ACCPL LOG EHS OPERATIONAL CONTROL PROCE
PURPOSE: To protect ACCPL properties, Employees and Electrical contractor
Servicing, Maintenance of Electrical equipment & System
Risk Management:
Location/ Activities Electrical Harzards
Crane, D G Set, Press Machine ,
Welding machine, General works , Shock, Arc flash, Blasts, Fire
Electrical Pannel Maintenance
Machine Installation, Operation- Process
Machine, Welding Machines, Robotic
Shock, Arc flash, Blasts, Fire
welding machines,, Grinding, Pannel
boards
Following PPE are used for electrical maintenance and servicing to prevent electrical shock
PPE's Images
Ensure the all earthling points are identified and proper preventive maintenance , and once in a
year earthling points are to be tested and reported.
Provide Boundary berickets to all HV panels’ main switches
Lotto procedure followed while servicing and maintenance of machines
Prepared By: Reviewed By:
ONTROL PROCEDURE FOR ELECTRICAL HAZARDS, SHOCKS AND CONTROLS
trical contractors exposed to electrical hazards such as Electrical Shocks and Fires duri
cal Harzards Risk Involved
c flash, Blasts, Fire Injury , Fetlity, Equipment Dammages
c flash, Blasts, Fire Injusry , Fetlity, Equipment Dammages, Property Da
ectrical shock Provide rubber mat in front of HV panel, transformers, machine electrical panel, main swi
Images for Pannel board with rubber mat
e , and once in a
To avoid loose wiring , hanging wares / cables
All main switches, HV panels are to be operated by trained operator, supervisor
To avoid electrical wire loose connection /open, necked connections to prevent arc flash
Avoid Messy wiring Avoid tangled wiring
Organized wiring Organized wiring
By: Approved By:
Ref. No:
Rev. No:
Rev. Date:
s and Fires during operation,
volved
pment Dammages
mmages, Property Dammages
cal panel, main switch boards.
t
supervisor
o prevent arc flash, arc blast, fire