Schedule of Columns:: Typical Wall Footing Detail Plan

The document contains details for column and wall foundations including: - Column C1 has 10mm diameter vertical bars spaced at 400mm with 10mm diameter ties at 300mm. It has reinforcement bars and ties. - Typical wall footings have 10mm diameter horizontal and vertical bars at 600mm spacing with reinforcement bars and 10mm diameter ties at 300mm. - Hollow concrete blocks are used with gravel fill. Reinforcing details are provided for column and wall foundations.

Uploaded by

chill chill
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

Schedule of Columns:: Typical Wall Footing Detail Plan

The document contains details for column and wall foundations including: - Column C1 has 10mm diameter vertical bars spaced at 400mm with 10mm diameter ties at 300mm. It has reinforcement bars and ties. - Typical wall footings have 10mm diameter horizontal and vertical bars at 600mm spacing with reinforcement bars and 10mm diameter ties at 300mm. - Hollow concrete blocks are used with gravel fill. Reinforcing details are provided for column and wall foundations.

Uploaded by

chill chill
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COLUMN LINE 10MMØ VERT.

BARS
SPACED @ 400MM O.C. SCHEDULE OF COLUMNS:
3000
10MMØ TIES
@ 300MM O.C. CHB C1
NGL 200

10MMØ HOR. & VERT.


BARS @ 600MM O.C.B.W.

300
3-12MMØ RSB CONT. BARS 2-12MMØ
WITH 10MMØ TIES SPACED @ CONT. BARS
300MM O.C.
10MMØ TIES
A @ 300MM O.C.

REBARS:
CHB 4 PCS. - 16MMØ
TIES: 10MMØ
3@50, 4@100, REST
@200
2 PLAN PLAN SECTION
S-2/5 SCALE 1:20 M

LINTEL BEAM 200X150 W/


2 OF 10MMØ HOR. BARS
4 TYPICAL WALL FOOTING DETAIL
S-4/5 NTS
200

HOLLOW BLOCKS
4''X16''X8" NGL NGL

10MMØ VERT.
BARS @ 400 MM O.C.

D
T

T
10MMØ HOR.
BARS @ 600 MM
GRAVEL FILL GRAVEL FILL

SECTION SECTION
3000

2800

16MMØ VERT. BARS


3850

Y
USE 10MMØ TIES
3@50,3@100 REST
@200

10MMØ TIES
@200MM O.C. X X
2-12MMØ RSB CONT. BARS
WITH 10MMØ TIES SPACED PLAN PLAN
NGL
@200 O.C. F1 F2
400

5 FOOTING DETAIL
600

S-5/5 NTS
850

5-12MMØ
200

5-12MMØ

SCHEDULE OF FOOTINGS
250

FOOTING X (MM) Y (MM) T (MM) D (MM) REBARS ALONG X REBARS ALONG Y

F1 900 900 250 850 5 - 12 MM 5 - 12 MM


3 BAY SECTION THRU A"-A" F2 900 900 250 850 5 - 12 MM 5 - 12 MM
A-3/5 SCALE 1:20 M

SHEET CONTENTS SHEET NO.


PROJECT PROPOSED FENCING GIL W. DARIA AS SHOWN

PRC NO: ISSUED ON: 1 / 27 / 2021


S-2/3
PTR NO: ISSUED AT: ZAMBOANGA CITY
ARCHITECT/ENGINEER
LOCATION GOV. CAMINS AVE, ZAMBOANGA CITY, PHILIPPINES 7000 OWNER'S APPROVAL
3 3