Renovation
Truss Works
If 6m
Item Qty Unit Total Qty Commercial Unit Price Bill of Materials
Length
Channel Bar 2x4 8.2 l.m Channel Bar 2x4x5mm 175.8 29.3 2900 84,970.00 Item Quantity Unit Unit Price Amount
8.2 l.m C-Purlins 2x3x1.5 232.2 38.7 730 28,251.00 TRUSS WORKS
Beam
8.2 l.m Truss C-Purlins 2x8x1.5 49.4 8.233333333333 1100 9,056.67 Channel Bar 2x4x5mm 30 pcs ₱2,900.00 ₱87,000.00
8.2 l.m Welding Rod C-Purlins 2x3x1.5 39 pcs ₱730.00 ₱28,470.00
8.2 l.m Cut off Disk 14" C-Purlins 2x8x1.5 9 pcs ₱1,100.00 ₱9,900.00
15 l.m King Post Cut off Disk 4" Welding Rod ₱0.00
7 l.m King Post Grinding Disk Cut off Disk 14" ₱0.00
56 l.m Rafter 122,277.67 Cut off Disk 4" ₱0.00
Sub-total 119 Grinding Disk ₱0.00
Roofing Long Span 110 350 38,500.00 Sub-total ₱125,370.00
Cpurlins 2x3 112.2 L.M Main House Gutter and Flashing 52.4 21.83333333333 550 12,008.33
Cpurlins 2x8 24.2 L.M Senepa ROOFING WORKS
Foundation and Column Long Span 0.5mm thck 110 ln.m ₱350.00 ₱38,500.00
Item Qty Unit Concrete 9.65 Cu.m Gutter and Flashing 53 ln.m ₱300.00 ₱15,900.00
Channel Bar 6 l.m Beam Truss Rebarworks - 16mm 46 pcs Sub-total ₱54,400.00
16 l.m Rafter Rebarworks - 10mm 90 pcs
34.8 l.m Rafter Tie Wire 2 rolls SPANDREL
Sub-total 56.8 Spandrel 51 l.m ₱75.00 ₱3,825.00
Wall Angle 50 l.m ₱250.00 ₱12,500.00
Cpurlins 2x3 120 L.M Kitchen Area Masonry Works 85.75 sq.m Fascia Cover 50 l.m ₱55.00 ₱2,750.00
Cpurlins 2x8 25.2 L.M Senepa Chb 5" 1150 pcs
Cement 87 bags Sub-total ₱19,075.00
Sand 7.24 cu.m
RSB 10mmx6m 65 pcs CONCRETE WORKS 9.65 cu.m
tie wire 1 roll Cement 86.85 bags ₱250.00 ₱21,712.50
Sand 4.825 cu.m ₱500.00 ₱2,412.50
Plastering 171.5 sq.m Gravel 9.65 cu.m ₱500.00 ₱4,825.00
Cement 74 Sub-total ₱28,950.00
Sand 4.29
REBARWORKS
Doors and Windows Rebarworks - 16mm 46 pcs ₱200.00 ₱9,200.00
Panel Door 0.70x2.10m 3 pcs Rebarworks - 10mm 90 pcs ₱150.00 ₱13,500.00
Casement window 1.2mx1.2m 1 pcs Tie Wire 2 rolls ₱2,250.00 ₱4,500.00
Awning 0.4mx1.2m 1 pcs Sub-total ₱27,200.00
Casement window 1mx1m 1 pcs
Awning 0.4mx0.6m 1 pc MASONRY WORKS 85.75 sq.m
Chb 5" 1150 pcs ₱15.00 ₱17,250.00
Cement 87 bags ₱250.00 ₱21,750.00
Plumbing Works Sand 7.24 cu.m ₱500.00 ₱3,620.00
Lump Sum RSB 10mmx6m 65 pcs ₱150.00 ₱9,750.00
tie wire 1 roll ₱2,250.00 ₱2,250.00
Sub-total ₱54,620.00
Electrical Works
Lump Sum PLASTERING WORKS 171.5 sq.m
Cement 74 bags ₱250.00 ₱18,500.00
Ceiling Works 90.6 31.45833333333 Sand 4.29 cu.m ₱500.00 ₱2,145.00
Sub-total ₱20,645.00
DOORS AND WINDOWS
Tileworks Panel Door 0.70x2.10m 3 pcs ₱4,500.00 ₱13,500.00
Main Floor 34.8 Casement window 1.2mx1.2m 1 pcs ₱3,000.00 ₱3,000.00
Comfort Rooms Awning 0.4mx1.2m 1 pcs ₱3,000.00 ₱3,000.00
Floor 5.4 Casement window 1mx1m 1 pcs ₱3,000.00 ₱3,000.00
Wall 23.04 Awning 0.4mx0.6m 1 pcs ₱3,000.00 ₱3,000.00
Kitchen Sink 5.64 0.18 Sub-total ₱25,500.00
128
PLUMBING WORKS 1 l.s ₱15,000.00
Painting Works 171.5 sq.m ELECTRICAL WORKS 1 l.s ₱15,000.00
Sub-total ₱30,000.00
Carpentry Works 30.24
0.72 CEILING WORKS 90.6 sq.m
Spandrel 50.4 l.m 7.83 Fiber Cement Board 4'x8'x1/4 thck 30 pcs ₱555.00 ₱16,650.00
Double Furring (5m) 100 pcs ₱120.00 ₱12,000.00
Carrying Channel (5m) 50 pcs ₱120.00 ₱6,000.00
Wall Angle (3m) 40 pcs ₱60.00 ₱2,400.00
W-Clip (Double) 150 pcs ₱15.00 ₱2,250.00
BlackScrew 1000 pcs ₱1.00 ₱1,000.00
Blind Rivet 5/32 x 1/2" 4 boxes ₱250.00 ₱1,000.00
Concrete Nail 1" 2 kgs ₱55.00 ₱110.00
Sub-total ₱41,410.00
TILEWORKS
60X60 tiles- Main Floor 110 pcs ₱220.00 ₱24,200.00
60X60 tiles- Cr Floor 15 pcs ₱220.00 ₱3,300.00
30x60 tiles - Wall 128 pcs ₱125.00 ₱16,000.00
60x120 Kitchen 10 pcs ₱990.00 ₱9,900.00
Tiles Adhesive pcs ₱300.00 ₱0.00
Tile Grout
Cement boxes ₱250.00 ₱0.00
Sand kgs ₱550.00 ₱0.00
Sub-total ₱53,400.00
PAINTING WORKS 171.5 sq.m
Skimcoat 10 bags ₱500.00 ₱5,000.00
Primer 7 gals ₱800.00 ₱5,600.00
Latex Paint 12 gals ₱800.00 ₱9,600.00
Sand Paper #100 20 pcs ₱20.00 ₱400.00
Roller Brush 7" 2 pcs ₱50.00 ₱100.00
Roller Brush 4" 2 pcs ₱50.00 ₱100.00
Paint Brush 2 psc ₱50.00 ₱100.00
Concrete Neutralizer gals ₱250.00 ₱0.00
Sub-total ₱20,900.00
CARPENTRY WORKS
3/4" thck Plyboard 10 pcs ₱1,000.00 ₱10,000.00
Stickwell 2 liters ₱250.00 ₱500.00
Finishing Nail 2 kgs ₱55.00 ₱110.00
Black Screw 1000 pcs ₱1.00 ₱1,000.00
Sub-total ₱11,610.00
Material Cost
Phase I ₱330,260.00
Phase II ₱182,820.00
Total Amount ₱513,080.00
Channel Bar 2x4
33.7
24 Beam Truss
6
14.4 King Post
5.4 King Post
63 Rafter
7.8 Rafter
48 Rafter
202.3
33.7166666666667
Cpurlins 2x3
100
192.5
292.5
48.75
Intersection - Angle Bar
108
84
7.68
1.28