MODIFICATION & RELOCATION
SERVICE APPLICATION
DIRECTIONS: Please save a copy of this form to your computer by selecting “FILE/SAVE AS” before entering text
and numbers. Then fill in your information electronically and select “SAVE.” Note that this form requires Adobe Reader® version 11.0
or greater to function properly. Download the most recent version of Adobe Reader® at http://get.adobe.com/reader.
APPLICATION PROCESS Below is the process to receive any type of electric service from ComEd:
 1    Establish or Verify Your Account                                4    Service Authorization
      If you have an existing ComEd account please enter the               Review all documents provided by your ComEd Project
      number in the “Existing ComEd Account #” field. If this              Lead, sign and return them to your representative along
      is a new service and you need to establish a ComEd                   with payment, if applicable, to authorize work to begin.
      account you must provide a SSN (Residential) or TaxID
      (Commercial) for account setup by calling ComEd at              5    “Service Need” Date Determination
      1-866-639-3532 (1-866-New-Elec). If this information is
                                                                           The “start work” and “service need” dates will be
      not provided, you can continue your submission,
                                                                           negotiated with you and every effort will be made to
      but a customer service representative will have
                                                                           meet your “preferred service” date. Delays in submitting
      to contact you before your application can
                                                                           the necessary documentation or changes to the project
      be processed.
                                                                           may adversely impact the “service need” date.
 2    Complete and Submit Service Application
                                                                      6    “Service Need” Date Confirmation
      Please work with a licensed electrical professional to
                                                                           Four weeks prior to the “start work” date, your ComEd
      complete your application. You have two options for
                                                                           representative will contact you to confirm whether work
      submitting your information:
                                                                           can begin. If the work cannot begin, the “start work” and
      Preferred Method: Enter your information directly into               “service need” dates will be adjusted accordingly. The
      the New Business Portal online form. You will                        new dates will be subject to ComEd’s workload and
      immediately receive a confirmation number for tracking               resource availability.
      your project status.
                                                                      7    Final Inspection
      Alternative Method: You may email your completed pdf
                                                                           Two weeks prior to the “start work” date, ComEd will
      application to ServiceApplications@ComEd.com.
                                                                           perform an on-site inspection to verify the
                                                                           site is ready for work to begin. If the site is not ready,
 3    Coordinate with Project Lead
                                                                           ComEd will let you know what needs to be done to make
      You will be assigned a ComEd Project Lead who will                   the site ready. ComEd reserves the right to reschedule
      determine how we can best meet your electric service                 the “start work” and “service need” dates based on the
      needs and will contact you to learn more about your                  work required to make the site ready.
      project. If needed, the assigned Project Lead will meet
      you at the project site to take measurements and
      evaluate equipment. They will create an agreement, a
      summary of any applicable charges, and diagrams
      depicting the service and will mail or email the
      documents to you.
Modification & Relocation
© Commonwealth Edison Company, 2019                             1
GENERAL SERVICE NOTES
≠≠   Unanticipated events such as severe weather or                  ≠≠   The “service need” date may be impacted depending on the
     other emergencies may delay the “start work” or meeting              amount of offsite work ComEd may need
     the “service need” date. ComEd will make every attempt to            to perform.
     notify you as soon as it becomes aware of such delays.
                                                                     ≠≠   If ComEd crews are required to work outside
≠≠   Like any other business, ComEd is obligated to                       of normal weekday hours, overtime labor charges
     obtain all necessary permits before beginning work.                  will apply.
     Promptly returning accurate and complete documents can
                                                                     ≠≠   For more information about the ComEd New Business
     help expedite this process.
                                                                          process, please go to: ComEd.com/NewBusiness
NEW, REVISED AND TEMPORARY SERVICE NOTES
≠≠   The date service that is provided may be impacted               ≠≠   You may be required to provide easements and space on
     depended on the existing capacity of the area.                       your property, or inside your building for
                                                                          ComEd equipment.
≠≠   Some municipalities may require separate Fire
     Pump and Emergency services. Please remember to include
     these services on your New Service application if
     applicable.
METERING NOTES
Please be aware that the ComEd System Meter department               Allow the ComEd System Meter department 10 business days
must approve the installation of main electrical panels and          to review and return your drawings.
all associated new electrical equipment that are rated greater
or equal to 1,200 amps & any service that is greater than            All customer-submitted plans/drawings must be stamped
600 volts.                                                           ComEd approved before service can be provided.
To obtain approval, email the following documents to                 Individual residential units are treated as separate
SWBD.Approvals@ComEd.com:                                            customers requiring separate metering per the ComEd rate
                                                                     book (ComEd.com/Rates).
      he ComEd Service Application (completely
     T
     filled out)                                                     *A diagram must be provided for each switchboard needing
                                                                     approval. These diagrams may be found in your project’s
      PDF of the existing or planned electrical/power system
     A                                                               electrical plans and manufacturer’s specifications. Confer with
     one-line diagram which illustrates the meter current            your electrical contractor, architect or engineer. Always include
     transformer cabinet, switchgear, power panels and               the name of the equipment manufacturer and model number in
     disconnect switch sequence.                                     the title block.
      PDF diagram* of the physical equipment which you
     A
     plan to install (e.g.. meter current transformer cabinet,
     switchgear and/or power panels).
      ne line drawings for multi-unit buildings must show
     O
     the location and amount of meters cabinets on each floor
     for approval.
OTHER
Please note that all customers now have a choice of electric suppliers, electric rates, metering option, etc. For more information,
visit our website at ComEd.com/Choice or call our Business Solutions at 1-877-426-6331 (1-877-4-ComEd-1).
Modification & Relocation
© Commonwealth Edison Company, 2019                              2
MODIFICATION & RELOCATION
LOAD INFORMATION
FORM TO BE COMPLETED BY QUALIFIED ELECTRICAL PROFESSIONAL
SITE & BUILDING INFORMATION
PROJECT NAME                                                            PROJECT TYPE                       EXISTING COMED ACCOUNT #
                                                                        Multi-unit
                                                                        Mixed
                                                                        Event
                                                                        Office
                                                                        Factory
                                                                        Retail
                                                                        Other  Space
                                                                                Comm./Res.
                                                                                   Residential
SITE ADDRESS                                                            CITY                               ZIP CODE
REQUESTED SERVICE
     Add Load                          Remove Load                         Permanent Relocation                Temporary Relocation
RESIDENTIAL # OF UNITS             TOTAL RESIDENTIAL SQ. FOOTAGE        COMMERCIAL # OF UNITS              TOTAL COMMERCIAL SQ. FOOTAGE
HOURS OF NORMAL OPERATION
Start:                       AM      PM     End:                          AM      PM         24-hour
NEW EQUIPMENT AND VOLTAGE                                                                                                 SAME AS EXISTING
PREFERRED SERVICE EQUIPMENT TYPE
   Underground                       Overhead                             Vault/High-rise                    Traffic Control
SERVICE VOLTAGE
   120/240V 1-phase 3-wire           120/240V 3-phase 4-wire              120/208V 3-phase 4-wire            277/480V 3-phase 4-wire
   480V 3-phase 3-wire (B-phase grounded, not allowed in Chicago)         480V 3-phase 3-wire (ungrounded, req. special equipment & approval)
   4kV                               12kV                                 34kV                               Other:
EXISTING EQUIPMENT AND VOLTAGE                                                                                                 TO BE REMOVED
PREFERRED SERVICE EQUIPMENT TYPE
   Underground                       Overhead                             Vault/High-rise                    Traffic Control
SERVICE VOLTAGE
   120/240V 1-phase 3-wire           120/240V 3-phase 4-wire              120/208V 3-phase 4-wire            277/480V 3-phase 4-wire
   480V 3-phase 3-wire (B-phase grounded, not allowed in Chicago)         480V 3-phase 3-wire (ungrounded, req. special equipment & approval)
   4kV                               12kV                                 34kV                               Other:
Modification & Relocation
© Commonwealth Edison Company, 2019                                 3
MODIFICATION & RELOCATION                                                                            PROJECT NAME
LOAD INFORMATION                                                                                     SWITCH NAME
FORM TO BE COMPLETED BY QUALIFIED ELECTRICAL PROFESSIONAL
NEW SWITCH INFORMATION (If more than one, please attach the following information per switch)                       SAME AS EXISTING
SWITCH NAME                                                         # TOTAL SWITCHES FOR PROJECT     # SWITCHES IDENTICAL TO THIS APP
SWITCH LOCATION, IF KNOWN                                           SWITCH SIZE (AMPS)               SIZE OF CONDUCTOR
SWITCH RATING (%)                 NUMBER OF SECONDARY SETS          CONDUCTOR MATERIAL
                                                                        CU            AL
EXISTING SWITCH INFORMATION (If more than one, please attach the following information per switch)                    TO BE REMOVED
SWITCH NAME                                                         # TOTAL SWITCHES FOR PROJECT     # SWITCHES IDENTICAL TO THIS APP
SWITCH LOCATION, IF KNOWN                                           SWITCH SIZE (AMPS)               SIZE OF CONDUCTOR
SWITCH RATING (%)                 NUMBER OF SECONDARY SETS          CONDUCTOR MATERIAL
                                                                        CU            AL
Modification & Relocation
© Commonwealth Edison Company, 2019                             4
MODIFICATION & RELOCATION                                                                                       PROJECT NAME
LOAD INFORMATION                                                                                                SWITCH NAME
FORM TO BE COMPLETED BY QUALIFIED ELECTRICAL PROFESSIONAL
NEW LOAD INFORMATION (All loads should be shown in kW, with a power factor of .85 used for conversion from KVA)
CATEGORY                      DESCRIPTION                                1-PHASE          1-PHASE               3-PHASE               3-PHASE
                                                                         CONNECTED        DIVERSIFIED           CONNECTED             DIVERSIFIED
                                                                         LOAD             CAPACITY*             LOAD                  CAPACITY*
Lighting
Appliances
Receptacle
Process Heat
Water Heat
Motors**
HVAC/Heating
HVAC/Cooling
Ventilation-All Year
Other
Total
NEW MOTOR INFORMATION (Please povide mechanical switchboard schedule)
EQUIPMENT TYPE             QTY         VOLTAGE    HP          STARTING     FULL LOAD   STARTER    STARTER FLA    # OF STARTS   NEMA          POSITION IN
                                                              AMPS         AMPS        TYPE       COEFFICIENT    PER DAY       CODE          STARTING
                                                                                                                                             SEQUENCE
*Diversify connected load per Chicago Electrical Code in the City of Chicago and applicable areas, diversify per
National Electrical Code in all other areas.
**Please provide mechanical switchboard schedule.
Modification & Relocation
© Commonwealth Edison Company, 2019                               5
MODIFICATION & RELOCATION                                                                                      PROJECT NAME
LOAD INFORMATION                                                                                               SWITCH NAME
FORM TO BE COMPLETED BY QUALIFIED ELECTRICAL PROFESSIONAL
EXISTING LOAD INFORMATION (All loads should be shown in kW, with a power factor of .85 used for conversion from KVA)
CATEGORY                         DESCRIPTION                            1-PHASE          1-PHASE               3-PHASE               3-PHASE
                                                                        CONNECTED        DIVERSIFIED           CONNECTED             DIVERSIFIED
                                                                        LOAD             CAPACITY*             LOAD                  CAPACITY*
Lighting
Appliances
Receptacle
Process Heat
Water Heat
Motors**
HVAC/Heating
HVAC/Cooling
Ventilation-All Year
Other
Total
EXISTING MOTOR INFORMATION (Please povide mechanical switchboard schedule)
EQUIPMENT TYPE             QTY           VOLTAGE   HP        STARTING     FULL LOAD   STARTER    STARTER FLA    # OF STARTS   NEMA         POSITION IN
                                                             AMPS         AMPS        TYPE       COEFFICIENT    PER DAY       CODE         STARTING
                                                                                                                                           SEQUENCE
*Diversify connected load per Chicago Electrical Code in the City of Chicago and applicable areas, diversify per
National Electrical Code in all other areas.
**Please provide mechanical switchboard schedule.
Modification & Relocation
© Commonwealth Edison Company, 2019                               6
MODIFICATION & RELOCATION                                                                                     PROJECT NAME
LOAD INFORMATION                                                                                              SWITCH NAME
FORM TO BE COMPLETED BY QUALIFIED ELECTRICAL PROFESSIONAL
REMOVED LOAD INFORMATION (All loads should be shown in kW, with a power factor of .85 used for conversion from KVA)
CATEGORY                      DESCRIPTION                              1-PHASE          1-PHASE               3-PHASE               3-PHASE
                                                                       CONNECTED        DIVERSIFIED           CONNECTED             DIVERSIFIED
                                                                       LOAD             CAPACITY*             LOAD                  CAPACITY*
Lighting
Appliances
Receptacle
Process Heat
Water Heat
Motors**
HVAC/Heating
HVAC/Cooling
Ventilation-All Year
Other
Total
REMOVED MOTOR INFORMATION (Please povide mechanical switchboard schedule)
EQUIPMENT TYPE             QTY        VOLTAGE    HP         STARTING     FULL LOAD   STARTER    STARTER FLA    # OF STARTS   NEMA          POSITION IN
                                                            AMPS         AMPS        TYPE       COEFFICIENT    PER DAY       CODE          STARTING
                                                                                                                                           SEQUENCE
*Diversify connected load per Chicago Electrical Code in the City of Chicago and applicable areas, diversify per
National Electrical Code in all other areas.
**Please provide mechanical switchboard schedule.
Modification & Relocation
© Commonwealth Edison Company, 2019                              7
MODIFICATION & RELOCATION                                                                                   PROJECT NAME
LOAD INFORMATION                                                                                            SWITCH NAME
FORM TO BE COMPLETED BY QUALIFIED ELECTRICAL PROFESSIONAL
WELDER INFORMATION
DESCRIPTION              QTY          VOLTAGE   SIZE (KVA)   TYPE       FULL LOAD   P.F. AT   STARTER FLA    WELDS PER    CYCLES PER   HOUR PER
                                                                        AMPS        PEAK      COEFFICIENT    MINUTE       WELD         DAY USE
Please fill out welder table if welder load required.
Modification & Relocation
© Commonwealth Edison Company, 2019                                 8
MODIFICATION & RELOCATION
PROJECT INFORMATION
SITE INFORMATION
PROJECT NAME                                                   CONTACT NAME
SITE ADDRESS                                                   CITY                                 ZIP CODE
CONTACT EMAIL                     CONTACT PHONE                TOTAL NUMBER OF SERVICE ENTRANCE LOCATIONS
ELECTRICAL PERMIT #               DATE OF GROUNDBREAKING       TOTAL NUMBER OF SWITCHES (Points of Service)
DATE COMED CAN BEGIN WORK         PREFERRED SERVICE DATE       TOTAL NUMBER OF METERS REQUESTED
BUSINESS INFORMATION
LEGAL NAME OF ENTITY (ELECTRIC CONSUMER)                       TAX I.D.                             EXISTING COMED ACCOUNT #
   Corporation                     Partnership                    Sole Proprietor                      Other:
PRINCIPLE(S) to sign agreements for service, easements, etc.
PROPERTY OWNER                                                 PHONE
BUILDING OWNER                                                 PHONE
BUILDING MANAGER                                               PHONE
Modification & Relocation
© Commonwealth Edison Company, 2019                        9
MODIFICATION & RELOCATION                                                PROJECT NAME
PROJECT INFORMATION
MAILING ADDRESS FOR AGREEMENTS
COMPANY                         EMAIL                PHONE               FAX
ADDRESS                                              CITY        STATE             ZIP CODE
MAILING ADDRESS FOR ELECTRIC BILLS
COMPANY                         EMAIL                PHONE               FAX
ADDRESS                                              CITY        STATE             ZIP CODE
PROJECT CONTACTS
CONSULTING ENGINEER                                  FIRM NAME
ADDRESS                                              CITY        STATE             ZIP CODE
EMAIL                                   PHONE                    FAX
GENERAL CONTRACTOR                                   FIRM NAME
ADDRESS                                              CITY        STATE             ZIP CODE
EMAIL                                   PHONE                    FAX
Modification & Relocation
© Commonwealth Edison Company, 2019             10
MODIFICATION & RELOCATION                                                                    PROJECT NAME
PROJECT INFORMATION
ELECTRICAL CONTRACTOR                                         FIRM NAME
ADDRESS                                                       CITY                   STATE             ZIP CODE
EMAIL                                    PHONE                                       FAX
OTHER                           ROLE                          FIRM NAME
ADDRESS                                                       CITY                   STATE             ZIP CODE
EMAIL                                    PHONE                                       FAX
REQUIRED DOCUMENTS
The following documents may be required (items are required for non-overhead services):
≠≠   Plat of Survey with legal description of property (for easement, if required)
≠≠   Site Plan showing building relative to property lines and elevation information for multi-story buildings
     – mark service entrance location(s)
≠≠   Civil drawings (showing water, sewer, gas, phone, electric, pavement, grading, etc.)
≠≠   Complete electrical drawings and/or load detail sheets
INFORMATION PROVIDED BY
SIGNATURE                                               PRINT NAME                                     DATE
Submit your information via the New Business Portal online form or email your completed pdf application to
ServiceApplications@ComEd.com.
Modification & Relocation
© Commonwealth Edison Company, 2019                      11
MODIFICATION & RELOCATION
CUSTOMER METER CHECKLIST
The following must be complete before any meters can be set (Check all that apply)
GENERAL REQUIREMENTS
    If applicable, a permit must be obtained prior to ComEd notification and/or approval.
    All fittings must have a CECHA stamp to receive ComEd approval. Fittings must be located in a ComEd approved location.
    All meter sockets must be clearly identified with unit number, fire pump, building meter, etc. on the fitting.
    All units must be clearly identified, using the final unit number, designation and/or address on the unit’s breaker panel.
    All load wires must be landed and terminated between the meter socket and unit panels.
    All new and existing services must have required grounds.
    One line drawings for multi-unit buildings must show the location and amount of meters cabinets on each floor for approval.
    I ndividual residential units are treated as separate customers requiring separate metering per the ComEd rate book
     (ComEd.com/Rates).
     o empty meter fittings allowed; if meter housing will not be used, please remove meter connection hardware and secure
    N
    with blank metal face plate.
SINGLE-PHASE METERING
    A fifth jaw is required at the nine o’clock position of the socket for “WYE” (120/208v) services.
    I f there is no bypass handle provided on the socket, jumping studs/horns are required on the line and load connectors of the
     meter fitting. Meter fitting(s) must be proper height. Service attachment (I-plate) must be installed in proper location and
     must be within minimum and maximum height clearances.
    Trees on private property must be trimmed and/or removed as needed by the customer to allow service drop installation.
THREE-PHASE SELF-CONTAINED METERING
     ll three-phase, 120/240V, four-wire, self-contained meter installations (200 Amps.or less), the high phase must be attached
    A
    on the right side of the fitting and clearly identified within the meter fitting and at the weatherhead.
    All phases and the neutral must be clearly identified.
    An integrated bypass lever is required for all three-phase, self-contained meter fittings.
THREE-PHASE TRANSFORMER-RATED METERING
     High phase must be in the center positon in all current-transformer cabinet installations.
     Please make sure the switchgear size, estimated demand load and voltages have been provided to the Project Engineer.
     Also, an approved wiring harness must be provided in all current-transformer cabinet installations (per ComEd
     requirements) when the meter fitting is on the CT cabinet door.
For metering standards and dimensions, please see ComEd’s Service and Meter Requirements on the ComEd website
at: ComEd.com/Redbook or ComEd.com/MeteringRequirements.
Modification & Relocation
© Commonwealth Edison Company, 2019                            12