1
PCID/J/F2/HSE/EHSMS/4.4.6/30
Date :
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :
Job : Install Gorong-gorong Title of person who does the job : Analyzed by lead of crew :
Pekerjaan : Jabatan personil yang melakukan pekerjaan : Supervisor Di analisa oleh pemimpin regu kerja :
Work Crew Supervisor : Executor Department : Section : Reviewed by HSE : Approved by Area Supv :
Pengawas Regu Kerja : Departemen Pelaksana : Bagian :Project Di Periksa Oleh HSE : Disetujui Oleh pengawas daerah kerja :
Alwan Arif Construction Team
Write down correct specifications of personal
Personal protective equipment (PPE) :
Put On PPE required for a safe job. protective equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield √ 11. SCBA 16. Safety shoes / boots √ Tuliskan spesifikasi alat pelindung diri yang
dibutuhkan (Konsultasikan dengan HSE Dept) :
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary √ 17. Rubber boots
3. Goggles – ordinary 8. Dust mask 13. Gloves - Chemicals 18. Prot. Clothing/ Apron
4. Goggles – tinted lenses 9. Air-purifying respirator 14. Gloves – Thermal √ 19.Body harness-line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
Urutan Pekerjaan Potensi Bahaya Peralatan Pelindung Prosedur Aman
1) Preparation Miscommunication Prepare Permit To Work
Misunderstanding Pre-job safety meeting.
Failure Discuss JSA to workers before
job
Discuss emergency response
preparedness to workers if
emergency situation happen
Good communication with
personnel
Everyone has permission to
stop the job when any unsafe
condition.
1) Persiapan Miskomunikasi Persiapan Izin Kerja
Kesalahpahaman Melakukan pembicaraan
Terjadi kegagalan keselamatan sebelum bekerja
Membicarakan JSA kepada
2
pekerja sebelum bekerja
Membicarakan tanggap
darurat ke pekerja jika terjadi
situasi darurat
Komunikasi yang baik antar
personil
Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan
pekerja di segala kondisi.
2) Preparation of Tools, and Equipment and Safety Pinch point Use hand gloves Ensure all the equipment has
Sign Miscommunication been inspected and check by
Misunderstanding PCI and fit for use
Failure Be careful when pick up tools
Watch body position
Everyone must pay attention at
all times
Stay focused
Ensure tools ready to use
Ensure all document for
already accepted and reviewed
by PCI
Proper Safety Sign and
barricade will be install prior
execution
During Mobilization to the
work location, ensure that
proper access and safe for
heavy equipment layout and
position
The equipment layout do not
interfere with another traffic or
transportation
Check list all equipment and
tools will be use before work
activity.
2) Mempersiapkan Izin Kerja dan alat-alat Terjepit Menggunakan sarung tangan Pastikan semua peralatan
3
Miskomunikasi yang dipergunakan untuk
Kesalahpahaman pekerjaan sudah lulus inspeksi
Terjadi kegagalan dan baik untuk digunakan.
Berhati-hati ketika mengambil
peralatan
Memperhatikan posisi tubuh
Setiap orang harus
memperhatikan pekerjaannya
dan lingkungannya setiap
waktu
Tetap focus
Memastikan semua peralatan
siap untuk digunakan
Memastikan semua dokumen
telah disetujui dan ditinjau
kembali oleh pihak PCI
Tanda Tanda Keselamatan
dan barricade terpasang
sebelum aktivitas dimulai.
Ketika mobilisasi alat berat ke
lokasi dipastikan lokasi
penempatan alat berat yang
aman dan tidak menganggu
aktivitas lalu lintas
transportasi
Periksa semua peralalatan dan
alat-alat yang akan digunakan
selama pekerjaan.
3) Trenching Excavator swing and collision Using Standard PPE Ensure the excavator position
is not at the edge of the soil
Hit by excavator bucket on existing heap.
pipe on location
Make sure the position of
Fallen down to the excavated hole excavator is stable
Hit by excavator bucket, personnel Ensure the workers position
injury out of radius bucket swing
Erosion Make sure the operator of view
is not blocked
Lack of lighting ( work at night ) Working whit full
4
concentration
Endure the excavator is
operated on hard land base
Ensure that working area is
safe for excavator movement
Provide signalman to handle
excavator activity
Provide barricade and warning
board at the working area
CTR provide certificate for
Operator
Uninvolved personnel to keep
away from working area
Daily check the excavator
condition before use
Ground disturbance should be
done as per PCI regulation.
The buried lines and live cable
shall be clearly marked before
start
Use manual handling if
required.
Ensure all the worker
competent and authorize to
perform the activity
Provide ladder and stick for
check pipe available on
location.
Provide portable light (work at
night)
Provide Rain Coat
Install safety sign
Provide traffic control
3) Penggalian Excavator terjungkal Gunakan Peralatan APD Pastikan excavator berada
tidak di posisi pinggir/tepi
Terkena cangkul dari excavator pada tumpukan tanah/galian.
lokasi pipa yang sudah ada.
Patikan posisi excavator stabil
Terjatuh kedalam galian
5
Tertabrak cangkul ketika mengayun, Memastikan pekerja jauh daru
cidera personil radius cangkul dari excavator
Pastikan pandangan dari
Tanah longsor
operator tidak tertutup
Minimnya pencahayan penerangan Bekerja dengan penuh
(bekerja malam hari) konsentrasi
Pastikan excavator beroperasi
di tanah landasan yang
keras/padat
Pastikan area excavator aman
dari pergerakan.
Sediakan barricade dan
rambu rambu keselamatan .
Semua certificate peralatan
dan operator harus
disediakan.
Pekerja yang tidak terlibat
diharapkan tidak berada
dilokasi penggalian.
Pemeriksaan harian excavator
harus dilakukan dan peralatan
aman untuk digunakan.
Pengecekan kondisi tanah
yang berhubungan dengan
jalur proses, listrik dan
instrument dibawah tanah
harus dilakukan.
Tandai jalur proses dan listrik
yang live didalam tanah dan
gunakan metode manual untuk
penggalian.
Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan
penggalian tanah.
Gunakan tangga dan
stik/tongkat pengecek pipa
tersedia di lokasi.
6
Sediakan lampu portable
Sediakan jas hujan
Pasang rambu penggalian
Sediakan tim pengatur lalu
lintas
4) Lowering gorong-gorong Pinch point Using Standard PPE Ensure that excavation has
Miscommunication been prepared for the
Misunderstanding unloading pipes
Adjust the position of
Failure excavators to follow overview
The equipment is fallen down of the planning work that will
(Excavator) be done.
Personnel Injury Ensure that no body
passing/working under the
Lack of lighting ( work at night )
object, except if consider
necessary by Lifting Supv. and
the number of personnel shall
be as minimum as possible and
lifting gears use properly
Control and make sure that
sling(s), or lifting gears
required are installed properly
and certified before lifting the
pipeline.
Control/check and make sure
that part line quantity of lifting
equipment is capable for lifting
object.
Pre lift the object with gradual
increase.
Only experienced & qualified /
trained personnel are handling
lifting devices.
Provide portable light (work at
night)
Provide Rain Coat
Install safety sign
Provide traffic control
7
4) Penurunan gorong-gorong Terjepit Gunakan Peralatan APD Pastikan galian telah siap
Miskomunikasi untuk aktifitas penurunan pipa.
Kesalahpahaman Atur posisi excavator
mengikuti gambar
Terjadi kegagalan perencanaan pekerjaan yang
Peralartan terjungkal (Excavator) akan di lakukan.
Cidera personil Pastikan tidak ada pekerja
lewat / bekerja di bawah objek,
Minimnya pencahayan penerangan
kecuali jika dianggap perlu
(bekerja malam hari)
oleh Rigging Supv. dan jumlah
personil harus seminimal
mungkin dan pastikan
menggunakan dengan benar
peralatan angkat tersebut
Kontrol dan pastikan bahwa
sling(s) and
shackle(s)terpasang dengan
benar dan bersertifikasi
sebelum melakukan
penganktan.
Kontrol dan memastikan bahwa
kuantitas bagian
pengangkatan peralatan yang
mampu
untuk mengangkat benda.
Lakukan pengangkatan objek
dengan bertahap.
Hanya yang berpengalaman
dan berkualitas/tenaga terlatih
yang dapat menangani
peralatan pengangkatan
Sediakan lampu portable
Sediakan jas hujan
Pasang rambu
Sediakan pengatur lalu lintas
5) Back Filling Excavator swing and collision Using Standard PPE Ensure the excavator position
is not at the edge of the soil
Hit by excavator bucket on existing heap.
8
pipe on location Make sure the position of
excavator is stable
Fallen down to the excavated hole
Ensure the workers position
Hit by excavator bucket, personnel out of radius bucket swing
injury Make sure the operator of view
Erosion is not blocked
Lack of lighting ( work at night ) Working whit full
concentration
Endure the excavator is
operated on hard land base
Ensure that working area is
safe for excavator movement
Provide signalman to handle
excavator activity
Provide barricade and warning
board at the working area
CTR provide certificate for
Operator
Uninvolved personnel to keep
away from working area
Daily check the excavator
condition before use
Ground disturbance should be
done as per PCI regulation.
The buried lines and live cable
shall be clearly marked before
start
Use manual handling if
required.
Ensure all the worker
competent and authorize to
perform the activity
Provide ladder and stick for
check pipe available on
location.
Provide portable light (work at
night)
9
Provide Rain Coat
Install safety sign
Provide traffic control
5) Pengisian galian kembali Excavator terjungkal Gunakan Peralatan APD Pastikan excavator berada
tidak di posisi pinggir/tepi
Terkena cangkul dari excavator pada tumpukan tanah/galian.
lokasi pipa yang sudah ada.
Patikan posisi excavator stabil
Terjatuh kedalam galian Memastikan pekerja jauh daru
Tertabrak cangkul ketika mengayun, radius cangkul dari excavator
cidera personil Pastikan pandangan dari
Tanah longsor operator tidak tertutup
Bekerja dengan penuh
Minimnya pencahayan penerangan konsentrasi
(bekerja malam hari)
Pastikan excavator beroperasi
di tanah landasan yang
keras/padat
Pastikan area excavator aman
dari pergerakan.
Sediakan barricade dan
rambu rambu keselamatan .
Semua certificate peralatan
dan operator harus
disediakan.
Pekerja yang tidak terlibat
diharapkan tidak berada
dilokasi penggalian.
Pemeriksaan harian excavator
harus dilakukan dan peralatan
aman untuk digunakan.
Pengecekan kondisi tanah
yang berhubungan dengan
jalur proses, listrik dan
instrument dibawah tanah
harus dilakukan.
Tandai jalur proses dan listrik
yang live didalam tanah dan
gunakan metode manual untuk
10
penggalian.
Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan
penggalian tanah.
Gunakan tangga dan
stik/tongkat pengecek pipa
tersedia di lokasi.
Sediakan lampu portable
Sediakan jas hujan
Pasang rambu
Sediakan pengatur lalu lintas
6) Housekeeping Bad housekeeping Proper PPE Ensure housekeeping
implemented before and after
working hours.
All equipment and toos is
stored in a safe place
6) Kebersihan Housekeeping yang buruk Gunakan PPE yang benar Pastikan housekeeping
dilakukan sebelum dan
sesudah jam kerja
Semua peralatan dan alat-alat
disimpan di tempat yang aman.
Note : - Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
- Do manual excavation near the existing pipeline.
- Good communication between operator and signalman, ensure the operator follow instruction/sign from signalman.
Catatan : - Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.
- Lakukan penggalian manual di dekat jalur pipa existing
- Komunikasi yang baik antara operator excavator dengan signalmen, yankinkan operator mengikuti instruksi/ tanda dari signalman.