0% found this document useful (0 votes)
78 views1 page

ET-Practical Check List

The document details a technical performance evaluation for eddy current testing. It lists 5 sections to be evaluated including demonstrating equipment operation, calibration setup, lift-off effect demonstration, calibration, and evaluation and reporting. Each section contains criteria to be marked yes or no for scoring.

Uploaded by

maxpan max
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

ET-Practical Check List

The document details a technical performance evaluation for eddy current testing. It lists 5 sections to be evaluated including demonstrating equipment operation, calibration setup, lift-off effect demonstration, calibration, and evaluation and reporting. Each section contains criteria to be marked yes or no for scoring.

Uploaded by

maxpan max
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

A-1 INSPECTION(S) PTE.

LTD

TECHNICAL PERFORMANCE EVALUATION

Name of Candidate:
Method of Examination: Eddy Current Testing
Date:
-------------------------------------------------------------------------------------------------------------------
1. Knowledge on Eddy current equipment (10)

Demonstrated operations of ET equipment YES/NO


Probe selection YES/NO

2. Understanding set up for calibration. (15)


Setting up Gain Horizontal and Vertical YES/NO
Filter Selection YES/NO
Display selection YES/NO

3. Demonstrated Lift-off effect (20)


Phase Angle Selection YES/NO
Gain Selection YES/NO

4. Calibration (15)
Balancing Done Before testing YES/NO
Identified EDM Notches on the calibration blocks YES/NO
Understand the signal amplitude of the Notches YES/NO

5. Evaluation and Reporting (40)

Followed Correct procedure and standards YES/NO

Identified Mandatory defects YES/NO

Correctly measured and evaluated the indications YES/NO

Report Preparation and Result analysis YES/NO

Marks Obtained:

Percentage:

You might also like