This document provides guidelines for implementing precision RNAV (P-RNAV) in terminal airspace. It outlines a multi-step process including collaboratively identifying the need for P-RNAV with stakeholders, conducting a cost-benefit analysis, designing procedures, updating charts and manuals, training controllers, and monitoring the system once implemented. References many ICAO and Eurocontrol documents for standards and best practices.

Uploaded by

Vito Gentile
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
712 views1 page

P-RNAV Implementation Guide

This document provides guidelines for implementing precision RNAV (P-RNAV) in terminal airspace. It outlines a multi-step process including collaboratively identifying the need for P-RNAV with stakeholders, conducting a cost-benefit analysis, designing procedures, updating charts and manuals, training controllers, and monitoring the system once implemented. References many ICAO and Eurocontrol documents for standards and best practices.

Uploaded by

Vito Gentile
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9 April 2003

GUIDELINES & REFERENCE MATERIAL FOR


Collaborative decision by Users & ANSP to identify need for P-RNAV implementation. P-RNAV IMPLEMENTATION
Consider -
ª Benefits of Terminal Airspace optimisation using P-RNAV e.g. ATC Workload reduction, fuel A. ECIP NAV.03
reduction, ACFT equipage cost (Cost benefit analysis)
ª Viability of phased implementation to ease transition from operational perspective B. EUROCONTROL: REVISED SPECIMEN AIC : OPERATION OF
ª Associated ATC Procedures required to reap benefits. PRECISION RNAV (P-RNAV) AIRBORNE EQUIPMENT IN ECAC
ª Impact of P-RNAV / Conventional Nav. Mix on ATC and Operators (e.g. Effects on operators TERMINAL AIRSPACE [Pending]
not P-RNAV approved)
ª Nav infrastructure requirements & associated RNAV flight checking C. STANDARDISED SPECIMEN AIP TEXT (TO BE PREPARED BY
ª PANS-OPS Procedure design: limitations & opportunities (e.g. Training of designers) EUROCONTROL)
Decision & Action -
ª Time scales for all actions associated with P-RNAV implementation
ª Notification of intent by operators to implement P-RNAV
( These items may only be of relevance to States regularizing their RNAV applications by
implementing P-RNAV)

ª Evaluation Phase (Qualitative Analysis)


ð Proposed P-RNAV route placement [subject to
NAV infrastructure availability & coverage] .
ð Consider P-RNAV procedure design (PANS-OPS) D. EUROCONTROL: TERMINAL AIRSPACE DESIGN - GUIDELINES FOR
ð Re-design of Terminal Airspace volume, if required . AN OPERATIONAL METHODOLOGY[Edition 1, 1998) Note: 2nd Edition
ð Re-design of ATC sectorisation, if required TERMINAL Under Development, contact TATF
ª Quantitative Analysis
AIRSPACE E. ICAO: ATS PLANNING MANUAL - Doc. 9426 ()
ð ATM safety case to assess acceptability of F. ICAO: MANUAL ON AIRSPACE PLANNING METHODOLOGY FOR THE
proposed routeing and airspace changes; incl MODIFICATIONS
DETERMINATION OF SEPARATION MINIMA - Doc. 9689 ()
FTS/RTS as required.
ð If acceptable, continue with PANS-OPS procedure
design for P-RNAV certified aircraft
.
ª APPLICATION OF AVAILABLE STANDARDS
G. ICAO: AIRCRAFT OPERATIONS - Doc. 8168 ()
AND GUIDANCE ON-
s Minimum complexity H. EUROCONTROL: GUIDANCE MATERIAL FOR DESIGN OF TERMINAL
s Way-point naming PROCEDURES (DME/DME, BARO-VNAV & RNP- RNAV) [Edition 3,
s Validation of procedures (e.g. flight checking & JANUARY 2003] **
flyability for all ACFT. types) I. ICAO: AERONAUTICAL INFORMATION SERVICE, ANNEX 15 ()
3.a ENSURE AVAILABILITY OF REQUIRED J. EUROCONTROL: DATA ORIGINATION STANDARD [1st Edition,
NAVAIDS Pending ]
s Determine current P-RNAV coverage . K. EUROCAE: STANDARDS FOR PROCESSING AERONAUTICAL DATA,
s Establish means of flight checking RNAV PANS-OPS ED-76A
3.b ENSURE ACCURACY AND INTEGRITY OF PROCEDURES L. EUROCAE: STANDARDS FOR AERONAUTICAL INFORMATION, ED-
ASSOCIATED CO-O0RDINATE DATA
s Verify WGS/84 compliance and associated AIS
DESIGN 77A
processes M. JAA: TEMPORARY GUIDANCE LEAFLET Number 10:
3.c P-RNAV PROCEDURE PUBLICATION AIRWORTHINESS AND OPERATIONAL APPROVAL FOR PRECISION
s AIP description incl. coding advice, charting, RNAV OPERATIONS IN DESIGNATED EUROPEAN AIRSPACE
advice on when to engage RNAV/FMS (e.g. [November 2000]; See specifically Section 4, ANSP assumptions.
LNAV); non P-RNAV procedures N. WGS SURVEYING, EUR DOC 007 (to be superceded by Ref. J) (see
s Application of available standards and guidance also http://www.wgs84.com/wgs84/downloads.html)

ª IntroduceP-RNAV ATC procedures as per ICAO


(e.g. use of waypoints for tactical routeings, aircraft
RNAV contingencies) supplemented by - . O. ICAO: AIR TRAFFIC MANAGEMENT, Doc. 4444 ATM/501 ()
s Local procedures, as required ATC PROCEDURES P. ICAO: REGIONAL SUPPLEMENTARY PROCEDURES, Doc. 7030 ()
s Local procedures for handling non-approved
aircraft
s Publication of ATC procedures in local operations
manuals and related documents.

ª Adapt local FDPS for processing of aircraft P-


RNAV equipment info;
ª Implement capability for automatic and systematic Q. Ref. A
display of individual aircraft RNAV equipment ATC SYSTEM
information to ATC; (Radar or Flight Strip) MODIFICATIONS

ª Schedule and perform


s Local ATC training, taking into account
6
R . EUROCONTROL TRAINING SUPPORT MATERIAL (Pending)
s Local real-time simulations ATC TRAINING

S. EUROCONTROL: P-RNAV R. SAFETY ARGUMENT (May be used as


As required by National Authority - basis for local P-RNAV Safety Case)
ª Documentation of processes and applied T. EUROCONTROL- SAFETY REGULATION COMMISSION: ESARR
standards 7
LOCAL P- RNAV http://www.eurocontrol.be/src/index.html
ª Address local peculiarities & local risk mitigation
T.1 http://www.eurocontrol.int/safety/GuidanceMaterials_SafetyPolicy.htm
where required SAFETY CASE
ª Detailed requirements dependent on requirements T.2 http://www.eurocontrol.int/safety/GuidanceMaterials_SafetyAssessment
set by state authority taking into account material Methodology.htm
agreed through EUROCONTROL safety regulation
material IMPLEMENTATION (Re H: This document incorporates two EUROCONTROL documents viz.
! EUROCONTROL: GUIDANCE MATERIAL FOR DESIGN OF TERMINAL
PROCEDURES FOR DME/GME & GNSS AREA NAVIGATION. [Edition 2.2, September
2001]
SYSTEM MONITORING ! EUROCONTROL: CHARTING GUIDELINES FOR RNAV PROCEDURES. [Edition 1_1,
& INCIDENT REPORTING May 2002])