ESTIMATOR

This document contains bills of materials and cost estimates for various construction elements including column footings, columns, beams and girders, wall footings, slabs, walls, lintel beams, ceilings, skirtings and mouldings, and fascia. It lists the materials required, quantities, unit costs, and total costs for each element. The elements cover the foundations, structural components, and finishes of a building project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
358 views14 pages

ESTIMATOR

This document contains bills of materials and cost estimates for various construction elements including column footings, columns, beams and girders, wall footings, slabs, walls, lintel beams, ceilings, skirtings and mouldings, and fascia. It lists the materials required, quantities, unit costs, and total costs for each element. The elements cover the foundations, structural components, and finishes of a building project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Column Footing Bill of Materials Cost of Estiamte

Class Cement: 198.0 bags Col. Footing Cost: 125946.6


Sand: 11.0 cu. m.
Thickness cm Gravel 21.9 cu. m.
Area 2.25 sq. m. Main Reinforcement: 137.0 lghts
# of Footing 39 pcs Tie Wire: 10.8 kg

Length of Reinf. 1.5 m


# of Bars along its L 7 pcs
# of Bars along its W 7 pcs

Price:
Cement 235 /bag
Sand 850 cu. m.
Gravel 800 cu. m.
Reinforcement 378 6m long
Tie Wire 70 /kg

Column Bill of Materials Cost of Estiamte


Class Cement: 36.0 bags Column Cost: 32207.0
Sand: 2.0 cu. m.
Length of Column 11 m Gravel: 4.0 cu. m.
# of Column 4 pcs Main Reinforcement: 32.0 lghts
Size of Column cm Tie Wire: 12.8 kg
Lateral Ties: 53.0 lghts
Total Length of Reinf. 6m
# of Reinf. 8 pcs
# of Lateral Ties 53 pcs
Length per Lateral Ties 1.5 m
Price:
Cement 250 /bag
Sand 850 cu. m.
Gravel 800 cu. m.
Reinforcement 378 6m long
Tie Wire 75 /kg
Lateral Ties 100 6m long

Beam & Girder


Class Bill of Materials Cost of Estiamte
Cement: 237.6 bags Beam/Girder Cost: 151188.9
Length of Beam 10 m Sand: 13.2 cu. m.
# of Beam 22 pcs Gravel 26.4 cu. m.
Size of Beam cm Main Reinforcement: 132.0 lghts
Tie Wire: 134.5 kg
Total Length of Reinf. 6m Lateral Ties: 148.5 lghts
# of Reinf. 6 pcs
# of Lateral Ties 135 pcs
Length per Lateral Ties 0.3 m

Price:
Cement 250 /bag
Sand 850 cu. m.
Gravel 800 cu. m.
Reinforcement 420 6m long
Tie Wire 70 /kg
Lateral Ties 170 6m long

Wall Footing
Class Bill of Materials Cost of Estiamte
Cement: 10.0 bags Wall Footing Cost: 4506.8
Depth 0.6 m Sand: 0.5 cu. m.
Width 0.3 m Gravel: 1.1 cu. m.
Length of Wall 6m Main Reinforcement: 3.0 lghts
# of Reinf. 3 pcs Tie Wie: 0.3 kg
Spacing Of Lat. Ties 0.4 m Lateral Ties: 3 lghts

Price:
Cement 235 /bag
Sand 450 cu. m.
Gravel 750 cu. m.
Reinforcement 260 6m long
Tie Wire 70 /kg
Lateral Ties 100 6m long

Slab Bill of Materials Cost of Estiamte


Class Cement: 144.0 bags Slab Cost: 75781.60
Sand: 8.0 cu. m.
Thickness cm Gravel: 16.0 cu. m.
Area 80 sq. m. Main Reinforcement: 158.2 lghts
Tie Wire: 15.1 kg
Type of Reinforcement way
Bar Spacing cm

Price:
Cement 255 /bag
Sand 1200 cu. m.
Gravel 1500 cu. m.
Reinforcement 170 6m long
Tie Wire 70 /kg

Wall Bill of Materials Cost of Estiamte


Class CHB: 625.0 pcs Wall Cost: 91816.0
Cement: 77.0 bags
CHB Size cm Sand: 5.0 cu. m.
Main Reinforcement: 312.0 lghts
Area: 50 sq. m. Tie Wire: 43.0 kg

Ver. Reinf. Spacing: cm


Hor. Reinf. Spacing: Layer

Price:
CHB 20 pcs
Cement 250 bags
Sand 800 cu. m.
Reinforcement 170 lghts
Tie Wire 70 kg

Lintel Beam Bill of Materials Cost of Estiamte


Class Cement: 0.2 bags Wall Cost: 419.6
Sand: 0.0 cu. m.
Length of lintel beam 2m Gravel: 0.0 cu. m.
Main Reinforcement: 1.0 lghts
Price: Tie Wie: 0 kg
Cement 235 bags Lateral Ties: 2 lghts
Sand 550 cu. m.
Gravel 700 cu. m.
Reinforcement 142 lghts
Tie Wire 70 kg
Lateral Ties 100 kg
Ceiling - Gypsum Board Bill of Materials
Ceiling Area 108.4 sq. m. Wall Angle: 17.0
Perimeter 47 m Concrete Nails: 157.7
Length of Hanger 3m J Furring: 58.0
Carrying Channel: 29
Price: Single Furring: 25
Wall Angle 45 /piece W - Clip: 193
Concrete Nails 2 /pcs Rivets: 2
J Furring 130 /lgth Ficem Screw: 2
Carrying Channel 125 /lght Gypsum Board: 37
Single Furring 100 /lght
W - Clip Double 4 /pcs
Rivets 550 /box
Ficem Screw 550 /box
Gypsum Board 650 sheets

Ceiling - Vinyl Soffits Bill of Materials


Width of Eaves 1.2 m Wall Angle: 63.0
Length of Eaves 85 m Concrete Nails: 601.0
Ceiling Area 180 sq. m. J Furring: 96.0
Perimeter of Entire Ceiling 180 m Carrying Channel: 48
Length of Hanger 2m Single Furring: 27
W - Clip: 320
Price: Rivets: 4
Wall Angle 66 /piece Ficem Screw: 4
Concrete Nails 2.5 /pcs Vinyl Soffits: 95
J Furring 220 /lgth J - Channel: 50
Carrying Channel 254 /lght
Single Furring 167 /lght
W - Clip Double 6.72 /pcs
Rivets 550 /box
Ficem Screw 600 /box
Vinyl Soffits 690 /lgth
J - Channel 300 /lgth
Skirtings and Mouldings Bill of Materials
Perimeter 66 m Moulding: 28.0
Depth of Skirting 0.15 m Skirting 28.0
Moulding Nails: 560
Price: Paint: 1
Moulding 530 /lgth
Moulding Nails 2 /pc
Paint 300 /gal

Fascia Bill of Materials


Perimeter of Celing 85 m Hardi Senepa: 36.0
Length of Senepa 2.4 m Moulding Nails: 2

Price:
Hardi Senepa 110 /lgth
Self drilling tile screw 550 /box
f Materials Cost of Estiamte
lgths Gypsum Cost: 41767.3
pcs
lgths
lgths
lgths
pcs
boxes
boxes
sheets

f Materials Cost of Estiamte


lgths Vinyl Soffits Cost: 130551.9
pcs
lgths
lghts
lghts
pcs
boxes
boxes
lgths
lghts
f Materials Cost of Estiamte
lghts Skirt & Mold Cost: 16260.0
lghts
pcs
gals

f Materials Cost of Estiamte


lghts Fascia Cost: 5060.0
boxes
Plain Cement Finish Bill of Materials
Class Cement: 199.0 bags
Sand: 3.68 cu. m.
Wall Area 230 sq. m.
Plaster Thickness
Thickness of Finishing 20 mm
# of sides 2

Price:
Cement 250 /bag
Sand 850 /cu. m.

Tile Bill of Materials


Area to be Tiled 175 sq. m. Tiles: 486 pcs
Tile Width 60 cm Cement: 151 bags
Tile Length 60 cm Joint Filler: 87.5 kg

Price:
Tile 700 /piece
Cement 250 /bag
Joint Filler 55 /kg
Paint Bill of Materials
Area to be Painted 240 sq. m. Primer: 10 /gal
No. of Coats 240 sq. m. Top Coat: 2304 /gal
Concrete Neutralizer: 2 /gal
Price: Flat Latex: 12 /gal
Primer 700 /gal
Top Coat 500 /gal
Concrete Neutralizer 200 /gal
Flat Latex 700 /gal
Cost of Estiamte
Finish Cost: 52878.0

Cost of Estiamte
Finish Cost: 382840
Cost of Estiamte
Finish Cost: 1169300
Column Bill of Materials
Length of Column 7m lumber: 5897.9 bd. ft.
# of Column 15 pcs
Lumber size cm

Price:
lumber 25 /bd. ft.

Beam Bill of Materials


Length of Beam 3m lumber: 2457.0 bd. ft.
# of Beam 63 pcs
Lumber size cm

Price:
lumber 30 /bd. ft.

Flooring Bill of Materials


Area 175 sq. m. lumber: 1592.5 bd. ft.
Lumber size cm plywood: 61 sheets

Price:
lumber 16 /bd. ft.
plywood 600 /sheet
Cost of Estiamte
Finish Cost: 147446.3

Cost of Estiamte
Finish Cost: 73710.0

Cost of Estiamte
Finish Cost: 62080.0

TOTAL: 283236.3