INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
1.0 DOCUMENTS
TR C
1.1 APPROVAL OF PROCEDURES
MFLT Verification of MFLT :GC18105000-9701 Approval of all appicable Approved Procedures H H
UT Procedure Approval UT: GC18105000-9702 / 9707 procedures
MPI MPI :GC18105000-9708
LPT LPT :GC18105000-9709
RT RT: GC18105000-9706
VBLT VBLT :GC18105000-9716
AIRTEST ALT :GC18105000-9717
HYDROTEST HT :GC18105000-9710
1.2 NDE PERSONNELQUALIFICATION FOR
MFLT Verification of personnel approval As per respective Procedures Aprroval of NDE personnel NDE Personnel CV and H R
UT Qualification criteria Certificates
MPI
DPT
VBLT
2.0 INSPECTION ACTIVITIES
2.1 Sweep Blast on Visual Inspection of Approved Drawg, Blasted Arae shall be clear Visual Inspection Report W S Sweep Blasting shall
inernal /external surface Blasted area enough to perform Inspection be performed
on shell , roof, and floor. on selected area by QP
windgirder, shell nozzles
and the like etc.
2.2 MFLT (100%) Inspection Review of MFLT Procedure Approved Drawg, Client Specification MFLT Report H S/R Provide 2 reports of tests, with
color “Mapping” of individual
on tank floor plate area Review of UT Procedure MFLT Procedure API 653
plates and complete floor area,
and annular plate and verifictaion of Activity/Report API 653 API 650 clearly identifying remaining plate
(Shall be s upported by UT for verification) API 650 thickness and location. This
should be supported by UT
where required for verification,
including the peripheral band
adjacent to the shell and / or
other obstructions.
2
INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
2.3 Vacuum Box Test (100%) Inspection for Review of Procedure Approved Drawg, Area Under Test is acceptable VBLT Report H S/R
when No Continuous Bubble
1- Floor Plate (Lap Welded Joints) Visual Inspection of all joints VBLT Procedure
Formation is observed
2- Annular Plate (Radial Butt Welded Joints) to verify the adequacy of weld API 653
3- Shell to Bottom API 650 No through-thickness leak.
2.4 MPI (100%) on Ring Joints between floor Review of MPI Procedure Approved Drawg, Client Specification MPI Report H S/R Non Accessible Areas DPT shall
be carried out as per QP
annular plate and bottom shell course and verifictaion of Activity MPI Procedure API 653 reuirement.
at internal and external side API 653 API 650
API 650
2.5 UT random thickness survey of Review of UT Procedure Approved Drawg, Client Specification UT Report H S/R
floor sump and verifictaion of Activity UT Procedure API 653
API 653 API 650
API 650
2.6 MPI (100%) on floor sump to floor plate Review of MPI Procedure Approved Drawg, Client Specification MPI Report H S/R
welding joint and verifictaion of Activity MPI Procedure API 653
API 653 API 650
API 650
2.7 MPI on Roof Leg Support striker plate Review of MPI Procedure Approved Drawg, Client Specification MPI Report H S/R
to floor plates welding joint & and verifictaion of Activity NDT Procedure API 653
On shell nozzles attachments welding Joints API 653 API 650
(reinforcement pad to nozzle pipe and shell, API 650
flange to neck)
3
INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
2.8 UT Wall Thickness survey Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
on shell strakes and identification of location for UT Procedure API 653
thickness check API 650 API 650
2.9 Vacuum Box Test on floating Roof Approved Drawg, Area Under Test is acceptable VBLT Report
Review of Procedure H S/R
when No Continuous Bubble
top deck plates lap welded joints VBLT Procedure Formation is observed
Visual Inspection of all joints
API 653 No through-thickness leak.
to verify the adequacy of weld
API 650
2.10 MPI on floating Roof top deck Review of MPI Procedure Approved Drawg, Client Specification MPI Report H S/R Non Accessible Areas DPT shall
be carried out as per QP
lap welded joints (Left out in Vaccum Box) and verifictaion of Activity NDT Procedure API 653 reuirement.
API 653 API 650
API 650
MPI Report
2.11 MPI Inspection of welds on Review of MPI Procedure Approved Drawg, Client Specification H/R S/R Non Accessible Areas DPT shall
be carried out as per QP
Roof leg support & sleeves and verifictaion of Activity MPI Procedure API 653 reuirement.
Roof Vents and Manwyas, API 653 API 650
Bottom Skin inside Pontoons API 650
Rolling Ladders
Dip Hatches
Guide Poles
Roof Attachments
2.12 UT random Thickness survey on Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
- floating roof deck Top & and identification of location for UT Proc.: GC18105000-9707 API 653
- floating roof Bottom plate(Product Side)
thickness check API 650 API 650
4
INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
2.13 UT random Thickness survey on Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
- foam dam and identification of location for UT Proc.: GC18105000-9707 API 653
thickness check API 650 API 650
2.14 UT random Thickness survey on Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
- floating roof outer rim plate and identification of location for UT Proc.: GC18105000-9707 API 653
thickness check API 650 API 650
2.15 UT random Thickness survey on Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
- tank shell nozzles and man ways and identification of location for UT Proc.: GC18105000-9707 API 653
thickness check API 650 API 650
2.16 UT random Thickness survey on Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
- tank Drain Pipe and identification of location for UT Proc.: GC18105000-9707 API 653
thickness check API 650 API 650
2.17 UT random Thickness survey on Review of UT Procedure Approved Drawg, Client Specification UT survey Report H/R S/R
- floating Roof leg support & and identification of location for UT Proc.: GC18105000-9707 API 653
- sleeves,
thickness check API 650 API 650
- manhole,
- roof vent,
- roof drain pipe.
5
INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
3.0 VISUAL INSPECTION
3.1 Visual Inspection of Visual inspeciton inline with Drawing Approved Drawg, Approved Drawg, Inspection Report H S/R Bottom Skin area inside of all
floating roof pontonns shall be
All foam and fire shield plates API 653 API 653
cleaned by wire brush.
Roof, Roof Vents and Manwyas, API 650 API 650
Foam Dam
Roof Drainage sump
Roof Support sleeve
Floating Roof Deck Plate and attachments
Bottom Skin inside Pontoons
Rolling Ladders
Dip Hatches
Guide Poles
Roof Attachments
Shell ladders,
Wind girder
handrails
nozzles
and attachments other
4.0 RADIOGRAPHY
4.1 RT of Butt Weldment RT in Vertical Joints API 650 API 650 RT Inspection Report H R Areas will be selected
(As Required) RT in longitudinal Joints API 653 API 653 By QP
RT in Tee Joints RT Proc. : GC18105000-9706
5.0 AIRTEST
5.1 Air Test for Visual Inspection of all joints Approved Drawings No visual evidence of leakage is Pressure test Report H R
Reinforcement plate, & Pressure drop API 650 permissible. The test pressure
API 653 shall be as per Procedure
ALT :GC18105000-9717
6
INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
6.0 OIL TEST
6.1 Oil Test for Visual Inspection of all joints Approved Drawings No Inspection Report H S/R
Floating Roof sump API 650
API 653
7.0 HYDROTEST OF ROOF
7.1 Hydrotesting of ROOF Visual Inspection of all joints Approved Drawings No visual evidence of leakage is Pressure test Report H H To be done before
artIculated drain system & Pressure drop API 650 permissible. The test pressure dismentalling
API 653 shall be as per drawings.
HT :GC18105000-9710
8.0 TANK SHAPE ASSESMENT (BY SGS)
8.1 Carryout full assement of tank shape Detailed report to be submitted to
rim seal manufacturer for proper
over full travel height at different locations design of mechanical rim seal.
(Max 32 Locations) Visual Inspection Where excessive shell plate
Approved project Drgs. Approved project Drgs.
Plumbness
API 650 API 650 Survey Report H S/R buckling is noted, peaking,
Visual Inspection banding and flat spots to be
API 653 API 653
Roundness measured, recorded and included
Visual Inspection in the report.
Peaking & Banding
9.0 TANK SETTLEMENT SURVEY (BY SGS)
9.1 Settlement Survey for tank shell and bottom Visual inspection Approved Procedure Approved project Drgs. Settlment Survey Report H S/R
plate / floor Review of report Approved project Drgs. API 653
To be carried out by laser beam API 653
OR equivalent
7
INSPECTION AND TEST PLAN : INITIAL INSPECTION
(PRE-REPAIR INSPECTION)
CLIENT: Qatar Petroleum CONTRCAT NUMBER: GC18105000 Doc. No. : GC18105000-1703
MAIN CONTRACTOR: TRAGS Rev. No. : 1
PROJECT NAME: REHABILITATION OF CRUDE OIL TANKS, FIREWATER TANK AND VESSEL V1 IN MESAIEED TANK FARM Date : 10-Oct-19
(TANK # 402-60-T-01, 02, 03, 04, 05, 06, 07, 08, 13, 14 & 16)
10.0 THIRD PARTY INSPECTION
10.1 Visual Inspection of Tanks and Visual Inspection of all tank item Approved Drawings Inspection Report H H
review of inspection records identify findings / areas of concern As per project scope of work - - - - -- -
11.0 DOCUMENTATION
11.1 Document Submission Compile Approved project specs. Approved project specs. Inspection Package H H/R
-All reports produced Approved project Drgs. Approved project Drgs.
-Inspection Reports API 653 API 653
-NDT Reports
-Survey Report
-Settlement Report
-Hydrotesting Report
-Third Party Inspection Report
-Correspondance