Inspection Check List Form                                                                           Ref:
PROJECT INFORMATION
CLIENT:                                                                                      AE FIRM
EAGLE HILLS ETHIOPIA REAL ESTATE P.L.C.                                                      ZIAS DESIGN INTERNATIONAL P.L.C.
PROJECT TITLE:                                                                               CONTRACTOR:
LA GARE RESIDENTIAL TOWER 1 BUILDING, COMPLETION WORKS PACKAGE                               ELMI OLINDO CONSTRUCTION P.L.C.
PROJECT LOCATION:                                                                            CONTRACT NO:
ADDIS ABABA
Submittal Information
                                                                                             Reference
Submission Date:                                                                             Drawing No.
Issue No:                                                                                    Technical Specificatio
Spec Division:                                                                               Bill Of Quantities
Section                                                                                      Catalogues
No. Pages In Submittal                                                                       Others
Element of Structure:
Construction of HCB
1. HCB quality test result is submitted.                                                             Yes                No
2. HCB size and geometry is inspected.                                                               Yes                No
3. Mortar ingredients (raw materials, sand cement & water) and strength test result are
submitted.                                                                                           Yes                No
4. Mortar Mix ratio /box size/ is checked.                                                           Yes                No
5. Mortar joint thickness checked.                                                                   Yes                No
6. Program to prevent expiry of mortar during longer break                                           Yes                No
7. Re-bar diameter checked & strength test is submitted, installing at vertical 1m spacing
and placing horizontal truss type at every two coarse checked.
                                                                                                     Yes                No
8. Internal / External Corner Coordinates are given.                                                 Yes                No
9. Offset Coordinates are given.                                                                     Yes                No
10. First course of the HCB work is checked as per the pre-set out coordinates.
                                                                                                     Yes                No
11. Horizontal Alignment of the wall is checked.                                                     Yes                No
12. Vertical alignment of the wall is checked using plum bob hand tool. (At every two(2)
courses of the wall.)                                                                                Yes                No
13. Inside Corner (right angle) of the wall is checked using squadra hand tool.
                                                                                                     Yes                No
14. Horizontal & vertical Re-bar diameter & arrangement are checked as per the drawing.
                                                                                                     Yes                No
15. The Proper implementation of Epoxy grouting is checked.                                          Yes                No
16. Confirm the wall can meet the specified STC class.                                               Yes                No
17. Embedment of electrical & sanitary items are checked.                                            Yes                No
18. Means of transport of goods.                                                                     Yes                No
19. Submittal of scaffolding design.                                                                 Yes                No
20. Labor tools Quality.                                                                             Yes                No
          Submitted By:                                  For Contractor
                Name                                                          Signature                               Date
                                                         For Consultant
              Surveyor
               Name                                                           Signature                               Date
            Site Inspector
                Name                                                          Signature                               Date
         Material Inspector