100% found this document useful (2 votes)
5K views1 page

Quality Checklist For Site Works: External & Partition Wall/ RR Masonry

This quality checklist is used to inspect various aspects of site works including external and partition walls. It contains items to check architectural elements like different types of bricks and blocks used in masonry works. It also contains structural items to check reinforcement and mortar mix proportions. Finally, it contains items to inspect interior works like partition frame works, heights, and provisions for electrical works. The checklist is to be filled by marking Yes, No or NA against each item and specifying corrective actions if any item is marked No.

Uploaded by

Budoy Smith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
5K views1 page

Quality Checklist For Site Works: External & Partition Wall/ RR Masonry

This quality checklist is used to inspect various aspects of site works including external and partition walls. It contains items to check architectural elements like different types of bricks and blocks used in masonry works. It also contains structural items to check reinforcement and mortar mix proportions. Finally, it contains items to inspect interior works like partition frame works, heights, and provisions for electrical works. The checklist is to be filled by marking Yes, No or NA against each item and specifying corrective actions if any item is marked No.

Uploaded by

Budoy Smith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUALITY CHECKLIST FOR SITE WORKS

EXTERNAL & PARTITION WALL/ RR MASONRY


ARCHITECTURAL STRUCTURAL INTERIOR SERVICES & UTILITY

1. Brick 2. Solid Block 3. Hollow Block 4. R . R 5. C. R

6. Aerocon Block 7. Gypsum 8. Wooden 10. Others


9. Glazed

Name of the Customer: Date:


Project Name: Project ID:
Name of the Contractor: Location:
Drawing Ref. No.: Quantity:

CL : 05
Sl.No. Description YES NO NA
Thickness :

1 Check for ALIGNMENT & LOCATION of wall. Is it as per


drawing?
2 Check for placing reinforcement RC bands as per specification.

3 Check for MORTAR MIX PROPORTION is ok?


4 Check for SIZES OF OPENINGS for Doors & Windows? /
Any other sevices.
AC duct, Cable tray, chilled water pipe, etc.
INTERIOR - (PARTITION / WALL PANELLING FRAME WORK)
1 Type of Partitions/ Frame etc.,

Frame work materials used.


a) Aluminum frames

b) Timber frames

c) G.I /M.S frames

2 If it is wooden partition, check for Anti-termite/ wood borer


preventing treatment provided?
3 Height of Partition.
b) Half height
4 Whether the frame work sufficiently anchored in the floor & true
ceiling?
5 Check provisions made in the frame work for fixing conduits for
electrical, Data lines etc., as per drawings.
6 Check for approved make of finishing materials as per
specification.
CORRECTIVE ACTION PROPOSED- Item wise.
If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)
Comments:

Contractor's Rep.: Client Rep.: Lemcon Rep.:

You might also like