0% found this document useful (0 votes)
81 views1 page

Grta Tie in Scope-Ndt Plan

This document outlines a non-destructive testing plan for tie-in joints during a turnaround at a plant. It lists 6 tie-in locations that require ultrasonic testing of welded joints, including the pipe size, joint type, planned completion date and crew. All joints were completed as planned and tested using phased array ultrasonic testing within 30 minutes per joint. The total number of joints was 11 taking approximately 0 hours to complete.

Uploaded by

kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

Grta Tie in Scope-Ndt Plan

This document outlines a non-destructive testing plan for tie-in joints during a turnaround at a plant. It lists 6 tie-in locations that require ultrasonic testing of welded joints, including the pipe size, joint type, planned completion date and crew. All joints were completed as planned and tested using phased array ultrasonic testing within 30 minutes per joint. The total number of joints was 11 taking approximately 0 hours to complete.

Uploaded by

kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GRTA TIE IN SCOPE- NDT PLAN

RT LAMINATIO Time/ Joint


TIE-IN TIE-IN NO. OF Welding Completion NDT Total Time
Sl.No TIE-IN TYPE JOINT CONFIGURATION LOCATION Planned N CHECK Minutes RT Crew REMARKS
NUMBER PERIOD JOINTS Time METHOD Minutes
Date STATUS

Considering set up plan shall


be dveloped before
151A-TEE TO PIPE
1 TP-151A/B GRTA 1 1/2" Welded, Sch 80 2 Unit-22 1/30/22 9:30 PM 31-Jan-22 Completed PAUT 30 mints / jt 60 UT Crew-01 proceeding to site and post
151B-PIPE TO PIPE
examination interpretation
shall be done off-line #REF!
57A-TEE TO PIPE
2 TP-060A/B GRTA 2" Welded, Sch 80 2 Unit-51 1/31/22 12:00 AM 2-Feb-22 Completed PAUT 30 mints / jt 60 UT Crew-01
57B-PIPE TO PIPE #REF!
Unit-51 Pipe
3 TP-039A/B GRTA 2" Welded, Sch 80 2 PIPE TO FLANGE 1/31/22 2:00 PM 2-Feb-22 Completed PAUT 30 mints / jt 60 UT Crew-01
rack #REF!
Unit-53 Pipe
4 TP-071 GRTA 2" Welded, Sch 80 1 FLANGE TO PIPE 1/30/22 9:00 PM 3-Feb-22 Completed PAUT 30 mints / jt 30 UT Crew-01
rack #REF!

5 TP-045 CRUDE 3/4" Welded, Sch80 2 FLANGE TO PIPE Unit-51 1/20/22 4:30 PM 21-Jan-22 Completed PAUT 30 mints / jt 60 UT Crew-01
#REF!

6 TP-220A/B RFCC 1 1/2" Welded, Sch 80 2 FLANGE TO PIPE Unit-53 1/21/22 4:30 PM 22-Jan-22 Completed PAUT 30 mints / jt 60 UT Crew-01
#REF!
TOTAL 11 0 0