How to Calcu
Method #1: Calculatio
In this method 'Predetermined Time Standard' (PTS) code are used to establ
Step 1: Select one operation for which you want to calculate SAM.
Step 2: Study the motions of that operation. Stand by side of an operator (ex
Step 3: List down all motion sequentially. Refer the synthetic data for TMU
Step 4: Standard allowed minutes (SAM) = (Basic minute + Bundle allowan
                                               Method #2: Calculatio
Step 1: Select one operation for which you want to calculate SAM.
Step 2: Take one stop watch. Stand by side of the operator. Capture cycle ti
Step 3: Performance rating. Now you have to rate the operator at what perfo
Step 4: Standard allowed minutes (SAM) = (Basic minute + Bundle allowan
I like to refer you an article Secret Behind Calculation of Machine Time in S
                                                  SAM CALUCULAT
                                                      Cutting
     OPERATIONS           AVERAGE SINGLE     AVERAGE SINGLE
                          CYCLE TIME /SEC   CYCLE TIME/MINIT
                                30                0.50
                                                          Sewing
                          AVERAGE SINGLE     AVERAGE SINGLE
     OPERATIONS           CYCLE TIME /SEC   CYCLE TIME/MINIT
                                30                0.50
                                                         Finishing
     OPERATIONS           AVERAGE SINGLE     AVERAGE SINGLE
                          CYCLE TIME /SEC   CYCLE TIME/MINIT
                                30                0.50
     How to Calculate SAM of a Garment?
              SAM or Standard Allowed Minute is used to measure task or w
hod #1: Calculation of SAM Using Synthetic Data
 code are used to establish 'Standard Time' of a garment or other sewing products. 
 alculate SAM.
y side of an operator (experienced one) and see the operator how he is doing it. Note a
 synthetic data for TMU (Time measuring unit) values. For synthetic data you can refe
minute + Bundle allowances + machine and personal allowances). Add bundle allowan
hod #2: Calculation of SAM Through Time Study
 alculate SAM.
 erator. Capture cycle time for that operation. (cycle time – total time taken to do all w
 e operator at what performance level he was doing the job seeing his movement and w
minute + Bundle allowances + machine and personal allowances). Add bundle allowan
on of Machine Time in SAM for better understand of SAM calculation. 
AM CALUCULATING
   Cutting
         RATING%   BASSIC MINIT   MD%     P/F    MD+PF    Allowances   BHT
            90%         0.45       10%    20%      30%       0.14      10%
      Sewing
         RATING%   BASSIC MINIT   MD%     P/F    MD+PF    Allowances   BHT
            90%         0.45       15%    20%      35%       0.16      10%
    Finishing
         RATING%   BASSIC MINIT   MD%     P/F    MD+PF    Allowances   BHT
            90%         0.45       5%     20%      25%       0.11      10%
 to measure task or work content of a garment. This term is widely used by in
Data
 r sewing products. 
w he is doing it. Note all movement used by the operator in doing one complete cycle
 hetic data you can refer GSD (without licence use of GSD code prohibited but for per
 ). Add bundle allowances (10%) and machine and personal allowances (20%) to basic
udy
 time taken to do all works needed to complete one operation, i.e. time from pick up p
ng his movement and work speed. Suppose that operator performance rating is 80%. S
). Add bundle allowances (10%) and machine and personal allowances (20%) to basic
ulation. 
            SAM
            0.69   41.10   11.10
            SAM
            0.71   42.45   12.45
            SAM
            0.66   39.75   9.75