Deployed of Machinery by Manish Patel (Sany)

The document contains details of machinery deployment by Manish Patel and Sumit over a period of 30 days. It includes information such as the date, machinery used (excavator), diesel consumed, working time period, total working hours and cumulative working hours for each day. The machinery was used for activities like soil loading, ballast packing and rectification work at different bridge locations by the operators on behalf of IRCON.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views8 pages

Deployed of Machinery by Manish Patel (Sany)

The document contains details of machinery deployment by Manish Patel and Sumit over a period of 30 days. It includes information such as the date, machinery used (excavator), diesel consumed, working time period, total working hours and cumulative working hours for each day. The machinery was used for activities like soil loading, ballast packing and rectification work at different bridge locations by the operators on behalf of IRCON.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Deployed of Machinery by Manish Patel (

Diesel in ltr. Working Time


SL. NO. Date Machinery Total Cumulative
( By RKD) From To
1 29.08.20 Excavator 50 4670.2 4673.7 3.5 3.5
2 30.08.20 Excavator 50 4673.7 4678.2 4.5 8
3 31.08.20 Excavator 90 4678.2 4684.4 6.2 14.2
4 01.09.20 Excavator 60 4684.4 4691.4 7 21.2

5 02.09.20 Excavator 70 4691.4 4697.6 6.2 27.4

6 03.09.20 Excavator 80 4697.6 4704.1 6.5 33.9

7 04.09.20 Excavator 80 4704.1 4710.1 6 39.9

8 05.09.20 Excavator 70 4710.1 4715.5 5.4 45.3

9 06.09.20 Excavator 60 4715.5 4718.9 3.4 48.7

10 07.09.20 Excavator 60 4718.9 4723.2 4.3 53

11 08.09.20 Excavator 60 4723.2 4729.1 5.9 58.9

12 09.09.20 Excavator 60 4729.1 4734.1 5 63.9

13 10.09.20 Excavator 60 4734.1 4739.9 5.8 69.7

14 11.09.20 Excavator 50 4739.9 4745.2 5.3 75

15 12.09.20 Excavator 50 4745.2 4750.5 5.3 80.3

16 13.09.20 Excavator 4750.5 4755.4 4.9 85.2

17 14.09.20 Excavator 4755.4 4758 2.6 87.8

18 15.09.20 Excavator 60 4758 4763 5 92.8

19 16.09.20 Excavator 4763 4763 0 92.8

20 17.09.20 Excavator 4763 4763 0 92.8

21 18.09.20 Excavator 60 4763 4767.5 4.5 97.3

22 19.09.20 Excavator 50 4767.5 4773.1 5.6 102.9


23 20.09.20 Excavator 4773.1 4773.1 0 102.9

24 21.09.20 Excavator 4773.1 4774.1 1 103.9


25 22.09.20 Excavator 4774.1 4776.2 2.1 106
26 23.09.20 Excavator 60 4776.2 4776.2 0 106
27 24.09.20 Excavator 50 4776.2 4780.3 4.1 110.1
28 25.09.20 Excavator 60 4780.3 4786.3 6 116.1
29 26.09.20 Excavator 60 4786.3 4793 6.7 122.8
30 27.09.20 Excavator 4793 4799.3 6.3 129.1
31 28.09.20 Excavator 60 4799.3 4805.7 6.4 135.5
32 29.09.20 Excavator 70 4805.7 4813 7.3 142.8
33 30.09.20 Excavator 70 4813 4819.8 6.8 149.6
hinery by Manish Patel (Sany)
Signature
Location of work (in brief) Remarks
M/c operator Agency IRCON
Br. 11 Loading Point for soil
Br. 11 Loading Point for soil
Br. 12 Recification work
Br. 12 Recification work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work

Br. 11 Loading Point for soil


sifting to RKD Camp location
Br. 08 siding line Ballast
Packing
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work

Br. 13 Plant end rectification Sifted to RKD Camp


work Reading 4775.6
Deployed of Machinery by Sumit (Hun
Working Time
Diesel in ltr.
SL. NO. Date Machinery Total Cumulative
( By Own) From To
1 30.08.20 Excavator 124 9800.2 9803.3 3.1 3.1
2 31.08.20 Excavator 9803.3 9812.2 8.9 12

3 01.09.20 Excavator 9812.2 9820.4 8.2 20.2

4 02.09.20 Excavator 192 9820.4 9822.7 2.3 22.5

5 03.09.20 Excavator 9822.7 9829.3 6.6 29.1

6 04.09.20 Excavator 240 9829.3 9836.3 7 36.1

7 05.09.20 Excavator 9836.3 9844.7 8.4 44.5

8 06.09.20 Excavator 9844.7 9849.9 5.2 49.7

9 07.09.20 Excavator 187 9849.9 9858 8.1 57.8

10 08.09.20 Excavator 9858 9864.1 6.1 63.9

11 09.09.20 Excavator 9864.1 9871.3 7.2 71.1

12 10.09.20 Excavator 187 9871.3 9879.4 8.1 79.2

13 11.09.20 Excavator 9879.4 9887.5 8.1 87.3

14 12.09.20 Excavator 250 9887.5 9895.8 8.3 95.6

15 13.09.20 Excavator 9895.8 9902.8 7 102.6

16 14.09.20 Excavator 9902.8 9907.9 5.1 107.7

17 15.09.20 Excavator 250 9907.9 9915 7.1 114.8

18 16.09.20 Excavator 9915 9919.3 4.3 119.1

19 17.09.20 Excavator 9919.3 9919.3 0 119.1

20 18.09.20 Excavator 9919.3 9928.5 9.2 128.3

21 19.09.20 Excavator 200 9928.5 9934.6 6.1 134.4


22 20.09.20 Excavator 9934.6 9934.6 0 134.4

23 21.09.20 Excavator 9934.6 9937.8 3.2 137.6

24 22.09.20 Excavator 110 9937.8 9939.9 2.1 139.7

25 23.09.20 Excavator 9939.9 9949.2 9.3 149

26 24.09.20 Excavator 187 9949.2 9965.3 16.1 165.1

27 25.09.20 Excavator 9965.3 9973.3 8 173.1

28 26.09.20 Excavator 9973.3 9978.3 5 178.1

29 27.09.20 Excavator 250 9978.3 9986.9 8.6 186.7

30 28.09.20 Excavator 9986.9 9994.2 7.3 194

31 29.09.20 Excavator 200 9994.2 10003.3 9.1 203.1

32 30.09.20 Excavator 10003.3 10003.3 0 203.1


achinery by Sumit (Hundai)
Signature
Location of work (in brief) Remarks
M/c operator Agency IRCON
Br. 12 Recification work
Br. 12 Recification work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Mine end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work

Br. 13 Plant end rectification Sifted to RKD Camp


work Reading 9937.1
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work
Br. 13 Plant end rectification
work