This document provides a risk assessment for transformer installation activities at the Khasab New Power Station project in Oman. It identifies three main hazards: 1) Slip and trip risks from improper housekeeping which could lead to human injury; 2) Struck by or crush risks during transformer installation which could result in human injury or property damage; and 3) Crane failure risks which pose human injury and property damage risks. Control measures are outlined for each hazard, including following safe work procedures, using PPE, planning work properly, and ensuring cranes are properly inspected. Residual risks are rated as low after controls. Training and implementing standard operating procedures are listed as ongoing actions.

Uploaded by

ghada gattouch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
323 views3 pages

004 Transformer Installation

This document provides a risk assessment for transformer installation activities at the Khasab New Power Station project in Oman. It identifies three main hazards: 1) Slip and trip risks from improper housekeeping which could lead to human injury; 2) Struck by or crush risks during transformer installation which could result in human injury or property damage; and 3) Crane failure risks which pose human injury and property damage risks. Control measures are outlined for each hazard, including following safe work procedures, using PPE, planning work properly, and ensuring cranes are properly inspected. Residual risks are rated as low after controls. Training and implementing standard operating procedures are listed as ongoing actions.

Uploaded by

ghada gattouch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

AL JOOD TRADING & CONTRACTION COMPANY LLC

TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION

Risk Ratings
Activity : Transformer Installation Concerned Department: RAEC Project Department 6-9 High Risk
3-4 Medium Risk
1-2 Low Risk

Risk Rating Score Residual Risk

Risk Rating (R=SxL)

Risk Rating (R=SxL)


Likelihood (L)

Likelihood (L)
Severity (S)

Severity (S)
Hazards Effects/
Sl Hazards/ Threat Control Measure Action Status
Consequences

1. Fallow the safe work procedure


2. Use adequate PPE such as hard hat,
safety shoes with toe protection,
hand gloves etc.
3. Maintain the good housekeeping Training shall
and keep clear the installation be provided
1 Slip and Trip Human injury, Fracture areas including the foundation and SOP shall
2

1
4. Work shall be planned properly to be
avoid any obstruction and to keep implemented
other working party away from the
proposed work areas.
5. Adequate safety signs shall be
posted and areas shall be secured.

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-004 Page 1 of 3
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFFollow
KHASAB NEW
the safe POWER
work STATION
procedure
2. Foundation areas shall be kept
clear; all the other required Training shall
structure shall be erected or be provided
Human injury, property fabricated only after the
2 Struck or Crush and SOP shall

1
damage, fatality installation of Tx. be
3. Adequate supervision and rigger implemented
shall be made available at site
during the installation of Tx.

1. Follow the safe work procedure


2. SWL for the crane shall be double
from the load of Tx
3. Only good condition, inspected and Training shall
with all the valid legal documents be provided
Human Injury, property crane shall be used
3 Failure of crane and SOP shall

1
damage, Fatality 4. Operator shall have the valid be
license and experience in the implemented
similar work.
5. Pre work inspection of crane shall
be carried out and recorded.

1. Competent rigger/single man shall


be appointed for work
2. Operator shall only follow the
Hand or any other instruction from the appointed Training shall
body parts can come single man be provided
Human Injury-cut, abrasion, 3. The competent and trained working
4 under the load while and SOP shall
2

1
fracture crew
putting Tx on be
foundation 4. Don’t put your hand or foot under implemented
the load
5. Use PPE such as safety shoes and
hand gloves.

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-004 Page 2 of 3
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFDamage
KHASAB NEW
or any POWER
leakage shall beSTATION
checked and ensured Training shall
2. Oil valve shall be checked and be provided
Human Injury- burn, irritation tighten
5 Chemicals exposure and SOP shall

1
etc 3. Use adequate PPE- Safety Shoes, be
Coverall, Hand Gloves, Safety Glass implemented
etc

Assessed by: Mohammed Imteyaz Khan Reviewed & Approved by: Ajesh Chandran

Position: Head of HSE Position: Project Manager

Signature: Signature:

Date: Date:

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-004 Page 3 of 3