The document outlines the definition, fix percentage, and scope of work for various stages of an electrical earthing and cabling project. It includes 1st fix work involving earth grids, ducting and piping installation from 25-100% completion. 2nd fix covers manholes, wiring and exposed cabling from 25-100% done. 3rd fix has fittings, boards and grounding completed 25-100%. Finally, testing and commissioning ranges from 25-100% for items like operation and maintenance manuals.

Uploaded by

roslan yusof
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views3 pages

1st 2nd 3rd Fix Definition

The document outlines the definition, fix percentage, and scope of work for various stages of an electrical earthing and cabling project. It includes 1st fix work involving earth grids, ducting and piping installation from 25-100% completion. 2nd fix covers manholes, wiring and exposed cabling from 25-100% done. 3rd fix has fittings, boards and grounding completed 25-100%. Finally, testing and commissioning ranges from 25-100% for items like operation and maintenance manuals.

Uploaded by

roslan yusof
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Definition Fix % Earthing

25%
Earth Grid, Earth Cable/Tape, External Ducting, 50%
Cable Containment; 1st Fix
Piping, Concealed Conduit/Trunking 75%
100%
25%
Manholes/Pit, Wiring Work, Earth Bars; 50%
Water Tanks/Pumps, Exposed Trunking, Gas 2nd Fix
Cylinders 75%
100%
25%
Final Fittings, LV Boards, Feeder Pillar, Complete
Grounding; 50%
Pipe Fittings, Floor Traps, AC units, Control 3rd Fix
75%
Panels, Fire Extinguisher, Sensors
100%
25%
50%
O&M, Pre-T&C, Final T&C, T&C Report T&C
75%
100%
Lightning Electrical ACMV Fire
Cold Water Sanitary