100% found this document useful (2 votes)
2K views4 pages

DWM Format

This document contains a schedule for various meetings and activities from August 3rd to August 18th. It lists internal meetings, shop floor visits, equipment trials, issue analysis, training sessions, audits, reviews, and weekly recurring meetings. Names of individuals and teams involved are also included for many of the entries.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views4 pages

DWM Format

This document contains a schedule for various meetings and activities from August 3rd to August 18th. It lists internal meetings, shop floor visits, equipment trials, issue analysis, training sessions, audits, reviews, and weekly recurring meetings. Names of individuals and teams involved are also included for many of the entries.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Name Date 9~10 10~11

1-Morning meeting
with Deactur 1-Internal morning
8/3/2021
2-Internal morning meeting with CFT.
meeting with CFT

1-Internal morning
1-Internal morning
8/4/2021 meeting with CFT.
meeting with CFT.
2-HLT data collection

1-Warranty tear down


1-Internal morning
form fill up.
8/5/2021 meeting with CFT.
2-Internal morning
2-Shop floor visit
meeting with CFT

2-Internal morning Meeting with NB-Decatur


8/6/2021
meeting with CFT team

8/9/2021 MRM MRM

8/10/2021

1-Internal morning
1-E mail check and
meeting with CFT.
reply.
8/11/2021 2-Shop floor visit
2-E79 APQP status
3-morning meeting with
review.
QA team

1-morning meeting
1-Internal morning
with QA team
8/18/2021 meeting with CFT.
2-E79/E88 APQP
2-Shop floor visit
status review.
DWM
11~12 12~13 13~14

1-morning meeting with QA


HLT machine discussion
team/Prod team. 1-To do list prepare
with team(Narendra/Vikash)
2-To do list Update

1-NAV issue discussion


Valve plate torque gun trial Valve plate torque gun trial
2-Meeting with Makita engineer
with MAKITA engineer with MAKITA engineer
for valve plate tightening tools

1-Snap ring issue analysis


1-morning meeting with QA 1-NCM review and mail to NB 2-QP31 compressor
team/Prod team. 2-Snap ring issue analysis (Eberspaecher) report made
and mail.

QP5H11-1009 ckd trial on A QP5H11-1009 ckd trial on A QP5H11-1009 ckd trial on A


line line line

1-morning meeting with QA


1-Short leave-Personal
team. A line TDC issue analysis
2-A line TDC issue analysis
2-Short leave-Personal

1-VDA review with Abhishek


1-VDA Audit with Santosh
VDA Audit with Santosh sir
2-Supplier quot review
2-
14~15 15~16 16~17

1-warranty meeting
warranty meeting with
warranty meeting with Shawn with Shawn.
Shawn
2.QMS meeting

QP31-1211 Warrnty
warranty/weekly meeting with warranty/weekly
repoprt mail to
Shawn meeting with Shawn
customer

1-Supplier
performance sheet F(QA-P-01)-23 supplier Weekly Quality review
review and fill up. complaint log sheet fillup meeting
2-RGP preparation

QP5H11-1009 ckd trial QP5H11-1009 ckd trial


QP5H11-1009 ckd trial on A line
on A line on A line

1-A line TDC issue analysis


A line TDC issue Weekly Production
2-Traning Given to operartoe at
analysis meeting
FH assy stage

Weekly maint/shortage
weekly meeting with Shawn
meeting
17~18

QMS meeting

warranty/weekly
meeting with Shawn

1-Weekly Quality
review meeting
2-APQP workbook to
Navistar

QP5H11-1009 ckd trial


on A line

1-India CAT QP5H09-


1938 PPAP review

Meeting with Carlos

You might also like