Permata Hijau Mansion MEP Work Plan

This document is a bill of quantities for an MEP (mechanical, electrical, plumbing) project for the Permata Hijau Mansion mock-up Type T510 area. It includes items for project preparation, electrical work, and lighting and power outlets for the basement, first floor, second floor and rooftop levels. The total cost is estimated to be IDR 147,848,454.98 for the electrical work and IDR 52,879,375.79 for lighting and power outlets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views5 pages

Permata Hijau Mansion MEP Work Plan

This document is a bill of quantities for an MEP (mechanical, electrical, plumbing) project for the Permata Hijau Mansion mock-up Type T510 area. It includes items for project preparation, electrical work, and lighting and power outlets for the basement, first floor, second floor and rooftop levels. The total cost is estimated to be IDR 147,848,454.98 for the electrical work and IDR 52,879,375.79 for lighting and power outlets.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

PROYEK : Permata Hijau Mansion

PAKET PEKERJAAN : MEP


AREA : MOCK UP Type T510
PEMILIK : MERRA LAND DEVELOPMENT / PT SPIRIT USAHA MANDIRI

Bill Of Quantity

NO. JENIS PEKERJAAN SPESIFIKASI MERK SAT. VOL. HARGA SAT. TOTAL

A PEKERJAAN PERSIAPAN 61.379.142,00


1 Mobilisasi & Demobilisasi ls 1,00 28.612.782,00 28.612.782,00
2 Kantor Lapangan + perlengkapan kantor , Gudang ls 1,00 By OWNER By OWNER
3 Proyek Manajemen dan Biaya Administrasi Lapangan ls 1,00 23.793.000,00 23.793.000,00
4 Alat-alat Keselamatan Kerja (APD) ls 1,00 By OWNER By OWNER
5 Pengadaan Gambar dan laporan ls 1,00 8.973.360,00 8.973.360,00
6 Penyediaan Tenaga Listrik ls 1,00 By OWNER By OWNER
7 Penyediaan Sumber Air Bersih ls 1,00 By OWNER By OWNER
8 Keamanan Proyek ls 1,00 By OWNER By OWNER
9 Asuransi Jamsostek ls 1,00 By OWNER By OWNER
10 Pengadaan material support/ scafolding ls 1,00 By OWNER By OWNER
11 Perijinan dengan instansi terkait selama pelaksanaan pekerjaan ls 1,00 By OWNER By OWNER
12 Pekerjaan perbaikan kembali jalan rusak akibat pelaksanaan pekerjaan ls 1,00 By OWNER By OWNER

B PEKERJAAN ELEKTRIKAL 147.848.454,98


I Pnel Distribusi 13.313.933,99
I.1 Pengadaan & Pemasangan MCB BOX Lt. Dasar Type 510 (220V/ 50Hz/ 1 PHASA) Unit 1,00 3.657.714,21 3.657.714,21
- MCB 3P-40A/6 KA ( Incoming ) DOMAE Schneider bh 1,00
- MCB 1P-20A/6 KA DOMAE Schneider bh 3,00
- MCB 1P-16A/6 KA DOMAE Schneider bh 1,00
- MCB 1P-6A/6 KA DOMAE Schneider bh 1,00
- BUS-BAR ( CU ) tipe sisir Installation Lot 1,00
- Pilot Lamp Indicator ( 2 A ) 1P Schneider Lot 1,00
- Wiring & Accessories + Cable Duck + Terminal Plug + Rell Mcb Installation Lot 1,00
- Box Panel IP.42 Lot 1,00

I.2 Pengadaan & Pemasangan MCB BOX Lt.1 Type 510 (220V/ 50Hz/ 1 PHASA) Unit 1,00 3.268.674,18 3.268.674,18
- MCB 1P-10A/6 KA ( Incoming ) DOMAE Schneider bh 1,00
- MCB 1P-10A/6 KA DOMAE Schneider bh 6,00
- MCB 1P-6A/6 KA DOMAE Schneider bh 1,00
- BUS-BAR ( CU ) tipe sisir Installation Lot 1,00
- Pilot Lamp Indicator ( 2 A ) 1P Schneider Lot 1,00
- Wiring & Accessories + Cable Duck + Terminal Plug + Rell Mcb Installation Lot 1,00
- Box Panel IP.42 Lot 1,00

I.3 Pengadaan & Pemasangan MCB BOX Lt.2 Type 510 (220V/ 50Hz/ 1 PHASA) Unit 1,00 3.268.674,18 3.268.674,18
- MCB 1P-16A/6 KA ( Incoming ) DOMAE Schneider bh 1,00
- MCB 1P-10A/6 KA DOMAE Schneider bh 6,00
- MCB 1P-6A/6 KA DOMAE Schneider bh 1,00
- BUS-BAR ( CU ) tipe sisir Installation Lot 1,00
- Pilot Lamp Indicator ( 2 A ) 1P Schneider Lot 1,00
- Wiring & Accessories + Cable Duck + Terminal Plug + Rell Mcb Installation Lot 1,00
- Box Panel IP.42 Lot 1,00

I.4 Pengadaan & Pemasangan MCB BOX Lt.Roof Top Type 510 (220V/ 50Hz/ 1 PHASA) Unit 1,00 3.118.871,42 3.118.871,42
- MCB 1P-16A/6 KA ( Incoming ) DOMAE Schneider bh 1,00
- MCB 1P-10A/6 KA DOMAE Schneider bh 5,00
- MCB 1P-6A/6 KA DOMAE Schneider bh 1,00
- BUS-BAR ( CU ) tipe sisir Installation Lot 1,00
- Pilot Lamp Indicator ( 2 A ) 1P Schneider Lot 1,00
- Wiring & Accessories + Cable Duck + Terminal Plug + Rell Mcb Installation Lot 1,00
- Box Panel IP.42 Lot 1,00

II Kabel Feeder 3.694.007,53


II.1 Pengadaan dan Pemasangan Kabel Feeder dari KWH PLN ke MCB BOX Lt. Dasar
- Kabel NYY 4 x 10 mm2 + NYA 4 mm2 c/w Pipa Conduit dia. 25mm + Aksesories 4 besar m 2,00 186.249,11 372.498,23
II.2 Pengadaan dan Pemasangan Kabel Feeder dari KWH PLN ke MCB BOX Lt. 1
- Kabel NYY 4 x 4 mm2 + NYA 4 mm2 c/w Pipa Conduit dia. 25mm + Aksesories 4 besar m 8,00 100.651,80 805.214,38
II.3 Pengadaan dan Pemasangan Kabel Feeder dari KWH PLN ke MCB BOX Lt. 2
- Kabel NYY 4 x 4 mm2 + NYA 4 mm2 c/w Pipa Conduit dia. 25mm + Aksesories 4 besar m 11,00 100.651,80 1.107.169,77
II.4 Pengadaan dan Pemasangan Kabel Feeder dari KWH PLN ke MCB BOX Lt. ROOFTOP
- Kabel NYY 4 x 4 mm2 + NYA 4 mm2 c/w Pipa Conduit dia. 25mm + Aksesories 4 besar m 14,00 100.651,80 1.409.125,16

III Penerangan dan Stop kontak 52.879.375,79


III.1 Pengadaan Penerangan dan Stop Kontak Lt. Dasar
c/w Material Bantu, Akessories, Material Pendukung
- Lampu Downlight LED 4200K-6W FBS 115 + LED bulb 6 W PHILIPS bh 3,00 184.134,98 552.404,94
- Lampu Downlight LED 4200K-9W FBS 115 + LED bulb 6 W PHILIPS bh 5,00 201.340,17 1.006.700,86
- Wall Lamp LED 6 W 3000K (Outdoor) SA 536 Cassa Bella bh 2,00 204.295,26 408.590,53
- Stopkontak 1P WESJP1121 / MWS Panasonic Style bh 2,00 64.959,46 129.918,92
- Stopkontak 1P c/w cover for outdoor WEJP1121-7 + WEJ89911 Panasonic WIDE bh 2,00 87.825,29 175.650,59
- Saklar ganda WESJ78029-W + WESJ5931 Panasonic Style bh 2,00 73.154,91 146.309,82
- Saklar Tunggal WESJ78019-W + WESJ5931 Panasonic Style bh 2,00 50.564,88 101.129,77

III.2 Pemasangan Insatalasi Penerangan dan Stop Kontak Lt. Dasar


Kabel NYM 3x2,5mm2 ( Dalam Pipa Conduit High Impact ) c/w Material Bantu,
Akessories, Material Pendukung
- Instalasi lampu Downlight LED 4200K-6W NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 3,00 391.232,09 1.173.696,28
- Instalasi lampu Downlight LED 4200K-9W NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 5,00 391.232,09 1.956.160,46
- Instalasi wall Lamp LED 6 W 3000K (Outdoor) NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 2,00 391.232,09 782.464,18
- Instalasi Stopkontak 1 P NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 4,00 588.782,81 2.355.131,22
- Instalasi Ceilling Exhaust Fan NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 588.782,81 588.782,81
III.3 Pengadaan Penerangan dan Stop Kontak Lt. 1
c/w Material Bantu, Akessories, Material Pendukung
- Lampu Downlight LED 4200K-6W FBS 115 + LED bulb 6 W PHILIPS bh 9,00 184.134,98 1.657.214,81
- Wall Lamp LED 6 W 3000K (Outdoor) SA 536 Cassa Bella bh 1,00 204.295,26 204.295,26
- Stopkontak 1P WESJP1121 / MWS Panasonic Style bh 5,00 64.959,46 324.797,29
- Stopkontak AC c/w Stekker WBJ1214-W + WEJ9111-W Panasonic WIDE bh 2,00 125.468,77 250.937,54
- Saklar ganda WESJ78029-W + WESJ5931 Panasonic Style bh 1,00 73.154,91 73.154,91
- Saklar Tunggal WESJ78019-W + WESJ5931 Panasonic Style bh 3,00 50.564,88 151.694,65

III.4 Pemasangan Insatalasi Penerangan dan Stop Kontak Lt. 1


Kabel NYM 3x2,5mm2 ( Dalam Pipa Conduit High Impact ) c/w Material Bantu,
Akessories, Material Pendukung
- Instalasi lampu Downlight LED 4200K-6W NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 9,00 391.232,09 3.521.088,83
- Instalasi wall Lamp LED 6 W 3000K (Outdoor) NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 391.232,09 391.232,09
- Instalasi Stopkontak 1 P NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 5,00 588.782,81 2.943.914,03
- Instalasi power AC Split NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 2,00 667.357,34 1.334.714,68
- Instalasi Ceilling Exhaust Fan NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 588.782,81 588.782,81

III.5 Pengadaan Penerangan dan Stop Kontak Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Lampu Downlight LED 4200K-6W FBS 115 + LED bulb 6 W PHILIPS bh 10,00 184.134,98 1.841.349,79
- Stopkontak 1P WESJP1121 / MWS Panasonic Style bh 9,00 64.959,46 584.635,12
- Stopkontak AC c/w Stekker WBJ1214-W + WEJ9111-W Panasonic WIDE bh 2,00 125.468,77 250.937,54
- Saklar ganda WESJ78029-W + WESJ5931 Panasonic Style bh 1,00 73.154,91 73.154,91
- Saklar Tunggal WESJ78019-W + WESJ5931 Panasonic Style bh 4,00 50.564,88 202.259,53

III.6 Pemasangan Insatalasi Penerangan dan Stop Kontak Lt. 2


Kabel NYM 3x2,5mm2 ( Dalam Pipa Conduit High Impact ) c/w Material Bantu,
Akessories, Material Pendukung
- Instalasi lampu Downlight LED 4200K-6W NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 10,00 391.232,09 3.912.320,92
- Instalasi Stopkontak 1 P NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 9,00 588.782,81 5.299.045,25
- Instalasi power AC Split NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 2,00 667.357,34 1.334.714,68
- Instalasi Ceilling Exhaust Fan NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 2,00 588.782,81 1.177.565,61

III.7 Pengadaan Penerangan dan Stop Kontak Lt. ROOFTOP


c/w Material Bantu, Akessories, Material Pendukung
- Lampu Downlight LED 4200K-6W FBS 115 + LED bulb 6 W PHILIPS bh 6,00 184.134,98 1.104.809,87
- Wall Lamp LED 6 W 3000K (Outdoor) SA 536 Cassa Bella bh 1,00 204.295,26 204.295,26
- Pool Lamp under water LED 12 V / 18 W 12 V/ 18 W under water China bh 2,00 2.873.004,75 5.746.009,50
- Stopkontak 1P WESJP1121 / MWS Panasonic Style bh 8,00 64.959,46 519.675,67
- Stopkontak AC c/w Stekker WBJ1214-W + WEJ9111-W Panasonic WIDE bh 1,00 125.468,77 125.468,77
- Saklar ganda WESJ78029-W + WESJ5931 Panasonic Style bh 2,00 73.154,91 146.309,82
- Saklar Tunggal WESJ78019-W + WESJ5931 Panasonic Style bh 1,00 50.564,88 50.564,88

III.8 Pemasangan Insatalasi Penerangan dan Stop Kontak Lt. ROOFTOP


Kabel NYM 3x2,5mm2 ( Dalam Pipa Conduit High Impact ) c/w Material Bantu,
Akessories, Material Pendukung
- Instalasi lampu Downlight LED 4200K-6W NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 6,00 391.232,09 2.347.392,55
- Instalasi wall Lamp LED 6 W 3000K (Outdoor) NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 391.232,09 391.232,09
- Instalasi Pool Lamp under water LED 12V/18W NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 2,00 391.232,09 782.464,18
- Instalasi Stopkontak 1 P NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 8,00 588.782,81 4.710.262,44
- Instalasi power AC Split NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 667.357,34 667.357,34
- Instalasi Ceilling Exhaust Fan NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 588.782,81 588.782,81

IV Grounding Panel Elektrikal 77.961.137,67


IV.1 Pengadaan Pemasangan Grounding Panel Elektrikal
Grounding Panel lengkap dengan stick rod, kabel penghantar NYA 10 mm2, grounding
-
rod dan control box dengan tahanan R. 2 Ohm Lot 1,00 77.961.137,67 77.961.137,67

C PEKERJAAN ELEKTRONIK Rp 5.612.949,18

I Telephone , TV cable , Wifi 3.954.594,31


I.1 Pengadaan Outlet Elektronik Lt. 1
c/w Material Bantu, Akessories, Material Pendukung
- One Gang Telephone Outlet (RJ11) WEJ2164 + WEJ78019-W Panasonic WIDE bh 1,00 107.959,31 107.959,31
- One Gang Data Outlet Cat 6 (RJ45) For STB WEJ24886 + WEJ78019-W Panasonic WIDE bh 1,00 180.194,86 180.194,86
- Outlet Wifi Access Point WEJ24886 + WEJ78019-W Panasonic WIDE bh 1,00 180.194,86 180.194,86

I.2 Pemasangan Instalasi Outlet Elektronik Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Instalasi Kabel ITC 2x2x0,6mm2 One Gang Telephone Outlet (RJ11) ITC 2x2x0.6mm+ PVC conduit Supre + BOSS ttk 1,00 299.735,28 299.735,28
- Instalasi Kabel UTP Cat 6 One Gang Data Outlet Cat 6 (RJ45) For STB UTP Cat 6 + PVC conduit Belden/setara + BOSS ttk 1,00 447.646,17 447.646,17
- Instalasi Kabel UTP Cat 6 Outlet Wifi Access Point UTP Cat 6 + PVC conduit Belden/setara + BOSS ttk 1,00 447.646,17 447.646,17

I.3 Pengadaan Outlet Elektronik Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- One Gang Telephone Outlet (RJ11) WEJ2164 + WEJ78019-W Panasonic WIDE bh 1,00 107.959,31 107.959,31
- One Gang Data Outlet Cat 6 (RJ45) For STB WEJ24886 + WEJ78019-W Panasonic WIDE bh 1,00 180.194,86 180.194,86
- One Gang Data Outlet Cat 6 (RJ45) For PC WEJ24886 + WEJ78019-W Panasonic WIDE bh 1,00 180.194,86 180.194,86
- Outlet Wifi Access Point WEJ24886 + WEJ78019-W Panasonic WIDE bh 1,00 180.194,86 180.194,86

I.4 Pemasangan Instalasi Outlet Elektronik Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Instalasi Kabel ITC 2x2x0,6mm2 One Gang Telephone Outlet (RJ11) ITC 2x2x0.6mm+ PVC conduit Supre + BOSS ttk 1,00 299.735,28 299.735,28
- Instalasi Kabel UTP Cat 6 One Gang Data Outlet Cat 6 (RJ45) For STB UTP Cat 6 + PVC conduit Belden/setara + BOSS ttk 1,00 447.646,17 447.646,17
- Instalasi Kabel UTP Cat 6 One Gang Data Outlet Cat 6 (RJ45) For PC UTP Cat 6 + PVC conduit Belden/setara + BOSS ttk 1,00 447.646,17 447.646,17
- Instalasi Kabel UTP Cat 6 Outlet Wifi Access Point UTP Cat 6 + PVC conduit Belden/setara + BOSS ttk 1,00 447.646,17 447.646,17

II CCTV 1.658.354,86
II.1 Pengadaan Unit CCTV Smart Home
c/w Material Bantu, Akessories, Material Pendukung
- CCTV Outdoor IP65 Camera Wifi loT Home Automation Smart IP camera outdoor BARDI STC bh 1,00 981.746,77 981.746,77
- Memory Card 128 GB V-GeN bh 1,00 INCLUDE
- Stopkontak 1P c/w cover for outdoor WEJP1121-7 + WEJ89911 Panasonic WIDE bh 1,00 87.825,29 87.825,29
- Instalasi Stopkontak 1 P NYM 3x2,5mm + conduit PVC 3 Besar / BOSS ttk 1,00 588.782,81 588.782,81
D PEKERJAAN VAC 61.530.727,90

I Air Conditioner 50.156.332,06


I.1 Pengadaan dan Pemasangan Unit Air Conditioner
c/w Material Bantu, Akessories, Material Pendukung
- AC Split Wallmounted uk/ 3/4 Pk ( Lt. 1 Dining Room ) STC20NV DAIKIN unit 1,00 6.593.135,47 6.593.135,47
- AC Split Wallmounted uk/ 1 Pk ( Lt. 1 Living Room ) STC25NV DAIKIN unit 1,00 7.249.822,27 7.249.822,27
- AC Split Wallmounted uk/ 3/4 Pk ( Lt. 2 Bedroom 1 ) STC20NV DAIKIN unit 1,00 6.593.135,47 6.593.135,47
- AC Split Wallmounted uk/ 1 Pk ( Lt. 2 Master Bedroom ) STC25NV DAIKIN unit 1,00 7.249.822,27 7.249.822,27
- AC Split Wallmounted uk/ 1 Pk ( Lt. ROOFTOP Hobby Room ) STC25NV DAIKIN unit 1,00 7.249.822,27 7.249.822,27

I.2 Pengadaan dan Pemasangan Pipa Refrigerant


c/w Material Bantu, Akessories, Material Pendukung
- Pipa Refrigrant uk/ 1/4 x 3/8 c/w Kabel Kontrol ( Lt. 1 Dining Room ) Universal Toyoda m 15,00 187.484,08 2.812.261,22
- Pipa Refrigrant uk/ 1/4 x 3/8 c/w Kabel Kontrol ( Lt. 1 Living Room ) Universal Toyoda m 15,00 187.484,08 2.812.261,22
- Pipa Refrigrant uk/ 1/4 x 3/8 c/w Kabel Kontrol ( Lt. 2 Bedroom 1 ) Universal Toyoda m 15,00 187.484,08 2.812.261,22
- Pipa Refrigrant uk/ 1/4 x 3/8 c/w Kabel Kontrol ( Lt. 2 Master Bedroom ) Universal Toyoda m 15,00 187.484,08 2.812.261,22
- Pipa Refrigrant uk/ 1/4 x 3/8 c/w Kabel Kontrol ( Lt. ROOFTOP Hobby Room ) Universal Toyoda m 15,00 187.484,08 2.812.261,22

I.3 Pengadaan dan Pemasangan Pipa Drain


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 3/4" + Isolasi ( Lt. 1 Dining Room ) PVC AW Wavin / Rucika m 6,00 15.524,49 93.146,92
- Pipa PVC AW dia. 3/4" + Isolasi ( Lt. 1 Living Room ) PVC AW Wavin / Rucika m 5,00 15.524,49 77.622,43
- Pipa PVC AW dia. 3/4" + Isolasi ( Lt. 2 Bedroom 1 ) PVC AW Wavin / Rucika m 8,00 15.524,49 124.195,89
- Pipa PVC AW dia. 3/4" + Isolasi ( Lt. 2 Master Bedroom ) PVC AW Wavin / Rucika m 9,00 15.524,49 139.720,38
- Pipa PVC AW dia. 3/4" + Isolasi ( Lt. ROOFTOP Hobby Room ) PVC AW Wavin / Rucika m 9,00 15.524,49 139.720,38
- Pipa PVC AW dia. 1 1/2" + Isolasi ( Pipa Riser Drain AC ) PVC AW Wavin / Rucika m 22,00 26.585,55 584.882,20

II Ventilating ( Exhaust Fan )


II.1 Pengadaan dan Pemasangan Unit Exhaust Fan 11.374.395,84
c/w Material Bantu, Akessories, Material Pendukung
- Ceilling Exhaust Fan ( Lt. Dasar Maid's Bathroom ) FV17CDUN Ex. Panasonic bh 1,00 1.206.662,00 1.206.662,00
- Ceilling Exhaust Fan ( Lt. 1 Powder Room ) FV17CDUN Ex. Panasonic bh 1,00 1.206.662,00 1.206.662,00
- Ceilling Exhaust Fan ( Lt. 2 Master Bathroom & Bathroom 1 ) FV17CDUN Ex. Panasonic bh 2,00 1.206.662,00 2.413.323,99
- Ceilling Exhaust Fan ( Lt. ROOFTOP Bathroom 2 ) FV17CDUN Ex. Panasonic bh 1,00 1.206.662,00 1.206.662,00

II.2 Pengadaan dan Pemasangan Pipa Exhaust Fan + Vent Cup


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC Class D dia. 4" ( Lt. Dasar Maid's Bathroom ) PVC D Wavin / Rucika m 4,00 118.115,19 472.460,75
- Pipa PVC Class D dia. 4" ( Lt. 1 Powder Room ) PVC D Wavin / Rucika m 1,00 118.115,19 118.115,19
- Pipa PVC Class D dia. 4" ( Lt. 2 Master Bathroom ) PVC D Wavin / Rucika m 1,00 118.115,19 118.115,19
- Pipa PVC Class D dia. 4" ( Lt. 2 Bathroom 1 ) PVC D Wavin / Rucika m 5,00 118.115,19 590.575,93
- Pipa PVC Class D dia. 4" ( Lt. ROOFTOP Bathroom 2 ) PVC D Wavin / Rucika m 1,00 118.115,19 118.115,19
- Gril Alumunium uk/ 150 x 400 Squre MODUL bh 5,00 784.740,73 3.923.703,63

E PEKERJAAN PLUMBING 225.198.922,05

I Air Bersih 113.826.108,86


I.1 Pengadaan dan Pemasangan Sumur Bor ( Semi Deep well )
c/w Material Bantu, Akessories, Material Pendukung
- Boring Sumur sumur dangkal 40 M Lokal lot 1,00 26.267.472,00 26.267.472,00
- Pompa jet 128 lpm , H 60 m c/w Panel Kontrol JPA 8-62 /JD Basic 7 GRUNDFOS unit 1,00 14.447.109,60 14.447.109,60
- Pipa PVC AW dia. 3" ( Untuk casing ) PVC AW Rucika , Wavin m 30,00 115.696,07 3.470.882,01
- Pipa PVC AW dia. 1 1/4" ( dari sumur ke Pompa ) PVC AW Rucika , Wavin m 30,00 41.798,49 1.253.954,66
- Pipa PVC AW dia. 1" ( dari Pompa Ke roof tank ) PVC AW Rucika , Wavin m 18,00 30.208,21 543.747,84
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz bh 2,00 600.603,30 1.201.206,60
- Pressure Gauge max. 10 bar 4" / 10 Bar NAGANO bh 1,00 563.384,25 563.384,25
- Kabel NYYHY 3 x 1,5 mm ( Dalam Pipa Conduit ) NYYHY + PVC conduit 20mm 3 Besar / BOSS m 20,00 29.989,05 599.781,04

I.2 Pengadaan dan Pemasangan Tandon ( Roof Tank )


c/w Material Bantu, Akessories, Material Pendukung
- Tandon air kap. 1,5 m³ Stainless TBSK 1500 Penguin unit 1,00 6.731.039,70 6.731.039,70
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz bh 1,00 600.603,30 600.603,30
- Gate Valve dia. 1 1/4" Bronze 125 Fig.FH Kitz bh 1,00 828.914,13 828.914,13
- Dudukan Tandon air By other
- Pompa Dorong 125 lpm , H 50 CMBE 5-62 GRUNDFOS unit 1,00 41.617.525,95 41.617.525,95

I.3 Pengadaan dan Pemasangan Instalasi Air bersih ( Dingin )


I.3.1 Instalasi Pipa Air bersih ( dingin ) Riser
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 1" ( Pipa Riser Vertical ) Gravitasi PVC AW Rucika , Wavin m 18,00 30.208,21 543.747,84
- Pipa PVC AW dia. 1 1/4" ( Pipa Riser Vertical ) Booster Pump PVC AW Rucika , Wavin m 13,00 41.798,49 543.380,35

I.3.2 Instalasi Pipa Air bersih ( dingin ) Lt. Dasar - Gravitasi


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz m 3,00 600.603,30 1.801.809,90
- Pipa PVC AW dia. 1" PVC AW Rucika , Wavin m 3,00 30.208,21 90.624,64
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 3,00 22.369,08 67.107,25
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 24,00 15.754,82 378.115,57

I.3.3 Instalasi Pipa Air bersih ( dingin ) Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz bh 1,00 600.603,30 600.603,30
- Pipa PVC AW dia. 1" PVC AW Rucika , Wavin m 14,00 30.208,21 422.914,98
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 4,00 22.369,08 89.476,33
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 17,00 15.754,82 267.831,86

I.3.4 Instalasi Pipa Air bersih ( dingin ) Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz bh 1,00 600.603,30 600.603,30
- Pipa PVC AW dia. 1" PVC AW Rucika , Wavin m 12,00 30.208,21 362.498,56
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 10,00 22.369,08 223.690,82
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 15,00 15.754,82 236.322,23
I.3.5 Instalasi Pipa Air bersih ( dingin ) Lt. Roof Top
c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz bh 1,00 600.603,30 600.603,30
- Pipa PVC AW dia. 1" PVC AW Rucika , Wavin m 9,00 30.208,21 271.873,92
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 4,00 22.369,08 89.476,33
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 13,00 15.754,82 204.812,60
- Gate Valve dia. 3/4" ( Balancing tank ) Gravitasi Kitz bh 1,00 435.105,99 435.105,99
- Pipa PVC AW dia. 3/4" ( Balancing tank ) Gravitasi PVC AW Rucika , Wavin m 14,00 22.369,08 313.167,15

I.4 Pengadaan dan Pemasangan Instalasi Air bersih ( Panas )


I.4.1 Instalasi Pipa Air bersih ( Panas ) Riser
c/w Material Bantu, Akessories, Material Pendukung
- Water Heater Instant 8 ltr/menit AURES EASY ARISTON set 1,00 3.488.648,63 3.488.648,63
- Gate Valve dia. 3/4" Bronze 125 Fig.FH Kitz bh 2,00 435.105,99 870.211,98
- Pipa PVC AW dia. 3/4" ( Pipa Riser Vertical ) Booster Pump PVC AW Rucika , Wavin m 23,00 22.369,08 514.488,90
- Dudukan Solar water heater By other

I.4.2 Instalasi Pipa Air bersih ( Panas ) Lt. Dasar


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 1/2" Bronze 125 Fig.FH Kitz bh 1,00 342.415,26 342.415,26
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 10,00 15.754,82 157.548,15

I.4.3 Instalasi Pipa Air bersih ( Panas ) Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 1/2" Bronze 125 Fig.FH Kitz bh 1,00 342.415,26 342.415,26
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 17,00 15.754,82 267.831,86

I.4.4 Instalasi Pipa Air bersih ( Panas ) Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 3/4" Bronze 125 Fig.FH Kitz bh 1,00 435.105,99 435.105,99
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 4,00 22.369,08 89.476,33
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 21,00 15.754,82 330.851,12

I.4.5 Instalasi Pipa Air bersih ( Panas ) Lt. Roof Top


c/w Material Bantu, Akessories, Material Pendukung
- Gate Valve dia. 3/4" Bronze 125 Fig.FH Kitz bh 1,00 435.105,99 435.105,99
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 7,00 22.369,08 156.583,58
- Pipa PVC AW dia. 1/2" PVC AW Rucika , Wavin m 8,00 15.754,82 126.038,52

II Air Hujan 13.317.261,73


II.1 Pengadaan dan Pemasangan Instalasi Air Hujan
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 4" PVC AW Rucika , Wavin m 42,00 178.478,00 7.496.075,90
- Pipa PVC AW dia. 2,5" PVC AW Rucika , Wavin m 22,00 87.156,74 1.917.448,22
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 3,00 63.669,97 191.009,91
- Roof Drain dia. 4" Cast Iron KHARISMA bh 3,00 500.672,70 1.502.018,10
- Roof Drain dia. 2,5" Cast Iron KHARISMA bh 4,00 283.476,60 1.133.906,40
- Roof Drain dia. 2" Cast Iron KHARISMA bh 1,00 246.767,40 246.767,40
- FCO Stainless dia. 4" KHARISMA bh 1,00 350.776,80 350.776,80
- Vent Cup dia. 4" bh 1,00 479.259,00 479.259,00

III Air Kotor 24.076.004,46


III.1 Pengadaan dan Pemasangan Instalasi Air Kotor
c/w Material Bantu, Akessories, Material Pendukung
- Septic Tank Kap 1.800 ltr BT - 12 BIOTECH unit 1,00 10.326.399,93 10.326.399,93
- Pipa PVC AW dia. 4" ( Outlet Biotec ) PVC AW Rucika , Wavin m 6,00 178.478,00 1.070.867,99
- Pipa PVC D dia. 2" ( Pipa Venting ) PVC D Rucika , Wavin m 6,00 145.461,33 872.768,00
- Vent Cup dia. 2" bh 1,00 211.077,90 211.077,90

III.2 Pengadaan dan Pemasangan Instalasi Air Kotor Lt. Dasar


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 4" PVC D Rucika , Wavin m 27,00 178.478,00 4.818.905,93
- FCO Stainless dia. 4" bh 1,00 350.776,80 350.776,80

III.3 Pengadaan dan Pemasangan Instalasi Air Kotor Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 4" PVC AW Rucika , Wavin m 12,00 178.478,00 2.141.735,97

III.4 Pengadaan dan Pemasangan Instalasi Air Kotor Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 4" PVC AW Rucika , Wavin m 17,00 178.478,00 3.034.125,96

III.5 Pengadaan dan Pemasangan Instalasi Air Kotor Lt. Roof Top
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 4" PVC AW Rucika , Wavin m 7,00 178.478,00 1.249.345,98

IV Air Bekas dan Air Bekas Kichen 5.198.009,58


IV.1 Pengadaan dan Pemasangan Instalasi Air Bekas Lt. Dasar
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 10,00 63.669,97 636.699,70

IV.2 Pengadaan dan Pemasangan Instalasi Air Bekas Kichen Lt. Dasar
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 3,00 63.669,97 191.009,91

IV.3 Pengadaan dan Pemasangan Instalasi Air Bekas Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 7,00 63.669,97 445.689,79

IV.4 Pengadaan dan Pemasangan Instalasi Air Bekas Kichen Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 5,00 63.669,97 318.349,85

IV.5 Pengadaan dan Pemasangan Instalasi Air Bekas Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 21,00 63.669,97 1.337.069,38
IV.6 Pengadaan dan Pemasangan Instalasi Air Bekas Lt. Roof Top
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 11,00 63.669,97 700.369,67

IV.7 Pengadaan dan Pemasangan Instalasi Pipa Riser Air Bekas


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2,5" PVC AW Rucika , Wavin m 18,00 87.156,74 1.568.821,27

V Pipa Venting 3.026.716,19


V.1 Pengadaan dan Pemasangan Instalasi pipa Venting Lt. Dasar
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC D dia. 1 1/4" PVC D Rucika , Wavin m 12,00 32.612,01 391.344,14

V.2 Pengadaan dan Pemasangan Instalasi pipa Venting Lt. 1


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC D dia. 1 1/4" PVC D Rucika , Wavin m 21,00 32.612,01 684.852,24

V.3 Pengadaan dan Pemasangan Instalasi pipa Venting Lt. 2


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC D dia. 1 1/4" PVC D Rucika , Wavin m 26,00 32.612,01 847.912,30

V.4 Pengadaan dan Pemasangan Instalasi pipa Venting Lt. Roof Top
c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC D dia. 1 1/4" PVC D Rucika , Wavin m 16,00 32.612,01 521.792,18

V.5 Pengadaan dan Pemasangan Instalasi Pipa Riser Venting


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC D dia. 2 1/2" PVC D Rucika , Wavin m 9,00 64.535,04 580.815,33

VI Kolam Renang 65.754.821,23


VI.1 Pengadaan dan Pemasangan Pompa Kolam renang
c/w Material Bantu, Akessories, Material Pendukung
- Pompa Pool Power Flo 3/4 SP 1575 LX HAYWARD Unit 1,00 11.689.025,04 11.689.025,04
- Sand Filter Type High Velocity Cap. 780 LPM S166T HAYWARD Unit 1,00 10.769.663,52 10.769.663,52
- Pipa Pcv AW Dia. 3" ( Header ) PVC AW Rucika , Wavin m 2,00 115.696,07 231.392,13
- Gate Valve dia. 2 1/2" Bronze 125 Fig.FH Kitz bh 2,00 3.221.028,36 6.442.056,72
- Gate Valve dia. 2" Bronze 125 Fig.FH Kitz bh 2,00 1.552.391,28 3.104.782,56
- Chek Valve dia. 2" Bronze 125 Fig.R Kitz bh 1,00 2.010.644,46 2.010.644,46
- Strainer dia. 2" Bronze 150 Fig.Y Kitz bh 1,00 2.645.917,56 2.645.917,56
- Flexible Join dia. 2" SCR 16K MURAFLEX bh 1,00 860.014,98 860.014,98
- Gate Valve dia. 1 1/2" Bronze 125 Fig.FH Kitz bh 2,00 1.041.521,58 2.083.043,16
- Flexible Join dia. 1 1/2" SCR 16K MURAFLEX bh 1,00 643.226,76 643.226,76
- Chek Valve dia. 1 1/2" Bronze 125 Fig.R Kitz bh 1,00 9.441.402,30 9.441.402,30
- Pressure Gauge max. 10 bar 4" / 10 Bar NAGANO bh 5,00 563.384,25 2.816.921,25
- Gate Valve dia. 1" Bronze 125 Fig.FH Kitz bh 6,00 600.603,30 3.603.619,80
- Gate Valve dia. 3/4" Bronze 125 Fig.FH Kitz bh 2,00 435.105,99 870.211,98
- Chek Valve dia. 3/4" Bronze 125 Fig.R Kitz bh 1,00 469.367,91 469.367,91
- Strainer Type Basket Skimer/3400 HAYWARD bh 1,00 2.140.798,97 2.140.798,97
- Inlet Pool / Nozel dia. 3/4" HAYWARD bh 2,00 288.942,19 577.884,38
- Main Drain Kolam Renang dia. 2 1/2" Round frame HAYWARD bh 1,00 1.602.315,79 1.602.315,79

VI.2 Pengadaan dan Pemasangan Instalasi Pipa Kolam Renang


c/w Material Bantu, Akessories, Material Pendukung
- Pipa PVC AW dia. 2 1/2" PVC AW Rucika , Wavin m 8,00 87.156,74 697.253,90
- Pipa PVC AW dia. 2" PVC AW Rucika , Wavin m 4,00 63.669,97 254.679,88
- Pipa PVC AW dia. 1 1/2" PVC AW Rucika , Wavin m 2,00 48.910,36 97.820,71
- Pipa PVC AW dia. 1" PVC AW Rucika , Wavin m 13,00 30.208,21 392.706,77
- Pipa PVC AW dia. 3/4" PVC AW Rucika , Wavin m 5,00 22.369,08 111.845,41
- Pipa PVC AW dia. 3" ( Pipa Riser Drain Kolam Renang ) PVC AW Rucika , Wavin m 19,00 115.696,07 2.198.225,27

You might also like