confirm the manometer of
reducing valve is on the 0 place. Pay attention that after cutting off air supply,
air moveable parts acting up and down will stop immediately.
3.3. Prepare safety helmet and gloves. Wear skid proof shoes to protect feet.
Tie your long hairs in your helmet, do not wear loose clothes to avoid injury your
body.
3.4. Prepare the ladder and then climb on the machine correctly.
or professors. All the used parts like screws are metric screw. Pipes of chiller water
and air are imperial screw parts. Please note such difference.
3.6. Machinery is not allowed to runner when there is worker checking for
3.7. Operators are not allowed into machine or security gate when machine is running.
8
4. Attention by machine operators
Regardless of the following notice, will cause human injury and machine
damage.
4.1. Any parts of the human body can not touch any moveable parts of the
4.2. Operators are not allowed into security gate, even not allowed hands into
4.3. Don’t put any tools on the machine, otherwise, will cause human
skidding. Meanwhile, if the robot clips foreign matter, it will cause bad injection.
4.4. Please don’t make the limit switch of the security gate come to short circuit.
5. Attention by examiner
5.1. Cut off all the electric switches before starting, and put on the board of
“prohibit electricity”.
5.2. Fix protective plate and security gate around the machine for protecting
workers. There is limit switch on the security gate and power box gate, if without
closing gate correctly, the machine can not start, even so when the switches are left
down and short circuit.
5.3. Before machine is finished, air loop is set. During adjustment, pressure
9
5.4. Our blow molding machine use compressed air. When changing air valve,
cylinder, safety valve, connector pipe such spare parts, please open the circuit
completely, and confirm the rest of air pressure is in 0 position. During operation of
moveable parts, in order to avoid falling down, on the lifting position please fix the
location rack or wood chip in the moveable parts. After working, smear suds on the
connection part to check if it leaks. During next maintenance please do so.
5.5. Because using chilled water, so regularly check the pipes to avoid leaking.
5.6. Please use the water pipes and air pipes complying with the pressure
5.7. Please use normal tools including suitable torque of screws and nuts
during maintenance.
5.9. Check regularly main machine, spare parts, wearing parts, metal rings and
5.10. After cutting of the main electric power and switches of other
connecting power, so please use insulating tools, and don’t wear jewelry or other
metals. If two workers are working, please both go to confirm the circumstance is
suitable for working.
5.13. Electric equipment and pipes are confirming with the followings:
10
5.13.1. Please fix the leakage protector in equipment power and the ventro-
machine.
5.13.2. Fix the earth wire and ground terminal in the proper position near to the
machine. However, after long time, because of insulation deterioration, electricity
supply can not run normally, so please note it.
5.13.3. Use regular fuse or switch without fuse.
5.13.4. Use insulated cable with sufficient electrical volume in electricity wire.
Connect the cable with the switch without fuse in the electrical controller.
5.14 After repairing machine, before connecting power, please make sure no accident
will happen, and no tools have been left.
Attention to the compressed air circuit, because it maybe cause explosion and
injury workers.
6.1. Set of pressure reducing valve can not be beyond of company pointed range.
It will not attack the air box.
6.2. When reduce pressure of compressed air circuit, stop the machine, stop
supplying air, at the same time open filter open, it is safety way.
6.3. For the machine using filter, after stopping machine and then stop supplying
air to machine, open the air exhaust gate under the air tank, and relieve pressure of air
box and circuit.
6.4. Completely stop supplying compressed air to machine, and make sure all
pressure in circuit is relieved, and then decompose circuit and take out components.
6.5. Do the following job in the place machine stops long time
Relieve air pressure, make sure the pressure is relieved completely, and then do
rust-proof and corrosion prevention job in inner side.
Set up air circuit at second time, please do as followings:
Set lower position to the pressure of reducing valve and start to supply air. Check
all the components under situation of low pressure. Set the highest pressure of
11
operation (0.69MPa), and check machine running.
6.7. Regular examination
Do exact examination according to chapter VII.
7. Rule of operation
When using machine, run it according to the rule of operation related with the machine.
8.1. All the operators must operate according to the rules of the machine
introduction
8.2. In order to be safe, please arrange two or more workers to operate and do
maintenance.
8.3. For maintenance, please arrange qualitificatory workers or professors to do
it.
8.4. In order to keep machine in sufficient production, please do maintenance
regularly, examine and repair machine.
8.5. Attention, without the manufacturer’s agreement, the user mustn’t remake or change the
machine; otherwise, we are not responsible for any results caused from your change in the
Through heating, mixture of resin and additive will relieve fume and miasma. Any unclear to
it, please require to resin supplier. Please fix air-change equipment in order to have a comfortable
environment.
Because there is a heater, in order to avoid fire, please note: do not put any
flammable articles near or in the machine; when plate is covering over the machine,
do not start it. Keep machine surrounding clean.
As to lubrication oil: smear it after stopping machine. There is nothing that is easy to make
fire around the machine; deal with oil cloth correctly to avoid fire. Clear oil stain ing around the
12
machine.
Number of cavity 8
Heating unit 4
Layer of lamp 9
Number of blowing bases 152
Dimension 5.45*2.15*2.1 m3
Weight 5t
Pressure 220/380v
Power
Frequency 50/60Hz
Operating power 40-70KW
Installation power 100KW
Low pressure 0.7~1.0MPa
Air
13
High pressure consuming 4.5-6.0m3/min[hot filling(15-18m3/min)]
Temperature ≤20°
Water Pressure 3-4bar
Flow 5m3/h
DMK-L8 automatic blow molding machines are available for kinds of stretching
plastic bottles. Through infrared lamps heating, and servo motor driving performs
heated in heater, and then come into blowing mold under high pressure air, performs
are blown into bottles.
Keep machine and spare parts running in stable, harmonized situation; correct
mold closing; sensitive reaction of controlling system and correct direction. It can
produce good products matching with the mold. Touchable screen operation makes
machine running clear for workers. Main electrical components (touchable screen)
adopt international brand, cylinder of action part is FESTO, SMC with high quality
and high guarantee.
14
SY30-00 示意图(图 1)
Blow molding machine is made up of following parts: perform feeding part,
bottle-out part, heating part, stretching mold closing part, chain driving part, electric
control system, air circuit, machine base, and air window and so on.
(图 2)
As the installation illustration-preform feeding, it is the turning perform-feeding
structure. Through lifter and unscrambler, performs are coming into the chain by the
turnover cylinder. Short stroke cylinder on the left controls the opening and closing of
the neck clip block. The turnover cylinder on the right controls the clip block turnover
action. In every setting parts drill many holes to adjust easily.
The following is location part, before performs, the part will stop bottle
supporter, so that the preforms can be put on the bottle supporter easily.
15
2.3 Chain driving structure
小链轮主动组件
主动链轮组件 定位机构
链轮张紧组件
(图 3)
Two lines of chains will be driven by two individual motors, one servo motor
drives big chain which forces blowing base revolution through perform feeding part,
heating part, mold-closing stretch part and bottle-out part. Smaller chain drives
blowing base rotation and make perform heated in balanced.
2.3.1 Blowing base
There are 156 blowing base on the blowing conveyer line. If the inner diameter
and the neck are the same with the last mold, there is no need to change the blowing
base. Otherwise, in order to be suitable for new molds, it is necessary to change the
blowing base. It will be fastened by the o-ring. Take o-ring off by cathode
screwdriver, and then take out the blowing base. Change for new blowing base and fix
o-ring into slot. Make sure there is enough room in heating channel and turn the
conveyer. Otherwise, the lamps and heater will be damaged easily.
2.3.2. Hand regulation conveyer
16
Connect the hand on the motor out shaft and then turn by hand, in the
circumstance that no electricity in servo motor. Generally security gate opens the
power will be cut off. But in order to be safe, please confirm it again.
2.4. Heating appliance
With installation illustration: infrared lamps heat. In order to heat performs
properly, it is necessary to adjust heating appliance height, and distance between
heating appliance and conveyer. Stop machine, put some performs into blowing base.
Move conveyer orbit by hand and heat the inner side of the heating appliance. Adjust
heaters in order according to perform size and shape.
Caution
Touch it by hand, the life of the infrared lamps will be short. Please keep
infrared lamps clean far from oil or other dirties. In operation, please note that
in order that lamps are not touched by performs, please adjust lamps backmost.
17
Put performs into the blowing base in front of heating appliance, with standard of
the lamp downmost.
Unfasten two screws of the heating appliance, turn four screws for height
adjustment.
Keep heating appliance with performs in parallel. At the same time, turn the
conveyer by hand. Make sure in conveying, performs will not touch heating
appliance. After adjustment, please fasten the location screws.
2.5 Structure of stretching mold- closing
As the illustration, this part is important in blow molding machine. When heated
performs are coming, the mold will close under action of three cylinder. Through high
pressure air, performs become into bottles. Please read the chapter III carefully.
3 Subordinate machines
Two sets of high pressure air compressor; one set of high pressure air tank; one
set of low pressure air tank; one set of chiller and two sets of oil-water separator. All
of these assistant machines are chosen specially and high efficiency.
As the illustration of lifter and performs separator: lift performs from the hopper
and convey into performs separator, which will separate bad performs out of the
machine.
18
高压空压机
冷干机
高压储气罐
SY30
吹瓶机
提升机 分坯机
4 Machine installations
19
4.2 Installation position (underlay)
Load of installation position is related with the machine horizontal plane. So
please keep machine installed horizontally. Meanwhile, before adjusting running
speed properly, it will increase machine load.
5. Electric
In machine operation, please comply with the local low, we suggest below
10Ω
5.3. Voltage
Supply machine with stable voltage. The suggestive range is < ±5%. The
allowed range is Max. < ±10%. If your power change is beyond the above range,
please fix voltage stabilizer.
5.4. Wire connection
Wire
Please connect the three-phase L1, L2, L3 with machine maingate QF1.Connect
neutral line (N bright blue wire) with N terminal or other N terminal of maingate QF1.
connect guide wire (PE, yellow and green streak line) with PE terminator.
Caution
20
6. Operation air and blow air
Two kinds of individual compressed air are in need in machine running and
blowing. Please comply with the machine installation, air circuit drawing and pressure
specification.
6.1. Operation air
Make sure air driving system and cooling system run under being supplied low
pressure air. Operation pressure: the Max. supply pressure: 0.97MPa. Pressure of air
reducing valve: 0.69MPa. Please refer to operate air circuit diagram. The actual value
depends on the cycle time.
6.2. Blowing air
Blow performs in blowing position according to the supplied high pressure air.
The maximum pressure of supplying machinery: 3.43 MPa. Please refer to air circuit
diagram. The practical needed pressure and quantity is determined by the finished
shape.
6.2.1. The first air-blowing and the second air-blowing [and the third air
blowing (hot filling)]
In order to make performs into bottles, it needs two kinds of pressure air: the first
air-blowing and the second air-blowing [and the third air blowing (hot filling)]. The
air pressure in blowing system is supplied according to the second air-blowing. The
first pressure is from the second air-blowing after pressure reducing in reducing valve.
[The third pressure is similar to the second air-blowing pressure (hot filling).]
6.3. Air reducing valve
The first air blowing and reducing valve: since the second air-blowing (air tank),
reduce pressure through adjusting screws. The first blowing pressure which should be
within the allowed range depends on the mold set.
Alarm
21
All the equipments in the buyer’s must be washed and clean, and then can
be connect with the machine. Otherwise, it will damage the air valve.
Forbidding using pipes with rust in inner side. In frond of supplying valve,
please fix exhausting valve.
7. Chilled water
22
Caution
Please arrange qualifictory operator who is specialized in pipe project
connect pipes. Otherwise, it will affect machine feature.
7.3 wash new installed water supply system
Wash order
Cut off machine supply and back to circuit near to the connector, and connect
with the temporary pipe. Run the water supply line. Wash water and waste through the
temporary pipe.
Caution
All the pipes should be washed first and then connect with the machine.
Forbid use pipes with rust in inner side.
7.4 Connection with machine
Temporary pipes and machine supply is going to be connected with pipes which
will not be rust (e.g., forbidding using heat sealing)
7.5 Water discharging connection
Discharge all water before starting machine, e.g., during parts and molds
exchange, please discharge water in order to damage spare parts.
Discharge way: firstly, close the stop valve of the water supply, and close stop
valve of the water-return. Open low pressure air valve and pourer water into other
container.
Caution
If there is no water flow in machine supply system and return gate, it will
damage machine and mold.
8 Examination of lubrication and screws
Please do the followings before machine starts automatically: remove antirust on
the machine and mold parts, clean, put lubrication and examine screws.
8.1 Lubrication
Remove antirust on the machine and mold parts, clean, and put lubrication,
please refer to the content: maintenance examination, lubrication, recommend oil. The
parts unload from the machine must be lubricate before installation.
8.1.1 Lubrication before starting machine
23
Some of the parts before starting need operating by hand. So after preparing,
please lubricate machine. When starting, all parts must be installed and operate
correctly.
Caution
Running automatically means start after lubrication.
8.2 Screw examination
Please check if all parts are installed correctly. Check the machine power supply
system. It is better to check more than two times to avoid missing.
24
All cylinders are backward to initial state (prevent sudden operation
during air supply)
2.3. Press safety relay resetting system button. Supply power to working
25
To used mould, install stretching and arrester as recorded data. For
the fist installation, please do in this order: do it under the most frequent
used working air pressure, confirm whether blowing mould is totally
opened, and whether handling is on initial position. Press hand-operated
valve AV2-3 to elevate stretching.
3.3.1 Confirm space between near bottom end of stretching and bottom
mould, usually 1-2mm.
3.3.2. If slight adjustment is necessary, unscrew stretching on fixing
board, and then adjust.
3.3.3. Adjustment by a big margin, please use stretching arrester.
3.3.4. When stretching backward, fix nuts.
26
bottom mould.
4.2.3. Open another half
4.2.4. Remove another half-mould in the same way.
Caution
Operator pay attention to avoid finger pinched and avoid damage by
bottom mould falling
5. Mould maintenance and lubrication
Details about lubrication are in chapter 7. Before machine
automatically runs, lubricate all folded surfaces and contacting surfaces
on mould, which is very important to extend mould utility longevity
Two proposals for maintenance:
Stop the machine for 10 minutes every day to maintain in short term.
Observe by eye to assure no screw slacking, no wear of pipe sand metal
threads.
Do regular maintenance at least once 60 days. According to products,
if mould needs to be replaced periodically, check it whenever removing.
If not so, have a thorough check-up in a 60-day cycle.
27
operation: lubricate, spray rust-preventive, protective spray can special for mold,
lubricating grease special for food machine with FDA certificate or lubricating can,
The agent of preventing heat burns, cotton waste, paper towel, tools, electric loop
detector and so on.
Before the operation of lubrication for molding, please visually check machinery
and die. If finding takeover damage and wire damage, or screws loop, timely
adjustment can prevent mechanical operation from the failure, and save outlay.
Machinery is composed of large installation of steel parts. Therefore, in condition of
low temperature starting machine, it usually takes long time to achieve the
temperature where the production can be put into. Therefore, a few minutes before the
re-start, please carry out air operation mode of the mechanical operation. Final
product quality has a lot to de with the perform's quality and temperature when
connected to mechanical. For producing a good bottle, trying to use the a good state
bottle is a very important premise. For stabling the preform's temperature, please set
aside the preform for some time (24 hours) before putting it into the blow molding
machine, so that it can natural cool down. When forming problem is found, please
make sure the state of your preforms you are using before contacting with us. Then
use the perform with a stable temperature and good condition for blow molding and
then observe whether there is improvement or not.
2. Examinations before connection with electricity
2.1 examinations to assistant machine
Please confirm the followings: all of the power pipes are washed, and
connection is correct; connection wire specifications are right, and make sure that the
fuse is of capacity requirement.
2.1.1 Trial running of assistant machines
Before supplying energy, please try and run assistant machines firstly. please
install and debug machine according to the machine instructions to finish. Before a
successful commissioning of machinery, please stop energy supply systems.
28
when the interface and the gap in the mold and make sure there isn’t broken and waste
things. Check back chain and bottle blowing frame.
2.3.2. Lubricant
Before the refueling, clean firstly the place, remove dust and gas bodies. Please
make all lubricating face sufficient lubricant. all the oil can will be added lubricant,
but cylinder does not need to refuel.
Notice
Quartz lamp has high lightness. Please look in the eye after wearing color glasses.
2.3.2. It won’t be heated fully if there is dirt on quartz heating machine. Clean
the heating lamp with clear cloth. When installing, it may cause residual substance on
the lamp. This may cause early accident. So look out when operating.
29
Check if all the safety devices have been installed correctly, if the safety gate
been open or shut correctly (machine will stop running when safety gate is open).
30
3.2. Supplement of blow air
31
3.3.2. Refer to the reference of cooling machine, start cooling device, then
cooling the compressor.
3.3.3. Before open the loop of cooling water, please open the backup valve of the
machine(out side of the machine) , then open supplying use valve( in side of the
machine).
3.3.4. Stop the machine when shaping, with the same time, the last circulation of
the machine, stop cooling water supplying immediately.
3.3.5. For stop supplying cooling machine, first shut supplying valve, then
backup valve.
3.3.6. The blowing machine need t stop more than 30 minutes, then stop cooling
machine running, this will save energy.
32
3.5.4. Check the following points:
If main power is on.
If all emergency buttons have been reset (in condition of not being
pushed)
If all safety gates are shut correctly.
If all cylinders in origin place (in order to avoid running violently when
recovering of working air).
3.5.5. Push RESET button of safety relay. Start air release valve, supply air to
each cylinder.
33
4.4.3. Push Blowing Ways button, start blowing.
4.4.4. Blowing work is going in the same time with next loading.
Note 1: the button of Blowing Ways is in use, just with the heating machine
switch on setting menu of the heating machine; if perform counter cannot assure 2
preforms, the machine cannot be started running.
5. Order of stop running
5.1. stop in short time
After stopping the main machine in short time, we can do simple repair and
adjust work. This method can stop running immediately, but performs will stay in the
machine.
5.1.1. Push the button of AUTO RUN on control panel, machine will stop
running when finish one cycling.
5.1.2. At the same time of running stop, the switch of heating machine also put to
OFF.
5.1.3. Shut supplying chilled water.
Notice
Attentions before running again
Stop running according to the method by 5.1, there still remained shaping
performs within the molding machine. Preform inside the heater will deform
because of the remaining heat. In this case, if it start running again, then bend
preform may have collision with the heater which will lead to mechanical
damages, so be sure to remove the bottle.
5.2. Restart running after stop for short time
Restart running according to the order of starting the machine. If machine stops
within 10 minutes, it may not run emptily.
5.3. Stop for long time, finish working
Stop running after all performs have been taken out of the machine.
5.3.1. Push supplying button to OFF on control panel.
5.3.2. Stop supplying performs, blowing ends.
5.3.3. After the last perform been blowed, push down AUTO RUN button. The
machine will stop after the running cycling.
5.3.4. At the same time, if we have set PLANING NUMBER in RUNNING
34
CONDITION NOW on the panel, the machine will stop automatically with the
producing ends.
5.3.5. After machine stop running, switch of the Heating Machine will get to
OFF automatically.
5.3.6. Stop supplying for cooling water.
5.4. Shut the power of the machine
5.4.1. If stop for 2-3 hours, please apply rust inhibitor for all moulds spare parts.
5.4.2. The mould will shut when Mode Setting open. Don’t shut totally, just keep
backlash for 10mm. this can not only prevent dust but also keep venting.
5.4.3. Stop supplying for work air and blowing air. When maintaining and
checking the machine, please release all the pressure in the loop.
5.4.4. Shut the main gate to OFF.
5.5. stop for long time and then restart the machine
Restart running the machine according to Order of starting the machine.
1.Preface
Welcome to use our company's DMK-L series full automatic blow molding
35
machine.
This equipment can only be operated by a certified professional person, before
the installation and commissioning of blowing or facilities, please be sure to read this
instruction manual, get familiar with the operating instructions of the necessary
components and mentioned on all cautionary and attaching signs, ensure that warning
signs placed in conspicuous places, and timely replacement of loss or damage to signs
should be done. If you did not follow the requirements of this manual operation, it
may lead to casualties, mechanical damage and other accidents. Excuse me for the
company's economic losses resulting irresponsible.
Certified staff:
The so-called "certified the staff" in this manual and the device means, the
personnel working on this device must be familiar with the installation,
commissioning, the steps and requirements of putting into operation and
avoid emergency situations arising in the Production process. He (she) must
also meet the following requirements.
1. Specially trained and can practice the circuit power, power, installation,
commissioning, emergency handling and other operations in accordance
with the provisions of the manual steps required for safe operation and
equipment.
2. Trained to be able to make a proper maintenance and use of protective
equipment in accordance with the provisions of the safe operation of the
manual steps required,.
3. Received first aid training.
◆
◆N otes
36
Pl eas e u s e th is man u al to th e en d u s er. ◆
Press the emergency stop button, all the machines will stop running, if you
do not lift the emergency stop button, machine no longer starts. To unlock it
you should turn the button to the right on the head. Before mechanical
operation, be sure to confirm all emergency stop buttons’ settings and
functions are correct.
For the security of the whole system work, please be sure to set the security
control system for the external circuit when the external power supply,
control system have abnormal failure.
Alarm works when the machine works abnormal or pressing the emergency
stop button. Beep reminds and warn the potential danger to the operators
around the host machine. Please make all those who work near the machine
understand the function.
The graphic instruments, may be a little different according to the
specifications of different machines.
A bsolute prohibition of lock device safety device, resulting its failure
Before supplying power to the equipment, check its work voltage, in order to
ensure normal working power.
37
Blowing machine control cabinet only can be used by blow molding
machine, it is prohibited to set external peripheral devices around the control
cabinet.
When inspect or replace the electrical components, you must turn off the
power.
2. Circuit Installation
Warning
Your company must have a formal grounding system, we recommend the
following ground resistance is under 10Ω.
38
2.4. Connection of power cord
Please connect three-phase 380VAC power supply (L1, L2, L3) with the mechanical
main gates QF11 reliable. Connect Neutral line (N, bright blue line) , mechanical
main gates QF11 of N terminal and another set of N terminal block with each other.
Protection conductor (PE, yellow / green striped line) and PE can be accessed to the
ground. Sectional area of the power line must meet the current requirements of the
machine.
Warning
Be sure to arrange a qualified electrician technical personnel to connect the
power cord operation,
This section will introduce each switch on the operation board. (Operation board picture as
follow)
39
3.1 Emergency stop button (press the button in the picture when you need emergency stop)
Press this button, all the actions of the main machine will stop immediately.
Cut off all power supply of air valves; vent all air in pressure circuit.
In order to remove the emergency stop, turn the button head right and unlock it, and then
press the pre-start button
If start emergency stop button on operation, then restart the machine must ensure that the
in situ
In normal operation of machine buzzer rang when anomalies, and the machine
will stop working, please understand that an operator function to handle in
time. In the operation panel can view of the relevant information
3.3 Selected switch
Heating the main contactor control switch, when required
heating to open the selector switch before opening the heater
40
3.4 Auto run starting button
4. Touch screen
4.1 Features
LCD monitor is in direct contact with buttons, operation is very simple。
Through surveillance pictures at the state observation drives and sensor,
convenient search problem。
Can record a number of parameters formula。
41
All electromagnetic valve and infrared heating lamp can manual control.
Bottle blowing parameters and heating parameters can be adjusted freely。
System user name ADMIN, password DMK.
4.2 Touch screen using basic common sense
To prevent damage, please only use the finger touch control panel screen. Do not
use a screwdriver, wrench and other metal instruments to reach. Also, please note
that long fingernails don’t contact with the screen.
Please keep hands clean。
Wipe the screen surface dirt, must first cut off power, Wipe with a damp cloth
which have neutral detergent.
Don't take on mechanical sensor, after the operation and machinery.
Operation during testing of components, make sure safe operation, each step
should be to observe the surroundings and to indicate the relevant personnel,
Components in the observed time, the hand should stop contact with touch screen
Note: The actual touch-screen graphics and images recorded in this article may
be under the machine model, the different specifications of different places.
42
a) Language button, the system with Chinese and English
Chinese-
English
Translation
with and
short
description
43
) The key is for the valve switch switchboard button, without any fault
tips, press this button the machine supply, press again to cancel supply. Screen
out of trouble prompt while the system automatically turn off gas supply.
a) b) c) For the shortcut keys, the entry into force of any page!
Click here to enter the function screen.
4.3.2 Functional screen
Alarm prompt: The alarm occurs this symbol can be seen here into the
alarm symbol interface, display the contents of the specific alarm, press Remove
alarm come into force, warning prompt disappears.
44
:Connected devices are filling the machine need to open this key, no
As the models
of different size and heat lamp heating lamp power layers are different, the
number of the order from the bottom up to the eighth floor level.
Button in the shutdown state is not in force, at boot time to realize the
operational heaters heat lamp master switch box
The actual lamp output power = the level set value output lamp* output %
The input on each floor lamps range from 0% to 100%, input to 0 to close the
output layer.
In manual tempering state, output % according to manually/output % setting
45
output
In automatic thermostat, compare actual preform temperature real-time
temperature slab and set to auto-tuning output %, Finally a constant value to
automatic/set temperature slab billet temperature = actual。Thermostat requires a
time expired, the general opening of the long-term production, setting process
shown in Figure.
Touch input numeric keyboard input after some (see below). Operation shown
below icon.
ESC
BSP
Enter
Left Right
4.3.4 Blowing
parameter
46
Boot from a
server startup
began to stop
for a starting
next servo
work cycle.
Each of the
time
amounts
on servo.
47
blank check when the movement time, movement of each component based on the
time to complete the movement forward after the servo;Wait time setting the time or
take more than blow molded bottle blanks to take action Part time, according to the
set wait time after time to run servo. To ensure Performs the same residence time in
the heating box, set the waiting time calculated by the following formula:
Wait time = Blowing job cycle time – servo time
48
4.3.5 access of parameter
参 数 存 取 : access
of parameter
返回:backward 保存: storage 读取:read
System can store 6 records , press execute command ,then the white area
records memo name ,and then press corresponding storage. storage indicates
that the heating parameters and blowing parameters saved successfully; press
the corresponding button read when need the data group. Read means data
read successfully, and the parameters of the current heating and blowing
parameter update immediately. If not start the command, any read operation is
invalid.
4.3.6 status display
Status display shows online the working condition of PLC input and output
points, which facilitate the user to identify the reasons. Black means no output,
white indicates output, Interface on the left shows electromagnetic valve
conducting electricity or not, the right interface means electromagnetic valve to
control cylinder detection information corresponding to the magnetic switch,
49
4.3.7 output statistics
To facilitate user to record output, two sets of data information can be recorded
separately.
50
手动测试:manual testing
下一页:next page
上一页:previous page
左合模:left mould closing
右合模:right mould closing
底模下降:bottom mold falling
封口上升:heal rising
拉伸上升:stretch rising
模 具 增 压 : mould pressure
increasing
增压排气:pressure increasing & air exhausting
冷却:cooling off
手动测试:manual testing
上一页:previous page
预吹:pre-blow
高吹:high blow
排气:air exhausting
Press manual permitting, valve testing switch and heating testing button on
the testing page take effect.
Press manual thermostat , heating tube output the percentage in accordance with
heating parameter page.
51
backward, then press it once again, A arm move backward.
Mould opening and closing is dynamic button, please decrease the base mould when
closing the mould.
Mould pressure increasing can start after the mould is closing, and there is a
pressurization protection proximity switch as limitation.. Air exhausting is automatic
主 伺 服 调 整 : main servo
adjustment 返 回 :
backward
正 转 点 动 /100: normal
inching turning /100 反转点
动:reverse inching turning
原 点 回 归 : origin return
补偿值:compensation value
分 坯 伺 服 调 整 : Sub-billet
servo adjustment 正转动点:normal inching turning
Click on normal or inching turning, then move to the requesting direction a mall
step(100 unit pulse).
origin return: when the dislocation occurs, if press this button, machine will
clear the procedure and system will back to the original position automatically.
Please do not move origin detection signal sensor arbitrarily, please re-adjust
compensation value after movement.
5. trial operation
52
1, check each component connecting firmly fixed or not
2, Check circuit connecting safe, reliable or not.
3, Check all infrared lamp in good status or not.
4, Check power supply stable and within safety mood.
5, Check machine connect the ground reliably or not.
6, Check machine in original position or not.
7, With electricity, check each protecting component and emergency stop switch is valid
or not.
8, With electricity, check each component fixed or not and check the target correctly.
9, With electricity, start air supply, observe the position of initial mode right or not
after air supplied, then in testing mode, manual test each electromagnetic valve
connecting and lamp output in each layer is right or not.
10, press alarm clear, clear abnormality to initial status.
11, press operation, start servo, preforn take-out manipulator move.
12, start heating selecting switch, run the heater
13, introduce perform after temperature of heater to a stable state
14, blow when perform is detected
15, press emergency to quit operation if there is any abnormality
16, If machine failed to operate, please determine the original location of the
machine when restart it.
6. basic operation
6.1 basic operation flow chart
53
17, 主机上电:main machine with electricity
54
伺服前进一个周期:servo forward a cycle
超时:overtime 取瓶部件动作: take out preform
启动进坯且检测有坯:start preform access and detect preform
吹模部件动作:blowing components action
启动吹模,有模进入:start blowing, with mould entered
加热器 ON:heater ON 自动调节:automatic adjustment 闭环调节:
closed-loop adjustment
手动调节:manual adjustment
If the user doesn’t operate the machines properly or the machine doesn't work normally, the
system will give the hint of , which shows that something is going wrongly. Then,
Click the prompt into alarm interface which will display concrete alarm content, the
warning relieves and the alarm prompt will disappear.
The common contents of warning generally fall into the following types:
●Operation movement is insufficient.
When the machine woks smoothly, if one valve doesn’t work or works overtime
(exceed 3 seconds), the machine will stop working and system will give the
warning of insufficient movement of operation.
Solutions: 1: See from the state displaying interfaces to check whether the body of
valve gives off output signals.
2: Check whether the pressure is normal.
3: check whether the magnetic switch for detecting position is in it place, and
whether it works well.
●Servo driver Warning
When the screen interface prompts that the warning comes from servo driver, observe the
sign displayed on the servo driver panel firstly to find out the concrete cause.
The common cases of servo driver warning are:
Mitsubishi servo YASKAWA servo
system system
AL.10 under pressure A.91 Overcapacity
AL.24 A.92 over capacity of
Earth fault of regeneration
electrical motor
AL.30 Abnormality of regeneration A.86 Overheating of
retaining encoder
AL.32 over current A.71 Instant maximum load
AL.33 overpressure A.72 continuous maximum
load
55
AL.46 Overheating of A.40 Over voltage
electrical motor
AL.E0 Over current of A.41 under voltage
regeneration retaining
AL.E1 Warning of A.30 Abnormality of regeneration
overcapacity
A.32 Overcapacity of regeneration
● Synchronous signal warning
When the machinery works normally, as servo goes forward for one time, the chain
should stop correctly at the original position and the synchronized signal of bottle
blowing should detect the target accurately. If there is no signal, the system will give
warning.
Warning indicates: 1. synchronous magic eye of bottle blowing is off the ball
2. Chain blocking
3. Failing to detect every bearing that passes.
7. Test signal calibration
7.1 blowing simultaneously with the blowing test
With the use of two detection switches, identify whether the mold is in the blank tube
or not and judge mold which number mold is entered.
Prerequisite: the machine must be in original location
Requirements:
1,.To guarantee the signal you should get the blowing machine to the first left one of
the heating group.
2. Ensure detection switch can detect each of the chain bearing accurately.
1. At this time, blowing electric eye detected the middle of the first two sets of
heating, and air.
2. Ensure that the blowing test can accurately detect every blank tube.
56
Undesirable phenomena Reasons Solutions
1. Bottle sticks up Time of base Quicken timing
to the bottom base closure and bottom machine (time of bottom
base’s rising up is base’s rising up)
inconsistent. Extending blowing
Blowing time.
time is too short.
2. Cannot blowing Heating tem. Strengthen heating to
of preform is too low. preform (enhancing output of
Pressure of heating machine)
blowing air is too Confirm with the
low. pressure of blowing air.
3. The bottom of Tem. of Lower the heating to
bottle falls off bottom of preform is preform bottom.
too high. Raising the tem. of
Beyond of other part beyond of preform
the bottom, the bottom.
preform tem. is too Checking the front of
57
running, it will be in
this situation.
even results in the break of early (it can appear (once or twice) beginning
58
wrinkling. blowing time in one machine in one time.
time. Higher up the tem. of
Tem. of the this part by heating machine.
Relative part of Check the preform.
59
low.
Volume of
blowing air is not
enough.
10. The bottle has strips. Gonorrhea is Check the quality of
on the preform. preform.
Tem. of Adjust the heating
preform is not machine.
average.
The low
tem. part of preform
being stretched, this
part will has stripe
and be more thick.
11.The circle of the Preform is Check the preform.
bottle is leaning (unaverage leaning.
in thickness)
60
13.The surface of bottle The preform Check the preform
has scar has scar.
14. Foreign matter is on The cutting Check the preform.
the bottle surface. part of the preform Check the loop of
61
Chapter VII Maintenance and Checking
In this chapter, we will talk about how to maintain and check with the extrusion
machine produced by our company. Please do right manipulation after carefully
62
reading and understanding.
1. Regularly checking items
It is very important to maintain and check regularly, in order to keep the machine
in good condition. Make sure the following items are put in practice. There are also
items showed in the list of maintaining and checking. Please take it as your reference.
1.1. Daily checking items (before shaping running)
1.1.1 Make sure the running of all sensors is correct, accessories of screw threads
are tight enough, setting parts are in the right position, etc.
1.1.2 Oiling to the wrinkled part and places need to oiling, especially to the eight
linear bearings for opening and closing moulds.
1.1.3Checking with safety gate and switch: make sure all the gates are in good
condition. Make sure if the limit switch of safety gate is running correctly by showing
of the delays. Check all the emergency switches are running well.
1.1.4 Open the valve under air loop and air filter, then push out water and foreign
matter.
1.1.5 The power of accessories should be go through before main machine in
principle. After the power of accessories is on, check the running condition and
initialization of all accessories (tem. etc).
1.1.6 Running conditions and supplying efficiency to main machine (water, air,
etc), play important roles in running of main machine. Besides opening, please check
if these machines are in good conditions when running.
1.1.7 There are differences on installing of accessory machines, according to the
different specifications supplied by the suppliers. For detailed information, please
refer to the constructions of the machine. The main points to the following items,
Cooling water: check the tem. and flux of the cooling water;
Compressor: check the pressure and volume of the air supplied to the extrusion
machine. There are two systems, high/low pressure;
Water chiller (if used): check the tem. and flux of the water.
The above loops must not leak.
1.1.8 By manual maintaining, check whether the running of bottom base and
63
dying assembly of extrusion moulds are well or not.
1.1.9 Check if the faces of moulds are in good condition in visual observation.
Make sure there is no dewing, rust, foreign matter.
1.1.10 Check if springs parts of machines of the mould guide rail are in good
condition.
1.1.11 Check the initialization of heating machine and check if the machine is
running well.
1.2. Daily checking items (when running)
The checking items when the machine is running
1.2.1. Check the pressure of working air and blowing air. If the air pressure
changes, the running of machine and blowing result will be affected. In this situation,
we can check if air supplying, air tank or filter machine are working well.
1.2.2. Check if there are abnormal sounds and librations at each part of the
running machines.
1.2.3. Do eye survey to the working condition of cylinder (driving devices).
1.2.4. Do eye survey to the working condition of perform, as well as the bottles’
carrying, supplying and fetching part.
1.2.5. Do eye survey to the working condition of servo motors. (transport part for
blowing)
1.3. Running finished
After a day or a week’s working, when running finished, please clean up each
part of the machine and its surroundings. This will avoid many potential problems. If
you have any problem or question, please check immediately.
1.4. Weekly checking items
The following items need to be checked every week. Do shut the power when
checking.
1.4.1. Add lubricant to the machines
Refer to the manual.
1.4.2. Die devices of blowing moulds
Check if the install of extension rod is tight enough. If the front of extension rod
64
out of shape or broken, it will affect bottle shaping. If necessary, change the parts.
1.4.3 Checking the heating machine
Check if there are breakages on the quartz heating machine, if the wire of heating
machine is ok. Check if the screws are tight enough, if there are broken wires. Clean
up the deflection plate. The dirt will cause bad heated perform and damage of heating
machine and deflection plate.
1.4.4 Check the installation of the moulds and machines. Check if the screws are
tightly put.
1.4.5 Clean up all the parts of the moulds. Check if there are damages and
deformations.
1.5. Monthly checking items
The following items need to be checked every month. Do shut the power when
checking.
1.5.1 Check the screw and nut of moved part and installation screw of moulds’
part. Check they are tight enough. In order to know the situation of screw as soon as
possible, please mark the screw place in paint. When find laxation, screw it down at
once and make the same mark.
1.5.2 Check and clean up every silencers of air loop. If the jam cannot be
removed after cleaning up, then change parts. If parts are not changed, the running
condition of air machines is likely to be undesirable.
1.5.3 Checking the assorted pipes
Check if the interface leaks air and if the parts are broken. Check if surfaces of
assorted pipes are broken, crooked or cracked.
1.5.4 Add grease lubricant to interface of moulds.
1.5.5 Check dirt situation of the filter. If it’s heavy, clean up immediately.
1.5.6 Check whether the moving desk (carriage part of blowing) and piston are
located to the same core.
1.5.7 Check if the silencer of exhaust is broken or blocked up.
1.5.8 There are different ways of checking and installing with the accessory
machines, which is according to the manufacturers and product model. For details,
65
please refer to the instruction books of each machine.
1.6. Checking items in every six months
1.6.1Clean and check the whole machine
Check again with the problems found in daily and monthly checking items.
1.6.2 Check all the power wires and electrical outlets
Check the place of screw thread and interface, to see if there is laxation and wire
exposed. Check if oil and water immerges into the controlling case, or if there is dirt
and dust in the case. The eyewinker may cause damage and electrical leak to the
machine. Please clean up whenever find eyewinker. Also check the lids of controlling
box and connecting hole of the machine to see if the lids are tight enough.
1.6.3 Insulation resistance test (testing megger)
To avoid the accident of electric leakage, please do insulation resistance
test. Ask electrical engineering company to do this test.
1.6.4 Check the air loop and exhaust gas silencer
If there is big jam, please exchange. Or it may cause the air machine runs bad.
1.6.5 Check the safety valve of the air tank.
1.6.6 Clean the inside of the pipings of cooling water
Clean up the moulds, interfaces and inside of pipings.
共 1 页
Automatic Blow Molding Machine Total 1 Page
DMK-L8
Eligible Certificate 第 1 页
Page 1
66
本产品执行中华人民共和国行业标准
This product performs professional standard in the People’s Republic of China
QB/T1487(轻工部 1992-04-14 批准)
QB/T1487(Approved by QB on 04-14-1992)
经检验合格准予出厂
Admit producing after checking eligible
出厂编号_______________
Producing No. _______________
检验:________________
Inspection_____________
厂长:________________
factory director__________
年 Year 月 Month 日 Day
浙江德玛克机械有限公司
Zhejiang Demark Machinery Co., Ltd
67